You are on page 1of 7

1.

PREDIMENSIONAMIENTO

=1.2((8700+3000)/30)
ts= 468 mm
Usaremos ts= 0.50 m

2. ACCIONES INTERNAS EN FRANJA INTERIOR

Losa (DC) 1 x 0.544 x 2.40 = 1.306

=(1.3068.70)/2= =(1.306 8.70 ^2)/8=


5.681 T 12.356 T/m

Asfalto (DW) 1 x 0.05 x 2.25 = 0.113

=(0.1138.70)/2= =(1.306 8.70 ^2)/8=


0.492 T 1.069 T/m

3. ACCIONES INTERNAS EN FRANJA EXTERIOR

Losa (DC) 1 x 0.50 x 2.40 = 1.200


Vereda (DC) 0.8 x 0.225 x 2.40 = 0.432
Baranda (DC) = 0.150
= 1.782

=(1.7828.70)/2= =(1.782 8.70 ^2)/8=


7.752 T/m 16.860 T/m

Asfalto (DW) 1 x 0.05 x 2.25 = 0.113

=(0.1138.70)/2= =(1.306 8.70 ^2)/8=


0.492 T/m 1.069 T/m

Peatonal (PL) 0.60 x 0.36 = 0.216

=(0.2168.70)/2= =(0.216 8.70 ^2)/8=


0.940 T/m 2.044 T/m

4. CAMION DE DISEO

=0.33114.51+2.11714.51
M= 35.520 T-m/via
=14.511+14.510.509+3.630.018

V= 21.961 T/via

5. TNDEM DE DISEO

=11.342.165+11.341.606
M= 42.763 T-m/via

=11.341+11.340.862
V= 21.115 T/via
6. CARGA DE CARRIL

=(0.958.70)/2= =(0.95 8.70 ^2)/8=


4.133 T/via 8.988 T-m/via

7. REQUISITOS GENERALES

7.1 CAMION DE DISEO + CARGA DE CARRIL DE DISEO


+=..+.= 33.341 T/via

+=1.3335.520+8.988= 56.230 T-m/via

7.2 TANDEM DE DISEO + CARGA DE CARRIL DE DISEO


+=1.3321.115+4.133= 32.21595 T/via

+ =..+.= 65.863 T-m/via

8. ANCHO DE FRANJA INTERIOR


8.1 PARA UN CARRIL CARGADO
1=250+0.42(87008800)= 6174.94 mm

8.2 PARA DOS CARRILES CARGADOS


2=2100+0.12(87008800)= 3149.983 mm

=8.20/3.60=2.282 /=8800/2=4400

Ei = 3200mm

9. ANCHO DE FRANJA EXTERIOR


=+300+0.25
=300+300+0.25(3200)= 1400 mm

0.50(Ei) 0.50 (3200) = 1600


1800 = 1800 =/(0.85

Ee = 1400 mm

10. MOMENTOS Y CORTANTES


10.1 FRANJA INTERIOR
+=33.341/3.20=10.419 / +=65.863/3.20=20.582 /

10.2 FRANJA EXTERIOR


+=(33.341/2)/1.40=11.908 / +=(65.863/2)/1.40=23.523 /
+=(65.863/2)/1.40=23.523 /
11. RESISTENCIA I
11.1 FRANJA INTERIOR
=(1.25+1.50+1.75+)
=1.05[1.25(5.681)+1.5(0.492)+1.75(10.419)]=27.376 /

=(1.25+1.5+1.75+)
=1.05(1.2512.356+1.51.069+1.7520.582)=55.720 /

11.2 FRANJA EXTERIOR


=(1.25+1.50+1.75+1.75+)
=1.05(1.25(7.752)+1.50(0.492)+1.75(0.940)+1.75(11.908))=34.558 /

=(1.25+1.50+1.75+1.75+)
=1.05(1.25(16.86)+1.50(1.069)+1.75(2.044)+1.75(23.523))=70.792 /

12. MOMENTO DE AGRIETAMIENTO

=2(^ )=2280=33.466/2334.7/2

=3/12=(1.00 0.50 ^3)/12=0.0104 4 =/2=0.50/2=0.25

=()/=(334.70.0104)/0.25=13.924

=7.5/(2(+)

13. MOMENTO DE DISEO


13.1 FRANJA INTERIOR 13.2 FRANJA EXTERIOR
=55.72 =70.792
4/3=4/355.72=74.293 4/3=4/370.792=94.389

1.2=1.213.924=16.709 1.2=1.213.924=16.709

=. =.

14. REFUERZO PRINCIPAL POR FLEXION


14.1 FRANJA INTERIOR
=55.72
=503.77=46.23
=/(0.85)=(55.72 10 ^5)/(0.850.9280100)=260.131

=( ^22)=46.23( 46.23 ^2(2260.131) )=6.019


=(0.85^ )/(^ )=(0.852801006.019)/4200=34.108 2

Acero de refuerzo Acero colocado/m


L1 1" @ 12.50 cm 35.47 cm2
14.2 FRANJA EXTERIOR
=70.792
=503.77=46.23
=/(0.85)=(70.792 10 ^5)/(0.850.9280100)=330.495

=( ^22)=46.23( 46.23 ^2(2330.495) )=7.808


=(0.85^ )/(^ )=(0.852801007.808)/4200=44.245 2

Acero de refuerzo Acero colocado/m


L2 1" @ 10.00 cm 45.61 cm2

15. ARMADURA DE DISTRIBUCION


%=1750/50% %=1750/8700=18.762%50%

=0.1876244.245=8.302
Acero de refuerzo Acero colocado/m
L3 5/8" @ 20.00 cm 9.90 cm2

16.ARMADURA POR TEMPERATURA


=7.5/(2(+) ^ )=(75600)/(2(1000+500)42)=0.3572

0.233=0.3571.27

As= 3.57 cm2/m


Acero de refuerzo Acero colocado/m
L4, L5 3/8" @ 20.00 cm 4.28 cm2

17. VERIFICACION POR FUERZA CORTANTE



==0.53(^ )
=0.900.5328010046.23=36899.569
==36.899
..