Surrounded by Fortune 500 Companies in 6 Industrial Estates

4,000 Multinational Companies 100,000 Business Owners


1 million cars production / year 100,000 Managers
10 million motorcycles production / year 12,000 Expatriates
Corridor of extraordinary economic growth.
with 6 new infrastructures + Direct Toll Access

JAKARTA

BANDUNG
Patimban Deep Seaport
Rp 40 T Investment, Partial Target 2019, Full Operational 2022
Kertajati International Airport
Already Topping Off, Operation Feb 18, Grand Opening June/July 18
Please Check BIJB Youtube here

Topping Off Ceremony


Express Train Jakarta Bandung
Already Ground Breaking, appointed WIKA contractor
Rp 65 T Investment
LRT (Light Rail Transport)
Cawang Bekasi Timur Cikarang Station
Target Finished 2019

1st Corridor
Cawang/ Bekasi Timur now under
construction

2nd Corridor
Cikarang Station will be integrated with the
APM (Monorail) system
Automated People Mover (Monorail)
Start constructing 2018, Target finished 2020
Jakarta Cikampek elevated toll
Target to operate April 2019
Rp 16,2 T Investment
CITY CONCEPT
&
WORLD CLASS FACILITIES
Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Why do we choose GRID SYSTEM?
Meikarta The New Metropolis

Advantages
- Easy to navigate and finding directions
- Easy to identify the blocks x,y based coordinate

Required
- Smart Residents

In terms of Urban System:


- Smart City = Smart Grid System
Why do we choose GRID SYSTEM?
New York Grid System

340 Ha Key Features:


- Grid System
- Central Park
- Public Transportation
Network
Why do we choose GRID SYSTEM?
Tokyo Grid System
340 Ha
Key Features:
- Grid System
- Imperial Palace
- Public Transportation
Network
Can you find something similar?
Meikarta The New Metropolis
Key Features:
- Grid System
A - Consistent
- Easy to change route

100 Ha

B
Can you find something similar?
To JABABEKA Meikarta The New Metropolis
APM Station Key Features:
- Grid System
APM Station APM Station - Consistent
APM Interchange - Easy to change route
To LIPPO CIKARANG
- Central Park:
- Zoo
100 Ha - Amusement Park

- Public Transportation Network


APM Station
- LRT (Light Rapid Transit)
- APM (Automated People Mover)

Stations are mostly within 5 minutes


walking radius (350m)

To DELTA MAS
APM Station
Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


Master Plan

Disclaimer: all drawings and layout is subject to change for improvement.


The 5 Pillars
Innovative
of Development Centre of
Infrastructure
& Art, Culture,
transportation Education, &
Health

HIGH Tech Business &


CBD & Commercial
Research uGreen, Hub
Hub Sustainable,
& Beautiful
Environment

Massive Scale of Development


New benchmark & trendsetter for future city
not only in Jakarta but in South East Asia
Innovative
Infrastructure
&
transportation

4 LAYERS OF COHERENT INTERNAL ROAD NETWORKS


Separating pedestrian & automobiles

Connecting all 2nd floors between buildings with convenient,


pedestrian fly-overs

With ROW of 30m (6 Lanes), 48m (8 Lanes) and 60m (10 Lanes),
based on internal road network

Internal Transportation at ground floor like Monorail, connecting


some parts of city-points and areas
Innovative
4 LAYERS OF COHERENT
Infrastructure
&
INTERNAL ROAD NETWORKS
transportation
4 LAYERS OF WELL PLANNED
ROAD NETWORKS
LRT / Monorail, Bus at below street level
4 LAYERS OF WELL PLANNED ROAD
NETWORKS
Road ROW of 30m (6 Lanes), 48m (8 Lanes) and 60m (10 Lanes)
Pedestrian
Fly-over
at 2nd level

Connections
between all
buildings
HIGH Tech
CBD & Top 3 Universities
Research
hub
HIGH Tech
CBD &
Indonesian Sillicon Valley
Research
hub
HIGH Tech
CBD &
Industrial Research Centre
Research
hub
uGreen,
Sustainable,
Central Park of 100 Ha
& Beautiful
Environment
Centre of Art,
TOP 5 High Schools
Culture,
Education, &
TOP 10 Primary schools
Health
Centre of Art, Opera & Theatres
Culture,
Education, &
Health
Centre of Art, City Library
Culture,
Education, &
Health
Centre of Art, National Hospital
Culture,
Education, &
Health
Business &
Convention Centre
Commercial
Hub 200,000 people capacities

JHCC = 15,000 capacities, ICE BSD = 10,000 capacities


Business &
5 Star International Hotels
Commercial
Hub
such as:
Business & International Finance Centre
Commercial
Hub
Business & Mall 300,000 m2
Commercial
Hub & Commercial Area of 1,500,000 m2
Business & Shopping Streets
Commercial
Hub
Distinctive Architecture of each
Residential Tower
Different Styles from various Historical
Periods and Cultures:

American Style
European Style
Asian Style
Modern Style
AMERICAN
STYLE
EUROPEAN
STYLE
ASIAN
STYLE
MODERN
STYLE
TOWER OVERVIEW
Unit Overview:
From:
2 BR (42.58 66.96 m2)
3 BR (63.8 75.23 m2)
4 BR (82.98 98.29 m2)
Tower Type A 8 units / floor
2 Bedroom 3 units
3 Bedroom : 2 units
4 Bedroom : 3 units

Tower Type B 12 units / floor


2 Bedroom : 9 units
3 Bedroom : 3 units
System Coding Number Tower in MEIKARTA

SETELAH LANTAI 39 MENJADI :


LANTAI 55
LANTAI 53
LANTAI 52
LANTAI 51
LANTAI 50
LANTAI 39
System Coding Number Tower in MEIKARTA

25031- 1A 31 - A
KODE UNIT
LANTAI
KODE BLOCK
TIPE TOWER
1(KIRI) A (TIPE TOWER)
1(KIRI) B (TIPE TOWER)

2 (KANAN) A (TIPE TOWER)


2 (KANAN) B (TIPE TOWER)
Available
Blocks
Available
Blocks
Available
BLOCKS

53022
52022
51022
50022
39022
38022
50023
39023
38023
38020
39021
50021
51021
52021
53021
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 38020

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 38022

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 38023

1B 2A
BLOCK 1B 2A
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 39021

1A 2B
BLOCK 1A 2B

L1
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 39022

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 39023

1A 2B
BLOCK 1A 2B

L1
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 50021

1A 2B
BLOCK 1A 2B

L1

L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 50022

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 50023

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 51021

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 51022

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 52021

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 52022

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 53021

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 53022

1B 2B
BLOCK 1B 2B

A D D A
B C C B

E H H E
F G G F

I J K L1L LL K J I

L1
L
Available
BLOCKS

55008
55009
56007
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 55008

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 55009

1B 2B
BLOCK 1B 2B
PLOTTING TYPE TOWER ON MASTERPLAN:
BLOCK 56007

1A 2B
BLOCK 1A 2B

L1
Tower A

C D E F
C D E F

B A H G
B A H G

8 Units / Floor
TOWER A
UNIT A

2 Bedroom
58.96 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT B

4 Bedroom
82.98 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT C

4 Bedroom
98.29 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT D

2 Bedroom
60.54 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT E

2 Bedroom
62.30 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT F

4 Bedroom
85.30 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT G

3 Bedroom
75.23 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER A
UNIT H

3 Bedroom
63.82 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
Tower B

A D
B C

E H
F G

I J K L

12 Units / Floor
TOWER B
UNIT A

3 Bedroom
68.73 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT B

3 Bedroom
64.92 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT C

3 Bedroom
66.96 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT D

3 Bedroom
68.73 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT E

3 Bedroom
73.11 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT F

2 Bedroom
49.76 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT G

2 Bedroom
47.11 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT H

2 Bedroom
56.75 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT I

2 Bedroom
52.56 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT J

2 Bedroom
42.58 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT K

2 Bedroom
42.58 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
TOWER B
UNIT L

2 Bedroom
52.58 m2

Disclaimer: Unit size is on gross built up area. Developer reserve the right for the fine tuning and improving the final product.
SPECIFICATION
SPECIFICATION
FINISHING & MATERIAL OPTION
HOMOGENEOUS TILE FLOOR 800 X 800
LIVING ROOM PAINTED GYPSUM WALL
PAINTED SKIM COAT CEILING WITH CORNICE
HOMOGENEOUS TILE FLOOR 800 X 800
DINING ROOM PAINTED GYPSUM WALL
PAINTED SKIM COAT CEILING WITH CORNICE
COMPOSITE WOOD FLOOR
BEDROOM PAINTED GYPSUM WALL
PAINTED SKIM COAT CEILING WITH CORNICE
CERAMIC TILE 600 x600 / HOMOGENEOUS TILE 800 X 800
KITCHEN PAINTED WALL
PAINTED SKIM COAT CEILING
CERAMIC TILE FLOOR 600 X 600
BATHROOM CERAMIC TILE WALL 300 x 600
PAINTED SKIM COAT CEILING
CERAMIC TILE FLOOR 300 X 300
BALCONY PAINTED WALL
PAINTED SKIM COAT CEILING
GENERAL SPECIFICATION
2.200 VA2BR
POWER 3.500 VA3BR
4.400 VA4 BR
WATER HEATER INSTALLATION ONLY
AIR CONDITIONING INSTALLATON ONLY
LIGHTING FIXTURE ONLY. NO BULB
INTERNET 1 LINE IN LIVING ROOM (INSTALLATION ONLY)
TV 1 LINE IN LIVING ROOM AND 1 LINE IN MASTER BEDROOM
AUDIO INTERCOM 1 LINE

SANITARY WARE
BATHROOM TOTO EQUIVALENT
PANTRY SINGLE BOWL, STAINLESS STEEL SINK
DRY CLEAN ROOM WATER AND ELECTRICAL POINTS ONLY
DOOR & WINDOWS
MAIN DOOR SOLID ENGINEERED DOOR
OTHER DOOR SOLID ENGINEERED DOOR
WINDOW ALUMINIUM FRAME WITH CLEAR GLASS
TERM PAYMENT
Booking Fee
Rp 2,000,000,-
Nama : PT Mahkota Sentosa Utama
A/C No : 127.30.11888.1
Bank : Nobu Bank
Cabang : Lippo Cikarang
Refundable bila tidak jadi memilih unit.
TYPE CARA PEMBAYARAN :

1. HARDCASH
Booking Fee Rp 2juta
DP 10% - 14 days after BF
90% - Final payment 30 days after DP

2. KPA BANK
Booking Fee Rp 2juta
DP 10% (luas unit <70m2) 14 days after BF
Plafond KPA 90% - Akad 30 days after DP

DP 15% (luas unit >70m2) 14 days after BF


Plafond KPA 85% - Akad 30 days after DP
TYPE CARA PEMBAYARAN :

3. Installment 12X
Booking Fee Rp 2juta
DP 10% - 14 days after BF
30 Days after DP:
90% - divided into 12 months (12X)
TYPE CARA PEMBAYARAN :

5. Installment 18X
Booking Fee Rp 2juta
DP 10% - 14 days after BF
30 Days after DP:
90% - divided into 18 months (18X)

6. Installment 24X
Booking Fee Rp 2juta
DP 10% - 14 days after BF
30 Days after DP:
90% - divided into 24 months (24X)
TYPE CARA PEMBAYARAN :
SPECIAL PAYMENT

Special payment 20x


2 BR 3 BR 4 BR
DP 5% 5% 5%
Bulan 1 -6 3,000,000 7,000,000 10,000,000
Bulan 7 - 12 9,000,000 12,000,000 15,000,000
Bulan 13 - 18 15,000,000 18,000,000 20,000,000
Pelunasan +/- 65% +/- 70% +/- 71%

Special payment 25x


2 BR 3 BR 4 BR
DP 5% 5% 5%
Bulan 1 -6 5,000,000 9,000,000 12,000,000
Bulan 7 - 12 7,000,000 11,000,000 14,000,000
Bulan 13 - 18 9,000,000 13,000,000 16,000,000
Bulan 19 - 23 11,000,000 15,000,000 18,000,000
Pelunasan +/- 63% +/- 71% +/- 71%
BANK KERJASAMA
NOBU NISP
MANDIRI MAYBANK
BNI MUAMALAT
BRI ICBC
BTN DANAMON
HANA BANK
CIMB NIAGA
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 3 May 2017
Preconstruction before launching
Progress photo per 7 May 2017
Preconstruction before launching
Progress photo per 7 May 2017