September 30, 2017

Robert M. Harary. P.E.


Director of Public Works
City of Carmel
Junipero, 2 SE of 4th Avenue
Carmel, CA 93921

Re: Request for Qualifications: Service Area No. 1, Architectural Services


Dear Mr. Harary,
Carmel-by-the-Sea has a substantial Capital Improvement Program, as presented t o City Council in March 2017. While the
largest expenditures are anticipated to be infrastructure projects, many of the City's municipal and cultural facilities need repair
and upgrade. LCA Architects is adept at providing as-needed services to our municipal clients, responding to both critical need
and planned upgrades. In addition to our municipal/cultural experience and expertise, LCA Architects' value is expressed in
relation t o your selection criteria :

Staff Availability: LCA has 33 employees currently working on projects from Salinas to Wendover, NV. Our clients are located
throughout the Western US and we are considered in selecting opportunities as to our ability to serve our clients with
excellence.
Familiarity w/ Carmel-by-the-Sea: from the Mediterranean climate to characteristic uneven pavement, your City is indeed
unique. We will retain this character and enhance the natural coastal beauty as it pertains to the work we undertake. Having
worked throughout the Monterey Peninsula over the last 2o years, we have designed within these parameters on many
occasions.
Similar Experience: LCA has completed projects with identical scope to those listed in your CIP on all manner of municipal
facilities. We specialize in working with public safety and public works departments and have a deep portfolio of historic and
cultural work.
Organization: You will have a single point of contact, Carl Campos, supported by a flexible organization, scalable to project
complexity.
Performance: Our clients return to LCA over and over. We maximize your capital dollars and enhance the City's reputation.
Project Controls: On-time, on budget is your minimum expectation. Our project management and OC protocols are best
practice.
Staff Qualifications: ALL LCA staff has extensive public sector renovation and ADA upgrade experience. More than Y2 are
licensed.
References: We invite you to check us out. Monterey County, Monterey County Regional Fire, building departments in Cities of
Monterey, Salinas and Carmel Valley, and Pajaro Valley Unified are all familiar with what LCA can do for you.
Responsive 500: We have followed the RSOQ instructions to the letter, providing relevant material to inform your evaluation.
Special Resources: LCA uses Building Information Modeling and Virtual Reality tools to convey concepts and collaboratively
experience the built environment. Our staff are Design Build Institute of America certified, meaning we can assist you in
employing alternative construction contracting methods. We employ seasoned construction personnel to provide construction
administration, making field decisions to minimize delays and change orders. Our planning & entitlement experts are renowned
for gaining project approvals from the toughest Architectural Review Boards, Planning Boards and City Councils in Northern
California.
Subconsultants: We are supported by a consultant team that we've worked with for years. Acting as a cohesive unit, we
produce well-detailed, coordinated documents efficiently. We have listed some, including local firms Bellinger Foster Steinmetz
and Whitson Engineers, with whom we have outstanding relationships. As project scope and City preferences become more
defined, we look forward to your input into final consultant selection for assigned tasks.

We are eager to collaborate with City of Carmel-by-the-Sea in delivering your architectural CIP projects and look forward to your
feedback on our qualifications package. We have much experience than can be conveyed here and are happy to provide

Carl \.odrn~J ~O,jl!~~::


LCA Architects, Inc
ccampos@lca-a .com (925)944-1626/(925)963-3320

Required Elements: a. closest office: Oakland, CA b. majority of work performed outside local area c. Carl Campos, CEO

590 Ygnacio Valley Road, Suite 310 Walnut Creek, CA 94596 925.944.1626
1970 Broadway, Suite 800 o Oakland, CA 94612 o 510.272.1060
lea-architects. com
FORM A GENERAL FIRM INFORMATION

1. Firms Name: LCA Architects, Inc.


2. Firms Local Address: 590 Ygnacio Valley Rd., Suite 310, Walnut Creek, CA 94596

3. Is your local office the Head Office? X Yes No Branch Office? Yes X No
Only Office? Yes X No
4.Year your firm was established: 1974___
5. Year your local office was established: 1974 ___
6. Primary contacts (Principals) in the local office:
Name Title Telephone E-mail Address
Number
Carl Campos CEO (925) 944-1626 ccampos@lca-architects.com
David Bogstad President (925) 944-1626 dbogstad@lca-architects.com

7. List locations of no more than three (3) other offices where work may be performed (if
applicable):
Address Telephone Number # of Personnel
1970 Broadway, Suite 800
(510) 272-1060 3
Oakland, CA 94612

8. Total employees presently employed: 33__


a) In your local office 30__ b) In your firm 33__
9. Errors and Omissions Insurance
a) Amount your firm presently carries: $2,000,000.00 per occurrence_
b) Carriers name and address: Dealey, Renton & Associates__________
P.O. Box 12675, Oakland, CA 94604____

2|Page
FORM B TENTATIVE PROJECT TEAM
SERVICE AREA (Select one Service Area from list in SOQ package):

A. Consultants Key Personnel

Please identify your tentative, key Project Team members, their titles/roles and primary duties:
Name Title/Role Primary Duties
Carl Campos Principal Project Oversight
Brent Randall Architect Project Management
Greg Barton Designer Architectural Drawings
Larry Mack Technical Lead Construction Administration

B. Subconsultant and Support Services

Please identify up to four (4) key subconsultants or vendors, contact persons, and services they would
provide in order to support your Project Team.
Firm Name & Location Contact Person Support Services
HD Rueb Pleasant Hill, CA Mark Rueb Structural Engineer
Fard Engineers Walnut Creek, CA Max Saiidnia MEP Engineer
BFS Monterey, CA Mike Bellinger Landscape Architect
Whitson Monterey, CA Andrew Hunter Civil Engineer/ADA

C. Organizational Chart

Please see next page for an Organizational Chart of our tentative Project Team.

3|Page
Organizational Chart of Tentative Project Team

LCA ARCHITECTS INC.

CARL CAMPOS
Principal

BRENT RANDALL
Architect

GREG BARTON LARRY MACK


Designer Technical Lead

Subconsultant Team

HD RUEB STRUCTURAL BFS LANDSCAPE


ENGINEER ARCHITECTS
Structural Engineer Landscape Architect

FARD ENGINEERS INC. WHITSON ENGINEERS


MEP Engineer Civil Engineer/ADA

4|Page
FORM C RESUMES OF KEY PERSONNEL

1. Name: Carl Campos_________________________________________________________________


2. Role in this Service Area: Principal Project Oversight_____________________________________
3. Years of experience Total: _ 38_______ With current firm: 38_____
4. Education (Degree and Specialization): Bachelor of Architecture, 1976 California Polytechnic State_
University, San Louis Obispo, CA; University of Florence, Italy________________________________
5. Current Registration/Certification (State & Discipline): Architectural Licenses: AZ, CA, MT, NV, SC,
TX, UT, WA, NCARB__________________________________________________________________
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
_Design Build Institute, Certified Professional LEED______ _________________________________ _
7. Relevant Project Title & Location (City & State): East Garrison Fire Station Salinas, CA_________
- Year Completed Professional Services: 2017_________________________________________
- Year Completed Construction (if applicable): 2018 __________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Design services for a new 26,500 sf fire station with three-wide apparatus bay, and paved training__
area_ for firefighter use. Specific Role: Principal in Charge._________________________________ _
Cost estimate: $5.73M, Final Cost: TBD.________________________________________________ _
- Performed Relevant Project With Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): Contra Costa County Public Works - As Needed
Services__ _____ ___________________________________________________________________
- Year Completed Professional Services: Ongoing (2013 present)__________________________
- Year Completed Construction (if applicable): Ongoing (2013 present)_____________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Ongoing work for the Contra Costa Public Works Department providing As-Needed Services. Specific
Role: Principal in Charge for all CCCPWD task orders._______________________________________
- Performed Relevant Project With Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): Historic YWCA Event Center - Oakland, CA_______
- Year Completed Professional Services: 2000 _________________________________________
- Year Completed Construction (if applicable): 2000 ___________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Prepared background analysis and justification documents necessary to obtain FEMA funding _____
following earthquake damage, state historic preservation office approvals, culminating in_________
restoration of exterior facades and interior finishes, and building code and ADA accessibility_______
upgrades. Specific Role: Principal in Charge_______________________________________________
- Performed Relevant Project With Current Firm: Yes X No

5|Page
FORM C RESUMES OF KEY PERSONNEL

1. Name: Brent Randall________________________________________________________________


2. Role in this Service Area: Project Architect Project Management ____________________________
3. Years of experience Total: ___28_________ With current firm: 28 ______________
4. Education (Degree and Specialization): Bachelor of Architecture, 1995 California Polytechnic State
University San Luis Obispo, CA _________________________________________________________
5. Current Registration/Certification (State & Discipline): Architectural License: CA_________________
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
__________________________________________________________________________________
7. Relevant Project - Title & Location (City & State): Contra Costa County Public Works As Needed
Services_______________________________________________________________________ __
- Year Completed Professional Services: Ongoing (2013 present)__________________________
- Year Completed Construction (if applicable: Ongoing (2013 present)______________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Ongoing work for the Contra Costa Public Works Department providing As-Needed Services. Specific
Role: Project Manager________________________________ _______________________________
- Performed Relevant Project With Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): City of Rohnert Park Public Safety and Public_____
Works Programming and Master Plan Rohnert Park, CA__________________________________ _
- Year Completed Professional Services: 2016_________________________________________ _
- Year Completed Construction (if applicable): N/A Programming and Master Planning_______ _
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Develop a Master Plan for the City of Rohnert Park for a new corporation yard. Public Works___ __
Corporation Yard is proposed to be a two-acre facility providing the following services:__________ _
administration offices, fleet apparatus shop,_ utility services (water and sewer), streets, parks and__
recreation, and general services. Specific Role: Project Manager______________________________
- Performed Relevant Project With Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): Historic YWCA Event Center - Oakland, CA_______
- Year Completed Professional Services: 2000_________________________________________
- Year Completed Construction (if applicable): 2000___________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
prepared background analysis and justification documents necessary to obtain FEMA funding______
following earthquake damage, state historic preservation office approvals, culminating in________ _
restoration of exterior facades and interior finishes, and building code and ADA accessibility_______
upgrades. Specific Role: Architect_____________________________________________________ _
- Performed Relevant Project With Current Firm: Yes X No

6|Page
FORM C RESUMES OF KEY PERSONNEL

1. Name: Greg Barton________________________________________________________________


2. Role in this Service Area: Project Manager Architectural Drawings__________________________
3. Years of experience Total: ____38______ With current firm: 11 _____________
4. Education (Degree and Specialization): Master of Architecture, 1981 University of Michigan;____
Bachelor of Architecture University of Michigan_________________________________________
5. Current Registration/Certification (State & Discipline): Architectural License: CA________________
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
LEED GA__________________________________________________________________________
7. Relevant Project Title & Location (City & State): Contra Costa County Public Works As Needed _
Services_______________________________________________________________________ __
- Year Completed Professional Services: Ongoing (2013 present)__________________________
- Year Completed Construction (if applicable: Ongoing (2013 present)______________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Ongoing work for the Contra Costa Public Works Department providing As-Needed Services. Specific
Role: provided Design Services for the CCCPWD Planning Department Offices._________________ _
- Performed Relevant Project With Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): East Garrison Fire Station Salinas, CA_________
- Year Completed Professional Services: 2017_________________________________________
- Year Completed Construction (if applicable: 2018____________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Design services for a new 26,500 sf fire station with three-wide apparatus bay, and paved training__
area_ for firefighter use. Specific Role: Architect._________________________________________ _
Cost estimate: $5.73M, Final Cost: TBD.________________________________________________ _
- Performed Relevant Project With Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): City of Rohnert Park Public Safety and Public_____
Works Programming and Master Plan Rohnert Park, CA__________________________________ _
- Year Completed Professional Services: 2016_________________________________________ _
- Year Completed Construction (if applicable): N/A Programming and Master Planning_______ _
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Develop a Master Plan for the City of Rohnert Park for a new corporation yard. Public Works_____ _
Corporation Yard is proposed to be a two-acre facility providing the following services:__________ _
administration offices, fleet apparatus shop,_ utility services (water and sewer), streets, parks and__
recreation, and general services. Specific Role: Project Architect _____________________________
- Performed Relevant Project With Current Firm: Yes X No

7|Page
FORM C RESUMES OF KEY PERSONNEL

1. Name: Larry Mack______________________________________________________________


2. Role in this Service Area: Technical Lead Construction Administration_______________________
3. Years of experience Total: ______43_____ With current firm: ___ __22________
4. Education (Degree and Specialization): BA Architecture, 1974 California Polytechnic State________
University, School of Architecture, San Luis Obispo, CA____________________________________ _
5. Current Registration/Certification (State & Discipline): Architectural License: California___________
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
__________________________________________________________________________________
7. Relevant Project Title & Location (City & State): Historic YWCA Event Center - Oakland, CA_______
- Year Completed Professional Services: 2000 _________________________________________
- Year Completed Construction (if applicable): 2000 ___________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
Prepared background analysis and justification documents necessary to obtain FEMA funding _____
following earthquake damage, state historic preservation office approvals, culminating in_________
restoration of exterior facades and interior finishes, and building code and ADA accessibility_______
upgrades. Specific Role: Technical Lead _______________________________________________
- Performed Relevant Project With Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): Fire Station 35 Fairfield, CA________________ _
- Year Completed Professional Services: 2015___________________________________________
- Year Completed Construction (if applicable: 2016_____________________________________ _
- Brief Description (Scope, size, cost, etc.) and Specific Role:
This fire station is a 7,570 sf, three-bay, four-dormitory, developer built new fire station. Specific_ _
Role: Technical Lead________________________________________________________________ _
- Performed Relevant Project With Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): Fire Station No. 75 Vacaville, CA
- Year Completed Professional Services: 2015___________________________________________
- Year Completed Construction (if applicable: 2016_______________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role:
This station was the first new station to open in Vacaville in 20 years. LCA services included Phase I_
Bridging Documents: consisting of the design phase, entitlement phase, design development phase,
and assistance to the Design Build Contractor Team. LCA participated in the interview/selection__ _
process with the City. 8,540 sf, two-bay, five-dormitory new station. Specific Role: Technical Lead_ _
- Performed Relevant Project With Current Firm: Yes X No

8|Page
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 X 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: East Garrison Fire Station_______________________________________


2. Project Location (City and State): Salinas, CA____________________________________________
3. Year Completed Professional Services: 2017___________________________________________
4. Year Completed Construction (if applicable): 2018______________________________________
5. Project Owners Information:
- Project Owner: UPC East Garrison LLCA_(Monterey County Regional Fire District)______________
- Point of Contact Name: Talli Robinson, Senior Planner____________________________________
- Point of Contact Telephone Number: (408) 207-9499_____________________________________
- Point of Contact E-Mail Address: trobinson@benchmarkcommunities.com __________________
6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Design services for a new 26,500 sf fire station with three-wide apparatus bay, and paved training area_
for firefighter use.______________________________________________________________________
Cost estimate: $5.73M, Final Cost: TBD._(Completion Nov. 2017) ________________________________

7. Subconsultants from FORM B Involved with this Example Project, if any:


Firm Name Firm Location Support Service
Fard Engineers Walnut Creek, CA MEP Engineer

Whitson Engineers Monterey, CA Civil Engineer

BFS Landscape Architects Monterey, CA Landscape Architect

9|Page
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 X 3 4 (Match the bottom of Form E)

1. Title of Example Project: Contra Costa County Public Works Department As-Needed Services____
2. Project Location (City and State): Contra Costa County, CA________________________________
3. Year Completed Professional Services: Ongoing (2013-present)__________________________
4. Year Completed Construction (if applicable): Ongoing (2013-present)____________________
5. Project Owners Information:
- Project Owner: Contra Costa County Public Works Department_____________________________
- Point of Contact Name: Ramesh Kanzaria, Capital Projects Division Manager_________________
- Point of Contact Telephone Number: (925) 313-2144_____________________________________
- Point of Contact E-Mail Address: ramesh.kanzaria@pw.cccounty.us _________________________
6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Contra Costa County Public Works Fire Sprinkler Project (4 sites)____________________________ _
Office of the Sheriff Warehouse (Roof Replacement)______________________________________ _
Richmond Pump Station (Rain Water Diversion Project)_____________________________________
Richmond Veterans Memorial Hall (Roof & Floor Replacement)_____________________________ _
Space Planning & Building Department Offices 11,000 sf facility remodel, roof replacement, ADA _
upgrades, addition of administrative offices and relocation of 500 employees ___________________

7. Subconsultants from FORM B Involved with this Example Project, if any:


Firm Name Firm Location Support Service

10 | P a g e
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 X 4 (Match the bottom of Form E)

1. Title of Example Project: Historic YWCA Event Center_____________________________________


2. Project Location (City and State): Oakland, CA___________________________________________
3. Year Completed Professional Services: 2000___________________________________________
4. Year Completed Construction (if applicable): 2000______________________________________
5. Project Owners Information:
- Project Owner: California College of the Arts (current)____________________________________
- Point of Contact Name: N/A, facility sold_______________________________________________
- Point of Contact Telephone Number: N/A, facility sold__________________________________ _
- Point of Contact E-Mail Address: N/A, facility sold_______________________________________
6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
The Julia Morgan-designed YWCA of Oakland is a cultural and social resource of incredible value to City_
of Oakland. The 5-story multi-use facility, built in 1915, is listed on the National Register of Historic___ _
Places. LCA Architects prepared background analysis and justification documents necessary to obtain__
FEMA funding following earthquake damage, state historic preservation office approvals, culminating in
restoration of exterior facades and interior finishes, and building code and ADA accessibility upgrades. _
The ornate plaster capitals and wood embellishments were retained while the buildings structure was _
reinforced and its electrical and plumbing systems replaced. Each plank in the 12 foot high paneling in _
the gymnasium was removed and catalogued to that it could be returned to its exact position. Original _
fixtures such as lighting, sinks and toilets were saved to retain the buildings historic fabric. Even the__ _
radiators in the building were retained. The building includes auditorium, performance stage,_________
conference/banquet facilities, residential units, and administrative space._________________________

7. Subconsultants from FORM B Involved with this Example Project, if any:


Firm Name Firm Location Support Service
HD Rueb Structural Engineer Pleasant Hill, CA Structural Engineer

11 | P a g e
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 4 X (Match the bottom of Form E)

1. Title of Example Project: City of Rohnert Park Public Safety and Public Works Programming and___
Master Plan________________________________________________________________________
2. Project Location (City and State): _Rohnert Park, CA __________________________________
3. Year Completed Professional Services: 2016 __________________________________________
4. Year Completed Construction (if applicable): N/A Programming and Master Planning ________ _
5. Project Owners Information:
- Project Owner: City of Rohnert Park, Department of Public Works__________________________ _
- Point of Contact Name: Vanessa Marin, Senior Engineering Technician_______________________
- Point of Contact Telephone Number: (707) 588-2252___________________________________ _
- Point of Contact E-Mail Address: vmarin@rpcity.org _____________________________________
6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
LCA Developed a Master Plan for the City of Rohnert Park for a new fire station, new corporation yard, _
and use assessment of city sewage transfer pump station. The Public Works Corporation Yard is______ _
proposed to be a two-acre facility providing the following services: Administration Offices, Fleet_______
Apparatus Shop, Utility Services (water and sewer), Streets, Parks and Recreation, and General________
Services.______________________________________________________________________________

7. Subconsultants from FORM B Involved with this Example Project, if any:


Firm Name Firm Location Support Service

12 | P a g e
FORM E KEY PERSONNEL PARTICIPATION
IN EXAMPLE PROJECTS

Key Personnel From Example Projects from


No. Role
Form C FORM D
1 2 3 4
1. Carl Campos X X X X

2. Brent Randall X X X
3. Greg Barton X X X
4. Larry Mack X

Example Projects Key from FORM D


No. Title of Example Project No. Title of Example Project
1. East Garrison Fire Station 3. Historic YWCA Event Center
2. Contra Costa Public Works As Needed 4. City of Rohnert Park Corporation Yard

13 | P a g e
FORM F APPLICABLE SPECIALIZED EQUIPMENT AND RESOURCES

List specialized and/or unique equipment, vehicles, software, or other resources your firm possesses
that is advantageous or necessary to perform this service and which your firm is willing to commit
locally. Equipment may include, but is not limited to: heavy equipment, special purpose or specially-
equipped vehicles, equipment, specialized computer programs, reference manuals/codes, laboratory
testing equipment, audio visual equipment, tools supplies, or other relevant resources.

1. Applicable Specialized Equipment

Virtual Reality Experiential

OCE TDS 750 Scanners/Plotters

2. Applicable Specialized Software Programs

Revit (BIM Modeling)

Navisworks

AutoCAD 2018

3. Applicable Reference Manuals, Codes, Data, etc.

SHPO Requirements

FEMA Guidelines

California Coastal Commission Manual

4. Other Applicable Resources

City of Carmel Capital Improvement Plan

City of Carmel General Plan

14 | P a g e
FORM G HOURLY RATE SHEET

Fully Burdened Hourly Rates


No. Key Personnel from Form C Role
2017 2018 2019
1. Carl Campos Principal $215.00 $215.00 $220.00
2. Brent Randall Architect $195.00 $195.00 $200.00
3. Greg Barton Designer $185.00 $185.00 $190.00
4. David Carpenter Technical Lead $170.00 $170.00 $175.00
Other Staff Fully Burdened Hourly Rates
No. Role
(or Classifications) 2017 2018 2019
5. CAD Technician $90.00 - $90.00 - $100.00 -
$140.00 $140.00 $145.00
6. Administration $90.00 - $90.00 - $95.00 -
$125.00 $125.00 $130.00

Does your firms fully burdened hourly rates include the following?
Software Yes No X Vehicles Yes No X
Phone/Cell Yes X No Printing Yes No X
Mileage Yes No X Postage/Courier Yes No X

Please initial here to acknowledge that markups for subconsultants and other direct costs shall not
exceed 10.0% __CEC___

15 | P a g e
FORM H ADDITIONAL INFORMATION

Provide any additional information that would further clarify your interest, expertise, similar experience,
and/or capabilities relevant to this service area.

ADA TRANSITION EXPERIENCE LIBRARY EXPERIENCE


Concord Airport Plaza Building Concord, CA A.S.C.E.N.D. Oakland, CA
Hilton Hotel Master Plan Concord, CA Various Locations Castro Valley, CA
Home Depot NorCal Facilities Mission San Jose School Fremont, CA
Hotel Pacific Monterey, CA Montair School Danville, CA
Sprindrift Inn Monterey, CA
PUBLIC WORKS EXPERIENCE
FIRE STATION EXPERIENCE City Hall Roof Replacement Fairfield, CA
City of Fairfield Fire Department City Hall & Public Safety Building Dublin, CA
City of Rohnert Park Fire Department (Staff Experience)
City of Vacaville East Bay Regional Parks District Admin Facility
Contra Costa County Fire Protection District Oakland, CA
East Contra Costa County Fire Protection Public Works Department, Corp Yard Master
District Plan Rohnert Park, CA
Menlo Park Fire Department Service Center San Ramon, CA
Monterey County Regional Fire District West Downtown Specific Plan Walnut Creek,
Moraga-Orinda Fire Protection District CA
San Ramon Valley Fire Protection District
Tracy Fire Department THEATER EXPERIENCE
Brenden Theaters Concord, CA
HISTORIC RENOVATION EXPERIENCE Caada College Theater Lobby Redwood City,
1716 Elm Street, Farm House El Cerrito, CA CA
Leech House Walnut Creek, CA Contra Costa School of Performing Arts
Oriental Warehouse Lofts San Francisco, CA Amphitheater Walnut Creek, CA
Northgate Theater Walnut Creek, CA

Signature of Authorized Representative: __ ______________________________________


Printed Name: __Carl Campos _________________________________________________________
Title of Signer: _CEO ____________________________________________________________________
Date Signed: __9/28/17_________________________________________________________________