CALCULO DEL FLETE - ALT 02

PROYECTO :CREACION DEL CANAL DE IRRIGACION DE GARUANGA - PAMPASH"


UBICACIN : DISTRITO DE CHACAS, ASUNCION, ANCASH
FECHA :ENERO 2017

1- DATOS GENERALES
A-POR PESO - FLETE TERRESTRE

MATERIALES UNIDAD CANTIDAD PESO.UNIT. PESO.TOTAL


CEMENTO PORTLAND TIPO I (42.5 kg) bol 5,292.58 42.50 224,934.68
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 17,680.51 1.00 17,680.51
ALAMBRE NEGRO RECOCIDO N 16 KG 1,829.81 1.00 1,829.81
ALAMBRE NEGRO RECOCIDO N 8 KG 1,314.84 1.00 1,314.84
CLAVOS Y GRAPAS KG 1,693.83 1.00 1,693.83
ESTACA, REGLA, MAD. PARA ENCOFRADO P2 7.67 5.00 38.35
MADERA EUCALIPTO M2 101.25 5.00 506.26
MADERA TORNILLO 2" x 2"x12' und 9,391.73 10.00 93,917.25
COMPUERTA METALICA und 3.00 30.00 90.00
REJILLA METALICA EN CAMARA DE CARGA und 5.00 14.00 70.00
TAPA METALICA 0.60X1.00 und 5.00 14.00 70.00
TAPA METALICA 1.00X1.00 und 46.00 14.00 644.00
TAPA METALICA 0.40X0.40 und 16.00 10.00 160.00
PINTURAS, THINER, IMPERM. Y OTROS GAL 30.50 4.50 137.25
ADITIVO IMPERMEABILIZANTE PARA MORTERO SIKA 1 gal 184.09 4.00 736.36
YESO BL 26.45 20.00 528.97
NITRATO kg 474.77 2.0000 949.54
DINAMITA kg 783.51 5.00 3,917.54
FULMINANTE UND 3,917.54 0.10 391.75
OTROS KG 7,000.00 1.00 7,000.00
PESO TOTAL 356,610.93

B-POR VOLUMEN - FLETE TERRESTRE

EN AGREGADOS
DESCRIPC. UNIDAD AFECTOS IGV SIN IGV
ARENA FINA M3 335.05
HORMIGN M3 332.64
AREANA GRUESA M3 139.54
PIEDRA CHANCADA 1/2" M3 212.22
PIEDRA MEDIANA DE 6" M3 4.70
PIEDRA GRANDE DE 8" M3 1.95
VOLUMEN TOTAL 667.68
CAPACIDAD DEL VOLQUETE (M3) 15.00
NUMERO DE VIAJES TOTAL 44.51
REDONDEO 45.00

C) EN TUBERIA FLETE -TERRESTRE


UNIDAD DE (2.20 M. x 6.00 M.) DE CARROCERIA, CON H= 1.80 M.
No de
CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No VIAJES
tubos/Roll
TUBERIA PVC-SAP C-10 S/P DE 4" X 5 m 350 UND 160 32 0.09
TUBERIA HDPE ISO 4427 D=200 mm C-10 SDR 21 200 roll 7,218 144 0.72
TUBERIA HDPE ISO 4427 D=1600 mm C-10 SDR 21 225 roll 840 140 0.62

NUMERO TOTAL DE VIAJES 1.44


REDONDEO 2.00
TUBERIA EN VOLUMEN 48
2- FLETE TERRESTRE

UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) CAPACIDAD DEL CAMION /M3
COSTO POR VIAJE S/. 750.00 COSTO POR VIAJE S/. 750.00
CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00
FLETE POR KG 0.08
0.08
DESCRIPCION AFECTO IGV SIN IGV TOTAL
FLETE POR PESO 30,289.17
FLETE POR VOLUMEN
AGREGADOS 33,750.00
TUBERIA PVC 1,500.00

COSTO TOTAL FLETE TERRESTRE 65,539.17 65,539.17

3- FLETE RURAL
MATERIALES AGREGADOS

La tubera sern transportada por acemilas de carga y peones


Costos de transporte por viaje

S/. 3.50 Peon S/. 5.00

Descripcion Cantidad Unidades de Capacidad de Nmero de Flete no


Carga Carga Viajes Afecto a IGV
TUBERIA PVC-SAP C-10 S/P DE 4" X 5 m 160.00 26.67 6.00 4.44 15.56
TUBERIA HDPE ISO 4427 D=200 mm C-10 SDR 21 7,217.8470 1202.97 4.00 300.74 1,052.60
TUBERIA HDPE ISO 4427 D=1600 mm C-10 SDR 21 840.0000 140.00 4.00 35.00 122.50
TUBERIA HDPE ISO 4427 D=200 mm C-10 SDR 21 903 18.06 1.00 18.06 252.84
POR PESO 356,611 1.00 35.00 10,188.88 35,661.09
AGREGADOS 667.68 1.0000 0.036 18,683.55 65,392.43
COSTO TOTAL DEL FLETE EN ACEMILA Y PEON S/. 102,497.02

4- RESUMEN DE FLETE TOTAL

DESCRIPCION SIN IGV


FLETE TERRESTRE 65,539.17
FLETE RURAL 102,497.02
FLETES TOTALES S/. 168,036.18

TOTAL DE FLETE 168,036.18


Recurso Unidad Cantidad

ACERO fy=4200 kg/cm2 kg 2,052.7415


ADAPTADOR PVC SAP 1" u 9.0000
ADAPTADOR PVC SAP 2" u 20.0000
ADITIVO IMPERMEABILIZANTE gal 8.0160
AGUA m3 0.5325
ALAMBRE DE PUAS PARA CERCO rll 4.9120
ALAMBRE NEGRO RECOCIDO # 16 kg 115.1070
ALAMBRE NEGRO RECOCIDO # 8 kg 50.6190 165.7260
ARENA FINA m3 4.5140
ARENA GRUESA m3 15.2280
BARRENO 5' X 1/8" u 0.1853
BISAGRA DE FIERRO DE 2 1/2" u 12.0000
CANASTILLA DE 3" u 3.0000
CANASTILLA DE 4" u 5.0000
CANDADO 45 mm u 4.0000
CEMENTO PORTLAND TIPO I (42.5 kg) bls 435.7390
CLAVOS PARA MADERA CON CABEZA DE 3" kg 50.6190
CODO DE FIERRO GALVANIZADO DE 2" X 90 u 3.0000
CODO PVC SAP 2" X 90 u 42.0000
COLLARIN D=2" u 2.0000
CONO DE REBOSE DE 3 A 2 u 8.0000
DINAMITA kg 6.9480
ESPIGA PVC 2" pza 2.0000
ESTACA DE MADERA TORNILLO TRATADA p2 2.8158
FULMINANTE u 57.9000
GRAVA PARA FILTRO m3 1.0000
GUIA m 23.1600
HIPOCLORADOR DE FLUJO SIFUSION u 2.0000
HIPOCLORITO DE SODIO kg 200.0000
HORMIGON m3 9.3139
LIJA u 8.2485
MADERA NACIONAL P/ENCOFRADO-CARP p2 921.8120
NITRATO kg 11.5800
PEGAMENTO PARA PVC gal 0.0700
PETROLEO gal 5.0619
PIEDRA CHANCADA m3 29.6560
PIEDRA MEDIANA DE 6" m3 0.1125
PINTURA ANTICORROSIVA gal 3.2500
PINTURA ESMALTE gal 13.4792
REGLA DE MADERA TORNILLO p2 6.6190
SOLDADURA SUPERCITO PUNTO AZUL 1/8" kg 2.0000
TAPA METALICA DE 0.60X 0.60 m, e=3/16" u 8.0000
TAPA METALICA DE 1.00 X 0.80 m, e=3/8" u 2.0000 22.8583
TAPA METALICA DE 40 X 40 cm, e=3/16" u 7.0000
TAPON MACHO PVC SAP DE 2" u 12.0000
TEE PVC SAP DE 2" x 2" u 18.0000
THINNER gal 6.1291
TRANSICION DE PVC u 1.0000
TUBERIA = 63 mm C- 7.5, AGUA POTABLE m 8.0000
TUBO DE FIERRO GALVANIZADO CONDUIT DE 2" X 3 m u 0.4000
TUBO FIERRO GALVANIZADO 2 1/2" m 120.0000
TUBO FIERRO GALVANIZADO 2" m 28.0000
UNION DE PVC SAP D=2" u 2.0000
UNION PVC SAP PARA AGUA PRESION DE 1 1/2" u 15.0000
UNION PVC SAP PARA AGUA PRESION DE 2" u 8.0000
UNION UNIVERSAL PVC SAP 2" u 20.0000
VALVULA COMPUERTA DE BRONCE DE 1" u 3.0000
VALVULA COMPUERTA DE BRONCE DE 2" u 10.0000
VALVULA DE AIRE DE 2" ROSCA MACHO u 2.0000
VALVULA FLOTADORA CON PILOTO DE 6" u 3.0000
YESO DE 28 Kg bls 0.7040
18.5280