Defect type Occurences Average cost Total percentage

Plumbing 33 78 2574 23.76


Electrical 25 74 1850 17.08
Damage wall 13 126 1638 15.12
HVAC 11 110 1210 11.17
Cabinetry 12 88 1056 9.75
Masonry 2 290 580 5.35
Landscacping 16 34 544 5.02
Interior paint 61 4 244 2.25
Woodwork 46 5 230 2.12
Fixtures 7 31 217 2.00
Roof 3 72 216 1.99
Coulking 28 7 196 1.81
Doors 14 11 154 1.42
Exterior paint 5 25 125 1.15
total 10834

Defect type Occurences percentage Cumulative %

Interior paint 61 22.10 22.10


Woodwork 46 16.67 38.77
Plumbing 33 11.96 50.72
Coulking 28 10.14 60.87
Electrical 25 9.06 69.93
Landscacping 16 5.80 75.72
Doors 14 5.07 80.80
Damage wall 13 4.71 85.51
Cabinetry 12 4.35 89.86
HVAC 11 3.99 93.84
Fixtures 7 2.54 96.38
Exterior paint 5 1.81 98.19
Roof 3 1.09 99.28
Masonry 2 0.72 100.00
Cumulative %
23.76
40.83 3000 120.00

55.95 2500 100.00


67.12
76.87 2000 80.00
82.22
1500 60.00
87.24
89.50 1000 40.00 Total
91.62 Cumulative %
93.62 500 20.00
95.62
0 0.00
97.42
98.85
100.00

70 120.00

60 100.00
50
80.00
40
60.00
30
40.00 Occurences
20 Cumulative %

10 20.00

0 0.00
Total
Cumulative %

120.00

100.00

80.00

60.00

40.00 Occurences
Cumulative %
20.00

0.00

You might also like