PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH - SERDANG - PUTRAJAYA

MUDAJAYA CORPORATION BERHAD


CICE FOR ALL MAJOR TEMPORARY WORKS INCLUDING GROUND TREATMENT

Item Description Unit Qty Rate (RM) Amount (RM)

Engineering Services

The CICE shall check, endorse the design, calculation


report and drawings and, perform onsite checking and
supervision for endorsing permit to load and permit to
unload for all major Temporary Works as follows:

A. Trestle/Scaffold System for Segmental Box Girders


Launching

Design checks for Segments, Piers at interfaces with


temporary works for Trestle Construction and
strengthening works which necessary to the Permanent
Structure or Temporary Structure

Trestle/Scaffold Design Check

Design check during Load Transfer (ie. Staged post


tensioning operations from Trestle Support to Pier
Support)

Check for tension in the joints and generate loads to the


trestle legs and produce maximum load experienced by
trestle leg suitable for calculatios of ground pressures

Design check for Trestle primary/secondary beam

Check for span overturning during and after erection


including parapet installation

Effects SBG erection to permanent MRT pier structure

Ground design works for Trestle Support

A1 Standard span single track (SC36.8) nr 4

A2 Standard span single track (SC39.8) nr 16

A3 Standard span single track (SS39.8) nr 2

A4 Standard span single track (SS36.8) nr 1

A5 Standard span single track (SA39.8) nr 3

A6 Standard span single track (SA33.8) nr 1

A7 Standard span single track (SC33.8) nr 3

A8 Standard span single track (SA30.8) nr 1

A9 Standard span single track (SC30.8) nr 2

A10 Merging span double track (DP18 - DP19 - Abut. AA) nr 2

Page : 1 To Collection
PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH - SERDANG - PUTRAJAYA
MUDAJAYA CORPORATION BERHAD
CICE FOR ALL MAJOR TEMPORARY WORKS INCLUDING GROUND TREATMENT

Item Description Unit Qty Rate (RM) Amount (RM)

ENGINEERING SERVICES (Cont'd)

The CICE shall check, endorsed the design and


calculation report and onsite checking for permit to load
and permit to unload for all major Temporary Works as
follows: (Cont'd)

B. Lifting Method

B1 2 Nos of MS lifting frame and segment lifting frame sum


including accessories for precast segment

B2 Precast beam lifting using slinging method sum

C. Field trips

C1 Site Visit trip (Provisional) nr 35

ANY OTHER ITEMS

Allow for any other items not described or included in


the above BQ items but required to be carried out as
necessary and as where shown in the Scope of Work,
Appendix, Drawings and Specifications including
all relevant Authorities requirements, approval and
other works, requirements and compliance which
is indispensably necessary to bring to satisfactory
completion of the whole Works.
CICE to specify:

i) ...................................................... sum

ii) ...................................................... sum

iii) ...................................................... sum

iv) ...................................................... sum

v) ...................................................... sum

Page : 2
PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH - SERDANG - PUTRAJAYA
MUDAJAYA CORPORATION BERHAD
CICE FOR ALL MAJOR TEMPORARY WORKS INCLUDING GROUND TREATMENT

Item Description Unit Qty Rate (RM) Amount (RM)

COLLECTION

Page : 1

Page : 2

Page : 3 (SUMM)