PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
COMPONENTE: TRABAJOS PRELIMINARES
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE OBRA UND 2 --- --- --- 2.00 2.00
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
PLANILLA DE METRADOS
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.70 18.83
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.70 19.95
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.70 18.80
Jr. s/n2 - berma 1 Area = 24.70 0.70 17.29
Jr. s/n3 - berma 1 Area = 22.60 0.70 15.82
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.70 18.66
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.70 35.42
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,525.12
En sardineles 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado 1 Area = 1,821.51 0.20 364.30
En rampas 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En cuneta tipo 2 1 38.40 0.80 0.60 18.43
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria 0.1 Volumen 10,115.88 --- 505.79
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - izq 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - der 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - izq 1 Area = 36.35 --- 36.35
Jr. Jose de la riva Agüero - der 1 Area = 27.30 --- 27.30
Jr. Jose de la riva Agüero - izq 1 Area = 31.05 --- 31.05
Jr. Sr. De Huanca - der 1 Area = 57.35 --- 57.35
Jr. Sr. De Huanca - izq 1 Area = 57.35 --- 57.35
Psje s/n - izq 1 Area = 27.90 --- 27.90
Jr. Jose de la riva Aliaga - der 1 Area = 30.90 --- 30.90
Jr. Jose de la riva Aliaga - izq 1 Area = 30.90 --- 30.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 32.10 --- 32.10
Jr. Felipe Pardo y Aliaga - izq 1 Area = 32.10 --- 32.10
Jr. Clorinda Matto de Turner - der 1 Area = 30.90 --- 30.90
Jr. Clorinda Matto de Turner - izq 1 Area = 30.90 --- 30.90
Jr. s/n2 - izq 1 Area = 24.90 --- 24.90
Jr. s/n3 - der 1 Area = 21.90 --- 21.90
Jr. Sanchez Cerro - der 1 Area = 30.90 --- 30.90
Jr. Sanchez Cerro - izq 1 Area = 30.90 --- 30.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1,004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga 50 120.00 5.00 0.002 60.00
Jr. Felipe Pardo Aliaga 50 120.00 5.00 0.002 60.00
Jr. Clorinda Matto de Turner 50 120.00 5.00 0.002 60.00
Jr s/n2 50 120.00 5.00 0.002 60.00
Jr. s/n3 50 120.00 5.00 0.002 60.00
Jr. Sanchez Cerro 50 120.00 5.00 0.002 60.00
Av. Ramon E. Gutierrez 50 120.00 5.00 0.002 60.00
en via durante la remosion 2 847.10 5.00 0.002 16.94
en via durante la remosion 2 842.10 5.00 0.002 16.84
en cantera 2 150.00 150.00 0.002 90.00
05.00.00 PAVIMENTO
05.01.00 SUB RASANTE
05.01.01 MATERIAL DE RELLENO M3 3,598.30
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 36.25 0.25 9.06
Jr. Orizaba - izq 1 Area = 36.20 0.25 9.05
Jr. Jose Maria Eguren - der 1 Area = 36.20 0.25 9.05
Jr. Jose Maria Eguren - izq 1 Area = 36.35 0.25 9.09
Jr. Jose de la riva Agüero - der 1 Area = 27.30 0.25 6.83
Jr. Jose de la riva Agüero - izq 1 Area = 31.05 0.25 7.76
Jr. Sr. De Huanca - der 1 Area = 57.35 0.25 14.34
Jr. Sr. De Huanca - izq 1 Area = 57.35 0.25 14.34
Psje s/n - izq 1 Area = 27.90 0.25 6.98
Jr. Jose de la riva Aliaga - der 1 Area = 30.90 0.25 7.73
Jr. Jose de la riva Aliaga - izq 1 Area = 30.90 0.25 7.73
Jr. Felipe Pardo y Aliaga - der 1 Area = 32.10 0.25 8.03
Jr. Felipe Pardo y Aliaga - izq 1 Area = 32.10 0.25 8.03
Jr. Clorinda Matto de Turner - der 1 Area = 30.90 0.25 7.73
Jr. Clorinda Matto de Turner - izq 1 Area = 30.90 0.25 7.73
Jr. s/n2 - izq 1 Area = 24.90 0.25 6.23
Jr. s/n3 - der 1 Area = 21.90 0.25 5.48
Jr. Sanchez Cerro - der 1 Area = 30.90 0.25 7.73
Jr. Sanchez Cerro - izq 1 Area = 30.90 0.25 7.73
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.25 77.39
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.25 251.20
Jr. Orizaba - berma 1 Area = 30.50 0.25 7.63
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.25 7.63
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.25 6.13
PLANILLA DE METRADOS
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.25 10.38
Psje s/n - berma 1 Area = 24.90 0.25 6.23
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.25 6.73
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.25 7.13
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.25 6.71
Jr. s/n2 - berma 1 Area = 24.70 0.25 6.18
Jr. s/n3 - berma 1 Area = 22.60 0.25 5.65
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.25 6.66
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.25 12.65
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
05.03.00 BASE
05.03.01 MATERIAL BASE M3 2,878.64
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 36.25 0.20 7.25
Jr. Orizaba - izq 1 Area = 36.20 0.20 7.24
Jr. Jose Maria Eguren - der 1 Area = 36.20 0.20 7.24
Jr. Jose Maria Eguren - izq 1 Area = 36.35 0.20 7.27
Jr. Jose de la riva Agüero - der 1 Area = 27.30 0.20 5.46
Jr. Jose de la riva Agüero - izq 1 Area = 31.05 0.20 6.21
Jr. Sr. De Huanca - der 1 Area = 57.35 0.20 11.47
Jr. Sr. De Huanca - izq 1 Area = 57.35 0.20 11.47
Psje s/n - izq 1 Area = 27.90 0.20 5.58
Jr. Jose de la riva Aliaga - der 1 Area = 30.90 0.20 6.18
Jr. Jose de la riva Aliaga - izq 1 Area = 30.90 0.20 6.18
Jr. Felipe Pardo y Aliaga - der 1 Area = 32.10 0.20 6.42
Jr. Felipe Pardo y Aliaga - izq 1 Area = 32.10 0.20 6.42
Jr. Clorinda Matto de Turner - der 1 Area = 30.90 0.20 6.18
Jr. Clorinda Matto de Turner - izq 1 Area = 30.90 0.20 6.18
Jr. s/n2 - izq 1 Area = 24.90 0.20 4.98
Jr. s/n3 - der 1 Area = 21.90 0.20 4.38
Jr. Sanchez Cerro - der 1 Area = 30.90 0.20 6.18
Jr. Sanchez Cerro - izq 1 Area = 30.90 0.20 6.18
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
De la planilla de metrados de pavimento 1 Area = 6,021.02 --- 6,021.02
De la planilla de metrados de pavimento 1 Area = 6,056.77 --- 6,056.77
Jr. Orizaba - der 1 Area = 36.25 --- 36.25
Jr. Orizaba - izq 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - der 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - izq 1 Area = 36.35 --- 36.35
Jr. Jose de la riva Agüero - der 1 Area = 27.30 --- 27.30
Jr. Jose de la riva Agüero - izq 1 Area = 31.05 --- 31.05
Jr. Sr. De Huanca - der 1 Area = 57.35 --- 57.35
Jr. Sr. De Huanca - izq 1 Area = 57.35 --- 57.35
Psje s/n - izq 1 Area = 27.90 --- 27.90
Jr. Jose de la riva Aliaga - der 1 Area = 30.90 --- 30.90
Jr. Jose de la riva Aliaga - izq 1 Area = 30.90 --- 30.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 32.10 --- 32.10
Jr. Felipe Pardo y Aliaga - izq 1 Area = 32.10 --- 32.10
Jr. Clorinda Matto de Turner - der 1 Area = 30.90 --- 30.90
Jr. Clorinda Matto de Turner - izq 1 Area = 30.90 --- 30.90
Jr. s/n2 - izq 1 Area = 24.90 --- 24.90
Jr. s/n3 - der 1 Area = 21.90 --- 21.90
Jr. Sanchez Cerro - der 1 Area = 30.90 --- 30.90
Jr. Sanchez Cerro - izq 1 Area = 30.90 --- 30.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
De la planilla de metrados de pavimento 1 Area = 5,590.86 --- 5,590.86
Jr. Orizaba - der 1 Area = 36.25 --- 36.25
Jr. Orizaba - izq 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - der 1 Area = 36.20 --- 36.20
Jr. Jose Maria Eguren - izq 1 Area = 36.35 --- 36.35
Jr. Jose de la riva Agüero - der 1 Area = 27.30 --- 27.30
Jr. Jose de la riva Agüero - izq 1 Area = 31.05 --- 31.05
Jr. Sr. De Huanca - der 1 Area = 57.35 --- 57.35
Jr. Sr. De Huanca - izq 1 Area = 57.35 --- 57.35
Psje s/n - izq 1 Area = 27.90 --- 27.90
Jr. Jose de la riva Aliaga - der 1 Area = 30.90 --- 30.90
Jr. Jose de la riva Aliaga - izq 1 Area = 30.90 --- 30.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 32.10 --- 32.10
Jr. Felipe Pardo y Aliaga - izq 1 Area = 32.10 --- 32.10
Jr. Clorinda Matto de Turner - der 1 Area = 30.90 --- 30.90
Jr. Clorinda Matto de Turner - izq 1 Area = 30.90 --- 30.90
Jr. s/n2 - izq 1 Area = 24.90 --- 24.90
Jr. s/n3 - der 1 Area = 21.90 --- 21.90
Jr. Sanchez Cerro - der 1 Area = 30.90 --- 30.90
Jr. Sanchez Cerro - izq 1 Area = 30.90 --- 30.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
06.01.00 NIVELADO Y COMPACTADO
06.01.01 MATERIAL SELECCIONADO M3 406.59
Jr. Illimani - Jr. Orizaba - der 1 Area = 76.65 0.13 9.58
Jr. Illimani - Jr. Orizaba - izq 1 Area = 74.35 0.13 9.29
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 92.55 0.13 11.57
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 108.75 0.13 13.59
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 1 Area = 87.05 0.13 10.88
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 1 Area = 101.55 0.13 12.69
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 78.60 0.13 9.83
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 93.40 0.13 11.68
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 1 Area = 289.20 0.13 36.15
Jr. Sr. De Huanca - Psje s/n - izq 1 Area = 164.45 0.13 20.56
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 136.40 0.13 17.05
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 1 Area = 222.80 0.13 27.85
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 0.13 28.14
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 0.13 31.20
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 0.13 29.08
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 0.13 18.66
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 0.13 13.44
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 0.13 10.59
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 0.13 15.13
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 0.13 22.30
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 0.13 47.33
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
06.01.04 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
06.02.00 VEREDAS
06.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Illimani - Jr. Orizaba - der 0.56 Area = 76.65 --- 42.92
Jr. Illimani - Jr. Orizaba - izq 0.56 Area = 74.35 --- 41.64
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.56 Area = 92.55 --- 51.83
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.56 Area = 108.75 --- 60.90
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.56 Area = 87.05 --- 48.75
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.56 Area = 101.55 --- 56.87
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.56 Area = 78.60 --- 44.02
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.56 Area = 93.40 --- 52.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.56 Area = 289.20 --- 161.95
Jr. Sr. De Huanca - Psje s/n - izq 0.56 Area = 164.45 --- 92.09
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.56 Area = 136.40 --- 76.38
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.56 Area = 222.80 --- 124.77
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.56 Area = 225.15 --- 126.08
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.56 Area = 249.60 --- 139.78
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.56 Area = 232.65 --- 130.28
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 19 2.00 --- 0.10 3.80
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 19 2.00 --- 0.10 3.80
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 18 2.00 --- 0.10 3.60
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 18 2.00 --- 0.10 3.60
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 54 2.00 --- 0.10 10.80
Jr. Sr. De Huanca - Psje s/n - izq 29 2.00 --- 0.10 5.80
Psje s/n - Jr. Manuel Ascencio Segura - izq 25 2.00 --- 0.10 5.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 40 2.00 --- 0.10 8.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 40 2.00 --- 0.10 8.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 44 2.00 --- 0.10 8.80
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 45 2.00 --- 0.10 9.00
Jr. Clorinda Matto - Jr. s/n3 - der 28 2.00 --- 0.10 5.60
Jr. Clorinda Matto - Jr. s/n2 - izq 21 2.00 --- 0.10 4.20
Jr. s/n3 - Jr. Sanchez Cerro - der 18 2.00 --- 0.10 3.60
Jr. s/n2 - Jr. Sanchez Cerro - izq 24 2.00 --- 0.10 4.80
Jr. Sanchez cerro - Av. Ramón E. - der 28 2.00 --- 0.10 5.60
Jr. Sanchez cerro - Av. Ramón E. - izq 52 2.00 --- 0.10 10.40
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- 0.25 23.30
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- 0.25 21.45
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- 0.25 37.90
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Illimani - Jr. Orizaba - der 16 1.70 --- --- 27.20
Jr. Illimani - Jr. Orizaba - izq 15 1.90 --- --- 28.50
Jr. Orizaba - Jr. Jose Maria Eguren - der 10 1.75 --- --- 17.50
Jr. Orizaba - Jr. Jose Maria Eguren - izq 10 2.10 --- --- 21.00
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 10 1.70 --- --- 16.15
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 10 2.00 --- --- 19.00
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 9 1.60 --- --- 14.40
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 9 2.00 --- --- 18.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 27 1.80 --- --- 48.60
Jr. Sr. De Huanca - Psje s/n - izq 15 2.00 --- --- 29.00
Psje s/n - Jr. Manuel Ascencio Segura - izq 13 2.00 --- --- 25.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 20 2.00 --- --- 40.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 20 2.00 --- --- 40.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 22 2.00 --- --- 44.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 23 2.00 --- --- 45.00
Jr. Clorinda Matto - Jr. s/n3 - der 14 2.00 --- --- 28.00
Jr. Clorinda Matto - Jr. s/n2 - izq 11 2.00 --- --- 21.00
Jr. s/n3 - Jr. Sanchez Cerro - der 9 1.90 --- --- 17.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 12 1.90 --- --- 22.80
Jr. Sanchez cerro - Av. Ramón E. - der 14 2.00 --- --- 28.00
Jr. Sanchez cerro - Av. Ramón E. - izq 26 2.00 --- --- 52.00
06.03.00 RAMPAS
06.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - Jr. Sanchez Cerro - der 17 0.45 --- --- 7.65
Jr. s/n2 - Jr. Sanchez Cerro - izq 23 0.45 --- --- 10.35
Jr. Sanchez cerro - Av. Ramón E. - der 27 0.45 --- --- 12.15
Jr. Sanchez cerro - Av. Ramón E. - izq 51 0.45 --- --- 22.95
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Psje s/n - Jr. Jose de la Riva Aliaga 2 107.80 --- 0.55 118.58
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 2 200.05 --- 0.55 220.06
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 2 224.60 --- 0.55 247.06
Jr. Clorinda Matto de Turner - Jr. s/n2 2 84.45 --- 0.55 92.90
Jr. s/n3 - Jr. Sanchez Cerro 2 64.25 --- 0.55 70.68
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 2 76.20 --- 0.55 83.82
Jr. orizaba - Sardinel de borde limite pavimento 4 10.00 --- 0.25 10.00
Jr. Jose Maria Eguren - lim pav 4 10.00 --- 0.25 10.00
Jr. Jose Riva Agüero - lim pav 4 7.00 --- 0.25 7.00
Jr. Sr. De Huanca - lim pav 4 15.50 --- 0.25 15.50
Psje s/n - lim pav 2 7.20 --- 0.25 3.60
Jr. Jose de la Riva Aliaga - lim pav 2 8.20 --- 0.25 4.10
Jr. Manuel A. Segura - lim pav 2 8.20 --- 0.25 4.10
Jr. Felipe Pardo y Aliaga - lim pav 4 8.60 --- 0.25 8.60
Jr. Clorinda Matto de Turner - lim pav 4 8.20 --- 0.25 8.20
Jr. s/n2 - lim pav 2 6.10 --- 0.25 3.05
Jr. s/n3 - lim pav 2 5.20 --- 0.25 2.60
Jr. Sanchez Cerro - lim pav 2 8.20 --- 0.25 4.10
Av. Ramon E. Gutierrez - lim Pav 2 108.40 --- 0.25 54.20
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - lim pav 3 0.40 --- --- 1.20
Jr. s/n2 - lim pav 2 0.40 --- --- 0.80
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
09.02.04 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
09.02.05 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
PLANILLA DE METRADOS
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
COMPONENTE: SEÑALIZACION VIAL
10.00.00 SEÑALIZACION
10.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
PROYECT CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
flechas 42 1.80 1.00 --- 75.60
linea de parada 20 6.90 0.50 --- 69.00
linea central 105 3.00 0.10 --- 31.50
linea central 106 3.00 0.10 --- 31.80
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO DERECHO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
00+000 0.000 4.76 7.15 6.60
00+020 20.000 5.41 101.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+040 20.000 5.43 108.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+060 20.000 4.93 103.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+080 20.000 4.88 98.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+100 20.000 4.80 96.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+120 20.000 4.92 97.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+140 20.000 4.87 97.85 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+160 20.000 4.75 96.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+180 20.000 4.68 94.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+200 20.000 4.76 94.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+220 20.000 4.92 96.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+240 20.000 4.97 98.85 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+260 20.000 5.19 101.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+280 20.000 5.31 104.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+300 20.000 5.32 106.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+320 20.000 5.33 106.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+340 20.000 5.68 110.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+360 20.000 5.38 110.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+380 20.000 4.72 100.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+400 20.000 4.63 93.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+420 20.000 4.80 94.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO DERECHO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
00+440 20.000 4.75 95.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+460 20.000 4.85 95.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+480 20.000 4.82 96.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+500 20.000 5.22 100.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+520 20.000 5.22 104.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+540 20.000 5.29 105.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+560 20.000 5.31 105.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+580 20.000 5.39 106.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+600 20.000 5.09 104.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+620 20.000 5.31 103.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+640 20.000 4.85 101.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+660 20.000 5.29 101.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+680 20.000 4.87 101.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+700 20.000 4.25 91.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+720 20.000 4.56 88.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+740 20.000 4.76 93.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+760 20.000 5.09 98.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+780 20.000 5.35 104.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+800 20.000 5.23 105.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+820 20.000 4.95 101.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+840 20.000 4.47 94.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+842 2.100 4.44 9.35 0.00 7.15 15.02 3.75 3.00 3.00 6.60 13.86
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO DERECHO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO DERECHO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO IZQUIERDO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
00+000 0.000 4.75 7.15 6.60
00+020 20.000 5.50 102.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+040 20.000 5.38 108.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+060 20.000 5.33 107.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+080 20.000 5.30 106.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+100 20.000 5.26 105.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+120 20.000 4.98 102.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+140 20.000 4.63 96.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+160 20.000 4.64 92.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+180 20.000 4.76 93.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+200 20.000 4.78 95.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+220 20.000 4.55 93.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+240 20.000 4.82 93.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+260 20.000 5.26 100.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+280 20.000 5.26 105.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+300 20.000 5.18 104.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+320 20.000 5.67 108.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+340 20.000 6.05 117.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+360 20.000 5.47 115.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+380 20.000 5.08 105.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+400 20.000 5.26 103.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+420 20.000 5.29 105.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+440 20.000 5.25 105.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO IZQUIERDO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
00+460 20.000 5.37 106.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+480 20.000 5.34 107.05 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+500 20.000 5.34 106.75 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+520 20.000 5.08 104.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+540 20.000 5.02 100.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+560 20.000 4.94 99.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+580 20.000 4.88 98.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+600 20.000 4.79 96.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+620 20.000 4.71 94.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+640 20.000 5.12 98.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+660 20.000 4.62 97.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+680 20.000 4.31 89.25 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+700 20.000 4.03 83.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+720 20.000 4.44 84.65 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+740 20.000 5.16 95.95 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+760 20.000 5.56 107.15 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+780 20.000 5.33 108.85 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+800 20.000 4.92 102.45 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+820 20.000 4.94 98.55 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+840 20.000 4.50 94.35 0.00 7.15 143.00 35.75 28.60 28.60 6.60 132.00
00+847 7.100 4.11 30.55 0.00 7.15 50.77 12.69 10.15 10.15 6.60 46.86
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO IZQUIERDO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
METRADO DE PAVIMENTACION - AV. INFANCIA
Proyecto: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Formula: CONSTRUCCION DE CALZADA - LADO IZQUIERDO
SUB RASANTE
Capa Relleno 0.25 m
SUB BASE 0.20 m
BASE 0.20 m
CARPETA ASFALTICA 0.08 m
Distancia AREA VOLUMENES CONFORMACION SUB RASANTE SUB BASE BASE PAVIMENTO FLEXIBLE
Progresiva Area Corte Area Relleno Vol Corte Vol Relleno Ancho Area Relleno Mat Sub Base Mat Base Ancho Carpeta Asf
m m2 m2 m3 m3 m m2 m3 m3 m3 m m2
PROYECTO CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
(TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
Canal
Tapa de canal
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1,004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 41.50
Psje s/n - berma 1 Area = 24.90 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Illimani - Jr. Orizaba - der 1 Area = 76.65 --- 76.65
Jr. Illimani - Jr. Orizaba - izq 1 Area = 74.35 --- 74.35
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 92.55 --- 92.55
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 108.75 --- 108.75
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 1 Area = 87.05 --- 87.05
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 1 Area = 101.55 --- 101.55
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 78.60 --- 78.60
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 93.40 --- 93.40
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 1 Area = 289.20 --- 289.20
Jr. Sr. De Huanca - Psje s/n - izq 1 Area = 164.45 --- 164.45
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 136.40 --- 136.40
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 1 Area = 222.80 --- 222.80
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
04.03.00 BASE
04.03.01 MATERIAL BASE M3
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose Maria Eguren - izq 1 Area = 47.10 --- 47.10
Jr. Jose de la riva Agüero - der 1 Area = 35.10 --- 35.10
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 --- 35.10
Jr. Sr. De Huanca - der 1 Area = 73.90 --- 73.90
Jr. Sr. De Huanca - izq 1 Area = 54.80 --- 54.80
Psje s/n - izq 1 Area = 35.90 --- 35.90
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 --- 39.90
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Psje s/n - lim pav 1 7.20 0.30 0.25 0.54
Jr. Jose de la Riva Aliaga - lim pav 1 8.20 0.30 0.25 0.62
Jr. Manuel A. Segura - lim pav 1 8.20 0.30 0.25 0.62
Jr. Felipe Pardo y Aliaga - lim pav 2 8.60 0.30 0.25 1.29
Jr. Clorinda Matto de Turner - lim pav 2 8.20 0.30 0.25 1.23
Jr. s/n2 - lim pav 1 6.10 0.30 0.25 0.46
Jr. s/n3 - lim pav 1 5.20 0.30 0.25 0.39
Jr. Sanchez Cerro - lim pav 1 8.20 0.30 0.25 0.62
Av. Ramon E. Gutierrez - lim Pav 1 108.40 0.30 0.25 8.13
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - Jr. s/n2 28 0.45 --- --- 12.60
Jr. s/n3 - Jr. Sanchez Cerro 21 0.45 --- --- 9.45
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 25 0.45 --- --- 11.25
Jr. orizaba - Sardinel de borde limite pavimento 3 0.40 --- --- 1.20
Jr. Jose Maria Eguren - lim pav 3 0.40 --- --- 1.20
Jr. Jose Riva Agüero - lim pav 2 0.40 --- --- 0.80
Jr. Sr. De Huanca - lim pav 5 0.40 --- --- 2.00
Psje s/n - lim pav 2 0.40 --- --- 0.80
Jr. Jose de la Riva Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Manuel A. Segura - lim pav 3 0.40 --- --- 1.20
Jr. Felipe Pardo y Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Clorinda Matto de Turner - lim pav 3 0.40 --- --- 1.20
Jr. s/n2 - lim pav 2 0.40 --- --- 0.80
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.56 Area = 92.55 --- 51.83
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.56 Area = 108.75 --- 60.90
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.56 Area = 87.05 --- 48.75
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.56 Area = 101.55 --- 56.87
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.56 Area = 78.60 --- 44.02
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.56 Area = 93.40 --- 52.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.56 Area = 289.20 --- 161.95
Jr. Sr. De Huanca - Psje s/n - izq 0.56 Area = 164.45 --- 92.09
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.56 Area = 136.40 --- 76.38
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.56 Area = 222.80 --- 124.77
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.56 Area = 225.15 --- 126.08
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.56 Area = 249.60 --- 139.78
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.56 Area = 232.65 --- 130.28
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 40 2.00 --- 0.10 8.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 40 2.00 --- 0.10 8.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 44 2.00 --- 0.10 8.80
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 45 2.00 --- 0.10 9.00
Jr. Clorinda Matto - Jr. s/n3 - der 28 2.00 --- 0.10 5.60
Jr. Clorinda Matto - Jr. s/n2 - izq 21 2.00 --- 0.10 4.20
Jr. s/n3 - Jr. Sanchez Cerro - der 18 2.00 --- 0.10 3.60
Jr. s/n2 - Jr. Sanchez Cerro - izq 24 2.00 --- 0.10 4.80
Jr. Sanchez cerro - Av. Ramón E. - der 28 2.00 --- 0.10 5.60
Jr. Sanchez cerro - Av. Ramón E. - izq 52 2.00 --- 0.10 10.40
Jr. Illimani - Jr. Orizaba - der 1 93.20 0.25 23.30
Jr. Illimani - Jr. Orizaba - izq 1 85.80 0.25 21.45
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 20 2.00 --- --- 40.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 22 2.00 --- --- 44.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 23 2.00 --- --- 45.00
Jr. Clorinda Matto - Jr. s/n3 - der 14 2.00 --- --- 28.00
Jr. Clorinda Matto - Jr. s/n2 - izq 11 2.00 --- --- 21.00
Jr. s/n3 - Jr. Sanchez Cerro - der 9 1.90 --- --- 17.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 12 1.90 --- --- 22.80
Jr. Sanchez cerro - Av. Ramón E. - der 14 2.00 --- --- 28.00
Jr. Sanchez cerro - Av. Ramón E. - izq 26 2.00 --- --- 52.00
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2
Rampas 44 3.00 1.20 --- 158.40
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 Area = 166.70 --- 166.70
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto de Turner 1 Area = 187.55 --- 187.55
Jr. Clorinda Matto de Turner - Jr. s/n2 1 Area = 68.40 --- 68.40
Jr. s/n3 - Jr. Sanchez Cerro 1 Area = 51.20 51.20
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez 1 Area = 61.40 61.40
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial
veces Largo Ancho Alto
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00
Total
2.00
24.00
1.00
1,689.20
19,911.74
1,781.80
LIACA - SAN ROMAN - PUNO
Total
1.00
10,230.29
LIACA - SAN ROMAN - PUNO
Total
1,512.41
2,139.97
14,927.83
14,556.63
LIACA - SAN ROMAN - PUNO
Total
487.91
609.88
3,252.70
LIACA - SAN ROMAN - PUNO
Total
3,515.22
LIACA - SAN ROMAN - PUNO
Total
14,556.63
LIACA - SAN ROMAN - PUNO
Total
2,911.33
LIACA - SAN ROMAN - PUNO
Total
14,556.63
LIACA - SAN ROMAN - PUNO
Total
2,911.33
14,556.63
LIACA - SAN ROMAN - PUNO
Total
13,627.57
LIACA - SAN ROMAN - PUNO
Total
13,627.57
116.65
LIACA - SAN ROMAN - PUNO
Total
1,420.24
202.60
LIACA - SAN ROMAN - PUNO
Total
1,272.79 3,252.70
1,821.51
LIACA - SAN ROMAN - PUNO
Total
576.10
LIACA - SAN ROMAN - PUNO
Total
602.25
LIACA - SAN ROMAN - PUNO
Total
158.40
44.00
1,805.20
38.40
LIACA - SAN ROMAN - PUNO
Total
346.95
192.98
964.90
LIACA - SAN ROMAN - PUNO
Total
105.00
10.00
1.00
2,973.55
LIACA - SAN ROMAN - PUNO
Total
1,007.74
1.00
1,054.73
20.00
90.00
3.00
19,911.74
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 41.50
Psje s/n - berma 1 Area = 24.90 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 1 Area = 87.05 --- 87.05
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 1 Area = 101.55 --- 101.55
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 78.60 --- 78.60
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 93.40 --- 93.40
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 1 Area = 289.20 --- 289.20
Jr. Sr. De Huanca - Psje s/n - izq 1 Area = 164.45 --- 164.45
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 136.40 --- 136.40
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 1 Area = 222.80 --- 222.80
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - der 1 Area = 47.25 --- 47.25
Jr. Orizaba - izq 1 Area = 47.80 --- 47.80
Jr. Jose Maria Eguren - der 1 Area = 47.10 --- 47.10
Jr. Jose Maria Eguren - izq 1 Area = 47.10 --- 47.10
Jr. Jose de la riva Agüero - der 1 Area = 35.10 --- 35.10
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 --- 35.10
Jr. Sr. De Huanca - der 1 Area = 73.90 --- 73.90
Jr. Sr. De Huanca - izq 1 Area = 54.80 --- 54.80
Psje s/n - izq 1 Area = 35.90 --- 35.90
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 --- 39.90
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - Jr. Jose maria Eguren 2 75.65 --- 0.55 83.22
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 2 69.55 --- 0.55 76.51
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 2 66.95 --- 0.55 73.65
Jr. Sr. De Huanca - Psje s/n 2 134.65 --- 0.55 148.12
Psje s/n - Jr. Jose de la Riva Aliaga 2 107.80 --- 0.55 118.58
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 2 200.05 --- 0.55 220.06
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 2 224.60 --- 0.55 247.06
Jr. Clorinda Matto de Turner - Jr. s/n2 2 84.45 --- 0.55 92.90
Jr. s/n3 - Jr. Sanchez Cerro 2 64.25 --- 0.55 70.68
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 2 76.20 --- 0.55 83.82
Jr. orizaba - Sardinel de borde limite pavimento 4 10.00 0.25 10.00
Jr. Jose Maria Eguren - lim pav 4 10.00 0.25 10.00
Jr. Jose Riva Agüero - lim pav 4 7.00 0.25 7.00
Jr. Sr. De Huanca - lim pav 4 15.50 0.25 15.50
Psje s/n - lim pav 2 7.20 0.25 3.60
Jr. Jose de la Riva Aliaga - lim pav 2 8.20 0.25 4.10
Jr. Manuel A. Segura - lim pav 2 8.20 0.25 4.10
Jr. Felipe Pardo y Aliaga - lim pav 4 8.60 0.25 8.60
Jr. Clorinda Matto de Turner - lim pav 4 8.20 0.25 8.20
Jr. s/n2 - lim pav 2 6.10 0.25 3.05
Jr. s/n3 - lim pav 2 5.20 0.25 2.60
Jr. Sanchez Cerro - lim pav 2 8.20 0.25 4.10
Av. Ramon E. Gutierrez - lim Pav 2 108.40 0.25 54.20
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n2 - lim pav 2 0.40 --- --- 0.80
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.56 Area = 232.65 --- 130.28
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Rampas 44 3.00 1.20 --- 158.40
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Psje s/n - Jr. Manuel Ascencio Segura - izq 24 0.45 --- --- 10.80
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 39 0.45 --- --- 17.55
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 39 0.45 --- --- 17.55
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 43 0.45 --- --- 19.35
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 44 0.45 --- --- 19.80
Jr. Clorinda Matto - Jr. s/n3 - der 27 0.45 --- --- 12.15
Jr. Clorinda Matto - Jr. s/n2 - izq 20 0.45 --- --- 9.00
Jr. s/n3 - Jr. Sanchez Cerro - der 17 0.45 --- --- 7.65
Jr. s/n2 - Jr. Sanchez Cerro - izq 23 0.45 --- --- 10.35
Jr. Sanchez cerro - Av. Ramón E. - der 27 0.45 --- --- 12.15
Jr. Sanchez cerro - Av. Ramón E. - izq 51 0.45 --- --- 22.95
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
09.00.00 PRUEBAS DE CONTROL DE CALIDAD
09.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD GLB 1 --- --- --- 1.00 1.00
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,313.59
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Lado derecho 1 10.75 4.00 0.35 15.05
0 1 11.40 4.00 0.35 15.96
0 1 10.65 4.00 0.35 14.91
0 1 7.00 4.00 0.35 9.80
0 1 16.90 4.00 0.35 23.66
0 1 10.00 4.00 0.35 14.00
0 1 10.00 4.00 0.35 14.00
0 1 9.70 4.00 0.35 13.58
0 1 7.00 4.00 0.35 9.80
0 1 7.00 4.00 0.35 9.80
lado izquierdo 1 11.30 4.00 0.35 15.82
0 1 10.80 4.00 0.35 15.12
0 1 11.00 4.00 0.35 15.40
0 1 7.50 4.00 0.35 10.50
0 1 16.90 4.00 0.35 23.66
0 1 8.00 4.00 0.35 11.20
0 1 9.60 4.00 0.35 13.44
0 1 9.70 4.00 0.35 13.58
0 1 8.80 4.00 0.35 12.32
0 1 6.90 4.00 0.35 9.66
0 1 9.20 4.00 0.35 12.88
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,583.64
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Lado derecho 1 10.75 4.00 0.20 8.60
0 1 11.40 4.00 0.20 9.12
0 1 10.65 4.00 0.20 8.52
0 1 7.00 4.00 0.20 5.60
0 1 16.90 4.00 0.20 13.52
0 1 10.00 4.00 0.20 8.00
0 1 10.00 4.00 0.20 8.00
0 1 9.70 4.00 0.20 7.76
0 1 7.00 4.00 0.20 5.60
0 1 7.00 4.00 0.20 5.60
lado izquierdo 1 11.30 4.00 0.20 9.04
0 1 10.80 4.00 0.20 8.64
0 1 11.00 4.00 0.20 8.80
0 1 7.50 4.00 0.20 6.00
0 1 16.90 4.00 0.20 13.52
0 1 8.00 4.00 0.20 6.40
0 1 9.60 4.00 0.20 7.68
0 1 9.70 4.00 0.20 7.76
0 1 8.80 4.00 0.20 7.04
0 1 6.90 4.00 0.20 5.52
0 1 9.20 4.00 0.20 7.36
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
03.02.00 EXCAVACIONES
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 41.50
Psje s/n - berma 1 Area = 24.90 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 1 Area = 87.05 --- 87.05
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 1 Area = 101.55 --- 101.55
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 78.60 --- 78.60
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 93.40 --- 93.40
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 1 Area = 289.20 --- 289.20
Jr. Sr. De Huanca - Psje s/n - izq 1 Area = 164.45 --- 164.45
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 136.40 --- 136.40
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 1 Area = 222.80 --- 222.80
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
04.02.02 CONFORMACION DE SUB BASE M2 14,556.63
De la planilla de metrados de Pavimento 1 Area = 6,021.02 --- 6,021.02
De la planilla de metrados de Pavimento 1 Area = 6,056.77 --- 6,056.77
Jr. Orizaba - der 1 Area = 47.25 --- 47.25
Jr. Orizaba - izq 1 Area = 47.80 --- 47.80
Jr. Jose Maria Eguren - der 1 Area = 47.10 --- 47.10
Jr. Jose Maria Eguren - izq 1 Area = 47.10 --- 47.10
Jr. Jose de la riva Agüero - der 1 Area = 35.10 --- 35.10
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 --- 35.10
Jr. Sr. De Huanca - der 1 Area = 73.90 --- 73.90
Jr. Sr. De Huanca - izq 1 Area = 54.80 --- 54.80
Psje s/n - izq 1 Area = 35.90 --- 35.90
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 --- 39.90
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - lim pav 1 5.20 0.30 0.25 0.39
Jr. Sanchez Cerro - lim pav 1 8.20 0.30 0.25 0.62
Av. Ramon E. Gutierrez - lim Pav 1 108.40 0.30 0.25 8.13
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Manuel A. Segura - lim pav 3 0.40 --- --- 1.20
Jr. Felipe Pardo y Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Clorinda Matto de Turner - lim pav 3 0.40 --- --- 1.20
Jr. s/n2 - lim pav 2 0.40 --- --- 0.80
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.56 Area = 225.15 --- 126.08
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.56 Area = 249.60 --- 139.78
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.56 Area = 232.65 --- 130.28
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
05.03.02 RAMPAS: REJILLA METALICA M 44.00
Rampas 44 1.00 --- --- 44.00
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 44 0.45 --- --- 19.80
Jr. Clorinda Matto - Jr. s/n3 - der 27 0.45 --- --- 12.15
Jr. Clorinda Matto - Jr. s/n2 - izq 20 0.45 --- --- 9.00
Jr. s/n3 - Jr. Sanchez Cerro - der 17 0.45 --- --- 7.65
Jr. s/n2 - Jr. Sanchez Cerro - izq 23 0.45 --- --- 10.35
Jr. Sanchez cerro - Av. Ramón E. - der 27 0.45 --- --- 12.15
Jr. Sanchez cerro - Av. Ramón E. - izq 51 0.45 --- --- 22.95
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sr. De Huanca 50 120.00 5.00 0.003 75.00
Psje s/n 50 120.00 5.00 0.003 75.00
Jr. Jose de la Riva Aliaga 50 120.00 5.00 0.003 75.00
Jr. Felipe Pardo Aliaga 50 120.00 5.00 0.003 75.00
Jr. Clorinda Matto de Turner 50 120.00 5.00 0.003 75.00
Jr s/n2 50 120.00 5.00 0.003 75.00
Jr. s/n3 50 120.00 5.00 0.003 75.00
Jr. Sanchez Cerro 50 120.00 5.00 0.003 75.00
Av. Ramon E. Gutierrez 50 120.00 5.00 0.003 75.00
en via durante la remosion 2 847.10 5.00 0.003 21.18
en via durante la remosion 2 842.10 5.00 0.003 21.05
en cantera 2 150.00 150.00 0.003 112.50
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 41.50
Psje s/n - berma 1 Area = 24.90 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 1 Area = 101.55 --- 101.55
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 78.60 --- 78.60
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 93.40 --- 93.40
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 1 Area = 289.20 --- 289.20
Jr. Sr. De Huanca - Psje s/n - izq 1 Area = 164.45 --- 164.45
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 136.40 --- 136.40
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 1 Area = 222.80 --- 222.80
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - izq 1 Area = 47.80 --- 47.80
Jr. Jose Maria Eguren - der 1 Area = 47.10 --- 47.10
Jr. Jose Maria Eguren - izq 1 Area = 47.10 --- 47.10
Jr. Jose de la riva Agüero - der 1 Area = 35.10 --- 35.10
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 --- 35.10
Jr. Sr. De Huanca - der 1 Area = 73.90 --- 73.90
Jr. Sr. De Huanca - izq 1 Area = 54.80 --- 54.80
Psje s/n - izq 1 Area = 35.90 --- 35.90
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 --- 39.90
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 2 69.55 --- 0.55 76.51
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 2 66.95 --- 0.55 73.65
Jr. Sr. De Huanca - Psje s/n 2 134.65 --- 0.55 148.12
Psje s/n - Jr. Jose de la Riva Aliaga 2 107.80 --- 0.55 118.58
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 2 200.05 --- 0.55 220.06
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 2 224.60 --- 0.55 247.06
Jr. Clorinda Matto de Turner - Jr. s/n2 2 84.45 --- 0.55 92.90
Jr. s/n3 - Jr. Sanchez Cerro 2 64.25 --- 0.55 70.68
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 2 76.20 --- 0.55 83.82
Jr. orizaba - Sardinel de borde limite pavimento 4 10.00 0.25 10.00
Jr. Jose Maria Eguren - lim pav 4 10.00 0.25 10.00
Jr. Jose Riva Agüero - lim pav 4 7.00 0.25 7.00
Jr. Sr. De Huanca - lim pav 4 15.50 0.25 15.50
Psje s/n - lim pav 2 7.20 0.25 3.60
Jr. Jose de la Riva Aliaga - lim pav 2 8.20 0.25 4.10
Jr. Manuel A. Segura - lim pav 2 8.20 0.25 4.10
Jr. Felipe Pardo y Aliaga - lim pav 4 8.60 0.25 8.60
Jr. Clorinda Matto de Turner - lim pav 4 8.20 0.25 8.20
Jr. s/n2 - lim pav 2 6.10 0.25 3.05
Jr. s/n3 - lim pav 2 5.20 0.25 2.60
Jr. Sanchez Cerro - lim pav 2 8.20 0.25 4.10
Av. Ramon E. Gutierrez - lim Pav 2 108.40 0.25 54.20
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 39 0.45 --- --- 17.55
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 39 0.45 --- --- 17.55
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 43 0.45 --- --- 19.35
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 44 0.45 --- --- 19.80
Jr. Clorinda Matto - Jr. s/n3 - der 27 0.45 --- --- 12.15
Jr. Clorinda Matto - Jr. s/n2 - izq 20 0.45 --- --- 9.00
Jr. s/n3 - Jr. Sanchez Cerro - der 17 0.45 --- --- 7.65
Jr. s/n2 - Jr. Sanchez Cerro - izq 23 0.45 --- --- 10.35
Jr. Sanchez cerro - Av. Ramón E. - der 27 0.45 --- --- 12.15
Jr. Sanchez cerro - Av. Ramón E. - izq 51 0.45 --- --- 22.95
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
09.01.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD GLB 1 --- --- --- 1.00 1.00
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.04.00 MOVILIZACION Y DESMOVILIZACION
02.04.01 MOVILIZACION Y DESMOVILIZACION DE MQUINARIA Y/O GLB 1 --- --- --- 1.00 1.00
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Orizaba - der 1 Area = 47.25 --- 47.25
Jr. Orizaba - izq 1 Area = 47.80 --- 47.80
Jr. Jose Maria Eguren - der 1 Area = 47.10 --- 47.10
Jr. Jose Maria Eguren - izq 1 Area = 47.10 --- 47.10
Jr. Jose de la riva Agüero - der 1 Area = 35.10 --- 35.10
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 --- 35.10
Jr. Sr. De Huanca - der 1 Area = 73.90 --- 73.90
Jr. Sr. De Huanca - izq 1 Area = 54.80 --- 54.80
Psje s/n - izq 1 Area = 35.90 --- 35.90
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 --- 39.90
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 --- 39.90
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 --- 41.45
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 --- 41.50
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 --- 39.90
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 0.15 0.55 6.97
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 0.15 0.55 5.30
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 0.15 0.55 6.29
Jr. orizaba - Sardinel de borde limite pavimento 2 10.00 0.30 0.25 1.50
Jr. Jose Maria Eguren - lim pav 2 10.00 0.30 0.25 1.50
Jr. Jose Riva Agüero - lim pav 2 7.00 0.30 0.25 1.05
Jr. Sr. De Huanca - lim pav 2 15.50 0.30 0.25 2.33
Psje s/n - lim pav 1 7.20 0.30 0.25 0.54
Jr. Jose de la Riva Aliaga - lim pav 1 8.20 0.30 0.25 0.62
Jr. Manuel A. Segura - lim pav 1 8.20 0.30 0.25 0.62
Jr. Felipe Pardo y Aliaga - lim pav 2 8.60 0.30 0.25 1.29
Jr. Clorinda Matto de Turner - lim pav 2 8.20 0.30 0.25 1.23
Jr. s/n2 - lim pav 1 6.10 0.30 0.25 0.46
Jr. s/n3 - lim pav 1 5.20 0.30 0.25 0.39
Jr. Sanchez Cerro - lim pav 1 8.20 0.30 0.25 0.62
Av. Ramon E. Gutierrez - lim Pav 1 108.40 0.30 0.25 8.13
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sr. De Huanca - Psje s/n 45 0.45 --- --- 20.25
Psje s/n - Jr. Jose de la Riva Aliaga 36 0.45 --- --- 16.20
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 67 0.45 --- --- 30.15
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 75 0.45 --- --- 33.75
Jr. Clorinda Matto de Turner - Jr. s/n2 28 0.45 --- --- 12.60
Jr. s/n3 - Jr. Sanchez Cerro 21 0.45 --- --- 9.45
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 25 0.45 --- --- 11.25
Jr. orizaba - Sardinel de borde limite pavimento 3 0.40 --- --- 1.20
Jr. Jose Maria Eguren - lim pav 3 0.40 --- --- 1.20
Jr. Jose Riva Agüero - lim pav 2 0.40 --- --- 0.80
Jr. Sr. De Huanca - lim pav 5 0.40 --- --- 2.00
Psje s/n - lim pav 2 0.40 --- --- 0.80
Jr. Jose de la Riva Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Manuel A. Segura - lim pav 3 0.40 --- --- 1.20
Jr. Felipe Pardo y Aliaga - lim pav 3 0.40 --- --- 1.20
Jr. Clorinda Matto de Turner - lim pav 3 0.40 --- --- 1.20
Jr. s/n2 - lim pav 2 0.40 --- --- 0.80
Jr. s/n3 - lim pav 2 0.40 --- --- 0.80
Jr. Sanchez Cerro - lim pav 3 0.40 --- --- 1.20
Av. Ramon E. Gutierrez - lim Pav 36 0.40 --- --- 14.40
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Illimani - Jr. Orizaba - izq 0.56 Area = 74.35 --- 41.64
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.56 Area = 92.55 --- 51.83
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.56 Area = 108.75 --- 60.90
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.56 Area = 87.05 --- 48.75
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.56 Area = 101.55 --- 56.87
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.56 Area = 78.60 --- 44.02
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.56 Area = 93.40 --- 52.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.56 Area = 289.20 --- 161.95
Jr. Sr. De Huanca - Psje s/n - izq 0.56 Area = 164.45 --- 92.09
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.56 Area = 136.40 --- 76.38
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.56 Area = 222.80 --- 124.77
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.56 Area = 225.15 --- 126.08
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.56 Area = 249.60 --- 139.78
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.56 Area = 232.65 --- 130.28
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.56 Area = 149.30 --- 83.61
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.56 Area = 107.50 --- 60.20
Jr. s/n3 - Jr. Sanchez Cerro - der 0.56 Area = 84.70 --- 47.43
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.56 Area = 121.05 --- 67.79
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.56 Area = 178.40 --- 99.90
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.56 Area = 378.60 --- 212.02
Jr. Orizaba - Berma Central 2.00 Area = 8.60 --- 17.20
Jr. Jose maria Eguren - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Agüero - berma central 2.00 Area = 8.60 --- 17.20
Jr. Sr. De Huanca - berma central 2.00 Area = 8.60 --- 17.20
psje s/n - berma central 2.00 Area = 8.60 --- 17.20
Jr. Jose de la Riva Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Felipe Pardo y Aliaga - berma central 2.00 Area = 8.60 --- 17.20
Jr. Clorinda matto de Turner - berma central 2.00 Area = 8.60 --- 17.20
Jr. s/n2 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 8.60 --- 8.60
Jr. s/n3 - berma central 1.00 Area = 15.15 --- 15.15
Jr. Sanchez Cerro - berma central 2.00 Area = 8.60 --- 17.20
Jr. Ramon E. Gutierrez - berma central 1.00 Area = 8.60 --- 8.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 44 2.00 --- 0.10 8.80
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 45 2.00 --- 0.10 9.00
Jr. Clorinda Matto - Jr. s/n3 - der 28 2.00 --- 0.10 5.60
Jr. Clorinda Matto - Jr. s/n2 - izq 21 2.00 --- 0.10 4.20
Jr. s/n3 - Jr. Sanchez Cerro - der 18 2.00 --- 0.10 3.60
Jr. s/n2 - Jr. Sanchez Cerro - izq 24 2.00 --- 0.10 4.80
Jr. Sanchez cerro - Av. Ramón E. - der 28 2.00 --- 0.10 5.60
Jr. Sanchez cerro - Av. Ramón E. - izq 52 2.00 --- 0.10 10.40
Jr. Illimani - Jr. Orizaba - der 1 93.20 0.25 23.30
Jr. Illimani - Jr. Orizaba - izq 1 85.80 0.25 21.45
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - Jr. Sanchez Cerro - der 9 1.90 --- --- 17.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 12 1.90 --- --- 22.80
Jr. Sanchez cerro - Av. Ramón E. - der 14 2.00 --- --- 28.00
Jr. Sanchez cerro - Av. Ramón E. - izq 26 2.00 --- --- 52.00
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 34 0.45 --- --- 15.30
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 34 0.45 --- --- 15.30
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 53 0.45 --- --- 23.85
Jr. Sr. De Huanca - Psje s/n - izq 28 0.45 --- --- 12.60
Psje s/n - Jr. Manuel Ascencio Segura - izq 24 0.45 --- --- 10.80
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 39 0.45 --- --- 17.55
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 39 0.45 --- --- 17.55
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 43 0.45 --- --- 19.35
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 44 0.45 --- --- 19.80
Jr. Clorinda Matto - Jr. s/n3 - der 27 0.45 --- --- 12.15
Jr. Clorinda Matto - Jr. s/n2 - izq 20 0.45 --- --- 9.00
Jr. s/n3 - Jr. Sanchez Cerro - der 17 0.45 --- --- 7.65
Jr. s/n2 - Jr. Sanchez Cerro - izq 23 0.45 --- --- 10.35
Jr. Sanchez cerro - Av. Ramón E. - der 27 0.45 --- --- 12.15
Jr. Sanchez cerro - Av. Ramón E. - izq 51 0.45 --- --- 22.95
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.04.00 MOVILIZACION Y DESMOVILIZACION
02.04.01 MOVILIZACION Y DESMOVILIZACION DE MQUINARIA Y/O GLB 1 --- --- --- 1.00 1.00
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 26.85
Jr. s/n2 - berma 1 Area = 24.70 24.70
Jr. s/n3 - berma 1 Area = 22.60 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 50.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 225.15 --- 225.15
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 Area = 249.60 --- 249.60
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 Area = 232.65 --- 232.65
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 149.30 --- 149.30
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 1 Area = 107.50 --- 107.50
Jr. s/n3 - Jr. Sanchez Cerro - der 1 Area = 84.70 --- 84.70
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 Area = 121.05 --- 121.05
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 178.40 --- 178.40
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 1 Area = 378.60 --- 378.60
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 --- 39.90
Jr. s/n2 - izq 1 Area = 31.50 --- 31.50
Jr. s/n3 - der 1 Area = 27.90 --- 27.90
Jr. Sanchez Cerro - der 1 Area = 39.90 --- 39.90
Jr. Sanchez Cerro - izq 1 Area = 39.90 --- 39.90
Av. Ramón E. Gutierrez - der 1 Area = 309.55 --- 309.55
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 --- 1004.80
Jr. Orizaba - berma 1 Area = 30.50 --- 30.50
Jr. Jose Maria Eguren - berma 1 Area = 30.50 --- 30.50
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 --- 24.50
Jr. Sr. De Huanca - berma 1 Area = 41.50 --- 41.50
Psje s/n - berma 1 Area = 24.90 --- 24.90
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 --- 26.90
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 --- 28.50
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 --- 26.85
Jr. s/n2 - berma 1 Area = 24.70 --- 24.70
Jr. s/n3 - berma 1 Area = 22.60 --- 22.60
Jr. Sanchez Cerro - berma 1 Area = 26.65 --- 26.65
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 --- 50.60
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 0.15 0.55 5.74
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 0.15 0.55 5.52
Jr. Sr. De Huanca - Psje s/n 1 134.65 0.15 0.55 11.11
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 0.15 0.55 8.89
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 0.15 0.55 16.50
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 0.15 0.55 18.53
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 0.15 0.55 6.97
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 0.15 0.55 5.30
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 0.15 0.55 6.29
Jr. orizaba - Sardinel de borde limite pavimento 2 10.00 0.30 0.25 1.50
Jr. Jose Maria Eguren - lim pav 2 10.00 0.30 0.25 1.50
Jr. Jose Riva Agüero - lim pav 2 7.00 0.30 0.25 1.05
Jr. Sr. De Huanca - lim pav 2 15.50 0.30 0.25 2.33
Psje s/n - lim pav 1 7.20 0.30 0.25 0.54
Jr. Jose de la Riva Aliaga - lim pav 1 8.20 0.30 0.25 0.62
Jr. Manuel A. Segura - lim pav 1 8.20 0.30 0.25 0.62
Jr. Felipe Pardo y Aliaga - lim pav 2 8.60 0.30 0.25 1.29
Jr. Clorinda Matto de Turner - lim pav 2 8.20 0.30 0.25 1.23
Jr. s/n2 - lim pav 1 6.10 0.30 0.25 0.46
Jr. s/n3 - lim pav 1 5.20 0.30 0.25 0.39
Jr. Sanchez Cerro - lim pav 1 8.20 0.30 0.25 0.62
Av. Ramon E. Gutierrez - lim Pav 1 108.40 0.30 0.25 8.13
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Av. Ramon E. Gutierrez - lim Pav 2 108.40 0.25 54.20
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 19 2.00 --- 0.10 3.80
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 19 2.00 --- 0.10 3.80
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 18 2.00 --- 0.10 3.60
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 18 2.00 --- 0.10 3.60
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 54 2.00 --- 0.10 10.80
Jr. Sr. De Huanca - Psje s/n - izq 29 2.00 --- 0.10 5.80
Psje s/n - Jr. Manuel Ascencio Segura - izq 25 2.00 --- 0.10 5.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 40 2.00 --- 0.10 8.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 40 2.00 --- 0.10 8.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 44 2.00 --- 0.10 8.80
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 45 2.00 --- 0.10 9.00
Jr. Clorinda Matto - Jr. s/n3 - der 28 2.00 --- 0.10 5.60
Jr. Clorinda Matto - Jr. s/n2 - izq 21 2.00 --- 0.10 4.20
Jr. s/n3 - Jr. Sanchez Cerro - der 18 2.00 --- 0.10 3.60
Jr. s/n2 - Jr. Sanchez Cerro - izq 24 2.00 --- 0.10 4.80
Jr. Sanchez cerro - Av. Ramón E. - der 28 2.00 --- 0.10 5.60
Jr. Sanchez cerro - Av. Ramón E. - izq 52 2.00 --- 0.10 10.40
Jr. Illimani - Jr. Orizaba - der 1 93.20 0.25 23.30
Jr. Illimani - Jr. Orizaba - izq 1 85.80 0.25 21.45
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 0.25 14.08
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 0.25 14.03
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 0.25 13.26
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 0.25 13.28
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 0.25 12.69
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 0.25 12.75
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 0.25 39.63
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 0.25 21.29
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 0.25 18.01
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 0.25 29.56
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 0.25 29.56
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 0.25 32.61
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 0.25 32.66
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 0.25 20.25
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 0.25 15.08
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 0.25 12.53
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 0.25 17.50
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 0.25 19.90
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 0.25 37.90
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 9 2.00 --- --- 18.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 27 1.80 --- --- 48.60
Jr. Sr. De Huanca - Psje s/n - izq 15 2.00 --- --- 29.00
Psje s/n - Jr. Manuel Ascencio Segura - izq 13 2.00 --- --- 25.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 20 2.00 --- --- 40.00
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 20 2.00 --- --- 40.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 22 2.00 --- --- 44.00
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 23 2.00 --- --- 45.00
Jr. Clorinda Matto - Jr. s/n3 - der 14 2.00 --- --- 28.00
Jr. Clorinda Matto - Jr. s/n2 - izq 11 2.00 --- --- 21.00
Jr. s/n3 - Jr. Sanchez Cerro - der 9 1.90 --- --- 17.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 12 1.90 --- --- 22.80
Jr. Sanchez cerro - Av. Ramón E. - der 14 2.00 --- --- 28.00
Jr. Sanchez cerro - Av. Ramón E. - izq 26 2.00 --- --- 52.00
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Psje s/n 1 13.60 13.60
Jr. s/n 2 1 12.90 12.90
Jr. s/n 3 1 11.90 11.90
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Psje s/n - Jr. Jose de la Riva Aliaga 1 Area = 88.20 --- 88.20
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 Area = 166.70 --- 166.70
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto de Turner 1 Area = 187.55 --- 187.55
Jr. Clorinda Matto de Turner - Jr. s/n2 1 Area = 68.40 --- 68.40
Jr. s/n3 - Jr. Sanchez Cerro 1 Area = 51.20 51.20
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez 1 Area = 61.40 61.40
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
PLANILLA DE METRADOS
CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AVENIDA EL TRIUNFO - I ETAPA DE LA CIUDAD DE JULIACA - SAN ROMAN - PUNO
PROYECT (TRAMO: JR. ILLIMANI - AV. RAMON E. GUTIERREZ)
FORMULA GENERAL: CONSTRUCCION DE CALZADA, VEREDAS, CUNETAS, CANAL, AREAS VERDES Y SEÑALIZACION
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
02.03.00 DEMOLICIONES
02.03.01 DEMOLICION DE VEREDAS M2 1,781.80
Jr. Illimani - Jr. Orizaba - der 1 Area = 77.40 --- 77.40
Jr. Illimani - Jr. Orizaba - izq 1 Area = 31.20 --- 31.20
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 Area = 50.85 --- 50.85
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 Area = 101.15 --- 101.15
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - der 1 Area = 51.60 --- 51.60
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero - izq 1 Area = 15.85 --- 15.85
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - der 1 Area = 91.90 --- 91.90
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca - izq 1 Area = 91.30 --- 91.30
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga - der 1 Area = 297.70 --- 297.70
Jr. Sr. De Huanca - Jr. s/n - izq 1 Area = 156.55 --- 156.55
Jr. s/n - Jr. Manuel Ascencio Segura - izq 1 Area = 126.95 --- 126.95
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 1 Area = 192.90 --- 192.90
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - der 1 Area = 166.10 --- 166.10
Jr. Felipe Pardo Aliaga - Jr. Clorinda Mato de Turner - izq 1 Area = 182.90 --- 182.90
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 1 Area = 93.75 --- 93.75
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 1 Area = 53.70 --- 53.70
03.02.00 EXCAVACIONES
03.02.01 EXCAVACION EN FORMA MANUAL M3 1,512.41
En sardineles (Item 05.01.00) 1 1,438.45 0.15 0.20 43.15
En veredas acabado frotachado (Item 05.02.01) 1 Area = 1,272.79 0.20 254.56
En veredas acabado coloreado (Item 05.02.02) 1 Area = 1,821.51 0.20 364.30
En rampas (Item 05.03.01) 1 Area = 158.40 0.20 31.68
En cuneta tipo 1 1 1,805.20 0.45 0.20 162.47
En área verde 1 Area = 964.90 0.15 144.74
en zona de corte c/maquinaria (item 03.01.01) 0.1 Volumen 10,230.29 --- 511.51
04.00.00 PAVIMENTO
04.01.00 SUB RASANTE
04.01.01 MATERIAL DE RELLENO M3 3,515.22
De la planilla de metrados de pavimento 1 Volumen = 1,505.25 --- 1,505.25
De la planilla de metrados de pavimento 1 Volumen = 1,514.19 --- 1,514.19
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
04.03.00 BASE
04.03.01 MATERIAL BASE M3 2,911.33
De la planilla de metrados de pavimento 1 Volumen= 1,204.20 --- 1,204.20
De la planilla de metrados de pavimento 1 Volumen= 1,211.35 --- 1,211.35
Jr. Orizaba - der 1 Area = 47.25 0.20 9.45
Jr. Orizaba - izq 1 Area = 47.80 0.20 9.56
Jr. Jose Maria Eguren - der 1 Area = 47.10 0.20 9.42
Jr. Jose Maria Eguren - izq 1 Area = 47.10 0.20 9.42
Jr. Jose de la riva Agüero - der 1 Area = 35.10 0.20 7.02
Jr. Jose de la riva Agüero - izq 1 Area = 35.10 0.20 7.02
Jr. Sr. De Huanca - der 1 Area = 73.90 0.20 14.78
Jr. Sr. De Huanca - izq 1 Area = 54.80 0.20 10.96
Psje s/n - izq 1 Area = 35.90 0.20 7.18
Jr. Jose de la riva Aliaga - der 1 Area = 39.90 0.20 7.98
Jr. Jose de la riva Aliaga - izq 1 Area = 39.90 0.20 7.98
Jr. Felipe Pardo y Aliaga - der 1 Area = 41.45 0.20 8.29
Jr. Felipe Pardo y Aliaga - izq 1 Area = 41.50 0.20 8.30
Jr. Clorinda Matto de Turner - der 1 Area = 39.90 0.20 7.98
Jr. Clorinda Matto de Turner - izq 1 Area = 39.90 0.20 7.98
Jr. s/n2 - izq 1 Area = 31.50 0.20 6.30
Jr. s/n3 - der 1 Area = 27.90 0.20 5.58
Jr. Sanchez Cerro - der 1 Area = 39.90 0.20 7.98
Jr. Sanchez Cerro - izq 1 Area = 39.90 0.20 7.98
Av. Ramón E. Gutierrez - der 1 Area = 309.55 0.20 61.91
Av. Ramón E. Gutierrez - izq 1 Area = 1,004.80 0.20 200.96
Jr. Orizaba - berma 1 Area = 30.50 0.20 6.10
Jr. Jose Maria Eguren - berma 1 Area = 30.50 0.20 6.10
Jr. Jose de la Riva Agüero - berma 1 Area = 24.50 0.20 4.90
Jr. Sr. De Huanca - berma 1 Area = 41.50 0.20 8.30
Psje s/n - berma 1 Area = 24.90 0.20 4.98
Jr. Jose de la Riva Aliaga - berma 1 Area = 26.90 0.20 5.38
Jr. Felipe Pardo y Aliaga - berma 1 Area = 28.50 0.20 5.70
Jr. Clorinda Matto de Turner - berma 1 Area = 26.85 0.20 5.37
Jr. s/n2 - berma 1 Area = 24.70 0.20 4.94
Jr. s/n3 - berma 1 Area = 22.60 0.20 4.52
Jr. Sanchez Cerro - berma 1 Area = 26.65 0.20 5.33
Av. Ramón E. Gutierrez - berma 1 Area = 50.60 0.20 10.12
05.02.00 VEREDAS
05.02.01 VEREDAS: CONCRETO F'C= 140 KG/CM2 FROTACHADO M2 1,272.79
Jr. Illimani - Jr. Orizaba - der 0.44 Area = 76.65 --- 33.73
Jr. Illimani - Jr. Orizaba - izq 0.44 Area = 74.35 --- 32.71
Jr. Orizaba - Jr. Jose Maria Eguren - der 0.44 Area = 92.55 --- 40.72
Jr. Orizaba - Jr. Jose Maria Eguren - izq 0.44 Area = 108.75 --- 47.85
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - der 0.44 Area = 87.05 --- 38.30
Jr. Jose Maria Eguren - Jr. Jose Riva Agüero - izq 0.44 Area = 101.55 --- 44.68
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - der 0.44 Area = 78.60 --- 34.58
Jr. Jose Riva Agüero - Jr. Sr. De Huanca - izq 0.44 Area = 93.40 --- 41.10
Jr. Sr. De Huanca - Jr. Jose de la Riva Aliaga 0.44 Area = 289.20 --- 127.25
Jr. Sr. De Huanca - Psje s/n - izq 0.44 Area = 164.45 --- 72.36
Psje s/n - Jr. Manuel Ascencio Segura - izq 0.44 Area = 136.40 --- 60.02
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga - der 0.44 Area = 222.80 --- 98.03
Jr. Manuel Ascencio Segura - Jr. Felipe Pardo Aliaga - izq 0.44 Area = 225.15 --- 99.07
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 0.44 Area = 249.60 --- 109.82
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 0.44 Area = 232.65 --- 102.37
Jr. Clorinda Matto de Turner - Jr. s/n3 - der 0.44 Area = 149.30 --- 65.69
Jr. Clorinda Matto de Turner - Jr. s/n3 - izq 0.44 Area = 107.50 --- 47.30
Jr. s/n3 - Jr. Sanchez Cerro - der 0.44 Area = 84.70 --- 37.27
Jr. s/n2 - Jr. Sanchez Cerro - izq 0.44 Area = 121.05 --- 53.26
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - der 0.44 Area = 178.40 78.50
Jr. Sanchez Cerro - Av. Ramon E. Gutierrez - izq 0.44 Area = 378.60 --- 166.58
Area de rampas -1.00 Area = 158.40 -158.40
05.03.00 RAMPAS
05.03.01 RAMPAS: CONCRETO F'C= 140 KG/CM2 BRUÑADO M2 158.40
Rampas 44 3.00 1.20 --- 158.40
05.04.00 CUNETA
05.04.01 CUNETA DE CONCRETO TIPO 1 M 1,805.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
07.04.00 CASETA PARA RIEGO UND 10 --- --- --- 10.00 10.00
07.05.00 IMPLEMENTACION CASETA DE RIEGO UND 1 --- --- --- 1.00 1.00
08.00.00 SEÑALIZACION
08.01.00 PINTURA EN SARDINELES M 2,973.55
Jr. Illimani - Jr. Orizaba 1 64.20 --- --- 64.20
Jr. Orizaba - Jr. Jose maria Eguren 1 75.65 --- --- 75.65
Jr. Jose maria Eguren - Jr. Jose de la Riva Agüero 1 69.55 --- --- 69.55
Jr. Jose de la Riva Agüero - Jr. Sr. De Huanca 1 66.95 --- --- 66.95
Jr. Sr. De Huanca - Psje s/n 1 134.65 --- --- 134.65
Psje s/n - Jr. Jose de la Riva Aliaga 1 107.80 --- --- 107.80
Jr. Jose de la Riva Aliaga - Jr. Felipe Pardo Aliaga 1 200.05 --- --- 200.05
Jr. Jose de la Riva Aliaga - Jr. Clorinda Matto de Turner 1 224.60 --- --- 224.60
Jr. Clorinda Matto de Turner - Jr. s/n2 1 84.45 --- --- 84.45
Jr. s/n3 - Jr. Sanchez Cerro 1 64.25 --- --- 64.25
Jr. Sanchez Ceroo - Av. Ramon E. Gutierrez 1 76.20 --- --- 76.20
Jr. Illimani - Jr. Orizaba - der 1 93.20 --- --- 93.20
Jr. Illimani - Jr. Orizaba - izq 1 85.80 --- --- 85.80
Jr. Orizaba - Jr. Jose Maria Eguren - der 1 56.30 --- --- 56.30
Jr. Orizaba - Jr. Jose Maria Eguren - izq 1 56.10 --- --- 56.10
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - der 1 53.05 --- --- 53.05
Jr. Jose Maria Eguren - Jr. Jose de la Riva Aliaga - izq 1 53.10 --- --- 53.10
Jr. De la Riva Agüero - Jr. Sr. De Huanca - der 1 50.75 --- --- 50.75
Jr. De la Riva Agüero - Jr. Sr. De Huanca - izq 1 51.00 --- --- 51.00
Jr. Sr. De Huanca - Jr. De la Riva Aliaga - der 1 158.50 --- --- 158.50
Jr. Sr. De Huanca - Psje s/n - izq 1 85.15 --- --- 85.15
Psje s/n - Jr. Manuel Ascencio Segura - izq 1 72.05 --- --- 72.05
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - der 1 118.25 --- --- 118.25
Jr. Jose de la Riva Aliaga - jr. Felipe Pardo - izq 1 118.25 --- --- 118.25
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - der 1 130.45 --- --- 130.45
Jr. Felipe Pardo Aliaga - Jr. Clorinda Matto - izq 1 130.65 --- --- 130.65
Jr. Clorinda Matto - Jr. s/n3 - der 1 81.00 --- --- 81.00
Jr. Clorinda Matto - Jr. s/n2 - izq 1 60.30 --- --- 60.30
Jr. s/n3 - Jr. Sanchez Cerro - der 1 50.10 --- --- 50.10
Jr. s/n2 - Jr. Sanchez Cerro - izq 1 70.00 --- --- 70.00
Jr. Sanchez cerro - Av. Ramón E. - der 1 79.60 --- --- 79.60
Jr. Sanchez cerro - Av. Ramón E. - izq 1 151.60 --- --- 151.60
11.02.00 NIVELACION DE CAJAS DE REGISTRO INST. DOMICILIARIA UND 90 --- --- --- 90.00 90.00
3821.640
00+000 3821.640
00+020 3821.648
00+040 3821.656
00+060 3821.665
00+080 3821.673
00+100 3821.681
00+120 3821.689
00+140 3821.698
00+160 3821.706
00+180 3821.714
00+200 3821.722
00+220 3821.731
00+240 3821.739
00+260 3821.747
00+280 3821.755
00+300 3821.763
00+320 3821.772
00+340 3821.780
00+360 3821.788
00+380 3821.796
00+400 3821.805
00+420 3821.813
00+440 3821.821
00+460 3821.829
00+480 3821.838
00+500 3821.846
00+520 3821.854
00+540 3821.862
00+560 3821.870
00+580 3821.879
00+600 3821.887
00+620 3821.895
00+640 3821.903
00+660 3821.912
00+680 3821.920
00+688 3821.923
Jr. Tupac amaru
00+000 51.2 20.00000 380.00000 380
00+020 51.2 20.00000
00+040 51.2 20.00000
00+060 51.2 20.00000
00+080 51.2 20.00000
00+100 51.2 20.00000
00+120 51.2 20.00000
00+140 51.2 20.00000
00+160 51.2 20.00000 0
00+180 51.2 20.00000
00+200 51.2 20.00000
00+220 51.2 20.00000
00+240 51.2 40.00000
00+280 51.2 20.00000
00+300 51.2 20.00000
00+320 51.2 20.00000
00+340 51.2 20.00000
00+360 51.2 20.00000 0
00+380 51.2 20.00000
00+400 51.2 20.00000
00+420 51.2 20.00000
00+440 51.2 20.00000
00+460 51.2 20.00000
00+480 51.2 20.00000
00+500 51.2 20.00000
00+520 51.2 20.00000
00+540 51.2 20.00000
00+560 51.2 20.00000
00+580 51.2 20.00000
00+600 51.2 20.00000
00+620 51.2 20.00000
00+640 51.2 20.00000
00+660 51.2 20.00000
00+680 51.2 20.00000
00+700 51.2 20.00000
00+720 51.2 20.00000
00+740 51.2 20.00000
00+760 51.2 20.00000
00+780 51.2 20.00000
00+800 51.2 20.00000
00+820 51.2 20.00000
00+840 51.2 2.10000
00+842 51.2 842.10000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 0.00000
00+000 51.2 #REF!
#REF! 51.2 #REF!
#REF! 51.2 #REF!
#REF! 51.2
cota rasante hc hr Hc Hr Hc final
70.3 0.09 0.09 0 -0.31 0.31
70.64 -0.29 0.29 0.69 0 0.69
70.99 -0.32 0.32 0.72 0 0.72
71.33 -0.1 0.1 0.5 0 0.50
71.67 0.18 0.181 0 -0.219 0.22
72.01 0.12 0.127 0 -0.273 0.27
72.39 -0.05 0.045 0.445 0 0.45
73.01 0.13 0.13 0 -0.27 0.27
73.91 -0.18 0.172 0.572 0 0.57
75.06 0.08 0.083 0 -0.317 0.32
76.25 0.09 0.08 0 -0.32 0.32
77.42 0.08 0.074 0 -0.326 0.33
78.6 0.06 0.058 0 -0.342 0.34
79.19 0.22 0.221 0 -0.179 0.18
79.78 0.34 0.335 0 -0.065 0.07
80.96 0.22 0.213 0 -0.187 0.19
81.55 0.03 0.028 0 -0.372 0.37
82.14 -0.61 0.614 1.014 0 1.01
82.73 -0.9 0.904 1.304 0 1.30
83.32 -1.06 1.066 1.466 0 1.47
82.65 0.03 0.026 0 -0.374 0.37
80.93 0.43 0.433 0 0.033 0.03
78.76 -0.11 0.111 0.511 0 0.51
74.4 0.1 0.092 0 -0.308 0.31
69.47 0.36 0.355 0 -0.045 0.05
65.43 -0.04 0.04 0.44 0 0.44
62.3 -0.35 0.35 0.75 0 0.75
59.17 0.05 0.049 0 -0.351 0.35
59.06 0 0 0 0.00
hc hr Hc Hr Hc final
0.162 0 -0.238 0.24
0.196 0.596 0 0.60
0.036 0.436 0 0.44
0.104 0.504 0 0.50
0.104 0 -0.296 0.30
0.081 0 -0.319 0.32
0.097 0.497 0 0.50
0.093 0 -0.307 0.31
0.274 0 -0.126 0.13
0.081 0.481 0 0.48
0.051 0.451 0 0.45
0.074 0 -0.326 0.33
0.095 0 -0.305 0.31
0.078 0 -0.322 0.32
0.128 0 -0.272 0.27
0.027 0 -0.373 0.37
0.003 0 -0.397 0.40
0.134 0 -0.266 0.27
Hc Hr nueva rasante
0.912 82.72
1.155 83.23
0.028 82.6
0.344 80.84
0.119 78.75