You are on page 1of 39

BAGIAN PRODUKSI

MAINTENANCE

INCOMING OUTGOING
MESIN
MATERIAL MATERIAL

OPERATOR/PEKERJA

A B C D E
total
M1 4.38 4.38 2 4.38 4.38 19.52
M2 4.38 4.38 1.5 4.38 4.38 19.02
M3 4.38 4.38 1.5 4.38 4.38 19.02
M4 4.38 4.38 1.5 4.38 4.38 19.02
M5 4.38 4.38 13 4.38 4.38 30.52
M6 4.38 4.38 6 4.38 4.38 23.52
M7 4.38 4.38 2 4.38 4.38 19.52
M8 4.38 4.38 2 4.38 4.38 19.52
14.76 14.76

KETERANGAN
G lebar mesin
B=D panjang material terpanjang + 20%
C panjang mesin
A=E=F=H
M1 M2 M3 M4 M5 M6 M7 M8

F 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38

1m 1 1 1 1 1 1 1 1

G 1.5 1 1 1 3.5 3 1.5 1.5

1m 1 1 1 1 1 1 1 1

H 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38

total 12.26 11.76 11.76 11.76 14.26 13.76 12.26 12.26


LUAS LANTAI

Jumlah Ukuran Mesin Material


Departemen Nama Mesin
Mesin Incoming
P (m) L (m) Luas (m2) P (m) L (m)
Meja Kerja 1 2 2 1.5 3 4.3896 1.5
Circular Saw 3 1.5 1 1.5 4.3896 1.5
Drill Press 4 1.5 1 1.5 0.27 0.03
Disc. Sand 2 1.5 1 1.5 0.27 0.03
Assembly
Spray Booth 2 13 3.5 45.5 0.27 0.03
Drying Racks 2 6 3 18 0.27 0.03
Meja Kerja 2 1 2 1.5 3 0.27 0.03
Meja Kerja 3 3 2 1.5 3 0.27 0.03

38.3688
28.7766
28.7766
28.7766
249.3972
115.1064
38.3688
38.3688
Allowance
Material
Operator Maintenance Transportasi
Incoming Outgoing
Luas (m2) P (m) L (m) Luas (m2) P (m) L (m) P (m) L (m)
6.5844 4.3896 1.5 6.5844 10.7792 1 10.7792 1 4.390
6.5844 0.27 0.03 0.0081 6.1596 1 6.1596 1 4.390
0.0081 0.27 0.03 0.0081 2.04 1 2.04 1 1.800
0.0081 0.27 0.03 0.0081 2.04 1 2.04 1 1.800
0.0081 0.27 0.03 0.0081 13.54 1 13.54 1 1.800
0.0081 0.27 0.03 0.0081 6.54 1 6.54 1 1.800
0.0081 0.27 0.03 0.0081 2.54 1 2.54 1 1.800
0.0081 0.27 0.03 0.0081 2.54 1 2.54 1 1.800
Luas Lantai Luas Total Luas
1 Mesin Ruangan Ruangan
(m2) (m2) (m2)

38 239.315 478.630 4
20 223.675 671.026 2
6 223.675 894.701 1
6 223.675 447.350 1
73 435.215 870.430 8
31 323.635 647.270 3
8 239.315 239.315 1
8 239.315 717.946 1
4966.669
sasis
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
2
1 O-1 Membuat pola Meja kerja 1 0.000 228.149 228.149
O-2 Memotong Circular saw 0.334 0.040 219.023 228.149
O-3 Melubangi Drill Press 0.334 0.020 214.643 219.023
O-4 Melubangi Drill Press 0.334 0.020 210.350 214.643
O-5 Melubangi Drill Press 0.334 0.020 206.143 210.350
O-6 Melubangi Drill Press 0.334 0.020 202.020 206.143
I-1 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-7 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-8 Mengecat Spray Booth 0.8 0.000 200.000 200.000
I-2 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

as roda
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
4
2 O-17 Membuat pola Meja kerja 1.2 0.000 210.438 210.438
O-18 Memotong Mesin Bubut 0.666 0.040 202.020 210.438
I-5 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-19 Menghaluskan Disc. Sand 0.334 0.010 200.000 202.020
O-20 Mengecat Spray Booth 1 0.000 200.000 200.000
I-6 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

roda
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
8
3 O-33 Membuat pola Meja kerja 0.8 0.000 210.438 210.438
O-34 Memotong Mesin Bubut 0.334 0.040 202.020 210.438
I-13 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-35 Menghaluskan Disc. Sand 0.666 0.010 200.000 202.020
O-36 Mengecat Spray Booth 0.8 0.000 200.000 200.000
I-14 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

bumper
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
4 O-65 Membuat pola Meja kerja 0.666 0.000 210.438 210.438
O-66 Memotong Circular saw 0.666 0.040 202.020 210.438
I-29 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-67 Menghaluskan Disc. Sand 0.8 0.010 200.000 202.020
O-68 Mengecat Spray Booth 0.934 0.000 200.000 200.000
I-30 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

base kepala
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
5 O-69 Membuat pola Meja kerja 0.8 0.000 210.438 210.438
O-70 Memotong Circular saw 0.534 0.040 202.020 210.438
I-31 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-71 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-72 Mengecat Spray Booth 1.134 0.000 200.000 200.000
I-32 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

kepala bawah
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
6 O-73 Membuat pola Meja kerja 0.8 0.000 228.149 228.149
O-74 Memotong Circular saw 0.666 0.040 219.023 228.149
O-75 Melubangi Drill Press 0.334 0.020 214.643 219.023
O-76 Melubangi Drill Press 0.334 0.020 210.350 214.643
O-77 Melubangi Drill Press 0.334 0.020 206.143 210.350
O-78 Melubangi Drill Press 0.334 0.020 202.020 206.143
I-33 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-79 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-80 Mengecat Spray Booth 1.06 0.000 200.000 200.000
I-34 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

kepala atas
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
2
7 O-81 Membuat pola Meja kerja 1 0.000 214.732 214.732
O-82 Memotong Circular saw 0.666 0.040 206.143 214.732
O-83 Melubangi Drill Press 0.334 0.020 202.020 206.143
I-35 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-84 Menghaluskan Disc. Sand 0.666 0.010 200.000 202.020
O-85 Mengecat Spray Booth 1 0.000 200.000 200.000
I-36 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

pin kepala
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
2
8 O-91 Membuat pola Meja kerja 0.666 0.000 208.268 208.268
O-92 Memotong Mesin Bubut 0.666 0.030 202.020 208.268
I-39 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-93 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-94 Mengecat Spray Booth 1 0.000 200.000 200.000
I-40 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

base badan
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
9 O-99 Membuat pola Meja kerja 1 0.000 210.438 210.438
O-100 Memotong Circular saw 0.334 0.040 202.020 210.438
I-43 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-101 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-102 Mengecat Spray Booth 0.934 0.000 200.000 200.000
I-44 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

penutup bak
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
2
10 O-103 Membuat pola Meja kerja 0.666 0.000 214.732 214.732
O-104 Memotong Circular saw 0.534 0.040 206.143 214.732
O-105 Melubangi Drill Press 0.334 0.020 202.020 206.143
I-45 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-106 Menghaluskan Disc. Sand 0.666 0.010 200.000 202.020
O-107 Mengecat Spray Booth 0.934 0.000 200.000 200.000
I-46 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

pin badan
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
4
11 O-113 Membuat pola Meja kerja 1 0.000 208.268 208.268
O-114 Memotong Mesin Bubut 0.666 0.030 202.020 208.268
I-49 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-115 Menghaluskan Disc. Sand 0.734 0.010 200.000 202.020
O-116 Mengecat Spray Booth 1 0.000 200.000 200.000
I-50 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

penutup atas
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
12 O-129 Membuat pola Meja kerja 1 0.000 268.503 268.503
O-130 Memotong Circular saw 0.666 0.040 257.763 268.503
O-131 Melubangi Drill Press 0.334 0.030 250.030 257.763
O-132 Melubangi Drill Press 0.334 0.030 242.529 250.030
O-133 Melubangi Drill Press 0.334 0.030 235.254 242.529
O-134 Melubangi Drill Press 0.334 0.030 228.196 235.254
O-135 Melubangi Drill Press 0.334 0.030 221.350 228.196
O-136 Melubangi Drill Press 0.334 0.030 214.710 221.350
O-137 Melubangi Drill Press 0.334 0.030 208.268 214.710
O-138 Melubangi Drill Press 0.334 0.030 202.020 208.268
I-57 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-139 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-140 Mengecat Spray Booth 1 0.000 200.000 200.000
I-58 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000
tangga
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
13 O-141 Membuat pola Meja kerja 1.134 0.000 210.438 210.438
O-142 Memotong Circular saw 0.666 0.040 202.020 210.438
I-59 Inspeksi Meja kerja 0.334 0.000 202.020 202.020
O-143 Menghaluskan Disc. Sand 1 0.010 200.000 202.020
O-144 Mengecat Spray Booth 1.2 0.000 200.000 200.000
I-60 Inspeksi Meja kerja 0.334 0.000 200.000 200.000
Merakit Meja kerja 0.666 0.000 200.000 200.000

rakit
NO Nama proses Nama mesin waktu (menit) % Scrap JYD JYHD
14 O-145 Merakit Meja kerja 0.666 0 200 200
O-146 Merakit Meja kerja 0.666 0 200 200
O-147 Merakit Meja kerja 0.666 0 200 200
O-148 Merakit Meja kerja 0.666 0 200 200
O-149 Merakit Meja kerja 0.666 0 200 200
O-150 Merakit Meja kerja 0.666 0 200 200
O-151 Merakit Meja kerja 0.666 0 200 200
O-152 Merakit Meja kerja 0.666 0 200 200
O-153 Merakit Meja kerja 0.666 0 200 200
O-154 Merakit Meja kerja 0.666 0 200 200
O-155 Merakit Meja kerja 0.666 0 200 200
O-156 Merakit Meja kerja 0.666 0 200 200
O-157 Merakit Meja kerja 0.666 0 200 200
O-158 Merakit Meja kerja 0.666 0 200 200
I-61 Inspeksi Meja kerja 0.666 0 200 200
% Efficiency % Reliability JMT
0.910 0.770 0.678 228.149365
0.910 0.760 0.230 228.149365
0.860 0.780 0.227 219.023391 Membuat pola
0.860 0.790 0.220 214.642923 saw
0.920 0.750 0.212 210.350065 bubut
0.850 0.770 0.219 206.143063 Melubangi
0.930 0.780 0.194 202.020202 Inspeksi
0.930 0.790 0.573 202.020202 Menghaluskan
0.870 0.760 0.504 200 Mengecat
0.880 0.740 0.214 200 Merakit
0.900 0.780 0.395 200

% Efficiency % Reliability JMT


0.850 0.780 0.794
0.900 0.790 0.411
0.870 0.780 0.207
0.870 0.790 0.205
0.940 0.740 0.599
0.900 0.740 0.209
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.910 0.760 0.507
0.900 0.750 0.217
0.930 0.730 0.207
0.940 0.730 0.408
0.870 0.760 0.504
0.930 0.730 0.205
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.940 0.730 0.426
0.920 0.770 0.412
0.860 0.760 0.215
0.860 0.730 0.536
0.880 0.740 0.598
0.910 0.790 0.194
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.870 0.790 0.510
0.880 0.730 0.364
0.930 0.760 0.199
0.910 0.740 0.625
0.890 0.760 0.699
0.900 0.770 0.201
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.890 0.760 0.562
0.900 0.760 0.463
0.940 0.790 0.205
0.890 0.750 0.224
0.900 0.740 0.220
0.940 0.790 0.193
0.930 0.760 0.199
0.920 0.770 0.594
0.870 0.790 0.643
0.900 0.790 0.196
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.910 0.770 0.638
0.910 0.790 0.414
0.930 0.760 0.203
0.860 0.750 0.218
0.870 0.780 0.413
0.930 0.770 0.582
0.870 0.780 0.205
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.860 0.740 0.454
0.920 0.770 0.408
0.930 0.750 0.202
0.850 0.730 0.678
0.870 0.740 0.647
0.900 0.730 0.212
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.910 0.770 0.626
0.850 0.750 0.230
0.920 0.790 0.193
0.920 0.790 0.579
0.880 0.740 0.598
0.940 0.760 0.195
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.850 0.730 0.480
0.880 0.780 0.348
0.890 0.740 0.218
0.930 0.760 0.199
0.920 0.730 0.417
0.860 0.740 0.612
0.870 0.780 0.205
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.890 0.740 0.659
0.830 0.750 0.464
0.920 0.750 0.204
0.910 0.760 0.447
0.900 0.750 0.617
0.940 0.730 0.203
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.860 0.740 0.879
0.860 0.790 0.548
0.860 0.770 0.271
0.840 0.760 0.273
0.910 0.740 0.251
0.930 0.720 0.244
0.850 0.760 0.246
0.830 0.770 0.241
0.890 0.770 0.218
0.880 0.750 0.220
0.850 0.720 0.230
0.820 0.720 0.713
0.900 0.720 0.643
0.860 0.720 0.225
0.900 0.780 0.395
% Efficiency % Reliability JMT
0.840 0.720 0.822
0.950 0.750 0.410
0.840 0.770 0.217
0.840 0.750 0.668
0.840 0.750 0.794
0.860 0.750 0.216
0.900 0.780 0.395

% Efficiency % Reliability JMT


0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
0.900 0.780 0.395
jmt jma
18.193 19 1
4.411 5 2
6.051 7 3
5.403 6 4
12.361 13 7
13.751 14 5
17.561 18 6
5.139 6 8
GUDANG BAHAN BAKU

LG

TUMPUKAN
PG LR
MATERIAL

A PR B
Jumlah Karakteristik
Tipe Rough Lumber No Part Nama Part part per Tebal
Produk (m)
BT-01 Sasis 2 0.01
BT-02 As Roda 4 0.09
BT-03 Roda 8 0.03
BT-04 Bumper 1 0.01
Rough Lumber 1/4 '' 365.76 cm x 5.08 cm x 3.175 cm
BT-07 Kepala Atas 2 0.035
BT-08 Pin Kepala 2 0.02
BT-10 Penutup Bak Depan dan Belakang 2 0.015
BT-11 Pin Badan 4 0.02
BT-13 Tangga 1 0.01
BT-05 Base Kepala 1 0.01
BT-06 Kepala Bawah 1 0.025
Rough Lumber 1/2 '' 365.76 cm x 12.7 cm x 3.175 cm
BT-09 Base Badan 1 0.01
BT-12 Penutup Atas 1 0.015

V BALOK Rough Lumber 1/4 ''


KOTAK
P 3,658 P
L 0.0508 L
T 0 T

V BALOK Rough Lumber 1/4 ''


SILINDER
P 3,658
L 0.051
T 0
Karakteristik Komponen
Kebutuhan
Lebar Jumlah Part dari 1 unit Bahan Terpakai 95%
Panjang (m) Part per jam
(m)
0.225 0.03 87270 82906.10 28.519
0.09 0.01 181525 172449.05 26.305
0.03 0.015 1089152 1034694.29 26.305
0.08 0.03 245445.7 233173.42 26.305
0.06 0.02 140254.7 133241.95 26.842
0.02 0.06 612647.9 582015.54 26.034
0.08 0.035 140254.7 133241.95 26.842
0.02 0.045 816863.9 776020.72 26.034
0.18 0.04 81815.2 77724.47 26.305
0.07 0.06 35063.7 33310.49 26.305
0.07 0.06 14025.5 13324.20 28.519
0.18 0.08 10226.9 9715.56 26.305
0.18 0.08 6817.9 6477.04 33.563

Rough Lumber 1/2 '' KOTAK


sasis 228.149365
3,658 as roda 210.4377104
0.0127 roda 210.4377104
0 bumper 210.438
base kepala 210.438

kepala bawah 228.149


kepala atas 214.732
pin kepala 208.268
base badan 210.438
penutup bak 214.732
pin badan 208.268
penutup atas 268.503
tangga 210.438
Kebutuhan Kebutuhan Jumlah RL
Jumlah
Part per Kebutuhan RL/LT RL per Luas Lantai (m2)
Tumpukan
Lead sejenis/LT Tumpukan
1141 0.01
1052 0.01
1 167 1 0.0068
1052 0.00
1052 0.00
1074 0.01
1 250 1 0.0048
1041 0.00
1074 0.01
1 100 1 0.0048
1041 0.00
1052 0.01
1 83 1 0.0108
1052 0.03
1141 0.09
1 62.5 1 0.0144
1052 0.11
1343 0.21 1 125 1 0.0000
Total 0.0416
Allowance Total Luas
(m2) Lantai (m2)

0.225
1.2
6.3720 6.3788
0.03

0.08
6.0960 6.1008
0.06
0.08
6.0960 6.1008
0.06
0.18
6.3360 6.3468
0.06
0.18
6.3840 6.3984
0.08
6.1920 6.1920 0.18 0.08
37.4760 37.5176
GUDANG BAHAN BAKU PEMBANTU

Jumlah Karakteristik Bahan


No Part Nama Part Part/
Produk Tipe Tebal (m)

BT-01 Sasis 2 Lacquar -


BT-02 As Roda 4 Lacquar -
BT-03 Roda 8 Lacquar -
BT-04 Bumper 1 Lacquar -
BT-07 Kepala Atas 2 Lacquar -
BT-08 Pin Kepala 2 Lacquar -
BT-10 Lacquar Penutup Bak Depan dan Belakang 2 Lacquar -
BT-11 Pin Badan 4 Lacquar -
BT-13 Tangga 1 Lacquar -
BT-05 Base Kepala 1 Lacquar -
BT-06 Kepala Bawah 1 Lacquar -
BT-09 Base Badan 1 Lacquar -
BT-12 Penutup Atas 1 Lacquar -
1 liter
Karakteristik Bahan Karakteristik Unit Received Kap Jumlah
Panjang Lebar Panjang Lebar Received/smaller Unit Produksi produk/ LT
Tebal (m)
(m) (m) (m) (m) unit Received (unit) (unit)
- - 0.457 0.305 0.305 1 3 24 960
- - 0.457 0.305 0.305 0.5 3 12 480
- - 0.457 0.305 0.305 0.5 3 24 960
- - 0.457 0.305 0.305 0.25 3 12 480
- - 0.457 0.305 0.305 0.5 3 12 480
- - 0.457 0.305 0.305 0.25 3 24 960
- - 0.457 0.305 0.305 0.5 3 24 960
- - 0.457 0.305 0.305 0.25 3 12 480
- - 0.457 0.305 0.305 0.25 3 12 480
- - 0.457 0.305 0.305 0.25 3 12 480
- - 0.457 0.305 0.305 0.25 3 12 480
- - 0.457 0.305 0.305 0.5 3 24 960
- - 0.457 0.305 0.305 0.25 3 12 480
Unit Jml unit Luas
Keb bahan/ Luas lantai/ Jml Allowance Total luas
Received received/ lantai
LT (unit) tump (m2) tump (m2) lantai (m2)
/ LT tump (m2)
1920 640 5 0.093025 116.992 10.88 2.25 13.13
1920 1280 5 0.093025 233.98 21.77 2.25 24.02
7680 5120 5 0.093025 935.936 87.07 2.25 89.32
480 640 5 0.093025 116.992 10.88 2.25 13.13
960 640 5 0.093025 116.992 10.88 2.25 13.13
1920 2560 5 0.093025 467.968 43.53 2.25 45.78
1920 1280 5 0.093025 233.984 21.77 2.25 24.02
1920 2560 5 0.093025 467.968 43.53 2.25 45.78
480 640 5 0.093025 116.992 10.88 2.25 13.13
480 640 5 0.093025 116.992 10.88 2.25 13.13
480 640 5 0.093025 116.992 10.88 2.25 13.13
960 640 5 0.093025 116.992 10.88 2.25 13.13
480 640 5 0.093025 116.992 10.88 2.25 13.13

Total 304.7291 29.2500 333.98


WAREHOUSE

LWH

PWH KARDUS 1M

A 1M B

LWH

PWH RAK DI WAREHOUSE LRWH

A PRWH B
LUAS LANTAI WAREHOUSE Jumlah
Produksi/jam 10
Produksi
Produksi/minggu 400

Dimensi
Tinggi 1
Panjang 1
Lebar 1

Kapasitas
Dus besar 60
Karakteristik Dus
Dus kecil 1

Total kapasitas 80

Tinggi tumpukan 2.5


Jumlah dus/tumpukan 2
Luas tumpukan 1

Kebutuhan dus besar 7


Kebutuhan Jumlah tumpukan 14
Kebutuhan luas lantai 14

Allowance Total Allowance 1.8

Luas Total Warehouse (m2) 520.94


Satuan Produk
unit 10
unit 400

m 1
m 1
m 1

dus kecil 60 1 jam = 10 unit produk


produk mainan truk 1 1 hari 8 jam kerja
1 hari = 80 unit
produk mainan truk/dus besar 80 1 minggu = 5 hari kerja
80 x 5
m 2.5 400
dus/tumpukan 2
m 1 tinggi rak 2.5 m
lebar rak 2.5 m
buah 7 panjang ra3.5 m
tumpukan 14
m 14 jumlah dus besar 7 unit
jumlah dus per rak 6 unit
m jumlah rak yg dibutu 2 rak

m lift truck 1.5 m


Luas lantai Luas lantai
warehousing shipping

520.94 52.094
Luas lantai Luas lantai
Luas lantai
gudang bahan gudang bahan
receiving
baku utama baku pembantu
56.5827 70.56 38.14281
BAGIAN MAINTENANCE

LM

LEBAR
PM MESIN MESIN

A PANJANG MESIN B
Jumlah Ukuran Luas Luas
Departemen Nama Mesin
Mesin P (m2) L (m2) (m2) Lantai
Mesin Bubut 2 2 1.5 3 6
Mesin Scrap 1 1.5 1 1.5 1.5
Maintenance Mesin Gerindra 2 2 1.5 3 6
Meja Kerja 2 2 1 2 4
Lemari Perkakas 1 2.5 1 2.5 2.5
Luas Lantai 20
Allowance 1.8
Total 21.8
LUAS LANTAI PELAYANAN PRODUKSI
Ukuran Allowance
No Nama Ruangan Luas
P (m) L (m) 50%
1 Menara air 2 2 4 2
2 Pemadam kebakaran 1 1 1 0.5
3 Gardu listrik 2 5 10 5
4 Kompresor 2 5 10 5
5 Generator 3 3 9 4.5
6 Bengkel 4 4 16 8
Total

LUAS LANTAI PELAYANAN PABRIK


Ukuran Allowance
No Nama Ruangan Luas
P (m) L (m) 40%
1 Garasi 15 8 120 48
2 Rumah jaga 3 3 9 3.6
3 Parkir mobil 3 2 6 2.4
4 Parkir motor 1 0.75 0.75 0.3
Total

LUAS LANTAI PELAYANAN PERSONEL PABRIK


Ukuran Allowance
No Nama Ruangan Luas
P (m) L (m) 40%
1 Mushola 8 8 64 25.6
2 Kantin & dapur 10 7 70 28
3 Toilet Pria 0.5 0.5 0.25 0.1
4 Kloset 1.5 1 1.5 0.6
5 Wash Table 0.5 0.5 0.25 0.1
6 P3K 3 3 9 3.6
7 Locker 0.5 0.4 0.2 0.08
8 Ruang ganti 2 1 2 0.8
Total

LUAS LANTAI PELAYANAN PERSONEL PABRIK


Ukuran Allowance
No Nama Ruangan Luas
P (m) L (m) 50%
1 Presiden Direktur 6 6 36 18
2 Wakil Direktur 5 5 25 12.5
3 Marketing, Sales & Research Director 5 5 25 12.5
4 Marketing & Research Manager 5 5 25 12.5
5 Staff 5 5 75 37.5
6 Sales Manager 7 6 42 21
7 Staff 7 6 84 42
8 Finance Director 9 8 72 36
9 Finance Manager 7 6 42 21
10 Staff 7 6 126 63
11 Accounting Manager 7 6 42 21
12 Staff 7 6 168 84
13 Production Director 7 6 42 21
14 Production Manager 5 6 30 15
15 Staff 5 6 1200 600
16 PPC Manager 4 3 12 6
17 Staff 4 4 64 32
18 Quality & Engineering Manager 6 8 48 24
19 Staff 9 8 360 180
Total
KSI
Luas + Jumlah Luas
Allowance Ruangan Lantai
6 1 6
1.5 15 22.5
15 1 15
15 1 15
13.5 1 13.5
24 1 24
96

K
Luas + Jumlah Luas
Allowance Ruangan Lantai
168 1 168
12.6 1 12.6
8.4 15 126
1.05 45 47.25
353.85

PABRIK
Luas + Jumlah Luas
Allowance Ruangan Lantai
89.6 2 179.2
98 1 98
0.35 5 1.75
2.1 9 18.9
0.35 5 1.75
12.6 1 12.6
0.28 0
2.8 10 28
340.2

PABRIK
Luas + Jumlah Luas
Allowance Ruangan Lantai
54 1 54
37.5 1 37.5
37.5 1 37.5
37.5 1 37.5
112.5 3 337.5
63 1 63
126 2 252
108 1 108
63 1 63
189 3 567
63 1 63
252 4 1008
63 1 63
45 1 45
1800 40 72000
18 1 18
96 4 384
72 1 72
540 5 2700
77910
No Bagian Luas (m2)
1 Gudang Bahan Baku Utama 56.5827
2 Gudang Bahan Baku Pembantu 70.56
3 Receiving 38.14281
4 Produksi 3147.584
5 Pelayanan Maintenance 693
6 Warehousing 101.5
7 Shipping 10.15
8 Pelayanan Produksi 81
9 Pelayanan Pabrik 353.85
10 Pelayanan Personil Pabrik 250.6
11 Perkantoran & Pelayanan Personil Kantor 1392
Total Luas Lantai Pabrik 6194.96951
No Pekerjaan/Kebutuhan Jumlah
1 Presiden Direktur 1
2 Wakil Direktur 1
3 Marketing, Sales & Research Director 1
4 Marketing & Research Manager 1
5 Staff 3
6 Sales Manager 1
7 Staff 2
8 Finance Director 1
9 Finance Manager 1
10 Staff 3
11 Accounting Manager 1
12 staff 4
13 Production Director 1
14 Production Manager 1
15 Staff 50
16 PPC Manager 1
17 Staff 4
18 Quality & Engineering Manager 1
19 Staff 5
Total 83
Tipe Jumlah Karakteristik Bahan
Rough No Part Nama Part part per Panjang Jumlah Part dari 1 unit
Lumber Produk Tebal (m) (m)
Lebar (m)

Silinder
303 4 0.005 0.03 0.005 4
penyangga atap
308 As roda 4 0.005 0.06 0.005 4
Silinder kepala
305 2 0.005 0.03 0.005 2
depan
Silinder kepala
306 2 0.015 0.03 0.015 2
belakang
310 Bumper 1 0.015 0.07 0.023 1
301 Rangka dasar 1 0.01 0.24 0.07 1
304 Penyangga palu 2 0.01 0.04 0.025 2
307 Dudukan roda 2 0.01 0.225 0.023 2
309 Roda 8 0.01 0.03 0.01 8
314 Tiang menara 1 0.01 0.06 0.01 1
317 Objek menara 4 0.01 0.06 0.06 4
311 Kepala tengah 1 0.02 0.06 0.06 1
312 Kepala atas 2 0.02 0.06 0.03 2
313 Atap 1 0.02 0.18 0.07 1
318 Batang palu 1 0.02 0.185 0.02 1
302 Penyangga atap 2 0.03 0.07 0.02 2
Objek pukulan
315 1 0.03 0.06 0.03 1
persegi
Objek pukulan
316 1 0.03 0.06 0.03 1
segitiga
319 Kepala palu 1 0.04 0.06 0.04 1
Kebutuha Jumlah
Kebutuha n RL RL per
Bahan Terpakai 95% Kebutuhan Part per jam Kebutuhan Part per Lead
n RL/LT sejenis/L Tumpuka
T n
3.8 40 3200 842.105

3.8 40 3200 842.105

1.9 20 1600 842.105

1.9 20 1600 842.105

0.95 10 800 842.105


0.95 10 800 842.105
1.9 20 1600 842.105
1.9 20 1600 842.105
7.6 80 6400 842.105
0.95 10 800 842.105
3.8 40 3200 842.105
0.95 10 800 842.105
1.9 20 1600 842.105
0.95 10 800 842.105
0.95 10 800 842.105
1.9 20 1600 842.105

0.95 10 800 842.105

0.95 10 800 842.105

0.95 10 800 842.105


Total
Jumlah Luas
Allowanc Luas
Tumpuka Lantai
e (m2) Lantai
n (m2)
(m2)

You might also like