C

PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
MANO DE OBRA
CAPATAZ hh 24.08 1,362.14 32,800.26 81.73 1,968.02 108.97
OPERARIO hh 20.07 16,442.83 330,007.65 986.57 19,800.46 1,315.43
OFICIAL hh 16.47 7,249.57 119,400.48 434.97 7,164.03 579.97
PEON hh 14.34 51,128.58 733,183.79 3,067.71 43,991.03 4,090.29
OPERADOR DE EQUIPO hh 19.18 209.89 4,025.75 12.59 241.54 16.79
OPERADOR DE EQUIPO PESADO hh 18.24 971.75 17,724.81 58.31 1,063.48 77.74
OPERADOR DE EQUIPO LIVIANO hh 16.08 4,153.45 66,787.39 249.21 4,007.25 332.28
OPERADOR DE MAQUINARIA-EQUIPO hh 18.24 128.53 2,344.30 7.71 140.66 10.28
TOPOGRAFO hh 16.08 363.68 5,847.91 21.82 350.88 29.09
MANO DE OBRA INSTALACION glb 552.59 1.00 552.59 0.50 276.30 0.50
MANO DE OBRA - C glb 1,501.14 1.00 1,501.14 0.50 750.57 0.50
ESPECIALISTA EN CAPACITACION DE LA JAAS Y EDUCACION mes 3,750.00 5.00
SANITARIA 18,750.00 0.50 1,875.00 0.50
ESPECIALISTA EN MITIGACION DE IMPACTO AMBIENTAL mes 3,750.00 10.00 37,500.00 1.00 3,750.00 1.00
MATERIALES
TRANSPORTE DE POSTES DE MADERA und 156.25 54.00 8,437.50 54.00 8,437.50
ALAMBRE NEGRO RECOCIDO N 16 kg 3.76 1,704.41 6,408.58 1,704.41 6,408.58
ALAMBRE NEGRO N 16 kg 3.76 696.55 2,619.03 696.55 2,619.03
ALAMBRE NEGRO N 8 kg 3.76 1,369.42 5,149.02 1,369.42 5,149.02
ANGULO DE FIERRO 1 1/2" x 1 1/2" x 1/8" m 14.20 59.80 849.16 59.80 849.16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 2.49 44,484.40 110,766.16 44,484.40 110,766.16
REJILLA DE FIERRO GALVA. 1/2" e=3.1mm(0.5m ED ANCHO) und 80.00 5.00 400.00 5.00 400.00
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
REJILLA DE ACERO INOXIDABLE 1"x1/4" (0.5m ED ANCHO) und 120.00 1.00 120.00 1.00 120.00
CLAVOS PARA MADERA CON CABEZA DE 2" kg 3.76 7.41 27.86 7.41 27.86
CLAVOS PARA MADERA CON CABEZA DE 2 1/2", 3", 4" kg 3.76 1.20 4.51 1.20 4.51
CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 3.76 160.98 605.28 160.98 605.28
CLAVOS CON CABEZA 3" kg 3.76 1,120.94 4,214.73 1,120.94 4,214.73
PLATINA DE FIERRO 1/8"X3/4" m 4.60 79.94 367.72 79.94 367.72
PLANCHA DE ACERO LAC 3/16" (4.8mm) pza 252.00 0.07 17.64 0.07 17.64
PLANCHA METALICA CON ORIFICIO DE 1/4" und 100.00 1.00 100.00 1.00 100.00
ABRAZADERAS PARA TUBO DE 2" und 10.00 12.00 120.00 12.00 120.00
ABRAZADERA FG PARA TUBO PVC 1/2" und 4.30 466.00 2,003.80 466.00 2,003.80
CABLE PUAS und 61.47 161.20 9,908.96 161.20 9,908.96
TUBERIA PVC-SAP C-10 S/P DE 1 1/4" X 5 m und 3.48 770.05 2,679.77 770.05 2,679.77
TUBERIA PVC CLASE 10 S/P DE 4" X 5 m m 29.04 50.65 1,470.88 50.65 1,470.88
TUBERIA PVC ISO 4435-DN 160 MM m 31.23 752.10 23,488.08 376.05 11,744.04 376.05
TUBERIA PVC ISO 4435-DN 200 MM m 47.67 6,294.32 300,050.23 3,147.16 150,025.12 3,147.16
TUBERIA PVC ISO 4435-DN 110 MM m 15.00 175.97 2,639.55 87.99 1,319.78 87.99
TUBERIA PVC-U 160mm DENTADO m 150.00 89.04 13,356.00 44.52 6,678.00 44.52
TUBERIA PVC CLASE 10 S/P DE 1/2" X 5 m m 2.40 1.01 2.42 1.01 2.42
TUBERIA PVC CLASE 10 1" x 5m ROSCADA m 24.00 1.00 24.00 1.00 24.00
TUBERIA PVC SAP C-10 R 2" m 7.92 18.20 144.14 18.20 144.14
TUBERIA PVC-CLASE 10 4" x 6m m 29.80 575.84 17,160.03 575.84 17,160.03
TUBERIA PVC-CLASE 7.5 2" x 6m m 6.60 128.63 848.96 128.63 848.96
TUBERIA PVC SAP C-10 2" ROSCADO m 7.92 2,556.92 20,250.81 2,556.92 20,250.81
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
TUBERIA PVC SAP C-10 2 1/2" ROSCADO m 13.20 230.04 3,036.53 230.04 3,036.53
TUBERIA PVC SAP C-10 3" ROSCADO m 18.48 1,830.12 33,820.62 1,830.12 33,820.62
TUBERIA PVC SAP C-10 4" ROSCADO m 29.04 1,180.44 34,279.98 1,180.44 34,279.98
TUBERIA PVC SAP C-10 1/2" ROSCADA m 2.40 233.00 559.20 233.00 559.20
CODO 90 PVC SAP C-10 4" pza 25.76 5.05 130.09 5.05 130.09
CODO 45 PVC SAP C-10 4" pza 21.19 29.00 614.51 29.00 614.51
CODO 90 PVC SAP C-10 1/2" und 0.21 1.00 0.21 1.00 0.21
CODO HDF BB PN =10 DN=100mm x 90 und 92.31 3.00 276.93 3.00 276.93
CODO HDF BB PN =10 DN=150mm x 90 und 103.33 2.00 206.66 2.00 206.66
CANASTILLA DE SUCCION DE BRONCE BB DN= 150mm und 405.51 1.00 405.51 1.00 405.51
CODO 90 PVC ISO C-7.5 2" pza 6.78 8.00 54.24 8.00 54.24
CODO 45 PVC ISO C-7.5 2" pza 5.08 8.06 40.94 8.06 40.94
CODO 90 PVC ISO C-7.5 2 1/2" pza 12.71 2.00 25.42 2.00 25.42
CODO 45 PVC ISO C-7.5 2 1/2" pza 11.02 1.00 11.02 1.00 11.02
CODO 90 PVC SAP C-10 2" und 18.42 7.00 128.94 7.00 128.94
CODO 90 PVC SAP C-10 2 1/2" und 22.71 2.00 45.42 2.00 45.42
CODO 45 PVC SAP C-10 2" pza 5.08 88.00 447.04 88.00 447.04
CODO 45 PVC SAP C-10 2 1/2" pza 11.02 13.00 143.26 13.00 143.26
CODO 45 PVC SAP C-10 3" pza 15.25 38.00 579.50 38.00 579.50
CODO 45 PVC SAP C-10 1/2" pza 5.08 466.00 2,367.28 466.00 2,367.28
CODO 90C/R PVC SAP P/AGUA DE 1/2" pza 0.12 42.00 5.04 42.00 5.04
CODO 90C/R PVC SAP P/AGUA DE 3/4" pza 0.45 21.00 9.45 21.00 9.45
CODO PVC SAL 4" x 45 und 1.02 233.00 237.66 233.00 237.66
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
CODO PVC DESAGUE 8" x 90 und 16.71 3.00 50.13 3.00 50.13
CODO PVC DESAGUE 8" x 45 und 8.34 1.00 8.34 1.00 8.34
CODO PVC SAL 6" x 90 und 11.31 9.00 101.79 9.00 101.79
CODO PVC SAL 4" x 90 und 1.11 39.00 43.29 39.00 43.29
CODO PVC SAP C-10 4"x45 und 25.42 6.30 160.15 6.30 160.15
CODO PVC SAP C-7.5 1 1/4" x 45 und 2.73 15.00 40.95 15.00 40.95
CODO PVC SAP C-7.5 1 1/4" x 90 und 3.93 1.00 3.93 1.00 3.93
CODO PVC SAL 2" x 90 und 0.27 10.00 2.70 10.00 2.70
TEE PVC SAL 8" (200mm) und 100.00 14.00 1,400.00 14.00 1,400.00
TEE PVC CLASE 10 SP 2" und 6.16 5.00 30.80 5.00 30.80
TEE PVC ISO C-7.5 2" pza 12.00 8.00 96.00 8.00 96.00
TEE PVC ISO C-7.5 2 1/2" x 2" pza 12.71 2.00 25.42 2.00 25.42
TEE PVC ISO C-7.5 2 1/2" pza 12.71 2.00 25.42 2.00 25.42
TEE PVC SAP CLASE-10 2" pza 12.80 16.00 204.80 16.00 204.80
TEE PVC SAP CLASE-10 2 1/2" pza 15.25 3.00 45.75 3.00 45.75
TEE PVC SAP CLASE-10 3" pza 21.18 12.00 254.16 12.00 254.16
TEE PVC SAP CLASE-10 4" pza 29.66 1.00 29.66 1.00 29.66
TEE PVC SAP CLASE-10 1/2" und 2.10 233.00 489.30 233.00 489.30
TEE PVC SAP C/R DE 1/2" und 1.50 20.40 30.60 20.40 30.60
TEE PVC SAP C/R DE 3/4" und 2.10 21.00 44.10 21.00 44.10
ADAPTADOR PR PVC D=63mm und 32.43 2.00 64.86 2.00 64.86
ADAPTADOR PR PVC D=50mm und 38.39 6.00 230.34 6.00 230.34
MEDIDOR DE AGUA TIPO ACTARIS und 473.75 233.00 110,383.75 233.00 110,383.75
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
ADAPTADOR PARA 3/4" A 1/2" und 5.00 233.00 1,165.00 233.00 1,165.00
REDUCCION PVC SAP DE 2" A 2" und 6.78 10.00 67.80 10.00 67.80
REDUCCION PVC SAP DE 3" A 2" und 10.17 9.00 91.53 9.00 91.53
REDUCCION PVC SAP DE 4" A 3" und 12.71 4.00 50.84 4.00 50.84
REDUCCION PVC SAP 2" A 2" und 16.00 3.00 48.00 3.00 48.00
TUBERIA PVC-SAL 6" X 5 m. m 25.98 41.61 1,081.03 41.61 1,081.03
TUBERIA PVC-SAL 4" X 3 m pza 33.00 37.90 1,250.70 37.90 1,250.70
TUBERIA PVC 2" und 9.15 2.00 18.30 2.00 18.30
TAPON PVC SAP CLASE-10 2" und 1.80 18.00 32.40 18.00 32.40
TAPON PVC SAP CLASE 10 3/4" und 3.00 233.00 699.00 233.00 699.00
TEE PVC-SAL 6" und 50.00 4.00 200.00 4.00 200.00
TRAMPA "P" PVC SAL DE 2" und 5.00 5.00 25.00 5.00 25.00
CACHIMBA DE PVC-SAL DE 200 mm X 160 mm X 45 und 16.00 233.00 3,728.00 233.00 3,728.00
REDUCCION PVC CLASE-10 SP 2" - 1 1/2" und 3.87 5.00 19.35 5.00 19.35
YEE PVC SAL 2" x 2" und 3.00 40.00 120.00 40.00 120.00
YEE PVC SAL 4" x 4" und 6.00 12.00 72.00 12.00 72.00
PIEDRA CHANCADA m3 100.00 385.76 38,576.00 154.30 15,430.40 115.73
PIEDRA GRANDE DE 8" m3 95.00 42.82 4,067.90 42.82 4,067.90
PIEDRA MEDIANA (MAX 4") m3 95.00 1.01 95.95 1.01 95.95
PIEDRA FILTRO m3 80.00 0.27 21.60 0.27 21.60
GRAVA DE FILTRO SELECCIONADO m3 80.00 0.34 27.20 0.34 27.20
GRAVILLA DE FILTRO SELECCIONADO m3 90.00 0.71 63.90 0.71 63.90
PIEDRA MEDIANA (MAX 3") m3 90.00 6.54 588.60 6.54 588.60
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
PIEDRA PARTIDA DE 3" m3 90.00 32.76 2,948.40 32.76 2,948.40
GRAVA SELECCIONADA DE 2.5cm m3 100.00 558.22 55,822.00 223.29 22,328.80 167.47
ARENA m3 63.22 53.94 3,410.09 26.97 1,705.04 26.97
ARENA FINA m3 180.00 93.33 16,799.40 46.67 8,399.70 46.67
ARENA GRUESA m3 100.00 1,338.98 133,898.00 535.59 53,559.20 401.69
HORMIGON m3 90.00 700.76 63,068.40 280.30 25,227.36 210.23
MATERIAL GRANULAR PARA FILTRO m3 100.00 18.70 1,870.00 0.00 18.70
MATERIAL SELECCIONADO m3 30.00 0.38 11.40 0.38 11.40
MATERIAL DE PRESTAMO m3 70.00 13.28 929.60 6.64 464.80 6.64
MATERIAL PROPIO ZARANDEADO m3 15.00 13,514.03 202,710.45 1,351.40 20,271.05
AGUA PUESTA EN OBRA m3 6.00 681.33 4,087.98 68.13 408.80 136.27
MALLA TEJIDA ALAMBRE GALV. #8 COC 2"x2" m2 14.00 3,002.21 42,030.94 1,501.11 21,015.47 1,501.11
WATER STOP 6" m 22.00 716.01 15,752.22 716.01 15,752.22
TUBERIA DN 150 mm ACERO SCH-40 m 114.04 9.50 1,083.38 9.50 1,083.38
TUBERIA DN 100 mm ACERO SCH-40 m 52.10 12.40 646.04 12.40 646.04
VALVULA COMPUERTA HFD BB PN-10 DN=100mm und 276.58 1.00 276.58 1.00 276.58
VALVULA COMPUERTA HFD BB PN-10 DN=150mm und 565.56 2.00 1,131.12 2.00 1,131.12
UNION FLEXIBLE TIPO DRESSER HDF PN-10 DN=100 und 187.98 2.00 375.96 2.00 375.96
UNION FLEXIBLE TIPO DRESSER HDF PN-10 DN=150 und 117.29 3.00 351.87 3.00 351.87
UNION PVC D=63mm und 18.55 1.00 18.55 1.00 18.55
UNION PVC D=50mm und 22.29 1.00 22.29 1.00 22.29
UNION UNIVERSAL PVC D=63mm und 27.02 2.00 54.04 2.00 54.04
UNION UNIVERSAL PVC D=50mm und 18.28 6.00 109.68 6.00 109.68
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
UNION PR PVC SAP 4" und 3.81 109.68 417.88 109.68 417.88
UNION PR PVC SAP 2" und 1.47 736.38 1,082.48 736.38 1,082.48
UNION PR PVC SAP 1 1/4" und 1.23 146.68 180.42 146.68 180.42
UNION PR PVC SAP 3" und 1.47 348.59 512.43 348.59 512.43
UNION PRESION-ROSCA PVC DE 1/2" und 8.00 233.00 1,864.00 233.00 1,864.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 19.20 8,307.68 159,507.46 8,307.68 159,507.46
CAL (BOLSA X 20 Kg) bol 8.39 810.64 6,801.27 810.64 6,801.27
CALAMINA METALICA glb 300.00 9.48 2,844.00 9.48 2,844.00
CALAMINA GALVANIZADA ONDULADA 1.80M und 9.07 123.54 1,120.51 123.54 1,120.51
YESO (BOLSA DE 18 Kg) bol 18.00 950.18 17,103.24 950.18 17,103.24
TUB. PVC SAP PRESION C-10 C/R 3/4" x 5m m 3.50 233.00 815.50 233.00 815.50
TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2" m 1.64 43.40 71.18 43.40 71.18
TUB. PVC SAP PRESION P/AGUA C-10 R. 3/4" m 3.50 23.00 80.50 23.00 80.50
CODO PVC DE 2" X 45 und 7.30 1.00 7.30 1.00 7.30
CODO PVC DE 2" X 90 SP und 5.36 7.00 37.52 7.00 37.52
ADAPTADORES und 74.00 5.00 370.00 5.00 370.00
UNION DRESSER Fo. Fdo. 8" und 160.00 3.00 480.00 3.00 480.00
TRANSICION Fo. Fdo. 8" und 160.00 1.00 160.00 1.00 160.00
BRIDA ROMPE AGUA Fo. Fdo. 8" und 120.00 1.00 120.00 1.00 120.00
UNION DE REPARACION PVC C-7.5 2 1/2" und 10.00 4.00 40.00 4.00 40.00
UNION DE REPARACION PVC C-7.5 2" und 9.00 10.00 90.00 10.00 90.00
TAPON MACHO PVC D=50MM und 7.77 2.00 15.54 2.00 15.54
LADRILLO K.K DE ARCILLA 9X13X24 cm und 0.92 64,086.93 58,959.98 32,043.47 29,479.99 32,043.47
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
LADRILLO PASTELERO (HUECO) 24X24X03 cm und 1.35 495.38 668.76 247.69 334.38 247.69
LADRILLO PARA TECHO 8H DE 15X30X30 cm und 2.14 275.10 588.71 137.55 294.36 137.55
LADRILLO KK MACIZO DE CONCRETO UNICON 9X13X24 mll 0.92 20,849.40 19,181.45 10,424.70 9,590.72 10,424.70
VIGUETAS DE CONCRETO PREFABRICADO CON ORIFICIO und 80.00 18.90 1,512.00 9.45 756.00 9.45
CONCRETO PREMEZCLADO F'C=210 kg/cm2 m3 350.00 436.11 152,638.50 0.00
TAPA SANITARIA und 205.00 2.00 410.00 2.00 410.00
TAPA DE CONCRETO PREFABRICADO 0.6x0.60. TIPO T-1 und 200.00 1.05 210.00 1.05 210.00
TAPA DE CONCRETO PREFABRICADO 0.8x0.80 und 200.00 14.70 2,940.00 14.70 2,940.00
TAPA DE CONCRETO PREFABRICADO CIRCULAR D=0.60 und 250.00 1.05 262.50 1.05 262.50
TAPA DE CONCRETO PREFABRICADO 0.70x0.70 und 190.00 25.20 4,788.00 25.20 4,788.00
TAPA DE CONCRETO PREFABRICADO 1.00x1.00 und 250.00 2.10 525.00 2.10 525.00
TAPA DE CONCRETO PREFABRICADO 2.00x1.45 und 350.00 1.05 367.50 1.05 367.50
TAPA DE CONCRETO PREFABRICADO 1.60x0.70 und 200.00 2.10 420.00 2.10 420.00
TAPA DE CONCRETO PREFABRICADO 2.20x2.00 und 400.00 2.10 840.00 2.10 840.00
TAPA DE CONCRETO PREFABRICADO 0.80x0.70 und 200.00 2.10 420.00 2.10 420.00
TUBERIA ALCANTARILLADO DE PVC D=110mm (4") m 13.12 1,502.85 19,717.39 1,502.85 19,717.39
AFORADOR DE CAUDAL und 274.36 1.00 274.36 1.00 274.36
CAJA DE CONCRETO PREFABRICADO CON ORIFICIO 1" und 70.00 19.95 1,396.50 19.95 1,396.50
CAJA DE CONCRETO PREFABRICADA PARA REGISTRO und 60.00 23.10 1,386.00 23.10 1,386.00
CAJA DE CONCRETO C/TAPA und 70.00 233.00 16,310.00 233.00 16,310.00
PEGAMENTO PARA PVC gal 213.55 53.62 11,450.55 53.62 11,450.55
PEGAMENTO PARA PVC AGUA FORDUIT gal 213.55 0.08 17.08 0.08 17.08
SILICONA und 32.00 4.12 131.84 4.12 131.84
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
COLA SINTETICA gal 15.25 7.66 116.82 7.66 116.82
LUBRICANTE PARA TUBERIAS gal 91.70 20.64 1,892.69 20.64 1,892.69
LOSA PREFABRICADA REMOVIBLE und 100.00 31.50 3,150.00 31.50 3,150.00
MADERA TORNILLO p2 7.40 22,789.56 168,642.74 9,115.82 67,457.10 9,115.82
MADERA TORNILLO - C glb 2,500.00 1.00 2,500.00 1.00 2,500.00
MADERA CEDRO p2 6.50 485.26 3,154.19 485.26 3,154.19
TRIPLAY pln 12.40 166.50 2,064.60 166.50 2,064.60
TRIPLAY LUPUNA 4mm x4" x 8" und 22.00 12.00 264.00 12.00 264.00
TRIPLAY 5MM X 4X8, ENCHAPADO CEDRO und 50.00 2.60 130.00 2.60 130.00
MADERA PARA BAFLE DE 1.35x0.80x0.025 und 60.00 1.05 63.00 1.05 63.00
MADERA PARA BAFLE DE 1.35x0.50x0.026 und 50.00 1.05 52.50 1.05 52.50
PLANCHA METALICA e=3/8" D=0.80M und 500.00 2.10 1,050.00 2.10 1,050.00
PLANCHA METALICA e=3/8" 0.90x0.90M und 470.00 2.10 987.00 2.10 987.00
PLANCHA METALICA e=3/8" 0.60x0.60M und 461.55 4.20 1,938.51 4.20 1,938.51
PLANCHA METALICA e=3/8" 1.15x1.15M und 480.00 1.05 504.00 1.05 504.00
PLANCHA METALICA e=3/8" 0.50x0.50M und 450.00 3.15 1,417.50 3.15 1,417.50
CILINDRO DE POLIETILENO, V=500 LITROS und 216.06 1.00 216.06 1.00 216.06
LIJA PARA FIERRO und 1.27 25.87 32.85 25.87 32.85
LIJA PARA MADERA und 0.71 242.70 172.32 242.70 172.32
PINTURA LATEX gal 55.00 1.10 60.50 1.10 60.50
PINTURA ESMALTE gal 45.00 3.87 174.15 3.87 174.15
PINTURA ESMALTE ANTICORROSIVO TEKNO gal 32.00 0.14 4.48 0.14 4.48
OLEO MATE gal 44.00 29.38 1,292.72 29.38 1,292.72
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
THINNER gal 44.65 1.08 48.22 1.08 48.22
DISOLVENTE PARA ESMALTE ANTICARROSIVO gal 15.00 - 0.00 0.00 0.00
IMPERMEABILIZANTE LIQUIDO PARA CONCRETO gal 25.80 201.66 5,202.83 201.66 5,202.83
SELLADOR BLANCO PARA MUROS gal 22.00 29.69 653.18 29.69 653.18
BARNIZ SELLADOR PARA MADERA gal 73.00 0.80 58.40 0.80 58.40
CINTA TEFLON und 1.50 31.40 47.10 31.40 47.10
CINTA SEALIZADORA rll 250.00 38.00 9,500.00 38.00 9,500.00
DESAGUE P/LAVATORIO 1" C/TAPON Y CADENA und 11.00 5.00 55.00 5.00 55.00
SUMIDERO DE BRONCE DE 2" und 9.55 5.00 47.75 5.00 47.75
TUBO DE ABASTO 1/2" und 12.00 10.00 120.00 10.00 120.00
TUBO DE ABASTO ALUMINIO TRENZADO 1/2"X7/8" und 23.00 5.00 115.00 5.00 115.00
UAS DE SUJECION PARA LAVATORIO und 7.00 5.00 35.00 5.00 35.00
BARRA LISA DE Fo. GALVANIZADO DE 3/4" m 25.00 6.00 150.00 6.00 150.00
PERNO DE ANCLAJE PARA SUJECION DE INODORO SIN CAPUCHON und 18.00 10.00
PLASTICO 180.00 10.00 180.00
PERNO DE TAZA DE TANQUE und 32.00 10.00 320.00 10.00 320.00
TRAMPA P CROMADA P/LAVAT. 1 1/4" und 17.00 5.00 85.00 5.00 85.00
BRIDA ROMPE AGUA DN=150mm und 188.59 2.00 377.18 2.00 377.18
BRIDA ROMPE AGUA DN=100mm und 137.74 4.00 550.96 4.00 550.96
PAPELERA DE LOZA COLOR und 64.25 5.00 321.25 5.00 321.25
REGISTRO DE BRONCE DE 4" ROSCADO und 14.90 22.00 327.80 22.00 327.80
REGISTRO ROSCADO DE 6" (150mm) TIPO RANURA und 41.90 14.00 586.60 14.00 586.60
ANILLO DE CERA PARA INODORO und 12.00 5.00 60.00 5.00 60.00
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
ANILLO DE JEBE P/TUBERIA PVC ISO 4435 DN 110 MM und 5.00 1,213.91 6,069.55 1,213.91 6,069.55
ANILLO DE JEBE P/TUBERIA PVC ISO 4435 DN 200 MM und 12.00 23.46 281.52 23.46 281.52
ANILLO DE JEBE P/TUBERIA PVC ISO 4435 DN 160 MM und 5.00 0.76 3.80 0.76 3.80
GANCHO DOBLE CROMADO und 58.15 5.00 290.75 5.00 290.75
JABONERA DE EMPOTRAR C/ASA (TREBOL) und 63.25 5.00 316.25 5.00 316.25
PUERTA METALICA 2.10x1.00, SEGUN PLANOS INC glb 444.96 2.00 889.92 2.00 889.92
VENTANA METALICA 2.35X0.40, SEGUN PLANOS INCLUYE glb 200.00 1.00
ACCESORIOS Y PINTURA 200.00 1.00 200.00
VENTANA METALICA 0.60X0.40, SEGUN PLANOS INCLUYE glb 150.00 1.00
ACCESORIOS Y PINTURA 150.00 1.00 150.00
PUERTA DE FIERRO glb 1,759.59 3.22 5,665.88 3.22 5,665.88
ASIENTO WC PLASTICO und 32.00 5.00 160.00 5.00 160.00
TUBO PVC-SAL -2" (3m) m 3.00 4.00 12.00 4.00 12.00
TUBO PVC-SAL -3" (3m) m 4.50 4.00 18.00 4.00 18.00
TUBO PVC-SAL -4" (3m) m 9.00 12.00 108.00 12.00 108.00
LAVATORIO NACIONAL FONTANA BLANCO und 28.82 5.00 144.10 5.00 144.10
INODORO NACIONAL SIFON JET COLOR BLANCO und 231.50 5.00 1,157.50 5.00 1,157.50
LAVADERO FONTANA BLANCO und 238.02 5.00 1,190.10 5.00 1,190.10
TANQUE DE AGUA DE ETERNIT (POLIETILENO) DE 1000 LITROS und 55.94 5.00
INCLUYE ACCESORIOS INTERNOS 279.70 5.00 279.70
TANQUE DE POLIETILENO, 600 LITROS und 254.15 1.05 266.86 1.05 266.86
TUBERIA DE FIERRO GALVANIZADO DE 2" und 30.24 5.40 163.30 5.40 163.30
TUBERIA DE FIERRO GALVANIZADO DE 3" und 38.77 12.60 488.50 12.60 488.50
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
TUBERIA DE F G 3" STANDAR m 12.00 23.58 282.96 23.58 282.96
TUBERIA DE Fo. Fdo 8" m 300.00 8.14 2,442.00 8.14 2,442.00
TUBERIA DE Fo. Fdo 6" m 250.00 1.05 262.50 1.05 262.50
TUBERIA DE FIERRO GALVANIZADO DE 3/4" m 7.02 4.80 33.70 4.80 33.70
CODO FIERRO GALVANIZADO DE 1" X 90 und 8.33 5.00 41.65 5.00 41.65
TEE HDF BB PN =10 DN= 100mm und 77.54 3.00 232.62 3.00 232.62
TEE HDF BB PN =10 DN=150mm und 94.49 1.00 94.49 1.00 94.49
CODO Fo. Fdo. 45 x 8" und 120.00 1.00 120.00 1.00 120.00
CODO Fo. Fdo. 90 x 6" und 100.00 1.00 100.00 1.00 100.00
TEE Fo. Fdo. 8" und 150.00 1.00 150.00 1.00 150.00
NIPLE DE FIERRO GALVANIZADO DE 1/2" x 1 1/4" und 0.80 10.00 8.00 10.00 8.00
NIPLE DE FIERRO GALVANIZADO DE 1" x 2 1/2" und 22.00 2.00 44.00 2.00 44.00
NIPLE DE FIERRO GALVANIZADO DE 2" x 4" und 26.00 11.00 286.00 11.00 286.00
NIPLE DE Fo Go DE 90MM und 3.41 4.00 13.64 4.00 13.64
NIPLE PARA REEMPLAZAR MEDIDOR und 20.00 233.00 4,660.00 233.00 4,660.00
TEE DE FIERRO GALVANIZADO 2" und 19.08 21.00 400.68 21.00 400.68
TEE DE FIERRO GALVANIZADO 2 1/2" und 18.00 2.00 36.00 2.00 36.00
UNION SIMPLE DE PVC SAP CLASE 10 SP 1/2" und 5.00 0.20 1.00 0.20 1.00
UNION UNIVERSAL DE FIERRO GALVANIZADO und 50.22 4.00 200.88 4.00 200.88
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" und 8.00 10.00 80.00 10.00 80.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2" und 58.00 10.00 580.00 10.00 580.00
VALVULA CORPORATION PVC 1/2", P/A und 18.00 233.00 4,194.00 233.00 4,194.00
VALVULA FLOTADORA und 276.81 1.00 276.81 1.00 276.81
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
VALVULA FLOTADORA PPVC CON BOYA 2" und 237.40 6.00 1,424.40 6.00 1,424.40
VALVULA COMPUERTA DE 1/2" und 20.00 5.00 100.00 5.00 100.00
VALVULA COMPUERTA DE 2" und 106.76 5.00 533.80 5.00 533.80
VALVULA COMPUERTA DE Fo. Fdo. 8" und 20.00 1.00 20.00 1.00 20.00
VALVULA COMPUERTA DE BRONCE DE 90MM und 192.25 1.00 192.25 1.00 192.25
VALVULA COMPUERTA DE BRONCE DE 2" und 140.00 5.00 700.00 5.00 700.00
VALVULA COMPUERTA PVC DE 1/2" und 20.00 1.00 20.00 1.00 20.00
VALVULA COMPUERTA D=63mm und 162.55 1.00 162.55 1.00 162.55
VALVULA COMPUERTA D=50mm und 194.34 3.00 583.02 3.00 583.02
VALVULA COMPUERTA DE F.F 50MM und 122.00 11.33 1,382.26 11.33 1,382.26
VALVULA COMPUERTA DE F.F 63MM und 162.00 2.00 324.00 2.00 324.00
SOLDADURA CELLOCORD P 3/16" kg 8.00 0.48 3.84 0.48 3.84
DUCHA SIMPLE und 146.94 5.00 734.70 5.00 734.70
LLAVE PARA LAVATORIO und 15.00 5.00 75.00 5.00 75.00
LLAVE PASO RT NIPLE TUERCA EMPAQUE 1/2" und 20.00 233.00 4,660.00 233.00 4,660.00
ELECTROBOMBA3.0 HP INC. ACCESORIOS Y PRUEBA und 2,500.00 2.00 5,000.00 2.00 5,000.00
CANASTILLA und 237.54 1.00 237.54 1.00 237.54
CANASTILLA PVC und 64.41 1.00 64.41 1.00 64.41
CANASTILLA PVC 63MM und 30.00 8.00 240.00 8.00 240.00
CANASTILLA PVC 50MM und 25.00 6.00 150.00 6.00 150.00
INTERRUPTOR DIFERENCIAL 3x40A - 30mA und 124.50 6.00 747.00 6.00 747.00
INTERRUPTOR TERMOMAGNETICO 3 X50 A und 90.90 6.00 545.40 6.00 545.40
INTERRUPTOR TERMOMAGNETICO 3 X60 A. und 126.00 1.50 189.00 1.50 189.00
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
TOMACORRIENTE DOBLE C/LINEA DE TIERRA T und 16.17 2.00 32.34 2.00 32.34
PLACA DE ALUMINIO 0.90x0.70, e=1/4" und 200.00 1.07 214.00 1.07 214.00
POSTE DE SEALIZACION DE CONCRETO Y MADERA und 19.90 50.00 995.00 50.00 995.00
TUBO DE FIERRO NEGRO 1 1/2" und 34.58 37.20 1,286.38 37.20 1,286.38
TUBO DE FIERRO GALVANIZADO 1 1/2" m 15.00 1,768.01 26,520.15 1,768.01 26,520.15
TUBO DE FIERRO GALVANIZADO 1" m 12.00 12.35 148.20 12.35 148.20
TUBO DE Fe 3/8" m 5.69 31.00 176.39 31.00 176.39
TUBO DE Fe 5/8" m 7.02 12.40 87.05 12.40 87.05
TUBO DE Fe 2" x 3mm m 90.00 312.90 28,161.00 312.90 28,161.00
CONO DE REBOSE PVC 4" A 2" und 25.00 6.00 150.00 6.00 150.00
CABALLETE DE MADERA H = 1.00M, ANC = 1.20M ESPESOR DE und 50.00 10.00
MADERA TORNILLO 3" 500.00 10.00 500.00
CAJA DE FoGo DE 150x150x75 und 500.00 6.00 3,000.00 6.00 3,000.00
CAJA DE REGISTRO CONCRETO 0.40x0.70 INC. BASE und 110.00 233.00 25,630.00 233.00 25,630.00
VERTEDERO TRIANGULAR DE MADERA TRATADA e=1/2" und 100.00 2.00 200.00 2.00 200.00
VERTEDERO RECTANGULAR DE MADERA TRATADA e=1/2" und 100.00 2.00 200.00 2.00 200.00
VERTEDERO DE PLANCHA GALVANIZADA DE 1/8" und 200.00 16.00 3,200.00 16.00 3,200.00
GIGANTOGRAFIA DE 3.60X4.80M und 419.20 2.00 838.40 2.00 838.40
MATERIALES DIVERSOS PARA LOGRAR LA CAPACITACION JAAS mes 1,000.00 5.00 5,000.00 5.00 5,000.00
MATERIALES DIVERSOS PARA LOGRAR IMPACTO AMBIENTAL mes 500.00 10.00 5,000.00 10.00 5,000.00
REGLA DE MADERA p2 5.50 280.04 1,540.22 280.04 1,540.22
ANDAMIO DE MADERA p2 5.50 275.72 1,516.46 275.72 1,516.46
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
MEDIDOR DE CAUDAL BB DN= 150mm ELECTROMAGNETICO PN=10 und 19.34 1.00
19.34 1.00 19.34
CABLE DE ENERGIA NYY 1x10mm2 m 5.00 4,580.06 22,900.30 4,580.06 22,900.30
CABLE DE ENERGIA NYY 1x6mm2 m 2.00 54.00 108.00 54.00 108.00
PERNO 1/4" X 7" CON TUERCA und 8.00 40.00 320.00 40.00 320.00
POSTE DE MADERA und 180.00 78.00 14,040.00 78.00 14,040.00
SOPORTE DE CONCRETO CON ANCLAJE und 156.87 5.00 784.35 5.00 784.35
TUBO ELECTROSOLDADO CUAD. 1"X1"mm m 8.97 11.07 99.30 11.07 99.30
ACCESORIOS VARIOS PARA POSTES glb 80.00 54.00 4,320.00 54.00 4,320.00
TUBO Fo.GALVANIZADO DE 2" m 32.00 25.20 806.40 25.20 806.40
ELECTRODO TIPO 6011 - CELLOCORD kg 8.00 21.69 173.52 21.69 173.52
TABLERO DE DISTRIBUCION und 1,000.00 2.00 2,000.00 2.00 2,000.00
TABLERO ELECTRICO PARA 12 POLOS und 460.00 1.50 690.00 1.50 690.00
HIPOCLORITO DE CALCIO 70% kg 19.20 348.37 6,688.70 348.37 6,688.70
HIPOCLORITO DE CALCIO _70% kg 1.00 0.80 0.80 0.80 0.80
PERFIL TEE 1/8" x 1 1/2" x 1 1/2" und 31.60 11.89 375.72 11.89 375.72
AGUA m3 6.00 287.28 1,723.68 287.28 1,723.68
SUMIN. Y COLOC. DE MARCO METALICO DE PLATINA e=1/8"x2" und 129.08 440.00 56,795.20 440.00 56,795.20
PRUEBA ROTURA DE PROBETA und 20.00 241.00 4,820.00 241.00 4,820.00
CORDEL m 0.30 3,973.99 1,192.20 3,973.99 1,192.20
EQUIPOS 0.00 0.00
NIVEL hm 16.00 88.00 1,408.00 0.00
TEODOLITO hm 18.00 445.00 8,010.00 89.00 1,602.00 89.00
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
EQUIPO - T glb 3,698.01 2.00 7,396.02 1.00 3,698.01 1.00
HERRAMIENTAS MANUALES %mo 42,694.71 1.00 42,694.71 0.30 12,808.41 0.30
HERRAMIENTAS %mo 2,126.72 1.00 2,126.72 1.00 2,126.72
CONO DE ROBOSE und 49.90 1.00 49.90 1.00 49.90
SOLDADORA A GASOLINA hm 12.00 79.00 948.00 79.00 948.00
HERRAMIENTAS - T glb 4,000.00 2.00 8,000.00 2.00 8,000.00
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 28.94 566.00 16,380.04 56.60 1,638.00
COMP. NEUMATICA - 93 HP-335/375 PCM hm 105.01 120.40 12,643.20 12.04 1,264.32
COMPACTADORA NEUMATICA - 93 HP - 335/375 PCM hm 105.01 154.00 16,171.54 15.40 1,617.15
MARTILLO NEUMATICO DE 29 kg CON BARRENO Y ACCESORIOS hm 4.97 536.10
2,664.42 536.10 2,664.42
MARTILLO NEUMATICO -25/29 KG hm 4.97 7.00 34.79 7.00 34.79
CARGADOR SOBRE LLANTAS DE 110-125 HP hm 154.96 162.80 25,227.49 0.00
CARGADOR RETROEXCAVADORA 62 HP 1 yD3 hm 125.62 849.00 106,651.38 0.00
RETROEXCAVADORA 80-110 HP hm 130.00 276.50 35,945.00 0.00
CAMION TIPO TRAILER, 25 TON. vje 5.00 11,312.00 56,560.00 0.00
TRANSPORTE EN TRAILER DE ACERO CORRUGADO, 25 TON. vje 0.10 44,994.39 4,499.44 44,994.39 4,499.44
TRANSPORTE TUBERIA EN TRAILER, 25 TON. vje 1.20 7,800.00 9,360.00 3,900.00 4,680.00 3,900.00
TRANSPORTE TUBERIA SAL EN TRAILER, 25 TON. vje 2.40 7,046.00 16,910.40 3,523.00 8,455.20 3,523.00
CAMIONETA PICK UP 4x2 1ton. hm 49.13 128.50 6,313.21 128.50 6,313.21
CAMION VOLQUETE 4x2 140/210 HP, 6 M3 hm 216.29 663.39 143,484.68 0.00
VIBRADOR A GASOLINA da 18.00 52.50 945.00 52.50 945.00
VIBRADOR A GASOLINA Y 1 3/4", 4 HP hm 5.38 480.00 2,582.40 0.00
C
PROYECTO :"INSTALACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL SECTOR ESTE, ANTAPAMPA - YARIHU
FECHA : SETIEMBRE - 2017

UND PRECIO PRESUPUESTO MES 01 MES 02


DESCRIPCION
. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT.
MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 5.38 0.30 1.61 0.00
MEZCLADORA DE CONCRETO TAMBOR 18HP 11P3 hm 14.00 574.00 8,036.00 0.00
MEZCLADORA DE CONCRETO TAMBOR 11P3, 22 HP hm 25.14 27.44 689.84 0.00
MEZCLADORA DE CONCRETO (TAMBOR) 7 P3, 18HP hm 9.00 4.00 36.00 0.00
CIZALLA ELECTRICA DE FIERRO hm 4.00 1,832.00 7,328.00 0.00
ANDAMIOS PARA COLOCAR POSTES glb 30.00 54.00 1,620.00 54.00 1,620.00

TOTALES S/.4,210,687.03 S/.1,585,448.18 S/.542,226.6


AVANCE MENSUAL 100.00% 37.65% 12.88%
AVANCE MENSUAL ACUMULADO 100.00% 37.65% 50.53%
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

2,624.03 149.84 3,608.04 163.46 3,936.04 190.70 4,592.05 190.70 4,592.05 149.84
26,400.61 1,808.71 36,300.84 1,973.14 39,600.91 2,302.00 46,201.06 2,302.00 46,201.06 1,808.71
9,552.03 797.45 13,134.05 869.95 14,328.05 1,014.94 16,716.06 1,014.94 16,716.06 797.45
58,654.71 5,624.14 80,650.22 6,135.43 87,982.06 7,158.00 102,645.74 7,158.00 102,645.74 5,624.14
322.06 23.09 442.83 25.19 483.08 29.38 563.60 29.38 563.60 23.09
1,417.98 106.89 1,949.72 116.61 2,126.97 136.05 2,481.46 136.05 2,481.46 106.89
5,343.00 456.88 7,346.62 498.41 8,014.50 581.48 9,350.25 581.48 9,350.25 456.88
187.55 14.14 257.88 15.42 281.33 17.99 328.21 17.99 328.21 14.14
467.84 40.00 643.28 43.64 701.76 50.92 818.72 50.92 818.72 40.00
276.30
750.57

1,875.00 0.50 1,875.00 0.50 1,875.00 0.50 1,875.00 0.50 1,875.00 0.50
3,750.00 1.00 3,750.00 1.00 3,750.00 1.00 3,750.00 1.00 3,750.00 1.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
11,744.04 0.00 0.00 0.00 0.00
150,025.12 0.00 0.00 0.00 0.00
1,319.78 0.00 0.00 0.00 0.00
6,678.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
11,572.80 115.73 11,572.80 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
16,746.60 167.47 16,746.60 0.00 0.00 0.00
1,705.04 0.00 0.00 0.00 0.00
8,399.70 0.00 0.00 0.00 0.00
40,169.40 401.69 40,169.40 0.00 0.00 0.00
18,920.52 210.23 18,920.52 0.00 0.00 0.00
1,870.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
464.80 0.00 0.00 0.00 0.00
0.00 6,757.02 101,355.23 4,054.21 60,813.14 1,351.40 20,271.05 0.00
817.60 68.13 408.80 68.13 408.80 68.13 408.80 68.13 408.80 68.13
21,015.47 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
29,479.99 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
334.38 0.00 0.00 0.00 0.00
294.36 0.00 0.00 0.00 0.00
9,590.72 0.00 0.00 0.00 0.00
756.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 218.06 76,319.25 218.06 76,319.25
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
67,457.10 4,557.91 33,728.55 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 44.00 704.00 44.00 704.00
1,602.00 0.00 0.00 133.50 2,403.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
3,698.01 0.00 0.00 0.00 0.00
12,808.41 0.30 12,808.41 0.10 4,269.47 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 169.80 4,914.01 169.80 4,914.01 113.20 3,276.01 56.60 1,638.00
0.00 36.12 3,792.96 36.12 3,792.96 24.08 2,528.64 12.04 1,264.32
0.00 46.20 4,851.46 46.20 4,851.46 30.80 3,234.31 15.40 1,617.15

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 65.12 10,091.00 48.84 7,568.25 48.84
0.00 0.00 0.00 339.60 42,660.55 254.70 31,995.41 254.70
0.00 0.00 0.00 110.60 14,378.00 82.95 10,783.50 82.95
0.00 0.00 0.00 4,524.80 22,624.00 3,393.60 16,968.00 3,393.60
0.00 0.00 0.00 0.00 0.00
4,680.00 0.00 0.00 0.00 0.00
8,455.20 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 265.36 57,393.87 199.02 43,045.40 199.02
0.00 0.00 0.00 0.00 0.00
0.00 0.00 144.00 774.72 144.00 774.72 96.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
AMPA - YARIHUATUN, DISTRITO DE OYON, PROVINCIA DE OYON -LIMA".

MES 02 MES 03 MES 04 MES 05 MES 06 MES 07


PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.
0.00 0.00 0.09 0.48 0.09 0.48 0.06
0.00 0.00 172.20 2,410.80 172.20 2,410.80 114.80
0.00 0.00 8.23 206.95 8.23 206.95 5.49
0.00 0.00 1.20 10.80 1.20 10.80 0.80
0.00 0.00 549.60 2,198.40 549.60 2,198.40 366.40
0.00 0.00 0.00
0.00 0.00 0.00

0.00
S/.542,226.69 S/.399,227.21 S/.242,129.53 S/.451,216.77 S/.387,236.39 S/.264,462.60
12.88% 9.48% 5.75% 10.72% 9.20% 6.28%
50.53% 60.01% 65.76% 76.48% 85.67% 91.96%
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL

3,608.04 149.84 3,608.04 108.97 2,624.03 68.11 1,640.02


36,300.84 1,808.71 36,300.84 1,315.43 26,400.61 822.14 16,500.38
13,134.05 797.45 13,134.05 579.97 9,552.03 362.48 5,970.02
80,650.22 5,624.14 80,650.22 4,090.29 58,654.71 2,556.43 36,659.19
442.83 23.09 442.83 16.79 322.06 10.49 201.28
1,949.72 106.89 1,949.72 77.74 1,417.98 48.59 886.24
7,346.62 456.88 7,346.62 332.28 5,343.00 207.67 3,339.37
257.88 14.14 257.88 10.28 187.55 6.43 117.22
643.28 40.00 643.28 29.09 467.84 18.18 292.40

1,875.00 0.50 1,875.00 0.50 1,875.00 0.50 1,875.00


3,750.00 1.00 3,750.00 1.00 3,750.00 1.00 3,750.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
408.80 68.13 408.80 68.13 408.80 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 133.50 2,403.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
7,568.25 0.00 0.00 0.00
31,995.41 0.00 0.00 0.00
10,783.50 0.00 0.00 0.00
16,968.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
43,045.40 0.00 0.00 0.00
0.00 0.00 0.00 0.00
516.48 96.00 516.48 0.00 0.00
MES 07 MES 08 MES 09 MES 10
PARCIAL CANT. PARCIAL CANT. PARCIAL PARCIAL
0.32 0.06 0.32 0.00 0.00
1,607.20 114.80 1,607.20 0.00 0.00
137.97 5.49 137.97 0.00 0.00
7.20 0.80 7.20 0.00 0.00
1,465.60 366.40 1,465.60 0.00 0.00
0.00 0.00 0.00 0.00
0.00

S/.264,462.60 S/.154,102.04 S/.111,003.59 S/.73,634.12


6.28% 3.66% 2.64% 1.75%
91.96% 95.62% 98.25% 100.00%
Precios y cantidades de recursos requeridos
Obra

Fecha
Lugar

Cdigo Recurso Unidad Cantidad

MANO DE OBRA
0147000032 TOPOGRAFO hh 361.7400
0147010002 OPERARIO hh 10,584.8800
0147010003 OFICIAL hh 11,947.5900
0147010004 PEON hh 34,078.0900
MATERIALES
0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 2,863.2500
0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 3,102.9700
0202010000 CLAVOS PARA MADERA CON CABEZA DE 1 1/2 " kg 2.5000
0202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 1,638.4500
0202110018 ACERO LISO 5/8 kg 5,722.3200
0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,874.2700
0204000000 ARENA FINA (PUESTO EN OBRA) m3 247.8100
0205000039 PIEDRA CHANCADA (PUESTO EN OBRA) m3 1,942.5600
0205010004 ARENA GRUESA (PUESTO EN OBRA) m3 1,533.4200
0205010037 AFIRMADO (MATERIAL GRANULAR) m3 3,042.1400
0213000006 ASFALTO RC-250 gal 1,719.0400
0221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 27,660.6400
0227010015 CORDEL m 1,465.2800
0229060006 YESO EN BOLSAS DE 20 kg bls 458.9000
0229200013 THINNER ACRILICO gal 79.2600
0230750112 GIGANTOGRAFIA C/MODELO SEGUN u 1.0000
ESPECIFICACIONES
0232970004 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y glb 1.0000
EQUIPO
0234020001 KEROSENE gal 548.7000
0238000000 HORMIGON (PUESTO EN OBRA) m3 0.1300
0239010101 ALQUILER DE ALMACEN mes 6.0000
0239050000 AGUA m3 647.7300
0239500097 REGLA DE MADERA p2 499.4900
0243040006 MADERA TORNILLO, PARA ENCOFRADO p2 24,174.5600
02436000010008 MADERA NACIONAL P/ENCOFRADO Y CARPINTERIA p2 80.0000
0243600002 MADERA EUCALIPTO 4" p2 1,091.7900
0244010003 ESTACA DE MADERA 2"x2"x1' pza 538.0900
0254010001 PINTURA ESMALTE SINTETICO gal 24.8700
0254450074 PINTURA ESMALTE PARA TRAFICO gal 81.9200
0260000007 PLANCHA DE TECKNOPOR DE 3" X 4' X 8' pl 1,865.2300
0266040053 TAPON PVC DE 3/4" u 3,443.5200
0273010032 TUBERIA PVC S/P 5M x 3/4" CL 10 m 69.8800
0298010193 FLETE TERRESTRE glb 1.0000
EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO
0337030000 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" u 1.4700
0337540001 MIRAS Y JALONES hm 361.7400
0348040004 CAMION CISTERNA 4 X 2 (AGUA) 178-210 HP 3000 gl hm 163.4900
0349030001 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 843.1700
0349030007 RODILLO LISO VIBRATORIO AUTOPROPULSADO 101- hm 281.2400
135HP 10-12 ton
0349040034 TRACTOR DE ORUGAS DE 190-240 HP hm 101.3500
0349040100 CARGADOR FRONTAL 200 - 250 HP hm 577.0000
0349070004 VIBRADOR DE CONCRETO 4 HP 2.40" hm 1,091.6400
0349090000 MOTONIVELADORA DE 125 HP hm 281.2400
0349100007 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1,087.0200
0349700051 VOLQUETE DE 10 m3 hm 288.9600
0349880003 TEODOLITO hm 361.7400
Precio S/. Parcial S/.

22.32 8,074.11
20.10 212,756.01
16.50 197,135.30
14.84 505,718.91 923,684.33

3.39 9,706.43
3.39 10,519.06
3.60 9.00
3.39 5,554.33
3.20 18,311.43
3.20 9,197.67
150.00 37,171.36
200.00 388,512.54
130.00 199,344.95
85.00 258,581.53
38.00 65,323.59
17.67 488,763.49
1.00 1,465.27
15.00 6,883.42
16.00 1,268.23
700.00 700.00
71,568.33 71,568.33
10.50 5,761.37
180.00 22.50
600.00 3,600.00
5.00 3,238.65
5.08 2,537.41
5.68 137,311.51
5.68 454.40
3.50 3,821.26
8.00 4,304.74
42.50 1,056.97
42.50 3,481.42
14.00 26,113.28
1.50 5,165.28
2.52 176.11
334,930.79 334,930.79 2,104,856.32

30,204.79
85.00 125.26
5.00 1,808.72
150.00 24,523.68
15.00 12,647.48
180.00 50,623.40
230.00 23,310.96
180.00 103,860.32
10.00 10,916.45
230.00 64,685.45
18.00 19,566.42
160.00 46,233.19
15.00 5,426.15

393,932.27