You are on page 1of 21

AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015

POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Cattubo I Hydroelectric Power Green Indigenous Environment


LUZON CAR Benguet Atok on-going study and permitting 2.00
Project Development Corporation

Cattubo II Hydroelectric Power Green Indigenous Environment


on-going study and permitting 3.00
Project Development Corporation

Bakun & Mankayan 1 Hydroelectric


HEDCOR, Inc. under evaluation for declaration of commerciality 12.70
Mankayan Power Project
Bokod Hydroelectric Power
Bokod Hedcor Mt, Province, Inc. on-going study and permitting 18.00
Project
Bokod & Kabayan 3 Hydroelectric Power
Hedcor Benguet, Inc. on-going study and permitting 14.30
Kabayan Project
Man-asok Hydroelectric Power
Buguias Benguet Electric Cooperative, Inc. under evaluation of declaration of commerciality 1.60
Project
Itogon 4 Hydroelectric Power
Itogon Hedcor Mabinay, Inc. on-going study and permitting 6.90
Project
Itogon 3 Hydroelectric Power
Hedcor Mabinay, Inc. on-going study and permitting 10.45
Project
Itogon 2 Hydroelectric Power
Hedcor Mabinay, Inc. on-going study and permitting 10.40
Project
Itogon 1 Hydroelectric Power
Hedcor Mabinay, Inc. on-going study and permitting 10.35
Project
Ambasa Hydroelectric Power Goldlink Global Energy
on-going study and permitting 5.00
Project Corporation
San Roque Upper East Pump Strategic Power Development
on-going study and permitting 600.00
Storage Corp.
Strategic Power Development
San Roque West Pump Storage on-going study and permitting 400.00
Corp.
Eddet Adaoay 2 Hydroelectric
Kabayan United Hydro Power Builders on-going study and permitting 1.80
Power Project
Eddet Adaoay 1 Hydroelectric
United Hydro Power Builders on-going study and permitting 1.00
Power Project
Natalang B Hydroelectric Power
Kabayan PNOC - Renewables Corp. under evaluation of commerciality 45.00
Project
Kapangan & Kapangan Hydroelectric Power Cordillera Hydro Electric Power
on-going construction 60.00
Kibungan Project Corporation

La Trinidad Bineng 1-2B Combination HEDCOR, Inc. on-going study and permitting 16.50

Apanta-an River Hydroelectric Inno Gold Mining and


Mankayan on-going study and permitting 5.00
Power Project Development Corporation
Sabangan Hydroelectric Power
Sabangan Hedcor Sabangan, Inc. Operational 14.00
Project
Abdao Hydroelectric Power
Tabaan Sur, Tuba AV Garcia Power Systems Corp. on-going permittings for construction 2.00
Project
Kanggas Hydroelectric Power Goldlink Global Energy
Tuba on-going study and permitting 3.00
Project Corporation
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Tadiangan Hydroelectric Power Goldlink Global Energy


LUZON CAR Benguet Tuba on-going study and permitting 4.70
Project Corporation

Nangalisan Hydroelectric Goldlink Global Energy


under evaluation of accomplishment under the milestone concept 2.30
Power Project Corporation
Sallapan Hydroelectric Power Goldlink Global Energy
under evaluation of accomplishment under the milestone concept 2.30
Project Corporation
Abdao 2 Hydroelectric Power
AV Garcia Power Systems Corp. on-going study and permitting 3.00
Project
Irisan 1 Hydroelectric Power
Tuba HEDCOR, Inc. Operational 3.80
Plant
Tublay 1 Hydroelectric Power
Tublay AT Dinum Company on-going study and permitting 0.90
Project

Maris Main Canals 2


Ifugao Alfonso Lista SN Aboitiz Power - Greenfield, Inc. ongoing study and permitting 1.75
Hydroelectric Power Project

Panubtuban Hydroelectric
Asipulo Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 8.00
Power Project
Asipulo & Likud Hydroelectric Power
Provincial Government of Ifugao Operational 1.00
Kiangan Project
Asin Hydroelectric Power
Kiangan Enerhighlands Corporation on-going study and permitting 4.00
Project

Ibulao 1 Hydroelectric Power


Enerhighlands Corporation on-going study and permitting 6.00
Project

Ibulao 2 Hydroelectric Power


Enerhighlands Corporation on-going study and permitting 8.80
Project
Hungduan Hydroelectric Power
Enerhighlands Corporation on-going study and permitting 4.00
Project
Ambangal Hydroelectric Power
Kiangan Provincial Government of Ifugao Operational 0.20
Plant
Alimit Hydroelectric Power
Lagawe SN Aboitiz Power - Ifugao, Inc. on-going study and permitting 100.00
Project
Ibulao Hydroelectric Power
Lagawe Hydrocore, Inc. on-going permittings for construction 4.50
Project
Lagawe & Olilicon Hydroelectric Power
SN Aboitiz Power - Ifugao, Inc. on-going study and permitting 10.00
Mayoyao Project
Alimit Pumped-Storage
SN Aboitiz Power - Ifugao, Inc. on-going study and permitting 240.00
Hydroelectric Power Project
Lamut Hydroelectric Power
Lamut Enerhighlands Corporation on-going study and permitting 9.00
Project
Tinoc 1 Hydroelectric Power
Tinoc Quadriver Energy Corporation on-going permittings for construction 4.10
Project
Tinoc 2 Hydroelectric Power
Quadriver Energy Corporation on-going permittings for construction 11.00
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Tinoc 3 Hydroelectric Power
LUZON CAR Ifugao Tinoc Quadriver Energy Corporation on-going permittings for construction 8.00
Project
Tinoc 4 Hydroelectric Power
Philnew Hydro Power Corp on-going permittings for construction 5.00
Project
Tinoc 5 Hydroelectric Power
Philnewriver Power Corp. on-going permittings for construction 6.90
Project (Lower Luhong)
Tinoc 6 Hydroelectric Power
Philnewriver Power Corp. on-going permittings for construction 8.00
Project (Wangwang)
Chico Hydroelectric Power San Lorenzo Ruiz Piat Energy and
Kalinga on-going study and permitting 150.00
Project Water, Inc.
Biyao Hydroelectric Power
Balbalan AV Garcia Power Systems Corp. ongoing permittings for construction 0.80
Project
Saltan B Hydroelectric Power
Balbalan PNOC - Renewables Corp. under evaluation for commerciality 24.00
Project
Bolala Hydroelectric Power
Pasil Hedcor Kalinga, Inc. on-going study and permitting 10.50
Project
Bulanao Hydroelectric Power
Tabuk DPJ Engineers and Consultants on-going construction 1.00
Project
Chico River Hydroelectric San Lorenzo Ruiz Builders &
on-going study and permitting 45.00
Power Project Developers Group, Inc.
Tanudan Hydroelectric Power
Tanudan Hedcor Kalinga, Inc. on-going study and permitting 12.70
Project
Tinglayan Hydroelectric Power Pan Pacific Renewable Power
Tinglayan under evaluation of declaration of commerciality 4.32
Project Philippine Corp.
Sadanga-Tinglayan
Hedcor Bokod, Inc. on-going study and permitting 60.00
Hydroelectric Power Project
Luplupa Hydroelectric Power
Hedcor Kalinga, Inc. on-going study and permitting 14.50
Project
Bugnay Hydroelectric Power
Hedcor Kalinga, Inc. on-going study and permitting 13.60
Project
Apayao-Abulog Hydroelectric Pan Pacific Renewable Power
Apayao Kabugao on-going study and permitting 600.00
Power Project Philippine Corp.
Mountain Tanudan Hydroelectric Power Asiapac Green Renewable Energy
Barlig under evaluation of accomplishment 2.40
Province Project Corporation
Enodey-Abit 1 Hydroelectric
Bauko Kadipo Bauko Hydropower Corp. under evaluation for their request of Force Majeure 2.00
Power Project
Enodey-Abit 2 Hydroelectric
Kadipo Bauko Hydropower Corp. under evaluation for their request of Force Majeure 1.20
Power Project
Enodey-Abit 3 Hydroelectric
Kadipo Bauko Hydropower Corp. under evaluation for their request of Force Majeure 2.00
Power Project
Ampassit Hydroelectric Power
Kadipo Bauko Hydro Power Corp. ongoing study and permitting 1.20
Project
Enodey 1A Hydroelectric Power
Kadipo Bauko Hydro Power Corp. ongoing study and permitting 1.80
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
BIMAKA Renewable Energy
Mountain Besao 1 Hydroelectric Power
LUZON CAR Besao Development Corporation ongoing permittings 4.50
Province Project
(BREDCO)
BIMAKA Renewable Energy
Besao 2 Hydroelectric Power
Development Corporation ongoing permittings 7.00
Project
(BREDCO)
BIMAKA Renewable Energy
Besao 3 Hydroelectric Power
Development Corporation ongoing permittings 4.00
Project
(BREDCO)
BIMAKA Renewable Energy
Besao 1A Hydroelectric Power
Development Corporation ongoing permittings 2.60
Project
(BREDCO)
BIMAKA Renewable Energy
Besao 1B Hydroelectric Power
Development Corporation ongoing permittings 1.70
Project
(BREDCO)
BIMAKA Renewable Energy
Besao 2A Hydroelectric Power
Development Corporation ongoing permittings 1.10
Project
(BREDCO)
Bontoc Hydroelectric Power
Bontoc Hedcor Bokod, Inc. under evaluation of accomplishment under the milestone concept 40.00
Project

Talubin Hydroelectric Power Mountain Province Electric


on-going study and permitting 5.40
Project Cooperative, Inc.

Mabungao Hydroelectric Power Southeast Asia Renewable Power


Mabungao on-going study and permitting 5.70
Project Corporation

Malecom Hydroelectric Power Southeast Asia Renewable Power


Malecom on-going study and permitting 0.80
Project Corporation

Malig Hydroelectric Power Southeast Asia Renewable Power


Malig on-going study and permitting 1.10
Project Corporation

Lower Siffu Hydroelectric Asiapac Green Renewable Energy


Natonin under evaluation of declaration of commerciality 8.00
Power Project Corporation

Upper Siffu Hydroelectric Asiapac Green Renewable Energy


under evaluation of declaration of commerciality 8.00
Power Project Corporation

Pantor Hydroelectric Power Southeast Asia Renewable Power


on-going study and permitting 1.20
Project Corporation

Dicapan Hydroelectric Power Asiapac Green Renewable Energy


Tadian on-going permittings for construction 3.00
Project Corporation

Tineg Lower Hydroelectric


Abra La Paz Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 12.00
Power Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Tineg Hydroelectric Power


LUZON CAR Abra Lagayan Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 16.00
Project

Luba Hydroelectric Power


Luba Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 7.50
Project

Three Rivers Hydroelectric


Manabo Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 10.00
Power Project

Amtuagan Hydroelectric Power


Tubo Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 8.50
Project

Gayaman (Tubo) Hydroelectric


Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 8.50
Power Project

Benguet & Bakun & Mankayan 2 Hydroelectric


HEDCOR, Inc. under evaluation for declaration of commerciality 20.30
Ilocos Sur Cervantes Power Project
Ifugao & Asipulo & Asipulo Hydroelectric Power
Hedcor Ifugao, Inc. on-going study and permitting 17.65
Nueva Ambaguio Project
Boga Hydroelectric Power
Mt. Province Bauko Kadipo Bauko Hydro Power Corp. on-going study and permitting 1.00
Project
Alilem Hydroelectric Power
I Ilocos Sur Alilem Philnewriver Power Corp. on-going permittings for construction 16.20
Project
Bakun AC Hydroelectric Power
Luzon Hydro Corporation Operational 70.00
Plant

Quirino Hydroelectric Power


Quirino Philnewriver Power Corp. under evaluation of declaration of commerciality 10.00
Project

Matibuey Hydroelectric Power


San Emilio Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 6.50
Project

Danac Hydroelectric Power


Sugpon Philnewriver Power Corp. on-going permittings for construction 3.00
Project

Baroro 1 Hydroelectric Power Team (Philippines) Renewable


La Union Bagulin ongoing study and permitting 1.00
Project Energy Corporation

Baroro 2 Hydroelectric Power Team (Philippines) Renewable


ongoing study and permitting 3.00
Project Energy Corporation

Baroro 3 Hydroelectric Power Team (Philippines) Renewable


ongoing study and permitting 1.50
Project Energy Corporation

Bagulin I Hydroelectric Power Green Indigenous Environment


on-going study and permitting 9.00
Project Development Corporation

Naguilian Hydroelectric Power Naguilian Mini-Hydro Electric


Naguilian on-going study and permitting 6.10
Project Corporation

Tubao Hydroelectric Power Tubao Mini-Hydro Electric


Tubao -on going permittings for construction 1.50
Project Corporation
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Butao Irrigation Drop


LUZON I Pangasinan San Manuel Mindoro Grid Corporation on-going study and permitting 1.40
Hydroelectric Power Project

Baua 1 Hydroelectric Power Pan Pacific Renewable Power


II Cagayan Gonzaga under evaluation of declaration of commerciality 4.44
Project Philippine Corp.

Pinacanauan River Sunwest Water & Electric


Peablanca on-going permittings for construction 6.00
Hydroelectric Power Project Company, Inc.

Santa Praxedes Hydroelectric


Santa Praxedes Phildane Resources Corporation on-going study and permitting 4.00
Power Project

Isabela / Dibuluan Hydroelectric Power Greenpower Resources


San Augustin under evaluation of declaration of commerciality 5.50
Quirino Project Corporation

Balasig 2 Hydroelectric Power Greenpower Resources


Isabela Balasig under evaluation of accomplishment under the milestone concept 7.00
Project Corporation

Malampit 1 Hydroelectric Greenpower Resources


Cabagan under evaluation of accomplishment under the milestone concept 10.00
Power Project Corporation

Balasig 1 Hydroelectric Power Greenpower Resources


under evaluation of accomplishment under the milestone concept 9.00
Project Corporation

Balasig 3 Hydroelectric Power Greenpower Resources


under evaluation of accomplishment under the milestone concept 7.00
Project Corporation
Magat F Hydroelectric Power
Cordon PhilCarbon Inc. on-going study and permitting 0.60
Project
Ilaguen 2 Hydroelectric Power
Dinapigue Isabela Power Corporation ongoing permittings for construction 14.00
Project
Ilaguen 3 Hydroelectric Power
Echague Isabela Power Corporation under evaluation of declaration of commerciality 11.00
Project
Ilaguen 4 Hydroelectric Power
Isabela Power Corporation on-going study and permitting 10.00
Project
Abuan River 1 Hydroelectric Greenpower Resources
Ilagan on-going study and permitting 10.80
Power Project Corporation
Ilagan Hydroelectric Power Trans-Asia Oil and Energy
Ilagan, on-going study and permitting 10.00
Project Development Corp,
Maris Main Canals 1
Ramon SN Aboitiz Power - Greenfield, Inc. ongoing study and permitting 6.00
Hydroelectric Power Project
Magat A Hydroelectric Power I-Magat Renewable Energy
ongoing rehabilitation 1.30
Project Corporation
Magat B Hydroelectric Power I-Magat Renewable Energy
ongoing rehabilitation 1.00
Project Corporation
San Augustin / Dabubu Hydroelectric Power Greenpower Resources
on going study and permittings 4.50
Madella Project Corporation
Disabungan Hydroelectric Greenpower Resources
San Mariano under evaluation of declaration of commerciality 5.50
Power Project Corporation
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

San Mariano & Ilaguen Hydroelectric Power


LUZON II Isabela Isabela Power Corp. on-going permittings for construction 19.00
San Guillermo Project

Magamian 2 Hydroelectric Greenpower Resources


San Pablo under evaluation of accomplishment under the milestone concept 15.00
Power Project Corporation

Malampit 2 Hydroelectric Greenpower Resources


Tumauini under evaluation of accomplishment under the milestone concept 15.00
Power Project Corporation

Tumauini Hydroelectric Power


Tumauini Quadriver Energy Corporation on-going permittings for construction 7.80
Project (Lower Cascade)

Tumauini Hydroelectric Power


Philnew Hydro Power Corp on-going permittings for construction 14.00
Project (Upper Cascade)

Nueva Alfonso Mangayngay Hydroelectric


United Hydro Power Builders on-going study and permitting 1.60
Vizcaya Castaeda Power Project

Denip Hydroelectric Power JRV Renewable Energy


on-going study and permitting 2.00
Project Corporation

Abaca Hydroelectric Power JRV Renewable Energy


Alfonzo under evaluation of accomplishment under the milestone concept 3.20
Project Corporation
Matuno 1 Hydroelectric Power
Ambaguio Smith Bell Mini-Hydro Corp. on-going study and permitting 6.00
Project
Matuno 2 Hydroelectric Power
Bambang Smith Bell Mini-Hydro Corp. on-going study and permitting 9.00
Project

Matuno Hydroelectric Power


Epower Technologies Corp. on-going permittings for construction 8.00
Project

Dupax del Norte


Casignan Hydroelectric Power JRV Renewable Energy
and Alfonzo under evaluation of accomplishment under the milestone concept 5.00
Project Corporation
Castaeda

Didipio 1 Hydroelectric Power


Kasibu AT Dinum Company on-going DED and permitting 2.50
Project
Didipio 2 Hydroelectric Power
AT Dinum Company on-going DED and permitting 6.60
Project
Namanaan Hydroelectric
AT Dinum Co. on-going study and permitting 0.60
Power Project
Edralin Hydroelectric Power
AT Dinum Co. on-going study and permitting 1.20
Project

Commonal-Uddiawan
Solano Smith Bell Mini-Hydro Corp. Operational 1.80
Hydroelectric Power Plant
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Addalam Hydroelectric Power


LUZON II Quirino Aglipay Quirino Power Energy Corporation on-going study and permitting 3.60
Project

Addalam Hydroelectric Power Quirino Resources Development


Cabbaroguis -completed FS 26.00
Project Corp.
Cabbaroguis and Diduyon Hydroelectric Power Green Energy Management (GEM)
on-going study and permitting 320.00
Dingasan Project & Holdings, Inc.
Geblem 1 Hydroelectric Power -on-going study and permitting -ongoing
Nagtipunan Gedangan Enterprises Co. 0.70
Project transfer to Gawagan Hydro Power Corp.
Gawagan 1 Hydroelectric -on-going study and permitting -ongoing
Gedangan Enterprises Co. 4.30
Power Project transfer to Gawagan Hydro Power Corp.
Gawagan 2 Hydroelectric -on-going study and permitting -
Gedangan Enterprises Co. 2.60
Power Project ongoing transfer to Gawagan Hydro Power corp.
Dakgan 1 Hydroelectric Power Asiapacific Renewables
on-going study and permitting 9.00
Project Corporation

Dakgan 2 Hydroelectric Power Asiapacific Renewables


on-going study and permitting 12.00
Project Corporation

Amro River Hydroelectric Alternergy Viento Partners


III Aurora Casiguran under evaluation of accomplishment under the milestone concept 3.00
Power Project Corporation
Talaytay Hydroelectric Power
Dinalungan Aurora Energy Corporation on-going study and permitting 1.45
Project
Davildavilan Hydroelectric Sunwest Water & Electric
Dingalan under evaluation of declaration of commerciality 1.00
Power Project Company, Inc.
Diteki Hydroelectric Power
San Luis Aurora Energy Corporation on-going study and permitting 1.67
Project
Calaanan Hydroelectric Power
Nueva Ecija Bongabon Hydrokinetic Corp. on-going study and permitting 2.00
Project
Dupinga Hydroelectric Power
Gabaldon Constellation Energy Corporation on-going permittings for construction 3.40
Project

Rio Chico Hydroelectric Power


General Tinio LGU of Gen. Tinio on-going study and permitting 2.00
Project

Balintingon Hydroelectric First Gen Luzon Power


General Tio on-going study and permitting 30.00
Power Project Corporation
Pantabangan (Pump
First Gen Prime Energy -conducted Public Scoping meeting to project for EIA and EIS to support the
Pantabangan Storage)Hydroelectric Power 300.00
Corporation application for the ECC on 25 September 2014
Project
Diaman Hydroelectric Power
United Hydro Power Builders on-going study and permitting 1.80
Project

PRISMC Hydroelectric Power


Rizal PNOC-Renewables Corporation on-going construction activities 1.00
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
SDC Hydroelectric Power
LUZON III Nueva Ecija San Jose PNOC-Renewables Corporation on-going study and permitting 0.50
Project
Angat (Pump Storage) First Gen Premier Energy
Bulacan Norzagaray on-going study and permitting 300.00
Hydroelectric Power Project Corporation

Mariveles Hydroelectric Power Southeast Asia Renewable Power


Bataan Mariveles under evaluation of declaration of commerciality 1.10
Project Corporation

Camiling 2 Hydroelectric Power


Tarlac Mayantoc Northgreen Energy Corporation on-going study and permitting 4.00
Project
Camiling 1 Hydroelectric Power
Northgreen Energy Corporation on-going study and permitting 5.40
Project

Camiling River 3 Hydroelectric


Northgreen Energy Corporation on-going study and permitting 3.40
Power Project

Tibagan Hydroelectric Power Sunwest Water and Electric Co.,


San Jose under evaluation of accomplishment under the milestone concept 2.53
Project Inc.
Tarlac, San Clemenete & Bacolan Hydroelectric Power
Northgreen Energy Corporation on-going study and permitting 3.00
Pangasinan Mangatarem Project
Coto 1 Hydroelectric Power -on-going study and permitting -ongoing
Zambales Masinloc Gedangan Enterprises Co. 6.50
Project transfer to Gawagan Hydro Power Corp.
South Lauis & Coto 2 Hydroelectric Power -on-going study and permitting -ongoing
Gedangan Enterprises Co. 2.80
Mabininal Project transfer to Gawagan Hydro Power Corp.

Laguna / Pangil / Real & Siniloan Hydroelectric Power


IV-A Sierra Madre Water Corporation under evaluation for extension 35.00
Quezon Mauban Project

Maapon Hydroelectric Power


Quezon Lucban Renesons, Energy Corporation on-going study and permitting 3.30
Project
Calmenue Hydroelectric Power
Mauban Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 2.00
Project

(Laguio) Laginbayan Malaki 2


Enervantage Supplier's Co., Inc. on-going study and permitting 3.70
Hydroelectric Power Project

Mauban Hydroelectric Power Aurora All Asia Energy


on-going study and permitting 10.00
Project Corporation

Kinanliman Hydroelectric
Real Municipality of Real, Quezon under evaluation of accomplishment under the milestone concept 1.60
Power Project

Labayat River (Upper Cascade) Repower Energy Development


on-going study and permitting 7.00
Hydroelectric Power Project Corporation

Piapi River Hydroelectric Power Repower Energy Development


on-going study and permitting 3.30
Project Corporation
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Labayat River (Lower Cascade) Repower Energy Development


LUZON IV-A Quezon Real on-going study and permitting 2.80
Hydroelectric Power Project Corporation

Tignoan River (Upper Cascade) Repower Energy Development


on-going study and permitting 3.50
Hydroelectric Power Project Corporation
Lalavinan River (Lower
Repower Energy Development
Cascade) Hydroelectric Power on-going study and permitting 7.00
Corporation
Project
Tibag Hydroelectric Power Repower Energy Development
on-going study and permitting 5.00
Project Corporation

Tignoan Hydroelectric Power Aurora All Asia Energy


on-going study and permitting 20.00
Project Corporation

Sampaloc Hydroelectric Power Aurora All Asia Energy


Sampaloc relinquished 8.00
Project Corporation

Laguio (Laginbayan) Malaki 1


Rizal Enervantage Supplier's Co., Inc. under evaluation of declaration of commerciality 2.00
Hydroelectric Power Project

Pililia Pumped Storage Trans-Asia Oil and Energy


Pililia, on-going study and permitting 300.00
Hydroelectric Power Project Development Corp,

Wawa Pumped Storage 1 Olympia Violago Water & Power,


Rodriguez ongoing study and permitting 500.00
Hydroelectric Power Project Inc

Wawa Pumped Storage 3 Olympia Violago Water & Power,


ongoing study and permitting 50.00
Hydroelectric Power Project Inc

Wawa Pumped Storage 2 Olympia Violago Water & Power,


ongoing study and permitting 100.00
Hydroelectric Power Project Inc
Maimpis Hydroelectric Power
Laguna Liliw & Majayjay Liliw Hydro Power Corporation under evaluation of accomplishment under the milestone concept 2.30
Project
Majayjay Hydroelectric Power Majayjay Hydropower Company,
Majayjay ongoing permittings for construction 2.20
Project Inc.
Indang and Indang Hydroelectric Power
Cavite Energywise Corporation on-going study and permitting 1.50
Maragondon Project

Oriental San Ignacio Hydroelectric Alpaparay Resort & Development


IV-B Baco on-going study and permitting 0.50
Mindoro Power Project Corporation

Dulangan Hydroelectric Power


Baco PNOC - Renewables Corp. under evaluation for commerciality 8.25
Project

Linao-Cawayan (Lower
Oriental Mindoro Electric
Cascade) Hydroelectric Power Operational 2.10
Cooperative, Inc.
Plant
Linao-Cawayan (Upper
Oriental Mindoro Electric
Cascade) Hydroelectric Power Operational 3.00
Cooperative, Inc.
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Oriental Bansud Hydroelectric Power Sunwest Water and Electric Co.,
LUZON IV-B Bansud on-going study and permitting 1.50
Mindoro Project Inc.
Bongabong Hydroelectric
Bongabong S&B Power Corporation under evaluation of accomplishment under the milestone concept 2.60
Power Project
Catuiran (Upper Cascade)
Naujan Philnew Hydro Power Corp under evaluation of declaration of commerciality 8.00
Hydroelectric Power Project
Catuiran Hydroelectric Power
Catuiran Hydro Power Corp. on-going construction 8.00
Project

Inabasan Hydroelectric Power


San Teodoro Ormin Power, Inc on-going construction of access road from existing road to the powerhouse 10.00
Project
Linao Cawayan Hydroelectric
Power Project (Phase 2 - tail - Mindoro Grid Corporation under evaluation of declaration of commerciality 1.00
end)
Alag Tributary 1 Hydroelectric
Constellation Energy Corporation on-going study and permitting 2.80
Power Project
Alag Tributary 2 Hydroelectric
Constellation Energy Corporation on-going study and permitting 2.80
Power Project
San Teodoro & Inabasan Phase II Hydroelectric
Ormin Power, Inc. on-going study and permitting 10.00
Puerto Gallera Power Project
Marangas River Hydroelectric
Palawan Bataraza AQA Global Power Inc. on-going study and permitting 12.00
Power Project
Sologon River Hydroelectric
Brooke's Point AQA Global Power Inc. on-going study and permitting 12.00
Power Project
Busuanga River 1 Hydroelectric
Busuanga AQA Global Power Inc. on-going study and permitting 8.00
Power Project

Ilian River (Kaliwa)


Dumaran AQA Global Power Inc. on-going study and permitting 20.00
Hydroelectric Power Project

Ilian River (Kanan)


AQA Global Power Inc. on-going study and permitting 12.00
Hydroelectric Power Project

Bulalakao-1 North River Alternergy Viento Partners


El Nido under evaluation of accomplishment under the milestone concept 0.34
Hydroelectric Power Project Corporation
Bulalakao-2 South River Alternergy Viento Partners
under evaluation of accomplishment under the milestone concept 0.44
Hydroelectric Power Project Corporation

Bato-Bato (Kaliwa)
Narra AQA Global Power Inc. on-going study and permitting 12.00
Hydroelectric Power Project
Estrella River Hydroelectric
AQA Global Power Inc. on-going study and permitting 8.00
Power Project
Malasgao (Kaliwa)
AQA Global Power Inc. on-going study and permitting 10.00
Hydroelectric Power Project

Batang-Batang Hydroelectric
Narra Langongan Power Corporation under evaluation of declaration of commerciality 3.50
Power Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Langogan Hydroelectric Power


LUZON IV-B Palawan Puerto Princesa Langongan Power Corporation under evaluation of accomplishments 6.80
Project

Iwahig Hydroelectric Power Sunwest Water and Electric Co.,


under evaluation of accomplishment under the milestone concept 1.50
Project Inc.

Puerto Princesa Inaguan River Hydroelectric


AQA Global Power Inc. on-going study and permitting 12.00
City Power Project

Culasian River Hydroelectric


Rizal AQA Global Power Inc. on-going study and permitting 10.00
Power Project

Barabakan River 1
Roxas AQA Global Power Inc. on-going study and permitting 15.00
Hydroelectric Power Project

Cantingas Hydroelectric Power


Romblon Romblon Romblon Electric Cooperative, Inc. Operational 0.90
Plant

Kanan B-1 Hydroelectric Power


Quezon General Nakar Energy World Kanan River, Inc. on-going study and permitting 150.00
Project

Upper Botocan River Aurora All Asia Energy


Laguna Majayjay on-going study and permitting 8.64
Hydroelectric Power Project Corporation

Camarines Barit 2 Hydroelectric Power


V Buhi People's Energy Services Inc. on-going study and permitting 0.60
Sur Project

Barit 1 Hydroelectric Power


People's Energy Services Inc. Operational 1.80
Plant

Barit (Irrigation Discharge)


Buhi NASCENT Technologies Corp. on-going permittings for construction 0.40
Hydroelectric Power Project

Rangas-River Hydroelectric Clean and Green Energy Solutions,


Goa & Tigaon, ongoing permittings for construction 1.50
Power Project Inc.

Coyaoyao (Middle Cascade)


Sagnay SKI Mini-Hydro Corporation under evaluation of accomplishments 0.70
Hydroelectric Power Project
Coyaoyao (Upper Cascade)
SKI Mini-Hydro Corporation under evaluation of accomplishments 0.20
Hydroelectric Power Project
Coyaoyao (Lower Cascade)
SKI Mini-Hydro Corporation under evaluation of accomplishments 0.40
Hydroelectric Power Project
Hitoma 1 Hydroelectric Power Sunwest Water & Electric
Catanduanes Caramoran Operational 1.50
Plant Company, Inc.
Kapipian Hydroelectric Power Sunwest Water & Electric
San Miguel on-going permittings for construction 2.40
Project Company, Inc.
Solong Hydroelectric Power Sunwest Water & Electric
Operational 2.10
Plant Company, Inc.
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Camarines Colasi Hydroelectric Power Colasi Mini Hydro Electric Power


LUZON V Mercedes ongoing permittings for construction 0.96
Norte Project Plant Corporation

Sunwest Water and Electric Co.,


Upper Cawayan 1 Hydroelectric
Sorsogon Inc. - Sorsogon II Electric Operational 0.60
Power Plant
Cooperative Inc (SUWECO-
Cawayan 2 Hydroelectric Power Sunwest Water and Electric Co.,
Sorsogon on-going study and permitting 0.99
Project Inc.

LUZON Sum 5,618.93 101.80

Main Aklan River Hydroelectric Sunwest Water & Electric


VISAYAS VI Aklan Libacao -on going transfer to SUWECO Aklan 1 Energy Corp. 15.00
Power Project Company, Inc.
Timbaban Hydroelectric Power Oriental Energy and Power
Madalag on-going access road 18.00
Project Generation Corporation
Aklan Pumped-Storage Strategic Power Development
Nabaoy on-going study and permitting 200.00
Hydroelectric Power Project Corp.
Villasiga Hydroelectric Power Sunwest Water & Electric
Antique Bugasong -99.18% total work accomplishment 8.00
Project Company, Inc. 2
Maninila (Lower Cascade)
San Remegio Century Peak Energy Corporation on-going permittings for construction 4.50
Hydroelectric Power Project
Maninila (Upper Cascade)
Century Peak Energy Corporation on-going permittings for construction 3.10
Hydroelectric Power Project
Sibalom (Upper Cascade)
Century Peak Energy Corporation on-going permittings for construction 4.20
Hydroelectric Power Project
Sibalom (Middle Cascade)
Century Peak Energy Corporation on-going permittings for construction 4.00
Hydroelectric Power Project
Sibalom (Lower Cascade)
Century Peak Energy Corporation on-going permittings for construction 4.00
Hydroelectric Power Project
Caro-an Hydroelectric Power
Sebaste Antique Electric Cooperative, Inc. under evaluation of declaration of commerciality 1.00
Project
Ipayo Hydroelectric Power
Antique Electric Cooperative, Inc. under evaluation of declaration of commerciality 1.30
Project

Igbulo (Bais) Hydroelectric -on-going construction of access road from powerhouse to weir
Iloilo Igbaras Century Peak Energy Corporation 5.10
Power Project -on-going construction of powerhouse and admin office

Negros Bago 4 Hydroelectric Power Alsons Energy Development


Bago & Murcia on-going study and permitting 11.00
Occidental Project Corporation
Talabaan Hydroelectric Power
Cadiz Basic Energy Corporation on-going study and permitting 2.00
Project

Don Salvador Bago 2 Hydroelectric Power Alsons Energy Development


under evaluation of accomplishment under the milestone concept 10.00
Benedicto Project Corporation
Hilabangan (Upper Cascade)
Kabankalan Century Peak Energy Corporation on-going permittings for construction 4.80
Hydroelectric Power Project
Hilabangan (Lower Cascade)
Century Peak Energy Corporation on-going permittings for construction 3.00
Hydroelectric Power Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Negros Puntian 1 Hydroelectric Power
VISAYAS VI Murcia Basic Energy Corporation on-going study and permitting 2.00
Occidental Project
Puntian 2 Hydroelectric Power
Basic Energy Corporation on-going study and permitting 2.00
Project

Lower Himogaan Hydroelectric


Sagay LGU of Sagay under evaluation of declaration of commerciality 4.00
Power Project

Bago 1 Hydroelectric Power Alsons Energy Development


San Carlos City under evaluation of accomplishment under the milestone concept 4.00
Project Corporation
Initihan Hydroelectric Power Bago River Hydro Power
under evaluation of declaration of commerciality 3.00
Project Corporation
Bago-Prosperidad 2 Bago River Hydro Power
under evaluation of declaration of commerciality 2.00
Hydroelectric Power Project Corporation
Malugo Hydroelectric Power
Silay Vivant-Malogo Hydropower, Inc. on-going permittings for construction 6.00
Project

Silay & E. B Malogo Phase 3 Hydroelectric


Vivant Energy Corporation under evaluation of accomplishment under the milestone concept 2.00
Magalona Power Project

Malogo Phase 2 Hydroelectric


Victorias & Cadiz Vivant Energy Corporation under evaluation of accomplishment under the milestone concept 5.00
Power Project
Victorias and Malogo 2 Hydroelectric Power
Basic Energy Corporation on-going study and permitting 3.00
Cadiz Project
Cantakoy Hydroelectric Power
VII Bohol Danao Quadriver Energy Corporation on-going construction 8.00
Project
Loboc Hydroelectric Power
Loboc Sta. Clara Power Corporation -operational 1.20
Plant
Sevilla Hydroelectric Power BOHECO 1 Sevilla Mini Hydro
Sevilla Operational 2.50
Plant Corp.
Kawasan Waterfalls
Cebu Alegria T.A.G. Mineral Resources, Inc. on-going study and permitting 0.50
Hydroelectric Power Project
Argao Hydroelectric Power
Argao Universal Hydrotechnologies, Inc. on-going study and permitting 0.80
Project
Basak II Hydroelectric Power
Badian Rapids Innoenergy, Inc. on-going permittings for construction 0.50
Project
Negros Amlan Hydroelectric Power Amlan Hydroelectric Power
Amlan ongoing rehabilitation 0.80
Oriental Plant Corporation
Amlan (Plant A) Hydroelectric Natural Power Sources
Amlan on-going permittings for construction 3.20
Power Project Intergration,Inc.
Amlan (Plant B) Hydroelectric Natural Power Sources
on-going permittings for construction 1.50
Power Project Intergration,Inc.
Amlan (Plant C) Hydroelectric Natural Power Sources
on-going permittings for construction 0.80
Power Project Intergration,Inc.
Pacuan -Guinobaan
La Libertad PNOC - Renewables Corp. under evaluation for commerciality 13.80
Hydroelectric Power Project
Canaway 1 Hydroelectric Power
Siaton Orbysy Holdings, Inc. on-going study and permitting 1.60
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Negros Canaway 2 Hydroelectric Power
VISAYAS VII Siaton Orbysy Holdings, Inc. on-going study and permitting 1.40
Oriental Project
Senona Hydroelectric Power
Siquijor Lazi AQA Global Power Inc. on-going study and permitting 3.20
Project
Gabangan Hydroelectric Power
AQA Global Power Inc. on-going study and permitting 4.14
Project
Eastern Pumped Storage Bolusao San Lorenzo Ruiz Samar Energy
VIII Lawaan on-going study and permitting 300.00
Samar Hydroelectric Power Project and Water, Inc.
Run-of-River Bolusao San Lorenzo Ruiz Samar Energy
on-going study and permitting 12.00
Hydroelectric Power Project and Water, Inc.
Maslog 1 Hydroelectric Power Maslog 1 Hydro Power
Maslog under evaluation of accomplishment 9.00
Project Corporation
Caminto River Hydroelectric
Leyte Inopacan Leyte IV Electric Cooperative, Inc. on-going study and permitting 0.50
Power Project
Binaha-an River Hydroelectric Engineering & Development
Jaro & Pastrana on-going study and permitting 2.20
Power Project Corporation of the Philippines
Bao Hydroelectric Power Leyte V Electric Cooperative, Inc
Kananga ongoing study and permitting 1.50
Project (LEYECO V)
Dumagocdoc River
Matalom Leyte IV Electric Cooperative, Inc. on-going study and permitting 0.60
Hydroelectric Power Project

Southern Himbangan River Hydroelectric


Saint Bernard Rapids Innoenergy, Inc. on-going study and permitting 2.00
Leyte Power Project

Bonbon Hydroelectric Power


Tomas Oppus Rapids Innoenergy, Inc. on-going study and permitting 1.00
Project
Western Calbiga Hydroelectric Power
Calbiga Meadowland Developers, Inc. on-going study and permitting 15.00
Samar Project

VISAYAS Sum 715.24 4.50

Zamboanga Bayog Hydroelectric Power


MINDANAO IX Bayog Global Sibagat Hydro Power Corp. on-going study and permitting 6.00
del Sur Project
Dumingag & Sindangan 4 Hydroelectric Alsons Energy Development
on-going study and permitting 8.00
Midsalip Power Project Corporation
Pasonanca (Upstream)
Zamboanga City PhilCarbon Inc. under evaluation of accomplishments 1.00
Hydroelectric Power Project
Pasonanca Hydroelectric Power
PhilCarbon Inc. on-going permittings for construction 0.05
Project
Saaz Hydroelectric Power
Meadowland Developers, Inc. on-going study and permitting 1.00
Project

Zamboanga Polandoc Hydroelectric Power Euro Hydro Power (Asia) Holdings,


Leon Postigo under evaluation of declaration of commerciality 2.00
del Norte Project Inc.

Dapitan River (Middle) Euro Hydro Power (Asia) Holdings,


Mutia under evaluation of accomplishment under the milestone concept 3.60
Hydroelectric Power Project Inc.
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Zamboanga Dapitan River (Upper) Euro Hydro Power (Asia) Holdings,
MINDANAO IX Mutia under evaluation of accomplishment under the milestone concept 3.60
del Norte Hydroelectric Power Project Inc.
Sergio Osmea, Cascade 1 Salug Daku Clean and Green Energy Solutions,
on-going study and permitting 4.40
Sr. Hydroelectric Power Project Inc.
Cascade 2 Salug Daku Clean and Green Energy Solutions,
on-going study and permitting 3.20
Hydroelectric Power Project Inc.
Zamboanga
Alimpaya Everhydro Corporation on-going study and permitting 0.50
City
Tamion Hydroelectric Power
Everhydro Corporation on-going study and permitting 0.50
Project
Patalon Hydroelectric Power
Everhydro Corporation on-going study and permitting 0.50
Project
Tagpangi Hydroelectric Power
Everhydro Corporation on-going study and permitting 0.50
Project
Ayala Hydroelectric Power
Everhydro Corporation on-going study and permitting 1.00
Project
Manicahan Hydroelectric
Manicahan River PhilCarbon Inc. ongoing study and permitting 1.70
Power Project
Pulunai River Hydroelectric Repower Energy Development
X Bukidnon on-going study and permitting 3.90
Power Project Corporation

Katipunan River Hydroelectric Repower Energy Development


on-going study and permitting 2.10
Power Project Corporation

Tumalaong Hydroelectric First Gen Mindanao Hydro Power


Baungon on-going permittings for construction 9.00
Power Project Corp.

Baungon and Bubunawan Hydroelectric FGEN Bubunawan Hydro


on-going permittings for construction 23.00
Libona Power Project Corporation

Baungon and Bubunawan Hydroelectric


Bubunawan Power Company, Inc. Operational 7.00
Libonan Power Plant

Dancagan Kitaotao 1 Hedcor Bukidnon, Inc. on-going study and permitting 35.00

Panoon Hydroelectric Power


Impasugong Gerphil Renewable Energy, Inc. Operational 0.23
Plant

Gakaon Hydroelectric Power


LGU of Impasugong on-going study and permitting 2.23
Project

Atugan 1 River Hydroelectric


Gerphil Renewable Energy, Inc. on-going study and permitting 2.40
Power Project

Impasugong and Tagoloan Hydroelectric Power


FGEN Tagoloan Hydro Corporation on-going permittings for construction 39.00
Sumilao Project
Maladugao River (Lower
Kalilangan & United Holdings Power
Cascade) Hydroelectric Power ongoing permittings for construction 10.00
Wao Corporation
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Umalag 1 Hydroelectric Power
MINDANAO X Bukidnon Libona Meadowland Developers, Inc. on-going study and permitting 1.80
Project
Sawaga Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Malaybalay under evaluation of declaration of commerciality 1.20
Project Inc.

Repower Energy Development


on-going study and permitting 2.00
Corporation
Upper Canayan Hydroelectric
Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 2.00
Power Project
Middle Canayan Hydroelectric
Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 3.00
Power Project
Lower Sawaga River Euro Hydro Power (Asia) Holdings,
on-going study and permitting 1.60
Hydroelectric Power Project Inc.
Upper Sawaga River Euro Hydro Power (Asia) Holdings,
on-going study and permitting 1.00
Hydroelectric Power Project Inc.
Malitbog Hydroelectric Power
Malitbog Philnewriver Power Corp. -on going study and permittings 5.00
Project
Silo-o Hydroelectric Power
Philnewriver Power Corp. on-going permittings for construction 4.50
Project
Culaman Hydroelectric Power Oriental Energy and Power
Manolo on-going permittings for construction 10.00
Project Generation Corporation

Agusan River Hydroelectric


Manolo Fortich FG Bukidnon Power Corp. Operational 1.60
Power Plant

Mangima Hydroelectric Power


Philnewriver Power Corp. on-going permittings for construction 10.00
Project
Maramag Hydroelectric Power First Bukidnon Electric
Maramag under evaluation of declaration of commerciality 2.00
Project Cooperative, Inc. transferred to
Manolo Fortich 1 Hydroelectric
Santiago Hedcor Bukidnon, Inc. on-going construction 43.40
Power Project
Manolo Fortich 2 Hydroelectric
Hedcor Bukidnon, Inc. on-going construction 25.40
Power Project
Manupali Hydroelectric Power
Valencia Matic Hydropower Corporation under evaluation of commerciality 9.00
Project

Upper Manupali Hydroelectric Bukidnon II Electric Cooperative,


ongoing study and permitting 2.00
Power Project Inc.
Saguimata Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Valencia City, on-going study and permitting 1.30
Project Inc.
Maladugao River (Upper UHPC Bukidnon Hydro Power I
Wao ongoing permittings for construction 5.50
Cascade) Hydroelectric Power Corporation
Cagayan de Mat-i 1 Hydroelectric Power
Claveria Philnew Hydro Power Corp on-going permittings for construction 4.85
Oro Project
Misamis Langaran Hydroelectric Power Misamis Occidental I Electric
Calamba on-going study and permitting 3.64
Occidental Project Cooperative, Inc.
Clarin Hydroelectric Power
Clarin Philnew Hydro Power Corp on-going permittings for construction 6.20
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Misamis Cagayan de Oro Limbatangon Hydroelectric Turbines Resource & Development
MINDANAO X on-going permittings for construction 9.00
Oriental City Power Project Corp.
Mat-i 2 Hydroelectric Power
Philnewriver Power Corp. on-going permittings for construction 1.60
Project
Mat-i 3 Hydroelectric Power
Philnewriver Power Corp. on-going permittings for construction 3.25
Project
Umalag 2 Hydroelectric Power
Meadowland Developers, Inc. on-going study and permitting 2.50
Project
Cabulig Hydroelectric Power
Claveria Mindanao Energy Systems, Inc. Operational 8.00
Plant
Lower Cabulig Hydroelectric
Jasaan Mindanao Energy Systems, Inc. ongoing study and permitting 10.00
Power Project
Odiongan, Odiongan River A Mini-
JE Hydropower Ventures, Inc. on-going study and permitting 0.25
Gingoog City Hydroelectric Power Project
Lanao del Bayug Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Iligan City under evaluation of declaration of commerciality 1.00
Norte Project Inc.
Lower Bayug Hydroelectric Euro Hydro Power (Asia) Holdings,
on-going study and permitting 4.00
Power Project Inc.
Upper Bayug Hydroelectric Euro Hydro Power (Asia) Holdings,
on-going study and permitting 3.30
Power Project Inc.
Bulanog-Batang Hydroelectric Bukidnon Hydro Energy
on-going study and permitting 150.00
Power Project Corporation
Agus VIII Modular Hydroelectric
Fu-Tai Philippines, Inc. on-going study and permitting 12.00
Power Project
Titunod Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Kolambogan under evaluation of declaration of commerciality 1.00
Project Inc.
Ruparan Hydroelectric Power Davao de Sur Electric Cooperative, - on-going transfer to Euro Hydro Power (Asia) Holdings, Inc.
XI Davao del Sur Digos City 5.00
Project Inc. -under evaluation of declaration of commerciality

Guma River Hydroelectric Euro Hydro Power (Asia) Holdings,


on-going study and permitting 1.70
Power Project Inc.

Malita Hydroelectric Power


Malita LGU of Malita, Davao del Sur under evaluation of declaration of commerciality 2.50
Project
Tudaya 2 Hydroelectric Power
Sta. Cruz Hedcor Tudaya, Inc. Operational 7.00
Plant
Tudaya 1 Hydroelectric Power
Hedcor Sibulan, Inc . Operational 6.60
Plant

Napon River Hydroelectric Euro Hydro Power (Asia) Holdings,


on-going study and permitting 2.50
Power Project Inc.

Compostela Upper Maco Hydroelectric


Maco Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 4.00
Valley Power Project

Mt. Leonard Hydroelectric


Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 2.00
Power Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Compostela Tagum R Hydroelectric Power


MINDANAO XI Maco Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 4.00
Valley Project
Hijo R. I Hydroelectric Power
Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 3.00
Project
Hijo R. II Hydroelectric Power
Sta. Clara Power Corp. under evaluation of accomplishment under the milestone concept 3.00
Project
New Bataan Hydroelectric Euro Hydro Power (Asia) Holdings,
New Bataan on going construction 2.40
Power Project Inc.
Davao Baganga River Hydroelectric
Baganga Global Sibagat Hydro Power Corp. on-going study and permitting 11.00
Oriental Power Project
Dapnan Hydroelectric Power Euro Hydro Power (Asia) Holdings,
on-going study and permitting 1.40
Project Inc.
Cateel River Hydroelectric
Global Sibagat Hydro Power Corp. on-going study and permitting 16.00
Power Project
Baganga River Hydroelectric Euro Hydro Power (Asia) Holdings,
Baganga, on-going study and permitting 2.00
Power Project Inc.
Osmea Hydroelectric Power LGS Renewable Energies
Caraga ongoing study and permitting 2.00
Project Corporation
Manorigao Hydroelectric LGS Renewable Energies
under evaluation of accomplishment under the milestone concept 17.00
Power Project Corporation
Sumlog 2 Hydroelectric Power Alsons Energy Development
Lupon on-going study and permitting 15.00
Project Corporation
Sumlog 1 Hydroelectric Power Alsons Energy Development
on-going study and permitting 8.00
Project Corporation
Manay Hydroelectric Power Euro Hydro Power (Asia) Holdings,
Manay on-going study and permitting 0.75
Project Inc.

Casauman Hydroelectric Power


Global Sibagat Hydro Power Corp. on-going study and permitting 34.00
Project
Quinonoan River Quinonoan River 2 Euro Hydro Power (Asia) Holdings,
on-going study and permitting 1.50
2 Hydroelectric Power Project Inc.
Quinonoan River Quinonoan River I Euro Hydro Power (Asia) Holdings,
on-going study and permitting 1.80
I Hydroelectric Power Project Inc.
Davao Hydroelectric Power San Lorenzo Ruiz Olympia Energy
Davao del Sur Davao City on-going study and permitting 140.00
Project and Water, Inc.
North Alamada Hydroelectric Power Euro Hydro Power (Asia) Holdings,
XII Alamada under evaluation of declaration of commerciality 1.00
Cotabato Project Inc.
Magpet 1 Hydroelectric Power
Magpet Universal Hydrotechnologies, Inc. under evaluation of commerciality 9.80
Project
Magpet 2 Hydroelectric Power
Universal Hydrotechnologies, Inc. under evaluation of commerciality 1.30
Project
Makilala-1 Hydroelectric Power
Makilala Universal Hydrotechnologies, Inc. on-going study and permitting 2.00
Project
Sultan Kabulnan 2 Hydroelectric
Isulan Philnewriver Power Corp. under evaluation of declaration of commerciality 110.00
Kudarat Power Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Siguil 1 Hydroelectric Power Alsons Energy Development
MINDANAO XII Sarangani Maasim under evaluation of declaration of commerciality 8.70
Project Corporation
Siguil 2 Hydroelectric Power Alsons Energy Development
under evaluation of declaration of commerciality 3.20
Project Corporation

Siguil 3 Hydroelectric Power Alsons Energy Development


under evaluation of declaration of commerciality 4.80
Project Corporation

Kalaong 3 Hydroelectric Power Alsons Energy Development


Maitum on-going study and permitting 4.00
Project Corporation
Kalaong 1 Hydroelectric Power Alsons Energy Development
Saranggani Maitum under evaluation of accomplishment under the milestone concept 12.00
Project Corporation

Kalaong 2 Hydroelectric Power Alsons Energy Development


under evaluation of accomplishment under the milestone concept 6.00
Project Corporation

South Koronadal & Euro Hydro Power (Asia) Holdings,


Marbel 1 ongoing rehabilitation 0.50
Cotabato Tampakan Inc.
Lanon (Lam-alu) Hydroelectric Euro Hydro Power (Asia) Holdings,
Lake Sebu ongoing permittings for construction 9.00
Power Project Inc.
Takbo Hydroelectric Power South Cotabato I Electric
Sebu, on-going study and permitting 15.00
Project Cooperative, Inc.
Agusan del Taguibo 1 Hydroelectric Power
XIII Butuan Equi-Parco Construction Co. under evaluation of declaration of commerciality 2.00
Norte Project
Taguibo 2 Hydroelectric Power
Equi-Parco Construction Co. under evaluation of declaration of commerciality 2.00
Project
Bugsukan Hydroelectric Power
Butuan City Global Sibagat Hydro Power Corp. on-going study and permitting 5.00
Project
Cabadbaran Hydroelectric First Gen Mindanao Hydro Power
Cabadbaran on-going permittings for construction 9.75
Power Project Corp.
Lake Mainit Hydroelectric -on-going construction -As of
Jabonga Agusan Power Corporation 25.00
Power Project August 2014, actual accomplishment for civil work is 15%
Puyo Hydroelectric Power -the project's implementation was on hold due to security threat in the
Jabonga FGEN Puyo Hydro Corporation 30.00
Project area
Asiga Hydroelectric Power
Santiago Asiga Green Energy Corporation on-going construction 8.00
Project

Surigao del Lower Carac-an Hydroelectric


Cantilan Meadowland Developers, Inc. on-going study and permitting 5.00
Sur Power Project

Carac-an Hydroelectric Power


Madrid Hydro Link Projects Corporation on-going study and permitting 25.00
Project

Agusan Del Upper Tago Hydroelectric Global Sibagat Hydropower


Lanuza on-going study and permitting 30.00
Sur Power Project Corporation

Wawa 1 Hydroelectric Power


Sibagat Equi-Parco Construction Co. under evaluation of accomplishment under the milestone concept 7.70
Project
AWARDED HYDROELECTRICPOWER PROJECTS as of June 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Agusan Del Wawa 2 Hydroelectric Power
MINDANAO XIII Sibagat Equi-Parco Construction Co. under evaluation of accomplishment under the milestone concept 7.00
Sur Project

Wawa 3 Hydroelectric Power


Equi-Parco Construction Co. under evaluation of accomplishment under the milestone concept 5.60
Project

Managong Hydroelectric Power Global Sibagat Hydropower


on-going study and permitting 6.00
Project Corporation
Wawa Hydroelectric Power Global Sibagat Hydropower
on-going study and permitting 13.00
Project Corporation
Surigao del Baoy Hydroelectric Power
Gigaquit Global Sibagat Hydro Power Corp. on-going study and permitting 12.00
Norte Project
Malabang & Maitling River Hydroelectric
ARMM Lanao del Sur AQA Global Power Inc. on-going study and permitting 50.00
Tubaran Power Project
Baras River Hydroelectric
AQA Global Power Inc. on-going study and permitting 30.00
Power Project
Matadi River Hydroelectric
AQA Global Power Inc. on-going study and permitting 27.00
Power Project
Lake Dapao Hydroelectric
AQA Global Power Inc. on-going study and permitting 50.00
Power Project
Lanao del
Pantar &
X/ARMM Norte/Lanao Agus III Maranao Energy Corp. on-going study and permitting 225.00
Baloi/Saguiaran
del Sur
MINDANAO Sum 1,550.37 30.43
Grand Total 7,884.54 136.73