Checklist for Shuttering

Project : Doc. No. : WES/QA/CL-SHT/

Client : Project Location :

SITE LOCATION DATE

YES NO NA
SHUTTERING
1 Shuttering Material is New/ Old?

2 Repairs are OK?

3 Cleanliness of Shuttering?

4 Oiling of Shuttering?

FIXED SHUTTERING
Shuttering Design OK? (Dimension, Diagonal, Sunken portions
5 etc.,)

6 Alignment/ Level/ Rigidity OK?

7 Check Props. Are they OK?

8 Check Acrow Span. Are they OK?

9 Check Braces. Are they OK?

10 Check sealing Joints/ Holes, OK?

11 Check for any rework or alterations

AFTER REMOVAL OF SHUTTER


12 Surface of Concrete - good moderate, level and line?

13 Repair of surface required?


(if YES then the same is to be carried out and checked by Quality
Assurance Engineer)

Remarks:

Signature Date Remarks/ Comments