You are on page 1of 64

VERIFICACION

CALCULOS PARA REDES DE AGUA POTABLE

1.- NOMBRE DEL PROYECTO


2.- NUMERO DEL EXPEDIENTE
3.- OFICINA ZONAL CUSCO

A.- POBLACION ACTUAL Po = 360


B.- TASA DE CRECIMIENTO (%) r= 1.70
C.- PERIODO DE DISEO (AOS) t= 20
D.- POBLACION FUTURA
Pf = Po ( 1+ r x t/100 ) Pf = 482

E.- DOTACION (LT/HAB/DIA) Dot. = 60


F.- CONSUMO PROMEDIO ANUAL (LT/SEG)
Q p= Pob. x Dot./86,400 Qp = 0.33

G.- CONSUMO MAXIMO DIARIO (LT/SEG)


Qmd = 1.30 x Qp Qmd = 0.44
H.- CAUDAL DE LA FUENTE (LT/SEG) 0.50
TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1.00
I.- VOLUMEN DEL RESERVORIO (M3)
V = 0.25 x Qmd x 86400/1000 V= 9.40
A UTILIZAR : V= 9.00
J.- CONSUMO MAXIMO HORARIO (LT/SEG)
Qmh = 1.30 x Qmd = 2.60 x Qp Qmh = 0.870

TIERRA COMPACTA = TC TIERRA COMPACTA ROCA SUELTA= TC-RS


ROCA SUELTA = RS TIERRA COMPACTA ROCA FIJA = TC-RF
ROCA FIJA = RF ROCA SUELTA -ROCA FIJA = RS-RF

LINEA DE CONDUCCION
ELEMENTO NIVEL DINAMICO LONGITUD (KM) Q DEL TRAMO TIPO SUELO PENDIENTES DIAMETRO (") DIAM.COMERC. VEL. FLUJO Hf H. PIEZOM. PRESION

CAPTACION 1,353.00 1,353.00 0.00


#VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
0.000 Kms
K.- CAUDAL UNITARIO(LT/SEG)
Nro. Familias NF = 60.00
Qu(Lts/Seg) : Qmh / NF Qu = 0.015

LINEA ADUCCION Y RED DE DISTRIBUCION


ELEMENTO NIVEL DINAMICO LONGITUD (KM) Q DEL TRAMO TIPO SUELO PENDIENTES DIAMETRO (") DIAM.COMERC. VEL. FLUJO Hf H. PIEZOM. PRESION

RESERVORIO 0.00

#VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!

Pgina 1
VERIFICACION
LINEA ADUCCION Y RED DE DISTRIBUCION
ELEMENTO NIVEL DINAMICO LONGITUD (KM) Q DEL TRAMO TIPO SUELO PENDIENTES DIAMETRO (") DIAM.COMERC. VEL. FLUJO Hf H. PIEZOM. PRESION

#VALUE! #VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!

Pgina 2
VERIFICACION
LINEA ADUCCION Y RED DE DISTRIBUCION
ELEMENTO NIVEL DINAMICO LONGITUD (KM) Q DEL TRAMO TIPO SUELO PENDIENTES DIAMETRO (") DIAM.COMERC. VEL. FLUJO Hf H. PIEZOM. PRESION

#VALUE! #VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
0.000 Kms
RESUMEN:
LINEA DE CONDUCCION
CRP - 6 0.00 Und.
TUB. PVC SAP C-7,5 8" 0.00 Mts.
TUB. PVC SAP C-7,5 6" 0.00 Mts.
TUB. PVC SAP C-7,5 5" 0.00 Mts.
TUB. PVC SAP C-7,5 4" 0.00 Mts.
TUB. PVC SAP C-7,5 3" 0.00 Mts.
TUB. PVC SAP C-7,5 2 1/2" 0.00 Mts.
TUB. PVC SAP C-7,5 2" 0.00 Mts.
TUB. PVC SAP C-7,5 1 1/2" 0.00 Mts.
TUB. PVC SAP C-10 1" 0.00 Mts.
TUB. PVC SAP C-10 3/4" 0.00 Mts.
TOTAL TUBERIAS 0.00 Mts.

TIERRA COMPACTA 0.00 Mts.


ROCA SUELTA 0.00 Mts.
ROCA FIJA 0.00 Mts.
TOTAL 0.00 Mts.

RED DE DISTRIBUCION
CRP - 7 0.00 Und.
PILETAS PUBLICAS 0.00 Und.
TUB. PVC SAP C-7,5 8" 0.00 Mts.
TUB. PVC SAP C-7,5 6" 0.00 Mts.
TUB. PVC SAP C-7,5 5" 0.00 Mts.
TUB. PVC SAP C-7,5 4" 0.00 Mts.
TUB. PVC SAP C-7,5 3" 0.00 Mts.
TUB. PVC SAP C-7,5 2 1/2" 0.00 Mts.
TUB. PVC SAP C-7,5 2" 0.00 Mts.
TUB. PVC SAP C-7,5 1 1/2" 0.00 Mts.
TUB. PVC SAP C-10 1" 0.00 Mts.
TUB. PVC SAP C-10 3/4" 0.00 Mts.
TUB. PVC SAP C-7,5 1/2" 0.00 Mts.
TOTAL TUBERIAS 0.00 Mts.

TIERRA COMPACTA 0.00 Mts.


ROCA SUELTA 0.00 Mts.
ROCA FIJA 0.00 Mts.
TOTAL 0.00 Mts.

Pgina 3
VERIFICACION

COTA PIEZO.SALIDA TIPO DE SUELO


1,353.00 TIER.COMPACTA ROCA SUELTA ROCA FIJA 8" 6" 5"
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00

COTA PIEZO.SALIDA TIPO DE SUELO


0.00 TIER.COMPACTA ROCA SUELTA ROCA FIJA 8" 6" 5"
0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
Pgina 4
VERIFICACION

COTA PIEZO.SALIDA TIPO DE SUELO


#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
Pgina 5
VERIFICACION

COTA PIEZO.SALIDA TIPO DE SUELO


#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
#VALUE! 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00

Pgina 6
VERIFICACION

TUBERIAS
4" 3" 2 1/2" 2" 1 1/2" 1" 3/4" 1/2" CRP-6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUBERIAS
4" 3" 2 1/2" 2" 1 1/2" 1" 3/4" 1/2" CRP-7 PILETAS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pgina 7
VERIFICACION

TUBERIAS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pgina 8
VERIFICACION

TUBERIAS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pgina 9
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

1.00 CAPTACION DE LADERA 1.00 UNID


1.01 TRAZO Y REPLANTEO 1.00 2.50 2.50 6.25
1.02 EXCAVACION MANUAL 1.00 1.80 1.50 0.80 2.16
1.03 ENCOFRADO Y DESENCOFRADO 4.00 0.70 1.00 2.80
4.00 1.00 1.00 4.00
2.00 0.70 0.10 0.14
4.00 1.00 1.35 5.40
2.00 0.40 0.60 0.48
1.00 0.50 0.60 0.30
3.00 0.40 0.60 0.72
1.04 CONCRETO F'C= 175 KG/CM2 1.00 1.10 1.10 0.15 0.18
1.00 1.10 0.20 0.20 0.04
1.00 1.10 0.20 0.35 0.08
1.00 0.70 0.55 0.10 0.04
2.00 1.00 0.15 1.00 0.30
2.00 0.70 0.15 1.00 0.21
1.00 1.00 0.25 0.10 0.03
1.00 0.85 0.25 0.10 0.02
1.00 0.75 0.10 0.10 0.01
1.00 0.70 0.10 0.10 0.01
2.00 1.00 0.15 1.35 0.41
2.00 0.40 0.10 0.60 0.05
1.00 0.60 0.10 0.60 0.04
1.05 ACERO FY= 4,200 KG/CM2 5.00 5.00
1.06 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1.00 0.70 0.70 0.50
4.00 0.70 1.00 2.80
1.07 TARRAJEO EXTERIOR MEZCLA 1:5 3.00 1.00 1.00 3.00
2.00 0.50 0.40 0.40
1.00 0.50 0.40 0.20
2.00 1.00 1.30 2.60
1.08 SUMINISTRO DE ACCESORIOS
CANASTILLA DE BRONCE D= 3" 1.00 1.00
VALVULAS COMPUERTA D =3" 1.00 1.00
TRANSICION PVC-SAP D= 3" 2.00 2.00
UNION UNIVERSAL FG D= 3" 2.00 2.00
NIPLE FG D= 3" x 4" 2.00 2.00
CODO PVC-SAP D= 3" x 90 1.00 1.00
UNION PVC-SAP D= 3" 1.00 1.00
CONO DE REBOSE DE 6" a 3" 1.00 1.00
TUBERIA PVC-SAP D= 3" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 2 1/2" 1.00 1.00


VALVULAS COMPUERTA D =2 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 2 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 2 1/2" 2.00 2.00
NIPLE FG D= 2 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2 1/2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 2 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 2" 1.00 1.00


VALVULAS COMPUERTA D =2" 1.00 1.00
TRANSICION PVC-SAP D= 2" 2.00 2.00
UNION UNIVERSAL FG D= 2" 2.00 2.00
NIPLE FG D= 2" x 4" 2.00 2.00
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

CODO PVC-SAP D= 2" x 90 1.00 1.00


UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 1 1/2" 1.00 1.00


VALVULAS COMPUERTA D =1 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 1 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 1 1/2" 2.00 2.00
NIPLE FG D= 1 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 1" 1.00 1.00


VALVULAS COMPUERTA D =1" 1.00 1.00
TRANSICION PVC-SAP D= 1" 2.00 2.00
UNION UNIVERSAL FG D= 1" 2.00 2.00
NIPLE FG D= 1" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1" 1.00 5.00 5.00

1.09 COLOCACION DE ACCESORIOS 11.00 11.00


1.10 TAPA METALICA 0,6 x 0,6 x 1/8" 2.00 2.00
1.11 FILTRO DE GRAVA 1.00 1.00 0.70 0.70 0.50
1.12 CONCRETO 1:4:8 1.00 1.70 1.00 0.20 0.34
1.13 PRUEBA HIDRAULICA Y LIMPIEZA 3.00 3.00
1.14 PINTURA DE MUROS EXTERIORES 3.00 1.00 1.00 3.00
1.00 1.00 1.00 1.00
3.00 0.40 0.40 0.48
2.00 1.00 1.25 2.50
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

6.25 m2
2.16 m3
13.84 m2
m2
m2
m2
m2
m2
m2
1.40 m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
5.00 kg
3.30 m2
m2
6.20 m2
m2
m2
m2

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

11.00 unid
2.00 und
0.50 m3
0.34 m3
3.00 glb
6.98 m2
m2
m2
m2
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

1.00 CAPTACION DE FONDO 1.00 UNID


1.01 TRAZO Y REPLANTEO 1.00 2.50 2.50 6.25
1.02 EXCAVACION MANUAL 1.00 1.80 1.50 0.80 2.16
1.03 ENCOFRADO Y DESENCOFRADO 4.00 0.70 1.00 2.80
4.00 1.00 1.00 4.00
2.00 0.70 0.10 0.14
4.00 1.00 1.35 5.40
2.00 0.40 0.60 0.48
1.00 0.50 0.60 0.30
3.00 0.40 0.60 0.72
1.04 CONCRETO F'C= 175 KG/CM2 1.00 1.10 1.10 0.15 0.18
1.00 1.10 0.20 0.20 0.04
1.00 1.10 0.20 0.35 0.08
1.00 0.70 0.55 0.10 0.04
2.00 1.00 0.15 1.00 0.30
2.00 0.70 0.15 1.00 0.21
1.00 1.00 0.25 0.10 0.03
1.00 0.85 0.25 0.10 0.02
1.00 0.75 0.10 0.10 0.01
1.00 0.70 0.10 0.10 0.01
2.00 1.00 0.15 1.35 0.41
2.00 0.40 0.10 0.60 0.05
1.00 0.60 0.10 0.60 0.04
1.05 ACERO FY= 4,200 KG/CM2 5.00 5.00
1.06 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1.00 0.70 0.70 0.50
4.00 0.70 1.00 2.80
1.07 TARRAJEO EXTERIOR MEZCLA 1:5 3.00 1.00 1.00 3.00
2.00 0.50 0.40 0.40
1.00 0.50 0.40 0.20
2.00 1.00 1.30 2.60
1.08 SUMINISTRO DE ACCESORIOS
CANASTILLA DE BRONCE D= 3" 1.00 1.00
VALVULAS COMPUERTA D =3" 1.00 1.00
TRANSICION PVC-SAP D= 3" 2.00 2.00
UNION UNIVERSAL FG D= 3" 2.00 2.00
NIPLE FG D= 3" x 4" 2.00 2.00
CODO PVC-SAP D= 3" x 90 1.00 1.00
UNION PVC-SAP D= 3" 1.00 1.00
CONO DE REBOSE DE 6" a 3" 1.00 1.00
TUBERIA PVC-SAP D= 3" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 2 1/2" 1.00 1.00


VALVULAS COMPUERTA D =2 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 2 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 2 1/2" 2.00 2.00
NIPLE FG D= 2 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2 1/2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 2 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 2" 1.00 1.00


VALVULAS COMPUERTA D =2" 1.00 1.00
TRANSICION PVC-SAP D= 2" 2.00 2.00
UNION UNIVERSAL FG D= 2" 2.00 2.00
NIPLE FG D= 2" x 4" 2.00 2.00
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

CODO PVC-SAP D= 2" x 90 1.00 1.00


UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 1 1/2" 1.00 1.00


VALVULAS COMPUERTA D =1 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 1 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 1 1/2" 2.00 2.00
NIPLE FG D= 1 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 1" 1.00 1.00


VALVULAS COMPUERTA D =1" 1.00 1.00
TRANSICION PVC-SAP D= 1" 2.00 2.00
UNION UNIVERSAL FG D= 1" 2.00 2.00
NIPLE FG D= 1" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1" 1.00 5.00 5.00

1.09 COLOCACION DE ACCESORIOS 11.00 11.00


1.10 TAPA METALICA 0,6 x 0,6 x 1/8" 2.00 2.00
1.11 FILTRO DE GRAVA 1.00 1.00 0.70 0.70 0.50
1.12 CONCRETO 1:4:8 1.00 1.70 1.00 0.20 0.34
1.13 PRUEBA HIDRAULICA Y LIMPIEZA 3.00 3.00
1.14 PINTURA DE MUROS EXTERIORES 3.00 1.00 1.00 3.00
1.00 1.00 1.00 1.00
3.00 0.40 0.40 0.48
2.00 1.00 1.25 2.50
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

6.25 m2
2.16 m3
13.84 m2
m2
m2
m2
m2
m2
m2
1.40 m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
5.00 kg
3.30 m2
m2
6.20 m2
m2
m2
m2

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

11.00 unid
2.00 und
0.50 m3
0.34 m3
3.00 glb
6.98 m2
m2
m2
m2
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

1.00 CAPTACION DE RIO 1.00 UNID


1.01 TRAZO Y REPLANTEO 1.00 2.50 2.50 6.25
1.02 EXCAVACION MANUAL 1.00 1.80 1.50 0.80 2.16
1.03 ENCOFRADO Y DESENCOFRADO 4.00 0.70 1.00 2.80
4.00 1.00 1.00 4.00
2.00 0.70 0.10 0.14
4.00 1.00 1.35 5.40
2.00 0.40 0.60 0.48
1.00 0.50 0.60 0.30
3.00 0.40 0.60 0.72
1.04 CONCRETO F'C= 175 KG/CM2 1.00 1.10 1.10 0.15 0.18
1.00 1.10 0.20 0.20 0.04
1.00 1.10 0.20 0.35 0.08
1.00 0.70 0.55 0.10 0.04
2.00 1.00 0.15 1.00 0.30
2.00 0.70 0.15 1.00 0.21
1.00 1.00 0.25 0.10 0.03
1.00 0.85 0.25 0.10 0.02
1.00 0.75 0.10 0.10 0.01
1.00 0.70 0.10 0.10 0.01
2.00 1.00 0.15 1.35 0.41
2.00 0.40 0.10 0.60 0.05
1.00 0.60 0.10 0.60 0.04
1.05 ACERO FY= 4,200 KG/CM2 5.00 5.00
1.06 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1.00 0.70 0.70 0.50
4.00 0.70 1.00 2.80
1.07 TARRAJEO EXTERIOR MEZCLA 1:5 3.00 1.00 1.00 3.00
2.00 0.50 0.40 0.40
1.00 0.50 0.40 0.20
2.00 1.00 1.30 2.60
1.08 SUMINISTRO DE ACCESORIOS
CANASTILLA DE BRONCE D= 3" 1.00 1.00
VALVULAS COMPUERTA D =3" 1.00 1.00
TRANSICION PVC-SAP D= 3" 2.00 2.00
UNION UNIVERSAL FG D= 3" 2.00 2.00
NIPLE FG D= 3" x 4" 2.00 2.00
CODO PVC-SAP D= 3" x 90 1.00 1.00
UNION PVC-SAP D= 3" 1.00 1.00
CONO DE REBOSE DE 6" a 3" 1.00 1.00
TUBERIA PVC-SAP D= 3" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 2 1/2" 1.00 1.00


VALVULAS COMPUERTA D =2 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 2 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 2 1/2" 2.00 2.00
NIPLE FG D= 2 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2 1/2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 2 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 2" 1.00 1.00


VALVULAS COMPUERTA D =2" 1.00 1.00
TRANSICION PVC-SAP D= 2" 2.00 2.00
UNION UNIVERSAL FG D= 2" 2.00 2.00
NIPLE FG D= 2" x 4" 2.00 2.00
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

CODO PVC-SAP D= 2" x 90 1.00 1.00


UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 2.00 5.00 10.00

CANASTILLA DE BRONCE D= 1 1/2" 1.00 1.00


VALVULAS COMPUERTA D =1 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 1 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 1 1/2" 2.00 2.00
NIPLE FG D= 1 1/2" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1 1/2" 1.00 5.00 5.00

CANASTILLA DE BRONCE D= 1" 1.00 1.00


VALVULAS COMPUERTA D =1" 1.00 1.00
TRANSICION PVC-SAP D= 1" 2.00 2.00
UNION UNIVERSAL FG D= 1" 2.00 2.00
NIPLE FG D= 1" x 4" 2.00 2.00
CODO PVC-SAP D= 2" x 90 1.00 1.00
UNION PVC-SAP D= 2" 1.00 1.00
CONO DE REBOSE DE 4" a 2" 1.00 1.00
TUBERIA PVC-SAP D=2" 1.00 5.00 5.00
TUBERIA PVC-SAP D= 1" 1.00 5.00 5.00

1.09 COLOCACION DE ACCESORIOS 11.00 11.00


1.10 TAPA METALICA 0,6 x 0,6 x 1/8" 2.00 2.00
1.11 FILTRO DE GRAVA 1.00 1.00 0.70 0.70 0.50
1.12 CONCRETO 1:4:8 1.00 1.70 1.00 0.20 0.34
1.13 PRUEBA HIDRAULICA Y LIMPIEZA 3.00 3.00
1.14 PINTURA DE MUROS EXTERIORES 3.00 1.00 1.00 3.00
1.00 1.00 1.00 1.00
3.00 0.40 0.40 0.48
2.00 1.00 1.25 2.50
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

6.25 m2
2.16 m3
13.84 m2
m2
m2
m2
m2
m2
m2
1.40 m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
5.00 kg
3.30 m2
m2
6.20 m2
m2
m2
m2

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

1.00 unid
1.00 unid
1.00 unid
10.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

1.00 unid
1.00 unid
2.00 unid
2.00 unid
2.00 unid
1.00 unid
1.00 unid
1.00 unid
5.00 ml
5.00 ml

11.00 unid
2.00 und
0.50 m3
0.34 m3
3.00 glb
6.98 m2
m2
m2
m2
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

4.00 CAMARA DE REUNION 1.00 UNID


4.01 TRAZO Y REPLANTEO 1.00 1.00 1.00 1.00
4.02 EXCAVACION MANUAL 1.00 1.00 1.00 0.80 0.80
4.03 CONCRETO F'C= 175 KG/CM2 1.00 1.00 1.00 0.10 0.10
2.00 0.80 0.10 1.10 0.18
2.00 0.60 0.10 1.10 0.13
4.04 ENCOFRADO Y DESENCOFRADO 4.00 0.60 1.10 2.64
4.00 0.80 0.30 0.96
4.05 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 0.60 1.10 2.64
1.00 0.60 0.60 0.36
4.06 TAPA METALICA 0,6 x 0,6 x 1/8" 1.00 1.00
4.07 SUMNISTRO DE ACCESORIOS
CODO FG D= 3" 1.00 1.00
TUBERIA FG D= 3" 1.00 0.35 0.35

CODO FG D= 2 1/2" 1.00 1.00


TUBERIA FG D= 2 1/2" 1.00 0.35 0.35

CODO FG D= 2" 1.00 1.00


TUBERIA FG D= 2" 1.00 0.35 0.35

4.08 COLOCACION DE ACCESORIOS 2.00 2.00


HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

1.00 m2
0.80 m3
0.41 m3
m3
m3
3.60 m2
m2
3.00 m2
m2
1.00 und

1.00 und
0.35 ml

1.00 und
0.35 ml

1.00 und
0.35 ml

2.00 und
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

4.00 LINEA DE CONDUCCION 0.00 ML


4.01 TRAZO NIVELES Y REPLANTEO 1.00 0.00 0.00
4.02 EXCAVACION MANUAL EN TIERRA COMPACTA 1.00 0.00 0.00
4.03 EXCAVACION MANUAL EN ROCA SUELTA 1.00 0.00 0.00
4.04 EXCAVACION MANUAL EN ROCA FIJA 1.00 0.00 0.00
4.05 REFINE Y NIVELACION DE FONDOS 1.00 0.00 0.00
4.06 CAMA DE APOYO PARA TUBERIAS 1.00 0.00 0.00
4.07 RELLENO Y APISONADO DE ZANJAS 1.00 0.00 0.00
4.08 TUBERIA PVC-SAP D= 8" C-7,5 1.00 0.00 0.00
4.09 TUBERIA PVC-SAP D= 6" C-7,5 1.00 0.00 0.00
4.10 TUBERIA PVC-SAP D= 5" C-7,5 1.00 0.00 0.00
4.11 TUBERIA PVC-SAP D= 4" C-7,5 1.00 0.00 0.00
4.12 TUBERIA PVC-SAP D= 3" C-7,5 1.00 0.00 0.00
4.13 TUBERIA PVC-SAP D= 2 1/2" C-7,5 1.00 0.00 0.00
4.14 TUBERIA PVC-SAP D= 2" C-7,5 1.00 0.00 0.00
4.15 TUBERIA PVC-SAP D= 1 1/2" C-7,5 1.00 0.00 0.00
4.16 TUBERIA PVC-SAP D= 1" C-10 1.00 0.00 0.00
4.17 TUBERIA PVC-SAP D= 3/4" C-10 1.00 0.00 0.00
4.18 SUMINISTRO DE ACCESORIOS
CODO PVC-SAP D= 2" x 90" 0.00
CODO PVC-SAP D= 1 1/2" x 90" 0.00
CODO PVC-SAP D= 1" x 90" 0.00
CODO PVC-SAP D= 3/4" x 90" 0.00
REDUCCION PVC-SAP D= 2" a 1 1/2" 0.00
REDUCCION PVC-SAP D= 2" a 1" 0.00
REDUCCION PVC-SAP D= 2" a 3/4" 0.00
REDUCCION PVC-SAP D= 1 1/2" a 1" 0.00
REDUCCION PVC-SAP D= 1 1/2" a 3/4" 0.00
REDUCCION PVC-SAP D= 1" a 3/4" 0.00
CRUZ PVC-SAP D=2" 0.00
CRUZ PVC-SAP D=1 1/2" 0.00
CRUZ PVC-SAP D=1" 0.00
CRUZ PVC-SAP D=3/4" 0.00
TEE PVC-SAP D= 2" x 2" 0.00
TEE PVC-SAP D= 1 1/2" x 1 1/2" 0.00
TEE PVC-SAP D= 1" x 1" 0.00
TEE PVC-SAP D= 3/4" x 3/4" 0.00
4.19 COLOCACION DE ACCESORIOS 0.00 0.00
4.20 DOBLE PRUEBA HIDRAULICA 1.00 0.00 0.00
5.00 VALVULAS DE PURGA
5.01 VALVULAS DE BRONCE COMPUERTA D= 4" 0.00
5.02 VALVULAS DE BRONCE COMPUERTA D= 3" 0.00
5.03 VALVULAS DE BRONCE COMPUERTA D= 2 1/2" 0.00
5.04 VALVULAS DE BRONCE COMPUERTA D= 2" 0.00
5.05 VALVULAS DE BRONCE COMPUERTA D= 1 1/2" 0.00
5.06 VALVULAS DE BRONCE COMPUERTA D= 1" 0.00
5.07 VALVULAS DE BRONCE COMPUERTA D= 3/4" 0.00
5.08 VALVULAS DE BRONCE COMPUERTA D= 1/2" 0.00
5.09 CAJA DE C PARA VALVULAS 0.00 0.00
6.00 CRUCE DE RIO
6.01 CONCRETO FC= 140 Kg/cm2 + 60% PG. 1.00 5.00 0.60 0.40 1.20
6.02 PROTECCION CON PIEDRA GRANDE 2.00 5.00 1.00 0.30 3.00

6.00 ANCLAJES DE CONCRETO EN PASE DE ROCA FIJA


6.01 DADOS DE ANCLAJE EN ARRANQUE Y FINAL 2.00 0.50 0.50 0.50 0.25
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

6.02 PERFORACION EN ROCA FIJA 13.00 0.50 0.15 0.15 0.15


6.03 CONCRETO F'C= 140 KG/CM2 13.00 0.50 0.15 0.15 0.15
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml

0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 ml

0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid

1.20 m3
3.00 m3

0.25 m3
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.15 m3
0.15 m3
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0
EXPED.: 0

PARTIDA DESCRIPCION VECES LONG. ANCHO

4.00 CRP T-6 0.00 UNID


4.01 TRAZO Y REPLANTEO 1.00 1.00 1.00
4.02 EXCAVACION MANUAL 1.00 1.00 1.00
4.03 CONCRETO F'C= 175 KG/CM2 1.00 1.00 1.00
2.00 0.80 0.10
2.00 0.60 0.10
4.04 ENCOFRADO Y DESENCOFRADO 4.00 0.60
4.00 0.80
4.05 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 0.60
1.00 0.60 0.60
4.06 TAPA METALICA 0,6 x 0,6 x 1/8" 1.00
4.07 SUMNISTRO DE ACCESORIOS
CODO PVC-SAP D=3"x 90 3.00
CODO FG D= 3" 1.00
TUBERIA FG D= 3" 1.00 0.35

CODO PVC-SAP D=2 1/2"x 90 3.00


CODO FG D= 2 1/2" 1.00
TUBERIA FG D= 2 1/2" 1.00 0.35

CODO PVC-SAP D=2"x 90 3.00


CODO FG D= 2" 1.00
TUBERIA FG D= 2" 1.00 0.35

CODO PVC-SAP D=1 1/2"x 90 3.00


CODO FG D= 2" 1.00
TUBERIA FG D= 2" 1.00 0.35

CODO PVC-SAP D=1"x 90 3.00


CODO FG D= 2" 1.00
TUBERIA FG D= 2" 1.00 0.35

CODO PVC-SAP D=3/4"x 90 3.00


CODO FG D= 2" 1.00
TUBERIA FG D= 2" 1.00 0.35

4.08 COLOCACION DE ACCESORIOS 4.00


HOJA DE METRADOS DE AGUA POTABLE

EVALUADOR: CARLOSL
FECHA: 9-Dec-17

ALTURA SUB-TOTAL TOTAL UNID.

1.00 0.00 m2
0.80 0.80 0.00 m3
0.10 0.10 0.00 m3
1.10 0.18 m3
1.10 0.13 m3
1.10 2.64 0.00 m2
0.30 0.96 m2
1.10 2.64 0.00 m2
0.36 m2
1.00 0.00 und

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

3.00 0.00 und


1.00 0.00 und
0.35 0.00 ml

4.00 0.00 und


HOJA DE METRADOS DE RESERVORIO

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

6.00 RESERVORIO 9.00 M3


6.01 TRAZO Y REPLANTEO 1.00 3.35 3.35
6.02 EXCAVACION MANUAL 1.00 3.35 3.35 0.80
6.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 3.35 3.35
6.04 CONCRETO F'C= 175 KG/CM2 1.00 3.35 3.35 0.20
2.00 2.95 0.15 1.60
2.00 2.65 0.15 1.60
1.00 2.95 2.95 0.10
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CM2 1.00 2.65 2.65
6.06 ENCOFRADO Y DESENCOFRADO 4.00 2.95 1.70
4.00 2.65 1.60
1.00 2.65 2.65
6.07 ACERO FY= 4,200 KG/CM2 1.00 716.09
6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.10
4.00 0.30

6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.65 1.60


1.00 2.65 2.65
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 2.95 1.70
1.00 2.95 2.95
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00
6.12 TUBERIA DE VENTILACION FG D= 2" 1.00
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00
6.15 PINTADO DE MUROS EXTERIORES 4.00 2.95 1.70
1.00 2.95 2.95

TIEMPO DE EJECUCION DE OBRA

PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL

6.00 RESERVORIO 9.00 M3


6.01 TRAZO Y REPLANTEO m2 11.22 200.00 1.00
6.02 EXCAVACION MANUAL m3 8.98 3.00 1.00
6.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 11.22 70.00 2.00
6.04 CONCRETO F'C= 175 KG/CM2 m3 5.80 9.00 2.00
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CM2 m2 7.02 70.00 2.00
6.06 ENCOFRADO Y DESENCOFRADO m2 44.04 10.00 1.00
6.07 ACERO FY= 4,200 KG/CM2 kg 716.09 250.00 1.00
6.08 ESCALINES DE FIERRO GALVANIZADO ml 5.40 15.00 1.00
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 23.98 6.00 1.00
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 28.76 10.00 1.00
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00
6.12 TUBERIA DE VENTILACION FG D= 2" und 1.00 10.00 1.00
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00
6.15 PINTADO DE MUROS EXTERIORES m2 28.76 25.00 1.00

TIEMPO APROX. EJECUCION RESERVORIO.


VALUADOR: CARLOS L
9-Dec-17

SUB-TOTAL TOTAL UNID.

11.22 11.22 m2
8.98 8.98 m3
11.22 11.22 m2
2.24 5.80 m3
1.42 m3
1.27 m3
0.87 m3
7.02 7.02 m2
20.06 44.04 m2
16.96 m2
7.02 m2
716.09 716.09 kg
4.20 5.40 ml
1.20

16.96 23.98 m2
7.02 m2
20.06 28.76 m2
8.70 m2
1.00 1.00 unid
1.00 1.00 unid
1.00 1.00 glb
1.00 1.00 unid
20.06 28.76 m2
8.70

PERSONAL BASE TIEMPO

1.00 0.45 Hrs.


5.00 4.79 Hrs.
2.00 1.28 Hrs.
2.00 5.16 Hrs.
2.00 0.80 Hrs.
5.00 7.05 Hrs.
1.00 22.91 Hrs.
1.00 2.88 Hrs.
2.00 15.99 Hrs.
2.00 11.51 Hrs.
1.00 1.60 Hrs.
1.00 0.80 Hrs.
1.00 0.80 Hrs.
1.00 0.80 Hrs.
1.00 9.20 Hrs.

UCION RESERVORIO. 10.75 Dias


RED DE DISTRIBUCION
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

13.00 RED DE DISTRIBUCION 0.00 ML


13.01 TRAZO NIVELES Y REPLANTEO 1.00 0.00 0.00
13.02 EXCAVACION MANUAL EN TIERRA COMPACTA 1.00 0.00 0.00
13.03 EXCAVACION MANUAL EN ROCA SUELTA 1.00 0.00 0.00
13.04 REFINE Y NIVELACION DE FONDOS 1.00 0.00 0.00
13.05 CAMA DE APOYO PARA TUB. MENORES A 6" 1.00 0.00 0.00
13.06 RELLENO Y APISONADO DE ZANJAS 1.00 0.00 0.00
13.07 TUBERIA PVC-SAP D= 8" C-7,5 1.00 0.00 0.00
13.08 TUBERIA PVC-SAP D= 6" C-7,5 1.00 0.00 0.00
13.09 TUBERIA PVC-SAP D= 5" C-7,5 1.00 0.00 0.00
13.10 TUBERIA PVC-SAP D= 4" C-7,5 1.00 0.00 0.00
13.11 TUBERIA PVC-SAP D= 3" C-7,5 1.00 0.00 0.00
13.12 TUBERIA PVC-SAP D= 2 1/2" C-7,5 1.00 0.00 0.00
13.13 TUBERIA PVC-SAP D= 2" C-7,5 1.00 0.00 0.00
13.14 TUBERIA PVC-SAP D= 1 1/2" C-7,5 1.00 0.00 0.00
13.15 TUBERIA PVC-SAP D= 1" C-10 1.00 0.00 0.00
13.16 TUBERIA PVC-SAP D= 3/4" C-10 1.00 0.00 0.00
13.17 TUBERIA PVC-SAP D= 1/2" C-10 1.00 0.00 0.00
13.18 SUMINISTRO DE ACCESORIOS
CODO PVC-SAP D= 2" x 90" 0.00
CODO PVC-SAP D= 1 1/2" x 90" 0.00
CODO PVC-SAP D= 1" x 90" 3.00 3.00
CODO PVC-SAP D= 3/4" x 90" 4.00 4.00
REDUCCION PVC-SAP D= 2" a 1 1/2" 0.00
REDUCCION PVC-SAP D= 2" a 1" 0.00
REDUCCION PVC-SAP D= 2" a 3/4" 0.00
REDUCCION PVC-SAP D= 1 1/2" a 1" 1.00 1.00
REDUCCION PVC-SAP D= 1 1/2" a 3/4" 1.00 1.00
REDUCCION PVC-SAP D= 1" a 3/4" 5.00 5.00
REDUCCION PVC-SAP D= 3/4 a 1/2" 15.00 15.00
CRUZ PVC-SAP D=2" 0.00
CRUZ PVC-SAP D=1 1/2" 0.00
CRUZ PVC-SAP D=1" 0.00
CRUZ PVC-SAP D=3/4" 0.00
TEE PVC-SAP D= 2" x 2" 0.00
TEE PVC-SAP D= 1 1/2" x 1 1/2" 1.00 1.00
TEE PVC-SAP D= 1" x 1" 6.00 6.00
TEE PVC-SAP D= 3/4" x 3/4" 25.00 25.00
TAPON HEMBRA PVC-SAP D= 2" 0.00
TAPON HEMBRA PVC-SAP D= 1 1/2" 0.00
TAPON HEMBRA PVC-SAP D= 1" 0.00
TAPON HEMBRA PVC-SAP D= 3/4" 15.00 15.00
13.19 COLOCACION DE ACCESORIOS 76.00 76.00
13.20 DOBLE PRUEBA HIDRAULICA 1.00 0.00 0.00
14.00 VALVULAS DE CONTROL 0.00
14.01 VALVULAS DE BRONCE COMPUERTA D= 4" 0.00
14.02 VALVULAS DE BRONCE COMPUERTA D= 3" 0.00
14.03 VALVULAS DE BRONCE COMPUERTA D= 2 1/2" 0.00
14.04 VALVULAS DE BRONCE COMPUERTA D= 2" 0.00
14.05 VALVULAS DE BRONCE COMPUERTA D= 1 1/2" 0.00
14.06 VALVULAS DE BRONCE COMPUERTA D= 1" 2.00 2.00
14.07 VALVULAS DE BRONCE COMPUERTA D= 3/4" 2.00 2.00
14.08 VALVULAS DE BRONCE COMPUERTA D= 1/2" 0.00
14.09 CAJA DE C PARA VALVULAS 4.00 4.00

Pgina 34
RED DE DISTRIBUCION
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

15.00 VALVULAS DE PURGA 0.00


15.01 VALVULAS DE BRONCE COMPUERTA D= 4" 0.00
15.02 VALVULAS DE BRONCE COMPUERTA D= 3" 0.00
15.03 VALVULAS DE BRONCE COMPUERTA D= 2 1/2" 0.00
15.04 VALVULAS DE BRONCE COMPUERTA D= 2" 0.00
15.05 VALVULAS DE BRONCE COMPUERTA D= 1 1/2" 0.00
15.06 VALVULAS DE BRONCE COMPUERTA D= 1" 0.00
15.07 VALVULAS DE BRONCE COMPUERTA D= 3/4" 2.00 2.00
15.08 VALVULAS DE BRONCE COMPUERTA D= 1/2" 0.00
15.09 CAJA DE C PARA VALVULAS 2.00 2.00
6.00 CRUCE DE RIO
6.01 CONCRETO FC= 140 Kg/cm2 + 60% PG. 2.00 5.00 0.60 0.40 2.40
6.02 PROTECCION CON PIEDRA GRANDE 4.00 5.00 1.00 0.30 6.00

Pgina 35
RED DE DISTRIBUCION
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml
0.00 ml

0.00 unid
0.00 unid
3.00 unid
4.00 unid
0.00 unid
0.00 unid
0.00 unid
1.00 unid
1.00 unid
5.00 unid
15.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
1.00 unid
6.00 unid
25.00 unid
0.00 unid
0.00 unid
0.00 unid
15.00 unid
76.00 unid
0.00 ml
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
2.00 unid
2.00 unid
0.00 unid
4.00 unid

Pgina 36
RED DE DISTRIBUCION
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
0.00 unid
2.00 unid
0.00 unid
2.00 unid

2.40 m3
6.00 m3

Pgina 37
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA

17.00 PASE AEREO L=MTS UNID


17.01 TRAZO Y REPLANTEO 1.00
17.02 EXCAVACION MANUAL 4.00 1.00 1.00 1.25
17.03 CONCRETO F'C= 175 KG/CM2 2.00 1.00 1.00 0.50
2.00 0.50 0.30 2.25

17.04 CONCRETO F'C= 140 KG/CM2 + 60% DE PM. 2.00 1.00 1.00 0.50
17.04 ENCOFRADO Y DESENCOFRADO 4.00 0.50 2.25
4.00 0.30 2.25
17.05 ACERO FY= 4,200 KG/CM2 12.00 2.95 1.00
16.00 1.00 1.00
24.00 1.60 0.25

17.06 TARRAJEO EN COLUMNAS 4.00 0.50 1.50


4.00 0.30 1.50
17.07 CABLE DE ACERO TIPO BOA D= 1/2" 1.00 32.00
17.08 TUBERIA FG 3/4" 1.00 14.00
17.09 ACCESORIOS PVC Y FG
TRANSICION PVC-SAP D= 3/4" 2.00
UNION UNIVERSAL FG D= 3/4" 4.00
17.10 COLOCACION DE ACCESORIOS 6.00
17.11 CERRAJERIA (GRAMPAS DE 1/2") 20.00
HOJA DE METRADOS DE AGUA POTABLE

EVALUADOR: CARLOSL
9-Dec-17

SUB-TOTAL TOTAL UNID.

0.00 0.00 ml
5.00 0.00 m3
1.00 0.00 m3
0.68 m3
0.00 ml
1.00 0.00 m3
4.50 0.00 m2
2.70 m2
35.40 0.00 kg
16.00 kg
9.60 kg

3.00 0.00 m2
1.80 m2
32.00 0.00 ml
14.00 0.00 ml

2.00 0.00 und


4.00 0.00 und
6.00 0.00 unid
20.00 0.00 unid
CRP T-7
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

16.00 CAMARA ROMPE PRESION CR-7 0.00 UNID


16.01 TRAZO Y REPLANTEO 1.00 1.80 1.10 1.98
16.02 EXCAVACION MANUAL 1.00 1.80 1.10 0.85 1.68
16.03 CONCRETO F'C= 175 KG/CM2 1.00 1.50 1.00 0.15 0.23
1.00 0.50 0.30 0.10 0.02
2.00 1.30 0.15 0.90 0.35
2.00 0.60 0.15 0.90 0.16
2.00 0.30 0.10 0.50 0.03
1.00 0.50 0.10 0.50 0.03
1.00 1.00 0.80 0.10 0.08
1.00 0.50 0.40 0.05 0.01
16.04 ENCOFRADO Y DESENCOFRADO 2.00 1.00 0.90 1.80
2.00 0.60 0.90 1.07
2.00 1.30 0.30 0.78
2.00 0.90 0.30 0.54
1.50 0.30 0.50 0.23
1.50 0.45 0.50 0.34
1.00 0.60 0.60 0.36
16.05 ACERO FY= 4,200 KG/CM2 1.00 8.93 0.56 5.00
16.06 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 2.00 1.00 0.90 1.80
2.00 0.60 0.90 1.08
1.00 1.00 0.60 0.60
16.07 TAPA METALICA 0,6 x 0,6 x 1/8" 1.00 1.00
16.08 ACCESORIOS PVC Y FG
CANASTILLA DE BRONCE D= 3/4" 1.00 1.00
VALVULAS COMPUERTA D =3/4" 1.00 1.00
TRANSICION PVC-SAP D= 3/4" 2.00 2.00
UNION UNIVERSAL FG D= 3/4" 2.00 2.00
UNION PVC-SAP D= 3/4" 1.00 1.00
CODO PVC-SAP D= 3/4" x 90 2.00 2.00
UNION FG D= 3/4" 1.00 1.00
VALVULA FLOTADOR D= 3/4" 1.00 1.00
CODO FG D= 2" X 90 3.00 3.00
TUBERIA PVC-SAP D= 3/4" 1.00 1.00 1.00
TUBERIA FG D= 2" 1.00 0.50 0.50

CANASTILLA DE BRONCE D= 1" 1.00 1.00


VALVULAS COMPUERTA D =1" 1.00 1.00
TRANSICION PVC-SAP D= 1" 2.00 2.00
UNION UNIVERSAL FG D= 1" 2.00 2.00
UNION PVC-SAP D= 1" 1.00 1.00
CODO PVC-SAP D= 1" x 90 2.00 2.00
UNION FG D= 1" 1.00 1.00
VALVULA FLOTADOR D= 1" 1.00 1.00
CODO FG D= 2" X 90 3.00 3.00
TUBERIA PVC-SAP D= 1" 1.00 1.00 1.00
TUBERIA FG D= 2" 1.00 0.50 0.50

CANASTILLA DE BRONCE D= 1 1/2" 1.00 1.00


VALVULAS COMPUERTA D =1 1/2" 1.00 1.00
TRANSICION PVC-SAP D= 1 1/2" 2.00 2.00
UNION UNIVERSAL FG D= 1 1/2" 2.00 2.00
UNION PVC-SAP D= 1 1/2" 1.00 1.00
CODO PVC-SAP D= 1 1/2" x 90 2.00 2.00
UNION FG D= 1 1/2" 1.00 1.00
VALVULA FLOTADOR D= 1 1/2" 1.00 1.00

Pgina 40
CRP T-7
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

CODO FG D= 2" X 90 3.00 3.00


TUBERIA PVC-SAP D= 1 1/2" 1.00 1.00 1.00
TUBERIA FG D= 2" 1.00 0.50 0.50

16.09 COLOCACION DE ACCESORIOS 16.00 16.00

Pgina 41
CRP T-7
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 m2
0.00 m3
0.00 m3
m3
m3
m3
m3
m3
m3
m3
0.00 m2
m2
m2
m2
m2
m2
m2
0.00 kg
0.00 m2
m2
m2
0.00 und

0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 ml
0.00 ml

0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 ml
0.00 ml

0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und
0.00 und

Pgina 42
CRP T-7
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 und
0.00 ml
0.00 ml

0.00 unid

Pgina 43
PILETAS
HOJA DE METRADOS DE AGUA POTABLE

PROYEC.: 0 EVALUADOR:
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

18.00 PILETAS PUBLICAS 0.00 UNID


18.01 TRAZO Y REPLANTEO 1.00 1.00 1.50 1.50
18.02 EXCAVACION MANUAL 1.00 1.00 1.00 1.00 1.00
18.03 CONCRETO F'C= 140 KG/CM2 1.00 0.80 0.85 0.30 0.20
1.00 0.85 0.80 0.10 0.07
2.00 0.85 0.10 0.10 0.02
2.00 0.60 0.13 0.10 0.02
1.00 0.25 0.15 0.70 0.03
18.04 ENCOFRADO Y DESENCOFRADO 2.00 0.25 0.70 0.35
2.00 0.85 0.20 0.34
2.00 0.80 0.16 0.25
4.00 0.60 0.10 0.24
18.05 ACERO FY= 4,200 KG/CM2 10.00 10.00
18.06 TARRAJEO EXTERIOR MEZCLA 1:5 2.00 0.25 0.70 0.35
2.00 0.85 0.11 0.19
2.00 0.80 0.10 0.16
4.00 0.60 0.10 0.24
1.00 0.60 0.60 0.36
18.07 ACCESORIOS PVC 1.00 1.00
18.08 COLOCACION DE ACCESORIOS 15.00 15.00
18.09 FILTRO DE GRAVA 1.00 1.00 0.50 1.00 0.50
18.10 TUBERIA PVC SAL D=2" 1.00 1.00 1.00
18.11 PRUEBA HIDRAULICA Y DESINFECCION 1.00 1.00 1.00

Pgina 44
PILETAS
HOJA DE METRADOS DE AGUA POTABLE

CARLOSL
9-Dec-17

TOTAL UNID.

0.00 m2
0.00 m3
0.00 m3
m3
m3
m3
m3
0.00 m2
m2
m2
m2
0.00 kg
0.00 m2
m2
m2
m2
m2
0.00 glb
0.00 unid
0.00 m3
0.00 ml
0.00 ml

Pgina 45
CALCULO DE ARMADURA DE RESERVORIO

DATOS
PROYECTO : 0 ACERO MUROS

EXPEDIENTE : 0 ACERO VERTICAL = 5/8 Pulg.

ZONAL : CUSCO DIAMETRO = 1.588 Cms.

EVALUADOR : CARLOS L AREA = 2.000 Cms2.

FECHA : 9-Dec-17 PESO = 1.600 Kg/ml


ACERO HORIZONTAL = 5/8 Pulg.
DIAMETRO = 1.588 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 2.000 Cms2.
VOLUMEN RESERVORIO = 9.00 m3 PESO = 1.600 Kg/ml
ALTURA UTIL RESERVORIO = 1.30 mts.
LADO UTIL RESERVORIO = 2.65 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 5/8 Pulg.
CONCRETO f'c = 175 Kg/cm2 DIAMETRO = 1.588 Cms.

SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 2.000 Cms2.

ACERO fy = 4,200 Kg/cm2 PESO = 1.600 Kg/ml

RESISTENCIA DEL SUELO = 1.00 Kg/cm2 ACERO LOSA DE FONDO

COEF. SISMICO = 0.12 ACERO HORIZONTAL = 5/8 Pulg.

RECUBRIMIENTO r = = 4.00 Cm DIAMETRO = 1.588 Cms.

fs = 2,100 Kg/cm2 AREA = 2.000 Cms2.

fc = 78.8 Kg/cm2 PESO = 1.600 Kg/ml

0.20 0.15 1.33

1.68

1.68

Sc Wc
SL
A' B'

WL NIVEL DE AGUA

S1

Ea

1.90 1.85 W1 0.43

1.00 Wa

A B

S2

0.10
C

W2
0.28

0.84

1.02
CALCULOS

W1= Pc x V1
W2 = Pc x V2
Wa = Pa x Va
WL = Pc x VL
Cms2. Ws = Sc x A
S1 = 0,12 x W1
S2 = 0,12 x W2
SL = 0,12 x WL
Cms2. Ss = 0,12 x Ws
Ea = 1,12 x 0,5 x Pa x H12

CHO VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB

V = Fh / A
Cms2.

Vc = 0,29 ( f'c )^1/2

V= 1.09 Kg/cm2

Cms2. CALCULO DE LA ARMADURA

ACERO VERTICAL CARA B'-B

MOMENTO MAXIMO EN LA BASE A-B

Mu
d = t1 - r - D/2

AREA DE ACERO
0.10 As1 = 69.92 Cms2
As2 = 2.37 Cms2 SE ASUME :
0.30
NIVEL DE AGUA CUANTIA = As / t1 x b

CUANTIA MINIMA POR FLEXION

USAR : 1 5/8 @ 0.30

1.30 ACERO HORIZONTAL B'B

ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,001

As = P x b x t1

USAR : 1 5/8 @ 0.30

ACERO EN LA ZAPATA
0.20
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO

D USAR : 1 5/8 @ 0.30

ACERO EN LA LOSA DE FONDO


P1
P2
P3
P4
P5

LUEGO: WuD :
WuL :
CALCULO DEL MOMENTO ULTIMO
576.00 Kg
806.40 Kg Mu = 0,0513 * Wu * L2
1729.00 Kg d = t1 - r - D/2
355.20 Kg AREA DE ACERO
222.00 Kg As1 = 104.28
103.68 Kg As2 = 3.43
145.15 Kg
63.94 Kg CUANTIA = As / t1 x b
47.95 Kg
1419.60 Kg CUANTIA MINIMA POR FLEXION

USAR : 1

1.09 Kg/cm2 ACERO EN LA LOSA DE TECHO

3.84 Kg/cm2 WuD = 2400 * t1 * 1,5


WuL = SC * 1,8
< Vc = 3.84 Kg/cm2 BIEN !!

CALCULO DEL MOMENTO ULTIMO

Mu = 0,0479 * Wu * L2
d = t1 - r - D/2
0.0178286812 AREA DE ACERO
0.0133715109 As1 = 35.71
885.12 Kg-mts. As2 = 1.12
10.21 Cms.
CUANTIA = As / t1 x b

CUANTIA MINIMA POR FLEXION


2.37 Cms2
As = P * t1 * b
0.0015814

0.0012 < 0.0016 BIEN!!


USAR : 1
mts.

RIZONTAL, CONSIDERANDO P = 0,0018

2.70 Cms2

mts.

mts.
3154.176
5114.88
4596.48
8128.51
13797.42

3970.90
270.00

Wu : 4240.90
LCULO DEL MOMENTO ULTIMO

1906.16 Kg--mts
15.21 Cms.

Cms2
Cms2 SE ASUME : 3.43 Cms2

0.001712606

ANTIA MINIMA POR FLEXION 0.0017 < 0.001713 BIEN!!

5/8 @ 0.25 mts.

ERO EN LA LOSA DE TECHO

360
270
Wu = 630

LCULO DEL MOMENTO ULTIMO

213.52 Kg--mts
5.20 Cms.

Cms2
Cms2 SE ASUME : 1.12 Cms2

0.001120364

ANTIA MINIMA POR FLEXION 0.0012 > 0.0011 MAL!! SE ASUME CUANTIA MINIMA P= 0.0012

1.20 Cms2

5/8 @ 0.25 mts


VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 9.00 M3
4.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.30 2.65
7.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95
3.35

0.15 0.30

0.20 0.15 TUB. FG 3/4


@ 0,30 Mts.

0.15

1.55 UNIONES
ELECTROSOLDA

0.10

2.65

ESCALINES FG
VER DETALLE
DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2

FLUENCIA DEL ACERO fy = 4200 Kg/cm2

0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm

0.20 0.15 2.65 0.15 0.20


FONCODES
RESERVORIO APOYADO
PLANTA
C. LOAYZA P. Dec-17
TUB. FG 3/4"
@ 0,30 Mts.

UNIONES
ELECTROSOLDADAS

ESPECIFICACIONES TECNICAS
Kg/cm2

Kg/cm2

FONCODES
9 M3
PLANTA
Dec-17
TAPA SANITARIA METALICA 5/8 @ 0.25 TUBERIA DE VENTILACION FG 2"
0,60 x 0,60 mts.

0.10



0.30

NIVEL DE AGUA

5/8 @ 0.30

5/8 @ 0.30 TARRAJEO C / IMPERMEABILIZANTE 1.60


1.30

5/8 @ 0.30


5/8 @ 0.25 PENDIENTE DE FONDO 1%

5/8 @ 0.30



0.20


0.050

0.88 SOLADO DE CONCRETO

0.20 0.15 2.65 0.15 0.20

FONCODES
RESERVORIO APOYADO 9
CORTE A-A
C. LOAYZA P. Dec-17
FONCODES
M3
CORTE A-A
Dec-17
5/8 @ 0.25

2.95

2 3/8

ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 175

FLUENCIA DEL ACERO fy = 4200

TRASLAPE MINIMO DE VARILLAS = 30

2 3/8

2.95 FONCODES
RESERVORIO APOYADO
ARMADURA DE LOSA DE TECHO
C. LOAYZA P. Dec-17
ESPECIFICACIONES TECNICAS
175 Kg/cm2

4200 Kg/cm2

30 cm

FONCODES
9 M3
ARMADURA DE LOSA DE TECHO
Dec-17
PLANILLA DE ARMADURA DE RESERVORIO DE 9 M3

ARMADURA LOSA DE TECHO LONGITUD VECES LONG. POR EN ML.

1/4" 3/8"
2.89

0.07 5/8 3.03 26.00

2.89

3/8 2.89 4.00 11.56

1.20

3/8 1.20 4.00 4.80

ARMADURA LOSA DE FONDO LONGITUD VECES 1/4" 3/8"


1.23

0.17 5/8 1.40 49.00

3.29

5/8 3.29 39.00

ARMADURA DE MURO LONGITUD VECES 1/4" 3/8"


0.11

1.76 5/8 1.98 44.00

0.15
2.80 5/8 6.05 13.00

1.48

PESO POR / ML. 0.25 0.58

LONG. TOTAL POR 0.00 16.36

RESUMEN GENERAL PESO TOTAL POR 0.00 9.49

NUMERO VARILLAS POR 2.00


RESUMEN GENERAL

PESO TOTAL 716.09 Kg


ARMADURA DE RESERVORIO DE 9 M3

LONG. POR EN ML.

1/2" 5/8"

78.78

1/2" 5/8"

68.76

128.31

1/2" 5/8"

87.12

78.65

1.02 1.60

0.00 441.62

0.00 706.60

0.00 49.00
716.09 Kg

You might also like