JOB HAZARD ANALYSIS WORKSHEET

PROJECT B11LQ
MAJOR WORK TRANSFER OF SCAFFOLDING
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT TRANSFER OF SCAFFOLDING MATERIALS TO SITES
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
1 Increased ignition Hot work activities 3C 2B 1B 3B Explosion Proper ventilation during hot 1B 1B 0 0 Proper job planning and HUC team / Rigger
sources work,Fire watcher, fire extinguisher supervision and good
are in placed coordination

2. Unignited HC N/A
release
Toxic/Asphyxiating
Release

3. High Pressure N/A


Liquid / Gas
Release

4. High / Low Cutting and Welding 3B 3B 3B 2B personnel Injury,Fire Fire extinguisher to be placed & 1B 1B 0 0 Proper job planning and HUC team / Rigger
Temperature shall be inspected peroidically. supervision and good
Liquid / Gas All combustible material shall be coordination
segregated.

5. Dropped Hook-up load (Cargo Basket) 3B 3B 2B 3B Trip and fall Use handrail when going down 1B 1B 0 0 Proper job planning and HUC team / Rigger
Objects/Swinging staircase, walk steadily supervision, good coordination
loads and adequate safe lifting
Lift Load Load swings, Load slips, Load Use taglines to control the swing, procedure
falls Use Cargo Basket, Do not stand
underneath load, Know the weight
of the load, Proper communication
to crane operator.

Lower the load Load swings, Load slips, Load Use taglines to control the swing,
falls Use Cargo Basket, Do not stand
underneath load, Know the weight
of the load, Proper communication
to crane operator trained hand
signals, Area to be barricade.

Unhook Load Hand Injuries, Hand crushed Be extra careful not to get caught
against equipment your finger between hook and
slings. Use appropriate
handgloves

6. Ship Impact Improper lifting of equipment 3B 3B 2B 2B Damage property Proper Coordination 1B 1B 0 0 Proper job planning and HUC team / Rigger
supervision

1 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK TRANSFER OF SCAFFOLDING
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT TRANSFER OF SCAFFOLDING MATERIALS TO SITES
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
7. Structural Failure / corroded structure 3B 3B 2B 3C Damage property Inspect the work area/structure 1B 1B 0 0 Proper Inspection HUC team / Rigger
Buoyancy Loss before work commences.

Use of weak structure to 3B 2C 1C 2C Personnel Injury Scaffolders and inspectors should 1B 1B 0 0 Proper Inspection
support scafffolding inspect the work area before
errecting of scaffolding.
8. Manual Handling Handling posture 3B 2B 1C 2C Personnel Injury, Damaged Adopt correct posture and 1B 1B 0 0 Proper job planning and HUC team /
Back injury property positioning when doing manual supervision Electrical
handling.
Sharp Object 3B 2B 1C 2C Personnel Injury Carry out visual inspection of 1B 1B 0 0 Proper job planning and
sharp edges/object. supervision
Wear proper hand gloves.
9. Chemical Handling N/A

10 Access / Engress Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0 Proper Inspection and HUC team / Rigger
all times comply wit scaff. Tag housekeeping
system.

11. Escape/Evacuation Unfamiliar to escape route 2B 2B 1C 1C Personnel Injury,Trap Limit the personnel working in the 1B 1B 0 0 Proper Inspection and HUC team / Rigger
area housekeeping
Congested area
Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0
all times comply wit scaff. Tag
system.
12. Location / H2S area, weather 3B 0 3B 3B Personnel Injury Proper H2S detection & escape 1B 0 0 0 Proper training and provision of HUC team / Rigger
Escalation equipment equipment

13. Electricity Electric shock 3C 2B 1C 1C Personal Injury Rubber type of gloves shall to be 2B 0 0 0 Proper job planning and HUC team / Rigger
use for hand protection.PTW supervision and good
coordination
Improper Isolation 2C 2B 2C 1C Personal Injury Observed Lock out & tag out. 2B 0 0 0

14. Working Heat from live equipment 1B 1C 1C 1C Barricade the area and sinage in 1B 0 0 0 Proper job planning and HUC team / Rigger
Conditions, e.g. place. supervision and good
heat, noise, bad coordination
Working beside high noise 1C 1C 1C 1C Personal Injury Use of ear muff/ear plug 1B 0 0 0
weather etc
equipment
Raining/windy condition. 1C 3C 1C 1B Stop work. 1B 0 0 0

2 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK TRANSFER OF SCAFFOLDING
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT TRANSFER OF SCAFFOLDING MATERIALS TO SITES
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
15. Others

Concurrent Activities Not Permitted/Restricted:


1) Restrict rigging and lifting activities when divers are in water.
2) Hot works will be restricted during operation activities which results in hydrocarbon release to atmosphere.