Professional Documents
Culture Documents
Paper organization
III. PROBLEM STATEMENT Vehicle motion calculation using the below formula
(1)
Fig. 2. Theoretical flow strategy for Real-Time traffic
and management system.
by computing the compelling separation as using eq. (1)
2016 International Conference on Emerging Technological Trends [ICETT]
In Figure 2 shows flow of the process Real-Time traffic Internet of things module
management system. plan a straightforward activity calculation
[14] to execute in the movement framework. The activity Approach is to completely IoT based vehicle
focuses are dealt with as autonomous areas. We take the information gathering system. Intel IoT kit with all latest
movement densities of various streets at a specific time as info. features and vehicle detection sensors. Connected the sensors
In light of out information, we have created two yields. based on our criteria we deploy on road km or 1 km and more
Movement Cycle ( ) is the aggregate time required for one it depends best is to deploy very near distance for getting better
results. At least 10 sensors are connected in each other and it
complete revolution of the sign lights at any activity point. The
communicates to the single IoT kit. All kits are connected to the
activity cycle is taken as an element of aggregate movement
network access sharing information among the Internet. It
thickness ( ) of vehicles given as (4).
continues monitoring for vehicles and updates are sending to the
=f( ) (4) big data storage and analytics.
The denser the activity, longer is the movement cycle. This Big Data Analytics Module
strategy is connected for more cycle span when there is more It Receives the sensors information with sensor Id.
movement (as in surge hour) so that more vehicles can breathe Compute all the information performing analytics operations.
easy. At the point when there is less movement, the activity Various factors are considering for calculating individual sensor
cycle is abbreviated with the goal that vehicles don't need to sit strength and add each other sensor entry and leaving vehicle
tight for a drawn out stretch of time in sign moves. The second details road capacity. Etc. factors are considered compute
parameter is weighted time portion analyzed report are to be produced it make ready through access
V. PRACTICAL EVALUATION MODEL by using internet either mobile APP or internet browser. Here
apply various forms are approaches [21] are connected with
In practical approach it consists the three different modules latest real-time streaming data processing mechanisms are used.
are adding.
User Interaction Modules
Experimental Setup
In this module consists of the latest analytics and
For experimental setup three different modules are there for decision tools are providing for travelers. Capacity of road
overall application designing. Based on below figure (3) shows number of vehicles are there status everything shown accessing
deploying technologies on root phase. internet. Multiple ways user wants to access the information
example mobile APP, internet browser throw enabling GPS on
Device, etc. In user point of view very faster interaction and fast
data processing are to be done by using background as big data
stream analytics. For better and faster real-time data stream
computing as well as analytics on top of that we apply