You are on page 1of 10

10/23/2017 OpsEngima Quiz-1

OpsEngima Quiz-1

OpsEngima Quiz-1

Name the logistic approach.

Cross Docking

Reverse logistics does not include


Recapturing

Remanufacturing

Refurbishing

Resonating

Name the concept of logistics.

https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 1/10
10/23/2017 OpsEngima Quiz-1

Your answer

Choose the Strategy Layout match


Customization Process layout

Standardization Product layout

Customization Product layout

Standardization Standard layout

In this strategy, goods that might be stored in different packages


(size of package, etc.) are not packaged till the last moment.
This allow to store nished products unpacked and minimize the
risks of excessive stocks. The strategy is called?

Your answer

In the picture Drum, Rope and buffer stands for

https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 2/10
10/23/2017 OpsEngima Quiz-1

Your answer

Which of the following is not a rm acquired by international


logistics rm DHL Express?
Polar

Tradeteam

XPO Logistics

MIT Safetrans

Which of the following is not a part of pre-de ned commercial


terms as de ned by International Chamber of commerce?
FCA- Free Carrier

DIP- Delivery Insurance Paid

DAT- Delivery at Terminal

FOB-Free on Board

https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 3/10
10/23/2017 OpsEngima Quiz-1

Your answer

What has effectively suppressed, standards for TQM?


ISO 9000

CE certi cation

UL certi cation

None of the above

Transportation cost(in most cases) is the function of


Density

Weight

Volume

Value

Which company has started the concept of six-sigma?


IBM

Toyota

General Electric

Motorola

Which of the following is not quality control tool?


Ishikawa Diagram

Pareto chart

Lean Manufacturing
https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 4/10
10/23/2017 OpsEngima Quiz-1
g

Flow chart

Which of the following is not a part of integrated supply chain?


Customer service management

Customer relationship management

Demand management

None of the above

Which of the following is not a pillar under 3BL?


Economic viability

Timelines

Social responsibility

Environmental Stewardship

Your answer

The major advantage of using containers is


Secured package

Intermodal transit ease

Long lasting container


https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 5/10
10/23/2017 OpsEngima Quiz-1
g g

High environmental safety

Jidoka

Mumbai Dabbawalas

Suppose it is not possible to achieve improvements beyond 3 or


4 sigma on existing process, which approch must be used to
achieve six-sigma in the process?
1-FMEA

DMADV

DMAIC

None of these

Which of the following is not a part of logistics?


Procurement

Product scheduling

Meandering
https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 6/10
10/23/2017 OpsEngima Quiz-1
g

Replenishment

Overburden-Inconsistency-Waste

Bottleneck-Variation-Inventory

Overburden-Waste-Inconsistency

Bottleneck-Inventory-Variation

Identify the concept.

Bullwhip Effect

Consider the baggage check-in time of a small airline where 200


passengers cheked-in from 10 a.m. to 11 a.m. Based on counting
the number of passenger waiting in line, it is found the average
number of passenger waiting for check-in was 25. How long did
average passenger have to wait in line?
https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 7/10
10/23/2017 OpsEngima Quiz-1

7.5 min

10 min

12.5 min

15 min

Warehouses emphasize ___________ and primary purpose is to


maximize _____________.
Rapid movement of products, throughput

Rapid movement of products, usage of available space

Product storage, throughput

Product storage, usage of available space

A responsive supply chain is different from effective supply chain


as its suppliers are
Fixed

Long term

According to product life cycle

None of the above

Which of the following is not waste in lean manufacturing?


Waiting

Defects

Excess Labor
https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 8/10
10/23/2017 OpsEngima Quiz-1

Transport

Which of the following company is not featured in Gartner Top 25


Supply Chain rankings of the 2017?
BASF

Nokia

L'Oral

Amazon

Which of the following is not a modelling approach for supply


chain design and analysis?
Deterministic analysis

Stochastic analysis

Economic models

None of the above

Company X is a bottler for one of the famous FMCG companies.


The bottling process involves 5 resources A, B, C, D and E all of
which are a sequence in which the units have to proceed. A can
process 60units/Min, B can process 45units/Min, C can process
50units/Min, D can process 46units/Min and E can process
h h
https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 9/10
10/23/2017 OpsEngima Quiz-1

55Units/Min.What is the output per minute? How many


constraints are there? What are they?
60, 1, A

45, 1, B

45, 2, BC

46, 2, BC

Page 2 of 2 BACK SUBMIT

Never submit passwords through Google Forms.

This form was created inside IIM Udaipur. Report Abuse - Terms of Service - Additional Terms

Forms

https://docs.google.com/forms/d/e/1FAIpQLSfwIY-ugnoqeC2kNzTIHEKkSwg11glE1U5OInzKQ-Cn48MMgQ/formResponse 10/10

You might also like