TEST REPORT FOR OC/EF PROTECTION RELAY

Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 1 of 6

TESTING FORMAT FOR OVER CURRENT,


EARTH FAULT PROTECTION
RELAY

PROJECT :REVIVAL OF RAMAGUNDAM FERTILIZER PLANT

NAME OF WORK :220 KV SWITCHYARD PACKAGE

JOB NO :A747

LOA NO : SKS/A747/LOA/T/0015/1016/2016 – 17/05 dtd. 09/11/2016

DOC NO : L&T/RFCL/A747/ELE/TF 14

OWNER :M/S RAMAGUNDAM FERTILESERS AND CHEMICALS LTD.

CONSULTANT :M/S ENGINEERS INDIA LTD.

CONTRACTOR :M/S L&T

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 2 of 6

Location :
Panel Ref :
Relay Make & Model :
Serial No :
VT & CT Ratio :

CT & VT Ratio : 220KV/110V & 600/1


MEASUREMENTS
VOLTAGE(volts) CURRENT(A)
Measured
Phase Injected Injected Measured
Voltage Angle Angle
Voltage (v) Current (A) Current (A)
(v)Ph-Ph
R-N 63.51 0 1 0
Y-N 63.51 -120 1 -120
B-N 63.51 120 1 120
1. Phase Over Current DMT – [ 51P] Non Directional Current (I) – : TMS- s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N
2. Phase Over Current DMT – [ 51P ] Non Directional Current (I) – A : Time Delay- s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N

3. Phase Over Current DMT – [ 51P ] Directional Current (I) – A : Time Delay- s

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 3 of 6

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N

4. Phase Over Current DMT – [ 51P ] Directional Current (I) – A : Time Delay- s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N
Y-N
B-N

5. Earth Over Current DMT – [ 51N ] Current (I) – A : Time Delay- s

Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N

6. Earth Over Current DMT – [ 51N ] Current (I) – A : Time Delay- s

Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 4 of 6

7. Earth Over Current DMT – [ 51N ]Directional Current (I) – A : Time Delay- s

Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(ms)
R-N
Y-N
B-N
8.Earth Over Current DMT – [ 51N ]Directional Current (I) – A : Time Delay- s
Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(ms)
R-N
Y-N
B-N

1. Phase Directional - [51P]

Phase Operating Region(in degrees) Non Operating Region(in degrees)


R-N 45-0-226 46-180-225
Y-N 105-180-284 104-0-285
B-N 164-0-346 165-0-345

2. Neutral Directional - [51N]

Phase Operating Region(in degrees) Non Operating Region(in degrees)


R-N 46-0-232 47-180-231
Y-N 105-180-280 104-0-281
B-N 158-0-344 159-0-343

3. Phase Directional - [50P]

Phase Operating Region(in degrees) Non Operating Region(in degrees)


R-N 45-0-226 46-180-225
Y-N 105-180-284 104-0-285
B-N 164-0-346 165-0-345
Test Performed by: Witnessed by: Witnessed by:
Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 5 of 6

4. Neutral Directional - [50N]

Phase Operating Region(in degrees) Non Operating Region(in degrees)


R-N 46-0-232 47-180-231
Y-N 105-180-280 104-0-281
B-N 158-0-344 159-0-343

1.Under Voltage Protection:


Phase Set Voltage (V) Inj. Voltage(V) Time (s) Trip Time(ms)
R-N
Y-N
B-N
5.

2.Over Voltage Protection:


Phase Set Voltage (V) Inj. Voltage(V) Time (s) Trip Time(ms)
R-N
Y-N
B-N

1. Ground Over Current DMT – [ 51G ] Current (I) – 0.20A : Time Delay- 0.10 s

Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N

2. Ground Over Current DMT – [ 51G] Current (I) – 0.20A : Time Delay- 0.10 s
Test Performed by: Witnessed by: Witnessed by:
Name: Name: Name:
Signature: Signature: Signature:
TEST REPORT FOR OC/EF PROTECTION RELAY
Doc. No. L&T/RFCL/A747/ ELE/TF 14 Date-

PROJECT : REVIVAL OF RAMAGUNDAM FERTILIZER PLANT


WORK : 220 KV SWITCHYARD PACKAGE Sheet No 6 of 6

Phase Set Current (A) Inj. Current(A) Time (s) Trip Time(s)
R-N
Y-N
B-N

Check List:
1. All Binary Inputs and Binary Outputs has configured as per the approved drawings
2. LED Functions has been checked and found ok.
3. Relay operations has been found satisfied and fit for service.

Test Performed by: Witnessed by: Witnessed by:


Name: Name: Name:
Signature: Signature: Signature: