Professional Documents
Culture Documents
P R O F I L E
2 IES
C O N T E N T S
Vision 4
History 6
About CEO 8
Activities at a glance 10
Equipment 12
Bored Pile 22
History
Setting Up: 1991- 1997 on Bangshi river at Mirzapore, Crown Cement Ltd
IES launched late in 1991 by Engr. Abu Mohammed at Mukterpur, Dhaka-Sylhet highway under Ircon
Masud, without any financial investment and International Ltd, Hz Shah Paran Bridge on Sylhet
without any employee on payroll. Onset a very small bi-pass road, Lafarge Surma Cement plant at Chattak
geotechnical laboratory setup in a rented garage. under Lerson &Toubru Ltd, Kin Bridge Sylhet etc and
In early 1992, Beximco Engineering Ltd awarded many other projects.
a small contract of bored pile work for Rangunia
Hathazaree electrical transmission line at Chittagong. During this period IES also started non-destructive
That was the beginning and later in following years pile testing work PIT, Pile integrity test and PDA,
IES did many small diameter bored pile construction High Strain Dynamic Testing for quality assurance test
project and completed successfully. Few of them are of pile foundation. Also, procured equipment for high
can mentioned here- UGC building, laundry building tonnage pile load test work and conducted many pile
of Hotel Sonergaon, Parishankhyan Bhaban at load test having test load more than 500 ton.
Agargaon, Twin tower, Concord Grand at Shantinagar,
Concord Regency at Panthapath, Golf Heights at Stage of Development: 2007-2012
Banani, ShundarbanTechnopark at Darussalam etc In 2007, we had under taken a large diameter bored
and many other small building projects. pile work for Arch bridge on Gulshan Lake between
Banani and Gulshan. Technical specification restricted
Decade for Stabilization: 1998- 2007 the rotary boring method to follow. IES have rented
Onset IES faced a lot of troubles due to faulty one table drive rotary drilling rig for the work but
workmanship of out sourced mechanical work failed to accomplish drilling. As a result, engineers
that resulted in huge backlog and idle time. To and workers had been humiliated and insulted by
overcome the crisis, IES set-up one mechanical the client and consultant. IES took that as challenge
workshop and started repair and maintenance of and started brain storming to develop a machine to
their own equipment and machines and IES got new accomplish the job. Finally, collected old components
momentum in site works. from Dholaykhal and assembled in their own
workshop to make a drilling machine and finally
During this period we have constructed bored succeeded and finished the piling work by newly
pile by conventional method for many prestigious developed rotary boring machine. This is a mile stone
projects having national importance. Off them we development of IES which boosted engineers and
may mentioned bored pile for Hatubhanga bridge workers to go ahead. Presently, IES have big fleet of
7 IES
construction and successfully used in many prestigious Advancement with New Technology: 2013 onward
projects of the country like- Hatirjheel integrated Since inception IES always looked forward with a vision
development project, Mirpur-airport road flyover, box to utilize modern machineries and practices essential for
girder bridge on river Brhammaputra at Gaffargaon, geotechnical engineering; and develop human resources
Y-bridge on river Titas at Bancharampur, bridges on on par with the international geotechnical sector. All their
Mahananda at Chapai, Gangachara bridge on river Teesta focuses are being collectively directed to become a leader
in Rangpur etc. of this nations geotechnical service providers. This has
already been achieved and become the only piling and
Another new division started on by procuring new diesel testing contractor in the country, who have introduced:
hammers and pile drivers to undertake many projects. Hydraulic drilling rig for bored cast-in-situ pile; fleet
Such as the 22,000 Flat construction project of RAJUK. IES of new diesel hammers; CFA piling; performing static
procured new diesel hammers from Delmag, and now, axial load tests using the most sophisticated and precise
have a fleet of diesel hammers ranging from D22 to D46 instrumentsdisplacement transducers and load cell; and
with pile drivers and are on the top of the list of contractors introducing dynamic testing of piles.
having highest number and heaviest diesel hammers and
pile drivers. IES have also taken initiatives to modernize the nations
geotechnical investigation sector. At present, IES is the
During this time IES have widened and introduced only geotechnical firm to implement the usage of auto-
High Strain Dynamic Pile Test by procuring two sets of trip hammer to carryout standard penetration test (SPT)
Pile Driving Analyzers and Pile Integrity Testers from and developed double tube thin walled vacuum sampler
Pile Dynamics Inc, USA and engineers and technicians for collection of undisturbed soil samples. In addition,
obtained certification from overseas training and the entire operation is digitally recorded and submitted
proficiency test from PDCA & PDI. to our clients. In the process, the quality assurance is
also guaranteed. Furthermore, it is also in our intention
IES, procured 2500 ton and 1500 ton test setups and to introduce internationally accepted CPT; and seismic
expanded their ability to conduct static pile load test up to survey to clearly map out geotechnical features of a
2500 ton. IES also procured half dozen vibrating wire load particular location.
cells, displacement transducers, 16 channel data loger,
readout unit fot instrumentation of static pile load test.
This is anew horizon and IES become only service provider
for instrumented pile load test.
8 IES
About CEO
Abu Mohammed Masud
B Sc Engg (Civil), FIEB
Obtained graduation degree in civil engineering from Rajshahi After returning home he joined DRILLTECH and did ground
Engineering College, Rajshahi, Bangladesh and started career improvement work such as dynamic consolidation, ground
as junior engineer for construction of slipway for Chittagong improvement by sand injection, construction of stone column,
Port Authority and then joined specialized geotechnical determination of lateral deformation of soil by using pressure
engineering German company, Soiltech International Ltd, meter, boring and installation of water well for drinking
pioneer of geotechnical engineering in Bangladesh. During purposes etc. During the period he became experienced in
four and half years service in Soiltech International Ltd he developing equipment for different purposes.
himself experienced boring and installation of water wells,
construction of bored pile, driven cast-in place pile, geotechnical Started his own business in 1991 under the banner of ICON
investigation, pile load testing work done for different project ENGINEERING SERVICES based only on past experience and
and started career as geotechnical engineer. personal contact. Construction of bored RC pile, geotechnical
investigation, pile load test and driving pre-cast concrete pile
Then, went abroad worked in a geotechnical investigation and works were the main stream of the business at the beginning.
material testing laboratory in Jeddah, KSA. He was responsible
there for doing geotechnical investigation work, asphalt mix
design, compaction test, CBR test, Marshall stability and flow
test on asphalt concrete, non-destructive concrete testing by
using ultra-sonic pulse machine and Schmidt hammer and
other routine concrete testing in laboratory.
9 IES
10 IES
Activities at a glance
Summary Activities
Large Diameter Bored Casi-in-situ Pile, Especially Deep Piles.
Capable to install any diameter bored pile at any depth.
Driving & Construction of Concrete Driven Piles.
Capable to undertake project of any size.
Static Compression, Uplift and Lateral Pile Load Test.
Capable to conduct pile load test up to 2500 ton.
Dynamic Pile Load Test & Pile Itegrity Test.
Capable to test any size of pile.
Geotechnical Investigation/ Survey.
For reliable, authentic and precise services.
Exceptional Activities
Geotechnical Investigation
Use hydraulic cat head to carryout SPT the most perfect technique.
Introduced auto-trip gear for conducting Standard Penetration Test, SPT.
Authentic SPT blow count- each & every operation captured by video footage.
Capable to drill upto 250m by using rotary boring machine.
Static sounding by electronic CPT.
12 IES
Equipment
Sl Item Qty
1 Hydraulic rotary boring rig for construction of large diameter bored One
RC pile - Soilmec SR-30
2 Hydraulic rotary boring rig for construction of large diameter bored RC pile - MAIT HR-180 One
Bored pile division
3 Hydraulic powered double clamped vibrotary Hammer (300 HP) - ICE model 1423C One
4 Mechanical table drive rotary boring machine for construction of large diameter Nine set
bored RC pile, diameter upto 1500 mm
5 Tripod and winch based percussion boring machine for bored RC pile Nine set
6 Drum type motorised bentonyte mixing cyclone complete Four set
7 Screw type air compressor AIRMAN PDS125S, Japan Two set
8 Vacuum priming centrifugal pump for RCD drilling One set
1 Open ended single acting diesel hammer
1.1 Delmag D 46, Germany Two set
1.2 WICE D 46, ICE Netherland One set
1.3 WICE D 36, ICE Netherland Two set
Driven pile division
1.1 Pile driving analyser, PDA including radio device etc plus software: CAPWAP, ICAP , GRL Two set
WEAP & PDI plot, model PAX-8 & PAX-4, pile dynamics inc, USA
2 Pile integrity tester, PIT, model PIT-V, pile dynamics inc, USA One unit
Two set
1 Greaves 65XL concrete transit mixture truck, TATA 2516, 7 m3 capacity
Concrete eqpt
Hydraulic rotary boring rig for construction Hydraulic rotary boring rig for construction
of large diameter bored RC pile of large diameter bored RC pile
soilmec SR-30, Italy MAIT HR-180, Italy
16 IES
Footstep hydraulic pile driver Open ended single acting diesel hammer
model TDJB62B, NHM China for driving pre-cast concrete pile
DELMAG model D36, Germany
Mechanical Table drive rotary boring Spindle type rotary drilling machine for deep
machine for construction for construction boring and coring, Toney Boring
of large diameter bored RC pile model TBM-88, Japan
Bored Pile Bored cast-in-situ RC pile technology is the most popular Name of few completed Bored Pile works
deep foundation construction method, which introduced 2013-14
in the country, by few foreign companies, since mid fifties 1200 & 1000 bored pile for Gangachara bridge over river
of last century. Unfortunately, no significant advancement Teesta at Rangpur under LGED. Main contractor- WMCE-
have been accomplished to improve quality, rather than NAVANA JV.
acquire few hydraulic powered rotary boring rig by general
contractors in last three to four years. Introduction of such 1000 bored pile for Khilgaon Flyover loop atKhilgaon,
sophisticated hydraulic rigs is definitely a forward step but Dhaka under LGED. Main contractor- WMCE-NAVANA JV
machines by themselves do not ensure good quality.
1200 & 1000 bored pile for bridge over river Kaliganga at
We are Emphasising on the construction technique that Manikgonj under LGED. Main contractor- WMCE-NAVANA JV
may ensure quality of bored pile as well as the economy.
We feel that quality of bored pile can be ensured by adding 1200 & 1000 bored pile for bridges at different location
a few activities in methodology such as skills of worker, Comilla under Eastern Bangladesh Bridge Improvement
overall management and few techniques. Based on our Project of RHD contract CP-03. Main contractor- Monico-
past experience and knowledge, we have developed and DIENCO JV
established following activities, which can improve quality of
bored pile substantially. 2012-2013
1000 45m deep bored pile for bridge on river Mahananda
Essence of our services: at Chapai Nawabgonj under LGED. Main contractor- WMCE-
Develop proper methodology. NAVANA JV
Use proper equipment.
Central quality control management. 1200 & 1000 52m deep bored pile for bridge on
Proper borehole flashing technique. river Titash at Bancharampur Comilla under LGED. Main
Proper concrete pouring technique. contractor- WMCE-NAVANA JV
23 IES
2011-2012 2006-07
1250 & 750 52m deep bored pile for Gaffargaon-Shaltia 1000 33m deep pile for Kin Bridge of RHD over river
bridge at Gaffargaon, Mymensingh under LGED. Main Surma at Sylhet. Main contractor- Abdul Monem Ltd,
contractor- Mir Akhter Husssin Ltd Bangladesh
1000 & 750 43m deep bored pile for Mirpur-Airport 2003-04
Road Flyover, Dhaka under 16 ECB, Corp of Engineers 750 28m deep pile for 3rd Surma Shah Paran Bridge over
Bangladesh Army. Main contractor- Mir Akhter Hossain Ltd river Surma at Sylhet under STJRIP project of RHD. Main
contractor- Monico Ltd
2010-11
900 & 750 33m deep bored pile for bridge- at Uttara 3rd 750 27m deep pile for 225m long Hatubhanga RC
Dhaka, Phase under RAJUK. Main contractor- Monico Ltd Guarder Bridge over river Bangshi at Mirzapore. Main
contractor- Monico Ltd
1000 28m deep bored pile for bridge number: 01, 03,
04 for Hatirjheel- Begunbari Khal Intigrated Development 2003-04
Project, Dhaka under 16 ECB, Corp of Engineers 1000 & 600 25m deep pile for LAFARGE SURMA
Bangladesh Army. CEMENT PLNT at Chattak, Sylhet. Main contractor- Laersen &
Toubro Ltd, India
2009-10
900 & 1000 30m deep pile for clinker silo at 2002-03
Meghnaghat, Narayengonj. Client- Unique Cement Ltd 900 & 750 pile for Dhaka-Sylhet Road Project Contract
1-B Aushkandi-Sylhet Section under RRMP-III Project of
2007-08 RHD. IRCON International Ltd, India
1200 58m deep pile for Kanaighat bridge of LGED over
river Surma at Sylhet. Main contractor- Abdul Monem Ltd,
Bangladesh
2013-2014
350mm square 18m long 650 nos pre-cast pile for Judicial
Complex, Laksmipur under Public Works Department.
350mm square 33m long 2500 nos pre-cast pile for Shahid
Sayed Najrul Islam Medical College Hospital, Kishoregonj
Public Works Department.
2012-2013
400 mm square 35 m long 3800 nos pre-cast pile for Uttara
Apartment Project under RAJUK, Dhaka.
2011-2012
350mm square 15m long 617 nos pre-cast pile for Baridhara
Crown, Baridhara, Dhaka. Main contractor-
2010-2011
375mm square 19m long pre-cast pile for RAB-7 Head
Quarter Patenga, Chittagong under Public Works Department,
Chittagong.
2010-2011
350mm square 23m long 200 nos pre-cast pile for Jessore
Madical College Hospital, Jessore under Public Works
Department.
2009-2010
350mm square 15m long 1100 nos pre-cast pile for Advance
Police Town at Saver, Gazipur
2010-2011
375mm square 18m long pre-cast pile for Petromax Refinary
at Mongla, Bagerhat.
2009-2010
400mm square 18m long pre-cast pile for bridge- at
Keranigonj,Dhaka, under In Land Container Terminal (ICT) at
Pangaon, Dhaka of BIWTA.
32 IES
Pile Load Test To evaluate movement and deformation of pile Pile movement measured by displacement
shaft under load are the main objectives of pile load transducer.
test. During early stages, IES started pile load test Use of hemi-spherical seat to minimize eccentric
work, their 1st job was to conduct pile load test in load.
compression on a pre-cast concrete pile for a bridge Data logger and electric readout unit for electronic
at Talma, PS- Boda, District- Panchagar under Local data acquisition.
Government Engineering Department. Journey Measuring deformation of concrete pile shaft
started at Talma with a 60t static axial pile load test, by using onetime concrete embedment strain
presently capable and equipped to conduct very high gauges at different level of pile shaft.
tonnage load test, up to 2500 ton test. We are now on
the top of the list of pile load testing contractor of the Presently, following pile load test services available
country. with us:
Apart from these, IES is now fully equipped with all High tonnage static axial compression pile load
the latest technology and devices used in industrially test by kentledge method using concrete block.
and technologically advanced countries. Very recently, High tonnage static axial compression pile load
IES has introduced instrumented pile load test. Few of test by anchor method.
them are mentioned below: High tonnage static axial uplift/ tensile pile load
test.
Measuring applied load by load cell, up to 2000 Lateral pile load test.
ton,
Please visit www.pdaproficiencytest.com to see the list of certified Engineers for PDA Worldwide
Pile Integrity Testing Work A pile integrity test is a method of testing deep The test works well in concrete or timber foundations
foundation to asses the defects, faults, change in that are not excessively slender. Usually the method is
diameter of the pile shaft. The method also known as applied to recently constructed piles that are not yet
low strain dynamic test, sonic echo test, and low strain connected to a structure
integrity test.
This method is standardized by ASTM with designation
The technique is developed based on wave D5882 Standard Test Method for Low Strain Integrity
propagation theory. A light impact is applied to a pile Testing of Piles.
top that produce a low strain. The impact produces
a compression wave that travels down the pile at a
constant wave speed and reflects when encounter a
change in cross sectional area or void/crack in material
or weak concrete.
Field PC
1.7kg Rubber Mallet
Geophone
3.7kg Rubber Mallet
45 IES
Overseas Clients
CLIENTS LTL Global Engineering Services (Pvt.) Limited,
IRCON International Ltd, India Srilanka
MTHojgaard as, Demark Dhaka-Sylhet Road Project Constructio of 52.2 MW RAJ-LANKA power plant,
Geotechnical Investigation, Static compression Nator, Rajshahi, Bangladesh
& uplift pile load test, crosshole sonic logging, The TATA Power Company Ltd, India 50 MW duel fuel (HFO/GAS) fired power plant,
Pile integrity test and Pile dynamic test PDA for Ishwardi-Khulna Power Transmission Project Jangalia, Comilla
Saidabad Water Treatment Plant Phase-II of Dhk
WASA China Geo Engineering Co, China Shimizu Corporation
Dhaka-Sylhet Road Project Construction of public food storage under Peoples
Simplex Infra Structure Ltd, India Republic of Bangladesh
Testing Work Gulistan-Jatrabari Flyover, Dhaka China Harbor Engineering Co, Chaina
Atrai river bridge on Hatikumrul-Banpara Road HIFAB International AB
Japan Weather Association, Japan project Sub regional Transport Project Preparatory Facility
Rader station at Khepupara, Cox'sbaxer and (Road Component: Package-2)
Moulavibazer The First Northeast Electric Power Enginering
Company (NEPC) Rosatom Group, Russia
Siam Tone Co., Ltd, Thailand 344.908 MW (NET) gas fired combined cycle Drilling works at Rooppur Nuclear Power Plant
Rader station at Khepupara, Cox'sbaxer and power station at Bibiyana-II, Bangladesh
Moulavibazer 337 MW/350 MW (NET) duel fuel combined cycle
power plant Meghana Ghat, Bangladesh
Larsen & Toubro Ltd, India
Lafarge Surma Cement Plant at Chattak
47 IES
Bangladesh Clients
Navana Construction Ltd. Orion Group
Monico Ltd. Spectra Engineers Ltd.
Mir Akter Hossain Ltd. Bengle Development Corporation (BDC)
Bangladesh Railway National Civil Engineers
Abdul Monem Ltd (AML) MAX Automobile
Islam Trading Consortium Ltd. (ITCL) Toma Construction & Co. Ltd.
Al-Amin Construction Ltd. Advanced Development Technologies
United Group M.M Builders & Engineers Ltd.
Rangs Group Meghna Group of Industries Limited
Concord Engineering & Construction Ltd. National Development Engineers Ltd. (NDE)
Bangladesh Erectors Ltd. Square Consumer Product Ltd.
Pubali International Ltd. Dulal Brothers Ltd.
Square Pharmaceuticals Ltd. Walton Hi-Tech Industries Ltd.
The ACME Laboratories Ltd. ACI Ltd.
MI Cement Factory Ltd. Local Government Engineering Department (LGED)
Ruby Cement Heidelberg Cement Group Public Works Department (PWD)
Building for Future Ltd. (BFL) Raod and Highways Department (RHD)
Hamid Construction Ltd. (HCL) Engineering Construction Battalion, Bangladesh Army
Cylinder
Ram
Fuel Pump
Exhaust port
Air under
compression
Strike Plate
Anvil
Hammar cushion