Energy through
small hydropower
We are
hydropower
The history of Pyry Energy GmbH is
founded in Austria upon more than 50 years
of experience in engineering and power plant
construction. Our special know-how has been
applied to many of the countrys hydropower
plants. You too can take advantage of this
expertise in the implementation of your
small hydropower projects!
3
Always at the
cutting edge
Ever since the Austrian Viktor Kaplan put his first turbine into operation
in 1919, a great many revolutionary developments have taken place in
power plant and turbine construction. We havent missed a single one
and co-designed many. However, amid this spirit of innovation, we never
lose sight of the essential: the user-friendliness, cost-efficiency and
durability of your plants.
Technically speaking, we at Pyry are always solutions can only be fully exploited if they are taken into account in environmental impact
at the cutting edge. Our engineers continu- intelligently integrated within proven technolo assessments, are well-versed in hydrological
ously deal with the latest developments in gy. What we wish to achieve for our customers surveys or make the economic calculations
building technology, in turbine construction, is the utmost availability, reliability and operat- concerning the profitability of your project.
in electrical engineering and automation. ing safety, as well as efficiency. Alongside Regardless of what you are planning, we
offering a consulting service for technical have the expertise to jointly implement your
Innovation & proven technology implementation, there are many other areas project with you.
However, due to our 50 years of experience, in which our employees can support you with
we know that the potential of innovative new their expertise: They know what needs to be
Electrical
Hydrology engineering
Small
Economy hydropower Automation
Our expertise in all Essential fields of small hydropower enables the integration of
proven technology and the Utilization of current innovations.
4
Construction phase 1
flood
hQ100
flow rate
4 m/s
3 m/s
2 m/s
1 m/s
0 m/s
6
Preliminary studies
Feasibility studies
Approval design
Tender Design
Project construction
8
To ensure that your project stands on a solid here for investment grants of up to 1 MW, and Styria funds already the plan-
economic foundation, we support you in the 1,500 Euro per KW or up to 30 % of the ning phase for consulting services of external
energy efficiency calculations and compile an eligible investment costs (see illustration). service providers.
initial rough cost estimate. In addition, there is Anyone planning a small hydropower plant is
also the possibility to apply for special funding. Federal state funding therefore advised to find out about funding
Both the federal and some state governments Alongside the State funding via OeMAG, the possibilities in advance.
support operators of small hydropower plants federal state (Bundeslnder) of Lower Austria,
in the construction and revitalisation of their Upper Austria and Styria have issued their The key web addresses:
plants. own funding programmes. Lower Austria, for OeMAG: www.oem-ag.at
Federal government funding is regulated via the example, increases the State funding by a Verband Kleinwasserkraft:
Eco Electricity Act ( 12a). This falls under the further 25 % upon approval. Upper Austria www.kleinwasserkraft.at
jurisdiction of the managing body of kostrom grants an increase of 25 % of investment KLIEN: www.klimafonds.gv.at
AG (OeMAG). Operators of small hydropower costs (maximum 50,000 Euro per plant/
plants of up to a maximum of 10 MW may apply operator) to plants with a potential capacity of
Originally operating solely as an engineering not only expands our technical competence,
company on the domestic market, Pyry has but we have also learnt to find intelligent,
now developed into an international provider of economic and sustainable solutions for the
engineering services. most diverse of problems against a variety of
We have been active in a series of overseas geographic and country-specific conditions.
countries on behalf of our customers in the These represent the pillars in the planning and
small hydropower segment. Internationalisation implementation of your projects.
10
REFERENCE PROJECTS
Preliminary studies power plant on the Traun by Energie AG Upper Salzburg AG on the Salzach, comprising two
Environmental sustainability assessment Austria. Within the scope of the study, nine hydroelectric generating sets and a four-field
(Georgia) power house variants were designed, a report weir plant. Pyry Energy GmbH also took care
Study into the environmental compatibility and on their pros and cons compiled, an energy of the geological investigation, a rough cost
feasibility of small hydropower projects (113 calculation made, the costs determined and a estimate, the static pre-dimensioning, the ap-
MW) in the Aragvi river basin for the European rough timetable put together. proval design and participation in proceedings
Bank for Reconstruction and Development with local authorities.
(EBRD). The assignment comprised the study Approval Design
itself, the analysis of the potential for small Revitalisation of Platzl power plant (Austria) New construction of power plant Agonitz
hydropower on-site and the support in the Approval design for the revitalisation of the de- (Austria)
development of projects. commissioned small hydropower plant of Platzl Preliminary studies, comparison of variants and
for Anton Putz. Preliminary draft and design the planning coordination for the new construc-
Energy efficient utilisation (Tittmoninger basin) for the 370kW small hydropower plant with tion of an existing power plant on the river Steyr,
Energy efficient utilisation concept of Tittmon- Kaplan S bulb turbine, two weir flaps, vertical with the prototype of a 550kW Straflo-Matrix
inger basin, lower Salzach, for sterreichisch- bar screens, fish ladders and power house. turbine for Energie AG Austria. In addition,
Bayrische Kraftwerk AG. Within the scope of Pyry Energy GmbH carried out the inventory
the project, the energy-efficient utilisation was New construction of Magerlmhle II and approval planning, detailed planning and
integrated in river bed restoration measures, power plant (Austria) tender design and the planning for the
a transverse structure developed and a rough Preliminary draft, design and approval design application process.
cost estimate put together. Furthermore, Pyry of the Magerlmhle II small hydropower plant
Energy GmbH was responsible for the coordina- for Wagner KG and Elektrizittswerke Berg Project construction
tion of the different measures. in Upper Austria. The goal was an improved
Nudorf power plant (Austria)
utilisation of the hydropower potential with
Consortium leader for the planning and con-
Hydropower potential study (Austria) simultaneous improvement of the hydrobiologi-
struction of the submersible small hydropower
Study for STERREICHS ENERGIE on the cal conditions in the diverted reach.
plant in the historic Schemerl weir at Nudorf for
optimisation of the utilisation of hydropower in
Verbund Hydro Power AG, Wienstrom and EVN.
Austria. The study looked at both the technical tender Design
Our services comprised the approval and de-
and economically effective hydropower poten- Klokun power plant (Bosnia-Herzegovina) tailed planning, the participation in proceedings
tial for the entire Austrian federal territory. Supervision of the tender process for the run- with local authorities, the coordination of con-
of-river power plant of Klokun commissioned struction, mechanical and electrical engineering,
Feasibility studies by Elektroprivreda HZ HB. In the process, as well as inventory planning.
Run-of-River hydropower plant Kravica/ special attention was given to environmental
Stubica (Bosnia-Herzegovina) aspects. The Pyry services comprised a Novakovici power plant (Bosnia-Herzegovina)
Feasibility study on different alternatives for two study of various alternatives, corresponding Complete planning, procurement and instal-
run-of-river hydropower plants with 2 x 2.6 MW feasibility studies and the compilation of the lation of the electrical and process control
und 2 x 1.3 MW capacities at the Waterfalls tender documents. The small hydropower technique machinery of a Bosnian small hydro-
near Kravica and Stubica for Elektroprivreda plant has two horizontal Kaplan S turbines power plant for the Carinthian energy service
HZ HB. Development of the tender documents. with a capacity of 3.26 MW. provider KELAG. Included among the services
offered were basic engineering, detailed en-
Stadl-Paura power plant (Austria) Hydropower plant Lehen (Austria) gineering, CAD documentation and program-
A feasibility study serves as a basis for Comparison of variants by means of 2D simu- ming, as well as the procurement, installation
decision-making in the construction of a small lations for the existing hydropower plant of and commissioning of the plants.
The prototype of a Strafo-Matrix turbine has been running as a pilot test in Agonitz power plant since 2004.
11
Pyry Energy GmbH
Laaerbergstrae 43
1100 Vienna
Austria
Tel. +43 1 536 05-0
Fax +43 1 536 05-165
E-mail: re.energy.at@poyry.com
www.poyry.at
Pyry is a global consulting and engineering company dedicated to balanced sustainability
and responsible business. With quality and integrity at our core, we deliver best-in-class
management consulting, total solutions, and design and supervision. Our in-depth expertise
extends to the fields of energy, industry, transportation, water, environment and real estate.
Pyry has about 7,000 experts and a local office network in about 50 countries.