METRADO DE FIERR

OBRA Construccion Auditorio PNP


PROPIETARIO :

FECHA 9/2/2010

N DE
PARTIDA DESCRIPCION DIAM
VECES
ACERO EN LAS ZAPATAS
ZAPATA -1

3.7

5/8" 8.00

2.8

5/8" 8.00
ZAPATA -2

4.00

5/8" 8.00

3.10

5/8" 8.00
ZAPATA -3

3.55

8.40
0.60 5/8" 2.00

0.07 1.70

0.55 8.40 5/8" 2.00


0.60
ZAPATA -4

0.25
0.07

0.27 8.40 1.30


0.60

0.27
5/8" 4.00

1.30

5/8" 4.00
ACERO EN VIGAS DE CIMENTACION

V.C. 1.00 X 0.50

0.07

0.86

0.36

3/4" 9.00

5/8" 9.00

ESTRIBOS

3/8" 9.00
V.C. 1.00 X 0.50 EJE A Y C

0.07

0.56

0.16

5/8" 2.00

ESTRIBOS
3/8" 2.00
V.C. 1.00 X 0.50 EJE 5 , 6 , 7 B
0.07

0.56

0.16
5/8" 4.00

ESTRIBOS
3/8" 4.00
ACERO EN COLUMNAS

COLUMNA - 1

PRIMER PISO

3/4" 18.00

ESTRIBOS

3/8" 36.00

COLUMNA - 2

PRIMER PISO

3/4" 7.00

ESTRIBOS

3/8" 7.00
COLUMNA - 3

PRIMER PISO

3/4" 3.00

ESTRIBOS

3/8" 3.00

ACERO EN VIGAS

VIGAS PRINCIPALES

V.S
long
3/4" 44.55
0.6

5/8" 1.8

ESTRIBOS

3/8" 24
27

VP
1"
3/4"
5/8"

ESCALERA

1/2"
1/4""
LOSA

1/2" 3376.6

3/8" 72

1/4" 2180
METRADO DE FIERROS
HOJA N : 1.00
PLANO N : Metrados de Fierros
HECHO POR :

REVISADO POR :

N DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"


LONG PARC (ml)
PIEZAS 0.25 0.56 0.99 1.55 2.24 3.97

444.00 689.09

15.00 3.70

425.60 660.53

19.00 2.80

512.00 794.62

16.00 4.00

520.80 808.28

21.00 3.10

63.90 99.17

9.00 3.55

61.20 94.98

18.00 1.70

36.40 56.49

7.00 1.30

36.40 56.49

7.00 1.30
360.36 805.40

4.00 10.01

180.18 279.64
2.00 10.01

1091.34 611.15

47.00 2.58

540.12 838.27

6.00 45.01

1535.76 860.03
486.00 1.58
72.00 111.74

6.00 3.00

120.08 67.24
19.00 1.58

15.00 9.00 2430.00 5431.05

38.00 1.74 2380.32 1332.98

6.00 9.00 378.00 844.83

38.00 1.22 324.52 181.73


8.00 9.00 216.00 482.76

38.00 1.32 150.48 84.27

LONG. TOTAL
4 1 2 356.4
6 3.6 7 90.72
0
0
2 7 28
TOTAL 475.12 ML

4 7 50.4 ML

2 48 TOTAL 312.84 ML
7 189

244.8 222.6 18 485.4


63.42 102.8
102.6

20
5
OBSERVACI
ONES
METRADO
PRIMER NIVEL

N DE
UNID.
Item Descripcin VECES

01 OBRAS PROVISIONALES

01.01 CARTEL DE OBRA UND 1.00


01.02 AGUA PARA LA CONSTRUCCION GLB 1.00
ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 1.00

02 TRABAJOS PRELIMINARES

02.01 LIMPIEZA DE TERRENO MANUAL M2 1.00


02.02 TRAZO DE NIVELES Y REPLANTEO M2 1.00

03 MOVIMIENTO DE TIERRAS

EXCAVACION ZANJAS PARA ZAPATAS M3


Z1 8.00
Z2 8.00
Z3 2.00
Z4 4.00

03.01 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS M3


eje A 7.00
eje A 1.00
eje A 1.00
eje B 1.00
eje C 1.00
eje C 7.00
eje C 1.00
eje 2 1.00
eje 10 1.00
eje 5,6,7 entre eje D 3.00

3.02 EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3


eje 3,4,5,6,7,8,9 7.00

RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3


entre eje 1 y 2 1.00
1.00
1.00
1.00
1.00
1.00
entre eje 2 y 3,3y4,4y5,5y6,6y7,7y8,8y9 7.00
entre eje 9y10 1.00

RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL DE PRESTAMO M3

03.03 ELIMINACION DE MATERIAL EXEDENTE DE EXCAVACIONES M3

04 OBRAS DE CONCRETO SIMPLE

04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3


eje A 7.00
eje A 1.00
eje A 1.00
eje B 1.00
eje C 1.00
eje C 7.00
eje C 1.00
eje 2 1.00
eje 10 1.00
eje 5,6,7 entre eje D 3.00

3.02 EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3


eje 3,4,5,6,7,8,9 7.00

04.02 SOBRECIMIENTOS M3
eje A 7.00
1.00
eje B 7.00
1.00

eje 2 y 10 2.00

04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO M2


eje A 7.00
1.00
eje B 7.00
1.00

eje 2 y 10 2.00
05 OBRAS DE CONCRETO ARMADO

05.01 ZAPATAS

05.01.01 CONCRETO f'c=210 kg/cm2 M3


Z1 8.00
Z2 8.00
Z3 2.00
Z4 4.00

05.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG

05.02 VIGAS DE CIMENTACION

05.02.01 CONCRETO f'c=210 kg/cm2 M3


V.C. 1.00 X 0.50 9.00
V.C. 0.70 X 0.30
eje A 1.00
7.00
1.00
eje B
eje C 1.00
7.00
1.00
eje 2 1.00
eje 5 , 6 , 7 3.00

05.02.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG

05.02.03 ENCOFRADO DE VIGAS DE CIMENTACION M2


V.C. 1.00 X 0.50 9.00
V.C. 0.70 X 0.30
eje A 1.00
7.00
1.00
eje B
eje C 1.00
7.00
1.00
eje 2 1.00
eje 5 , 6 , 7 3.00

05.03 COLUMNAS

05.03.01 COLUMNAS DE F'C = 210 KG/CM2 M3


C1 8.00
C2 8.00
C3 3.00
C4 4.00
C5 3.00

05.03.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2


C1 8.00
C2 8.00
C3 3.00
C4 4.00
C5 3.00

05.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG

05.04 VIGAS

05.04.01 VIGAS DE F'C = 210 KG/CM2 M3


eje 1 1.00
1.00
eje 2 , 3 , 4 3.00
3.00
eje 5 , 6 , 7 3.00
3.00
eje 8 , 9 , 10 3.00
3.00

eje A 1.00
7.00
1.00
eje B 1.00
eje C 1.00
7.00
1.00
eje D 2.00

05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2


eje 1 1.00
1.00
eje 2 , 3 , 4 3.00
3.00
eje 5 , 6 , 7 3.00
3.00
eje 8 , 9 , 10 3.00
3.00

eje A 1.00
7.00
1.00
eje B 1.00
eje C 1.00
7.00
1.00
eje D 2.00

05.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG

05.05 MUROS Y TABIQUES

05.05.01 MUROS DE LADRILLO KING KONG MECANIZADO DE CABEZA M2


eje A 1.00
1.00
8.00
8.00
eje C 1.00
1.00
1.00
1.00
1.00
eje 1 1.00
eje 2 1.00

05.05.02 MUROS DE LADRILLO KING KONG MECANIZADO DE SOGA M2


eje 4 1.00
eje 9 1.00
eje 2 1.00
entre eje 3 y 4 1.00
entre eje 2 y 3 1.00
entre eje B y A 1.00
entre B y C 1.00

05.06 LOSA ALIGERADA (ARMADA EN UNA DIRECCION)

05.06.01 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA M2


perimetro
area 8.00
8.00
1.00

05.06.02 ACERO GRADO 60 EN LOSA ALIGERADA DE FY = 4200 KG/CM2 KG

05.06.03 LADRILLO HUECO DE ARCILLA 30X30X20 CM PARA TECHO ALIGERADO UND

area

05.06.04 CONCRETO EN LOSA ALIGERADA DE F'C = 210 KG/CM2 M3

volumen losa llena


volumen ladrillo -3565.24

05.07 ESCALERAS

05.08 ACERO GRADO 60 EN ESCALERAS ZAPATAS FY = 4200 KG/CM2 KG

05.09 ENCOFRADO Y DESENCOFRADO DE ESCALERAS M2

N contra paso 27.00


area de losa de escalera
area debajo de gradas

05.10 CONCRETO EN ESCALERAS DE F'C = 210 KG/CM2 M3


volumen de concreto

06 REVOQUES ENLUCIDOS Y MOLDURAS

06.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-CAL-ARENA M2


06.02 TARRAJEO EN INTERIORES C/MORTERO 1:5, E=1.5 CM M2
06.03 TARRAJEO EN EXTERIORES M2
06.04 TARRAJEO COLUMNAS MEZ. C:A 1:5, E=2.0 CM M2
06.05 TARRAJEO VIGAS SUPERFICIE MEZ. C:A 1:5, E=1.5 CM M2
06.06 VESTIDURA ARISTAS DE COLUMNAS M
06.07 VESTIDURA DE DERRAMES M
06.08 BRUAS M

07 CIELO RASOS

07.01 CIELO RASO CON MEZC. C:A 1:5, E=1.5 CM M2


07.02 CIELORASOS SUSPENDIDOS CON BALDOSAS DE FIBRA MINERAL M2

08 PISOS Y PAVIMENTOS

08.01 FALSO PISO DE 2" M2


08.02 PISO DE MADERA MACHIHEMBRADA M2
08.03 SARDINELES DE CONCRETO DE f'c=175 kg/cm2 M
08.04 VEREDA DE CONCRETO DE 4" M2
08.05 PISO DE CEMENTO PULIDO Y BRUADO M2

09 CONTRAZOCALOS

09.01 CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm M

10 ZOCALOS

10.01 ZOCALO DE PLACA DE MADERA DURATREE EBANO 1.22 X 2.44 X 3MM M2


10.02 ZOCALO DE CERAMICO EN SS.HH. M2
10.03 ZOCALO DE MADERA M2

11 CARPINTERIA DE MADERA
11.01 PUERTA TIPO 1 UND
11.02 PUERTA TIPO 2 UND
11.03 DIVISIONES PARA SS.HH. UND

12 CERRAJERIA

12.01 CERRADURA PARA PUERTAS PZA

13 VIDRIOS, CRISTALES Y SIMILARES

13.01 VIDRIOS SISTEMA MODUGLASS P2


13.02 VIDRIOS PARA ESPEJO P2

14 PINTURA

14.01 PINTURA DE CIELORRASOS Y MUROS: AL TEMPLE M2


14.02 PINTURA DE CONTRAZOCALO CON ESMALTE ECONOMICO M
14.03 PINTURA EN EXTERIORES M2
14.04 PINTURA EN INTERIORES M2

15 APARATOS SANITARIOS Y ACCESORIOS

15.01 INODORO TANQUE BAJO BLANCO PZA


15.02 LAVATORIO DE PARED BLANCO 1 LLAVE PZA
15.03 URINARIO DE PARED TIPO CADET MEDIANO PZA
15.04 PAPELERAS CON ACCESORIOS PZA
15.05 COLOCACION DE APARATOS SANITARIOS PZA
15.06 COLOCACION DE ACCESORIOS SANITARIOS PZA

16 INSTALACIONES SANITARIAS

16.01 EXCAVACION DE ZANJAS M3


16.02 RELLENO DE ZANJA M
16.03 SALIDA DE DESAGUE PVC SAL 2" PTO
16.04 SALIDA DE DESAGUE PVC SAL 4" PTO
16.05 REDES DE DISTRIBUCION TUBERIA PVC SAL 1/2" M
16.06 REDES DE DISTRIBUCION TUBERIA PVC SAL 2" M
16.07 REDES DE DISTRIBUCION TUBERIA PVC SAL 4" M
16.08 REDES DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1/2" M
16.09 CODO PVC SAL 2"X45 PZA
16.10 CODO PVC SAL 2"X90 PZA
16.11 CODO PVC SAL 4"X45 PZA
16.12 CODO PVC SAL 4"X90 PZA
16.13 TEE PVC-SAP 2"* 2" UND
16.14 TEE PVC-SAP 4"* 4" UND
16.15 YEE PVC SAL 4" PZA
16.16 YEE DE PVC SAL SP SIMPLE DE 2" UND
16.17 SUMIDEROS DE 2" PZA
16.18 SUMIDERO DE BRONCE 2" UND
16.19 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA

17 SISTEMA DE AGUA DE LLUVIA

17.01 TUBERIA DE BAJADA Y DISTRIBUCION : TUBERIA PVC SAL 3" M


18 INSTALACIONES ELECTRICAS

18.01 SALIDA DE TECHO C/CABLE AWG TW2.5MM(14)+D PVC SEL 19MM(3/4") PTO
18.02 SALIDA TOMACORRIENTE C0N AWG TW 4.0 mm (12) + D PVC SEL 19 mm (3/4) PTO
18.03 INSTALACION DE INTERRUPTOR SIMPLE UND
18.04 INSTALACION DE INTERRUPTOR DOBLE UND
18.05 INSTALACION DE INTERRUPTOR TRIPLE UND
18.06 TABLERO DE DISTRIBUCION TRIFASICO (18 POLOS) PZA
18.07 FLUORESCENTE RECTO TIPO REJILLA 1x36 W C/EQUIPO Y PANTALLA UND
18.08 FLUORESCENTE CIRCULAR 1x32 W C/EQUIPO Y PANTALLA CUADRADA UND
N DE ANCHO (*)
LONG ALTO PARCIAL
ELEM. area Metrado

1.00
1.00
1.00

605.00 605.00
605.00 605.00

455.46
3.90 3.00 2.00 187.20
4.20 3.30 2.00 221.76
3.75 1.90 2.00 28.50
1.50 1.50 2.00 18.00

TOTAL 455.46

61.54
2.00 0.70 2.00 19.60
1.40 0.70 2.00 1.96
1.76 0.70 2.00 2.46
1.25 0.70 2.00 1.75
1.25 0.70 2.00 1.75
1.70 0.70 2.00 16.66
1.60 0.70 2.00 2.24
4.35 0.70 2.00 6.09
4.65 0.70 2.00 6.51
0.60 0.70 2.00 2.52

TOTAL 61.54

22.73
4.19 0.50 1.55 22.73

TOTAL 22.73

259.98
1.79 1.35 2.42
1.80 1.35 2.43
1.80 1.35 2.43
6.11 1.35 8.25
1.80 1.35 2.43
5.12 1.35 6.91
22.30 1.35 210.74
18.06 1.35 24.38

TOTAL 259.98

0.00

279.75 279.75

20.00
2.00 0.70 0.65 6.37
1.40 0.70 0.65 0.64
1.76 0.70 0.65 0.80
1.25 0.70 0.65 0.57
1.25 0.70 0.65 0.57
1.70 0.70 0.65 5.41
1.60 0.70 0.65 0.73
4.35 0.70 0.65 1.98
4.65 0.70 0.65 2.12
0.60 0.70 0.65 0.82

TOTAL 20.00

1.47
4.19 0.50 0.10 1.47

TOTAL 1.47

10.28
4.40 0.20 0.60 3.70
4.23 0.20 0.60 0.51
4.40 0.20 0.60 3.70
4.23 0.20 0.60 0.51

7.80 0.20 0.60 1.87

TOTAL 10.28

102.79
2.00 4.40 0.60 36.96
2.00 4.23 0.60 5.08
2.00 4.40 0.60 36.96
2.00 4.23 0.60 5.08

2.00 7.80 0.60 18.72

TOTAL 102.79
148.02
3.90 3.00 0.65 60.84
4.20 3.30 0.65 72.07
3.75 1.90 0.65 9.26
1.50 1.50 0.65 5.85

TOTAL 148.02

0.00

54.67
7.80 0.50 1.00 35.10

3.80 0.30 0.70 0.80


4.40 0.30 0.70 6.47
1.76 0.30 0.70 0.37
3.65 0.30 0.70 0.77
3.80 0.30 0.70 0.80
4.40 0.30 0.70 6.47
1.76 0.30 0.70 0.37
7.80 0.30 0.70 1.64
3.00 0.30 0.70 1.89

TOTAL 54.67

0.00

135.42
7.80 1.00 70.20
0.00
3.80 0.70 2.66
4.40 0.70 21.56
1.76 0.70 1.23
3.65 0.70 2.56
3.80 0.70 2.66
4.40 0.70 21.56
1.76 0.70 1.23
7.80 0.70 5.46
3.00 0.70 6.30

TOTAL 135.42

34.89
0.27 5.90 12.74
0.27 5.90 12.74
0.27 5.90 4.78
0.09 5.90 2.12
0.14 5.90 2.50

TOTAL 34.89

319.66
2.40 5.90 113.28
2.40 5.90 113.28
2.40 5.90 42.48
1.20 5.90 28.32
1.26 5.90 22.30

TOTAL 319.66

0.00

31.76
4.53 0.30 0.45 0.61
3.57 0.30 0.45 0.48
7.80 0.30 0.75 5.27
1.80 0.30 0.45 0.73
7.80 0.30 0.75 5.27
3.00 0.30 0.45 1.22
7.80 0.30 0.75 5.27
1.80 0.30 0.45 0.73

3.80 0.30 0.45 0.51


4.40 0.30 0.45 4.16
4.26 0.30 0.45 0.58
3.65 0.30 0.45 0.49
3.65 0.30 0.45 0.49
4.40 0.30 0.45 4.16
4.26 0.30 0.45 0.58
4.56 0.30 0.45 1.23

TOTAL 31.76

163.31
4.53 0.55 2.49
3.57 0.55 1.96
7.80 1.40 32.76
1.80 0.55 2.97
7.80 1.40 32.76
3.00 0.55 4.95
7.80 1.40 32.76
1.80 0.55 2.97
0.00
3.80 0.55 2.09
4.40 0.55 16.94
4.26 0.55 2.34
3.65 0.55 2.01
3.65 0.55 2.01
4.40 0.55 16.94
4.26 0.55 2.34
4.56 0.55 5.02

TOTAL 163.31

0.00

249.53 12.97 mortero cabeza


0.95 4.03 3.83 4.81 mortero soga
3.00 2.40 7.20
2.75 4.03 88.66
1.65 2.40 31.68
0.55 4.03 2.22
2.00 2.40 4.80
1.35 4.03 5.44
21.11 2.10 44.33
3.06 4.03 12.33
4.91 4.03 19.79
7.80 3.75 29.25

TOTAL 249.53

166.08
7.80 3.75 29.25
6.15 3.75 23.06
7.80 3.75 29.25
4.50 4.35 19.58
4.35 4.35 18.92
8.38 4.35 36.45
2.20 4.35 9.57

TOTAL 166.08

449.57
107.84 0.20 21.57
39.44 315.52
9.16 73.28
39.20 39.20

TOTAL 449.57

0.00

3,565.24

8.33 428.00 3565.24

TOTAL 3565.24

37.47

428.00 0.20 85.60


0.30 0.30 0.15 -48.13

total 37.47

0.00

32.25

2.00 0.17 9.18


9.27 9.27
13.80 13.80

TOTAL 32.25

7.14
7.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
RESUMEN DE METRADO AUDITORIO PNP

UNID.
Item Descripcin Metrado

01 OBRAS PROVISIONALES

CARTEL DE OBRA UND 1.00


AGUA PARA LA CONSTRUCCION GLB 1.00
ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 1.00

02 TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL M2 605.00


TRAZO DE NIVELES Y REPLANTEO M2 605.00

03 MOVIMIENTO DE TIERRAS

EXCAVACION ZANJAS PARA ZAPATAS M3 455.46

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS M3 61.54

EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3 22.73

EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3 1.47

RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 259.98

ELIMINACION DE MATERIAL EXEDENTE DE EXCAVACIONES M3 279.75

04 OBRAS DE CONCRETO SIMPLE

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 20.00

CIMIENTO PARA SOLADO DE VIGA DE CIMENTACION M3 1.47

SOBRECIMIENTOS M3 10.28

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO M2 102.79

05 OBRAS DE CONCRETO ARMADO

05.01 ZAPATAS

CONCRETO f'c=210 kg/cm2 M3 148.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.02 VIGAS DE CIMENTACION

CONCRETO f'c=210 kg/cm2 M3 54.67

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00


ENCOFRADO DE VIGAS DE CIMENTACION M2 135.42

05.03 COLUMNAS

COLUMNAS DE F'C = 210 KG/CM2 M3 34.89

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 319.66

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.04 VIGAS

VIGAS DE F'C = 210 KG/CM2 M3 31.76

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 163.31

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.05 MUROS Y TABIQUES

MUROS DE LADRILLO KING KONG MECANIZADO DE CABEZA M2 249.53

MUROS DE LADRILLO KING KONG MECANIZADO DE SOGA M2 166.08

05.06 LOSA ALIGERADA (ARMADA EN UNA DIRECCION)

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA M2 449.57

ACERO GRADO 60 EN LOSA ALIGERADA DE FY = 4200 KG/CM2 KG 0.00

LADRILLO HUECO DE ARCILLA 30X30X20 CM PARA TECHO ALIGERADO UND 3,565.24

CONCRETO EN LOSA ALIGERADA DE F'C = 210 KG/CM2 M3 37.47

05.07 ESCALERAS

ACERO GRADO 60 EN ESCALERAS ZAPATAS FY = 4200 KG/CM2 KG 0.00

ENCOFRADO Y DESENCOFRADO DE ESCALERAS M2 32.25

CONCRETO EN ESCALERAS DE F'C = 210 KG/CM2 M3 7.14


volumen de concreto

RESUMEN DE FIERROS UNID. TOTAL

VARIILLAS

1" Fierro de 9.00 ml VARILLAS 60.00


3/4" Fierro de 9.00 ml VARILLAS 145.00
5/8" Fierro de 9.00 ml VARILLAS 342.00
1/2" Fierro de 9.00 ml VARILLAS 385.00
3/8" Fierro de 9.00 ml VARILLAS 678.00
1/4" Fierro de 9.00 ml KG 8,740.00

RESUMEN DE BOLSAS DE CEMENTO UNID. TOTAL

CEMENTO BLS 2,635.00


ARENA M3 353.00
PIEDRA 3" M4 7.00
PIEDRA 8" M5 18.00
HORMIGON M6 246.00
LADRILLO PARA TECHO UND 3,600.00
LADRILLO KING KONG UND 13,560.00
PIES DERECHOS DE 4.30 M UNID 840.00
ENCOFRADO TABLAS 370.00

CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 46.00


piedra 8" m3 18.00
hormigon m3 14.50

SOLADO DE VIGA DE CIMENTACION


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 4.00
piedra 3" m3 1.00
hormigon m3 1.00

SOBRE CIMIENTO
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 29.00
piedra 3" m3 5.00
hormigon m3 10.00
ECOFRADO TABLA 62.00
ZAPATAS
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 1,185.00
arena m3 75.00
hormigon m3 105.00

viga de cimentacion
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 438.00
arena m3 27.00
hormigon m3 38.00

columnas
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 280.00
arena m3 18.00
hormigon m3 24.00

vigas
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 255.00
arena m3 158.00
hormigon m3 22.00

MUROS DE LADRILLO KING KONG MECANIZADO DE CABEZA


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 40.00
arena m3 28.00
ladrillos UND 12,980.00

MUROS DE LADRILLO KING KONG MECANIZADO DE SOGA


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 35.00
arena m3 25.00
ladrillos UND 5,700.00

LOSA ALIGERADA (ARMADA EN UNA DIRECCION)


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 302.00
arena m3 18.00
hormigon m3 26.00
Ecofrado M2 450.00
LADRILLO UND 3,600.00

ESCALERAS
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos BLS 57.00
arena M3 3.50
hormigon M3 5.00
Encofrado M2 32.25
RESUMEN DE METRADO AUDITORIO PNP

UNID.
Item Descripcin Metrado

01 OBRAS PROVISIONALES

CARTEL DE OBRA UND 1.00


AGUA PARA LA CONSTRUCCION GLB 1.00
ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 1.00

02 TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL M2 605.00


TRAZO DE NIVELES Y REPLANTEO M2 605.00

03 MOVIMIENTO DE TIERRAS

EXCAVACION ZANJAS PARA ZAPATAS M3 455.46

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS M3 61.54

EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3 22.73

EXCAVACION DE ZANJA PARA SOLADO DE VIGA DE CIMENTACION M3 1.47

RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 259.98

ELIMINACION DE MATERIAL EXEDENTE DE EXCAVACIONES M3 279.75

04 OBRAS DE CONCRETO SIMPLE

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 20.00

CIMIENTO PARA SOLADO DE VIGA DE CIMENTACION M3 1.47

SOBRECIMIENTOS M3 10.28

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO M2 102.79

05 OBRAS DE CONCRETO ARMADO

05.01 ZAPATAS

CONCRETO f'c=210 kg/cm2 M3 148.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.02 VIGAS DE CIMENTACION

CONCRETO f'c=210 kg/cm2 M3 54.67

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00


ENCOFRADO DE VIGAS DE CIMENTACION M2 135.42

05.03 COLUMNAS

COLUMNAS DE F'C = 210 KG/CM2 M3 34.89

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 319.66

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.04 VIGAS

VIGAS DE F'C = 210 KG/CM2 M3 31.76

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 163.31

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00

05.05 MUROS Y TABIQUES

MUROS DE LADRILLO KING KONG MECANIZADO DE CABEZA M2 249.53

MUROS DE LADRILLO KING KONG MECANIZADO DE SOGA M2 166.08

05.06 LOSA ALIGERADA (ARMADA EN UNA DIRECCION)

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA M2 449.57

ACERO GRADO 60 EN LOSA ALIGERADA DE FY = 4200 KG/CM2 KG 0.00

LADRILLO HUECO DE ARCILLA 30X30X20 CM PARA TECHO ALIGERADO UND 3,565.24

CONCRETO EN LOSA ALIGERADA DE F'C = 210 KG/CM2 M3 37.47

05.07 ESCALERAS

ACERO GRADO 60 EN ESCALERAS ZAPATAS FY = 4200 KG/CM2 KG 0.00

ENCOFRADO Y DESENCOFRADO DE ESCALERAS M2 32.25

CONCRETO EN ESCALERAS DE F'C = 210 KG/CM2 M3 7.14


volumen de concreto

RESUMEN DE FIERROS UNID. TOTAL

VARIILLAS

1" Fierro de 9.00 ml VARILLAS 60.00


3/4" Fierro de 9.00 ml VARILLAS 145.00
5/8" Fierro de 9.00 ml VARILLAS 342.00
1/2" Fierro de 9.00 ml VARILLAS 385.00
3/8" Fierro de 9.00 ml VARILLAS 678.00
1/4" Fierro de 9.00 ml KG 8,740.00

RESUMEN DE BOLSAS DE CEMENTO UNID. TOTAL

CEMENTO BLS 2,635.00


ARENA M3 353.00
PIEDRA 3" M4 7.00
PIEDRA 8" M5 18.00
HORMIGON M6 246.00
LADRILLO PARA TECHO UND 3,600.00
LADRILLO KING KONG UND 13,560.00
PIES DERECHOS DE 4.30 M UNID 840.00
ENCOFRADO TABLAS 370.00

CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 46.00


piedra 8" m3 18.00
hormigon m3 14.50

SOLADO DE VIGA DE CIMENTACION


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 4.00
piedra 3" m3 1.00
hormigon m3 1.00

SOBRE CIMIENTO
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 29.00
piedra 3" m3 5.00
hormigon m3 10.00
ECOFRADO TABLA 62.00
ZAPATAS
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos Bls 1,185.00
arena m3 75.00
hormigon m3 105.00

viga de cimentacion
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 438.00
arena m3 27.00
hormigon m3 38.00

columnas
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 280.00
arena m3 18.00
hormigon m3 24.00

vigas
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 255.00
arena m3 158.00
hormigon m3 22.00

MUROS DE LADRILLO KING KONG MECANIZADO DE CABEZA


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 40.00
arena m3 28.00
ladrillos UND 12,980.00

MUROS DE LADRILLO KING KONG MECANIZADO DE SOGA


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 35.00
arena m3 25.00
ladrillos UND 5,700.00

LOSA ALIGERADA (ARMADA EN UNA DIRECCION)


CEMENTO PORTLAND 42.5 KG PARA cimientos corridos bls 302.00
arena m3 18.00
hormigon m3 26.00
Ecofrado M2 450.00
LADRILLO UND 3,600.00

ESCALERAS
CEMENTO PORTLAND 42.5 KG PARA cimientos corridos BLS 57.00
arena M3 3.50
hormigon M3 5.00
Encofrado M2 32.25
RESUMEN DE METRADOS