You are on page 1of 2

JOB Number: 10789

Scope of Work: gg3347

Structural Steel - Final Inspection

XXXX PROJECT
Description:
Steelwork Erection
Check List No.: OK-SSCL-10789-017 Date: 5/1/2017
CTS-19, CTS-19A, CTS-3A-1, CTS-3A-2, CTS-4A-1, CTS-4A-2, CTS-12A-1, CTS-12-2, CTS-12A-
Items : 3, CTS-13, CTS-23, CTS16

UK-ddd-01-31-102070
Drawings: AREA - 223

Ref: Check Description Complete

1 Correct steelwork has been installed & dimensionally checked. YES


2 Steelwork is at the correct location onsite. YES
3 Steelwork position and alignment is correct. YES
4 Steelwork elevation is correct. YES
5 The steelwork does not clash with adjacent items. YES
6 All bolts installed & of correct size & length YES
7 The correct lindapter type has been used. YES
Lindapters are square and clamping cleanly to steelwork, with no
8 YES
clashes.
9 All bolts have been torqued & marked. YES
10 50% of torque settings have been verified. YES
11 Painting touched up or added to punchlist YES
12 Drawings red lined. YES
13 Worksite is clean and free of tools & waste. YES
Comments:
Structural steel installation complete.
Paint touch up handed over to company.

Checked By Signature

Form OK-PD-10789-001 Page 1 of 2


10789

gg3347

5/1/2017
A-1, CTS-12-2, CTS-12A-

Complete

YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES
YES
YES

Form OK-PD-10789-001 Page 2 of 2