You are on page 1of 262

NATIONAL HIGHWAY AUTHORITY

MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES


JANUARY 2011

(SINDH)
WORK SPONSORED BY:

PLANNING WING

OF

NATIONAL HIGHWAY AUTHORITY


ISLAMABAD

(i)
CONTENTS

1. Foreword
2. General
3. Manpower Code List
4. Material Code List
5. Equipment Code List
6. Performa for Estimating Owning & Operating Costs of Equipment
7. Plant & Equipment Owning and Operating Cost
8. List of the Districts in Pakistan
9. List of Quarries in Sindh
10. Conversion Factors
11. Graphs Showing Transportation Rates in Sindh
12. District wise Composite Schedule of Rates for Sindh
13. Patronage (Client)
14. Services (Consultant)
15. References

(ii)
FOREWORD

Following the increases in prices of materials and labour in the year 2010, the revision /
updation of CSR has been carried out. In the year 2010 we have seen the prices of steel /
diesel / bitumen go up considerably. Analysts are still uncertain with the prices in the year
2011. For the year 2010, we have carried out a general revision of all prices up to January
2011 in consultation with leading manufacturers, supplier, and specialist contractors.

These rates have been developed using NHA Rate Analysis formulae developed for
previous CSRs with slight improvements wherever necessary. The variation in the
proposed rates is anticipated in certain cases, which may be due to varying degrees / levels
of productivity and price differences of various inputs at the regional level.

The rates, prices and outputs included in the resources and unit cost calculations, including
allowances for wastage, normal productivity and efficiency are based on roadwork and
bridge projects being carried out by NHA. The unit rates are average unit rates for a
particular district and not project specific. The market can change very rapidly, which would
obviously have an impact on the unit rates.

It must be understood that main objective of the CSR is to provide a realistic reference base
for preparing Cost Estimates / PC-I and Evaluation of Bids, for NHA projects.

Our gratitude is to The Chairman NHA, Member (Planning), Member (Finance), Member
(Operations), Member (Construction) and Member (Motorway) without whose support it
would have been difficult to develop this Document.

In the end, my appreciation is for my team, for all the technical and professional efforts to
produce Revised Composite Schedule of Rates 2011.

It is hoped that the CSR 2011, would serve as a Basic Engineer’s Estimate reference
document for National Highway Authority, various Government Departments and the
construction industry in general.

Whilst all efforts are made to ensure the accuracy of the data and information used in
updating the CSR , neither NHA or M/s Sampak International (Pvt.) Ltd. can in any way
accept liability for loss of any kind resulting from the use of CSR, made by any person,
institution, company, department etc.

S. M. A Shirazi
Managing Director
SAMPAK International (Pvt.) Ltd

(iii)
1. GENERAL

For many years National Highway Authority has been compiling / updating the
Composite Schedule of Rates for use in the Civil Engineering Industry. The Civil
Engineering Industry uses this Schedule of Rates for pricing work by the application
of unit rates to the quantities measured from the designer’s drawings. The main
objective of the CSR is to provide a realistic reference base for cost estimates. One
has to understand no two projects are the same, there are variables which effect the
price of the project i.e., the volume of work below ground, embankment height, cut &
fill, increased exposure to weather, and the tremendous variety of the projects, in
terms of type, complexity and scale makes the straight forward use of unit rates less
reliable. This uncertainty is compounded by the lower number of bill of items
generated in Civil Engineering Projects as compared to Building Works so that the
precise nature of work is less apparent from bill descriptions and the statistical effect
of ‘swings and roundabout’ has less scope to average out extremes of pricing.
To prepare a price for a Civil Engineering project, then, it is necessary to have
regard to the method to be adopted in executing the work, draw up a detailed
programme and then cost out the resources necessary to execute the chosen
method. The first part of this process is the field of construction planner, there has
been a tendency to postpone detailed estimating until the tendering stage itself, with
the employer relying, up to that point, upon an estimate prepared on a ‘Thumb Rule’
basis.
There is increasing growing pressure on the part of project sponsors for an
improvement to budgetary advice, so that a decision to commit expenditure to a
particular project is taken on firmer grounds. The absence of detailed price method
during the pre-contract phase also inhibits the accurate costing of alternative designs
and regular cost checking to ensure that the design is being developed within the
employer’s budget. The CSR gives unit rates for use when quantities can be taken
from available drawings. To take some note of the range of unit rates that might
apply to an item, the rates themselves are in some cases related to working method
– for example by identifying the different types of equipment that would suit varying
circumstances. Nonetheless, it would be a folly to propose that all types of Civil
Engineering work could be covered by the use of CSR. While developing these unit
rates, we had in mind the type and scale of work to be commissioned by NHA.
The CSR does embrace the great majority of work undertaken by NHA. Although
almost all projects will have individual features that require careful attention in
pricing, there will be some projects that are so specialist that they will not conform to
standard pricing information at all. But for most projects, within the range of work
covered, this CSR should provide a firm foundation for:
 Preparing Project Cost Estimate and PC-1
 Evaluating Tender / Bids
 Evaluating Claims and Variation Order
 Arbitration Matters
In order to prepare an authentic Composite Schedule of Rates and to keep it
effective, the basic requirements are as under:
 Collection of first hand, prudent and legitimate information for inputs
(Manpower, Material & Equipment) in the rate analysis.

(iv)
 Merging the above information in proper proportion according to Design
Specifications and Constructional requirements to create the rate of a work
item.
 Updating the data inputs every year or from time to time, to revalidate the item
rates.
2. GENERAL METHODOLOGY:
a. Composite Schedule of Rates was originally published in the year 1991 and
subsequent revisions were carried out in 1995, 2000, 2005, 2006, 2008 and
2009. There are total of 109 Districts considered and are given numbers in
Alphabetical order and their Province wise breakdown as under:

PROVINCE No. of Districts


Punjab 36
Sind 20
Khyber Pakhtunkhwa 24
Baluchistan 29

Specifications and Methodology for Construction items have been adopted as


given in General Specification of National Highway Authority (1998). Items of
work for construction have been given the same numbers as appearing in the
General Specifications of National Highway Authority. Some items have been
added in CSR-2011, which were necessary but are not covered under
General Specifications 1998. Hence, it has become imperative to revise and
update the Specifications.
b. These rates are based on the existing formulae and equipment efficiency
levels used in the preparation of CSR 2000 with some modifications.
c. The rates analysis of individual items of CSR 2011 consists of four basic
inputs, which have been assigned the same code numbers as in the previous
Composite Schedule of Rates.
i. Manpower code starting from 1001 onwards

ii. Material code starting from 2001 onwards

iii. Equipment code starting from 3001 onwards

iv. Overheads, Profits & Preliminaries

d. For the preparation of rates following documents have been referred:


i. General Specifications 1998

ii. NHA Composite Schedule of Rates 2000 and 2009

iii. Statistical Bulletins by Federal Bureau of Statistics

iv. Current Market rates study

(v)
Code list of Manpower, Material and Equipment appear at the end of the
chapter for the convenience of the users.

2.1 MANPOWER:
a. Allocation of Code Numbers:
Costs of manpower engaged on Plant & Equipment have been included in
rental charges of Plant & Equipment and only site supervisory staff has been
considered under the heading of Manpower. Code numbers are allocated
accordingly to such manpower that is directly charged to the items of work.
Manpower cost for top supervision, administration and other non-productive
works of support services have been considered under overhead charges.
b. Formulation of Rates:
Manpower basic rates collected from districts have been first scrutinized, to
eliminate irrational information and following overheads are applied to include
fringe benefits and other charges:
i. Social Security Payment

ii. E.O.B.I. Payment

iii. Education Cess Payment

iv. Yearly Leave Salary (Earned, casual and sick)

v. Bonus (Compulsory)

vi. Provident Fund (Contribution of Employer) or Gratuity

vii. Mess Expenses (Site Staff)

viii. Entertainment Allowance (Provisional)

ix. Group Life Insurance

x. Site Staff Accommodation

After including above overheads, manpower rates for each of the 109 district
have been calculated and separate records developed for use by the
Computer Program.

2.2 CONSTRUCTION MATERIAL:


a. Allocation of Code Numbers to Materials:
List of materials required for road construction has been first prepared from
the construction items appearing in the General Specifications of National
Highway Authority. After arranging the construction material list in order, code
numbers have been allocated.

(vi)
b. Formulation of Rates:
Considering the location of each district, Engineers decided the most
appropriate source of construction materials for all the code numbers. The
cost of material at source has been established from field data and
transportation rates calculated, to arrive at the landed cost of material at the
district headquarters.
c. Cost of Material
In order to arrive at a “Material at sources” rate, following considerations have
been made.
i. Material royalty at quarry (actual or estimated)

ii. Cost of Preparation of material

iii. Loading of material in truck / trailer etc

d. Cost of Transportation
Transportation charges have been taken as actual, where local transporters
are available. However, in some districts where local transporters rates are
not quoted, transportation charges from graphs have been used.
In case of quarry materials, the source of materials for embankment, Sub-
Base or Base Course can be more than one; however, the most appropriate
source from the point of view of quality and economy has been used for
preparing the Composite Schedule of Rates – 2011.
2.3 PLANT AND EQUIPMENT
a. Allocation of Code Numbers
The list of plant and equipment includes major equipment whereas small
equipment, tools and attachments are ignored, as these have been charged
under the item of overhead. After arranging the list in order, code numbers
have been allocated starting from 3001 (onwards).
b. Power, Performance and Maintenance of Plant & Equipment
To arrive at the decision for choosing the right horse power, appropriate
performance level and reasonable maintenance charges, the
recommendation of well known suppliers have been considered. In order to
decide the price level of any equipment, average cost has been used, which
includes C&F price, plus duties and taxes etc.
c. Formulation of Rates of Plant and Equipment
The owning and operating costs are similar for all the districts, unlike
manpower and materials where rates may differ for each district.
The owning and operating costs are developed by using a standard format.
The duties and taxes have been calculated as per the latest Excise and Land
Customs Tariff for calculating total cost of equipment.

(vii)
Fuel consumption, working efficiency and maintenance costs have been fixed
after consulting the recommendation of the manufacturers. Equipment
economical life and tire life have been fixed after consulting several
organizations using heavy and light equipment in the present indigenous
conditions.
The owning and operating costs for 85 types of equipment is provided at the
end of this chapter.

2.4 FORMULAE FOR CONSTRUCTION ITEMS


All the basic inputs have been updated in the individual rate analysis. These
formulae have been created by appropriate quantitative inputs of the following
items:
Manpower Hour and Number
Material Weight, Volume, Length and Unit
Plant Equipment Hour and Number
Overheads, profit and
25 percent
preliminaries

2.5 OVERHEADS, PROFIT & PRELIMINARIES


a. Profit
The level of profit is governed by the degree of competition applicable to the
job which is in turn a function of the industry’s current work load. The
appropriate addition is highly variable.
b. Head Office Overheads
An addition to the estimate needs to be made to the net estimate to cover all
costs incurred in operating the central services provided by head office. Apart
from general management and accountancy, this will normally include the
departments dealing with:
 Tendering / Estimating
 Planning & design
 Wages and bonus
Finance Cost: Some companies would include finance costs with head office
overheads, but this will vary from contractor to contractor.
The appropriate addition varies with the extent of services provided centrally
and company to company, rather than on site, and with size of organization.
c. Preliminaries
Preliminaries cost in Civil Engineering works are indirectly related to the
actual quantity of work being carried out. It comprises a definition of method
related charges, a checklist of items to be accounted for on typical Civil
Engineering Contract.
Generally contract document gives detailed requirements for the facilities and
equipment to be provided for the employer and the Engineer’s Representative

(viii)
given in the Bill of Quantities. Thus General Items given in the BOQ are
excluded from the check list of preliminaries.
The following checklist is representative but not exhaustive which is not
covered in the BOQ or General items section. The list describes the major
preliminaries which are included, implicitly or explicitly, in a typically Civil
Engineering Contract.
 Contractor’s site on costs

 Temporary works (other than those included in unit cost)

 General purpose plant (other than those included in unit cost)

 Other services, charges and fees

 Site Staff Salaries


All non-productive supervisory staff on site i.e., agents, clerks,
computer operators, security guards, store men, drivers for staff
vehicles, cleaners, general labour for general clearance etc.
 Plant Maintenance
Fitters, electricians and assistants engaged on general plant
maintenance on site (excludes drivers who are provided in the unit
costs)
 Site Transport for Staff and General Use
Vehicles / buses provided for use of staff and others including running
costs etc.
 Contractor’s offices rental / construction / site huts and
associated running costs.
 Canteen, welfare / medical
 General office expenditure

 Provision of postage, stationary and other consumables for


general office use.
 Mobilization and demobilization of resources.
 Telecommunications
 Furniture and equipment
 Small tools
 Traffic Control, traffic diversion and signs
 Fencing
 Protective clothing
 Health and safety
 Road lighting
 Cleaning roads etc
 Progress photographs

(ix)
 Water Supply
 Electric connection
 Notice boards and signs
 Insurances / bonds / bank guarantees / Employees liabilities
insurance etc.

There will be many other items of preliminaries which may have to be


considered, which probably will be project and site specific. Preliminaries
percentage can vary from project to project.
d. Tax
Tax has been included as per Government rules.
In the CSR, 25% is added on the estimated unit cost of the items which
includes over heads, taxes, preliminaries and profit, however this will vary
from project to project and contractor to contractor.

2.6 VARIABLES AFFECTING THE RATE ANALYSIS


Rate analysis in CSR have been prepared based on policy explained here
above. However, there are certain factors which are to be considered while
deciding about more realistic rates in special situations.

a. Price Escalation
General and Special escalation has been considered as published by
Government Agencies. However, care is to be exercised to consider
Government Legislation, which may create condition of Special Escalation.

b. Double Taxation
In International tenders, a factor is to be considered which may handicap the
contractors from such countries, whose governments have no agreement with
the Government of Pakistan to avoid double taxation. Effect of this item will be
equal to the limit of tax level in such a country.

c. Service Roads
No provision has been made in this rate analysis for road diversion cost or
service road, which the contractor has to construct or maintain as a non-BOQ
item.

d. Extra Overhead for Expatriate Staff


International tenders will require a factor to employ expatriate staff on the
project. Effect of this will be equal to the actual expenses on such item.

e. Other Factors
Some of the items mentioned in above text included as overhead Cost in
Estimates of CSR, may appear as a B.O.Q item in a tender, the cost of such
items are to be adjusted from the total estimate of the project.

(x)
CSR-2011
LIST OF MANPOWER CODES

S. No. CODE DESCRIPTION

1 1001 SITE ENGINEER


2 1002 ASPHALT PLANT ENGINEER
3 1003 CONCRETE PLANT ENGINEER
4 1011 FOREMAN ASPHALT
5 1012 FOREMAN EARTHWORK
6 1013 FOREMAN CONCRETE
7 1014 GENERAL FOREMAN
8 1021 SUPERVISOR
9 1022 SURVEYOR
10 1023 ASSISTANT SURVEYOR
11 1031 MASON
12 1032 CARPENTER
13 1033 PAINTER
14 1034 STEEL BINDER/CUTTER
15 1040 HIGHLY SKILLED LABOUR
16 1041 HELPER
17 1042 WELDER
18 1051 LABOUR

Notes:

Cost of following Manpower has been included elsewhere as under:

1. Top Management and Senior Engineers etc. included in overhead of the Project.

2. All indirect Manpower such as Clerk, Typist, Accountant, Lab Staff, Workshop Staff, Store
Staff, Security Staff etc. are included under overhead.

3. All Operator of Light and Heavy Duty equipment and plant included in the hourly rate of the
equipment.

(xi)
CSR-2011
LIST OF MATERIAL CODES

Material Code No. Description Unit


2001 ROCK CM
2002 SOIL CLASS-A1 (A) CM
2003 SOIL CLASS-A1 (B) CM
2004 SOIL CLASS-A2 (4) CM
2005 SOIL CLASS-A2 (5) CM
2006 SOIL CLASS-A2 (6) CM
2007 SOIL CLASS-A2 (7) CM
2008 SOIL CLASS-A3 CM
2009 SOIL CLASS-A4 CM
2010 SOIL CLASS-A5 CM
2011 SOIL CLASS-A6 CM
2012 SOIL CLASS-A7-5 CM
2013 SOIL CLASS-A7-6 CM
2014 CRUSHED AGGREGATE BASE A CM
2015 CRUSHED AGGREGATE BASE B CM
2016 CRUSHED AGGREGATE BASE B1 CM
2017 GRANULAR SUB-BASE A CM
2018 GRANULAR SUB-BASE B CM
2021 COARSE SAND CM
2022 FINE SAND CM
2023 AGGREGATE 2"-1.1/2" CM
2024 AGGREGATE 1.1/2"-3/4" CM
2025 AGGREGATE 3/4" - 3/8" CM
2026 AGGREGATE 3/8"-No.4 CM
2027 AGGREGATE NO.4 - NO.200 CM
2028 FILLER MATERIAL CM
2029 BRICK CLASS A NO.
2030 STONE RANDOM CLASS-A CM
2031 STONE RANDOM CLASS-B CM
2032 STONE RANDOM CLASS-C CM
2033 STONE RANDOM CLASS-D CM
2034 STONE DRESSED CM
2035 HAND BROKEN STONE 2.1/2"-1/2" CM
2041 ASPHALT GRADE 60/70 TON
2042 ASPHALT GRADE 80/100 TON
2043 ASPHALT M.C.70 TON
2044 ASPHALT M.C.250 TON
2045 ASPHALT M.C.800 TON
2046 ASPHALT R.C.70 TON
2047 ASPHALT R.C.250 TON
2048 ASPHALT R.C.800 TON
2049 ASPHALT S.S. 1 TON
2050 ASPHALT S.S. 1H TON
2051 ASPHALT R.S. 1 TON

(xii)
CSR-2011
LIST OF MATERIAL CODES

Material Code
Description Unit
No.
2052 ASPHALT R.S. 2 TON
2053 CEMENT TYPE-I (OPC) BAG
2054 CEMENT TYPE-II (LOW S.R) BAG
2055 CEMENT TYPE-III (QUICK SETTING) BAG
2056 CEMENT TYPE-IV (LOW HEAT STRENGTH) BAG
2057 CEMENT TYPE-V (HIGH S.R) BAG
2058 ACCELERATOR LIT
2059 RETARDER LIT
2060 CURING COMPOUND LIT
2061 STEEL GRADE. 40 TON
2062 STEEL GRADE. 60 TON
2063 PRE-STRESSING STRAND, 3/8", 1/2" TON
2064 STEEL WIRE MESH, 4" x 4" KG
2065 WATER 1000 LIT
2068 STEEL EXPANSION JOINT (LOCAL) KG
2070 COLD STEEL WIRE AASHTO M-32 TON
2072 STRUCTURES STEEL SHAPES ASTM A-36 TON
2073 ELASTOMERIC BEARING PAD M-183 CCM
2077 RCC PIPE CLASS II 310 MM (AASHTO M-170) LM
2078 RCC PIPE CLASS II 380 MM (AASHTO M-170) LM
2079 RCC PIPE CLASS II 460 MM (AASHTO M-170) LM
2080 RCC PIPE CLASS II 610 MM (AASHTO M-170) LM
2081 RCC PIPE CLASS II 760 MM (AASHTO M-170) LM
2082 RCC PIPE CLASS II 910 MM (AASHTO M-170) LM
2083 RCC PIPE CLASS II 1070 MM (AASHTO M-170) LM
2084 RCC PIPE CLASS II 1220 MM (AASHTO M-170) LM
2085 RCC PIPE CLASS II 1520 MM (AASHTO M-70) LM
2091 CAT EYE SINGLE (RAISED PROFILE) NO.
2092 CAT EYE DOUBLE (RAISED PROFILE) NO.
2093 STEEL/MATAL BEARING DEVICES KG
2095 BITUMEN IMPREGINATED FIBER BOARD SM
2096 NEOPRENE RUBBER JOINT FELT SM
2097 ASPHALT FELT (3 - PLY) SM
2099 BENTONITE POWDER KG
2100 JOINT SEALENT FILLER KG
2101 TRAFFIC SIGN CAT 1 NO.
2102 TRAFFIC SIGN CAT 2 NO.
2103 TRAFFIC SIGN CAT 3 (A, B, C) SM
2104 PAVEMENT MARKING NON-REFLECTING (CR) LIT
2105 PAVEMENT MARKING REFLECTING (CR) LIT
2106 CATS-EYE SINGLE (FLUSH SURFACE) NO.
2107 CATS-EYE DOUBLE (FLUSH SURFACE) NO.
2108 TUNGSTON CARBIDE BITS SET

(xiii)
CSR-2011
LIST OF MATERIAL CODES

Material
Description Unit
Code No.
2109 RED OXIDE PAINT LIT
2110 QUICK LIME KG
2111 DIESEL LIT
2112 SUPER – GASOLINE LIT
2113 REGULAR – GASOLINE LIT
2114 OILS (ALL TYPES) LIT
2115 LUBRICANTS (GREASE) KG.
2116 FURNACE OIL LIT
2117 BLASTING MATERIAL CM
2118 ELECTRIC CHARGES COMMERCIAL KWH
2119 MASTIC WATER PROOF PAINT KG
2120 SYNTHETIC ENEMAL PAINT LIT
2121 SHUTTERING (107 b) CM
2122 SHUTTERING (a) CM
2123 SHUTTERING (b) CM
2124 SHUTTERING (c) CM
2125 SHUTTERING (d) CM
2126 SHUTTERING (407 h) LS
2127 SHUTTERING (407 i) LS
2128 SHUTTERING (407 j) LS
2129 SCAFFOLDING (A) CM
2130 SCAFFOLDING (B) SM
2131 G.M.S BARBED WIRE KG
2133 ANGLE IRONS DIFFERENT SIZES KG
2134 STEEL CHANNELS KG
2135 SHEATHS ( 2” DIA) LM
2136 LIVE ANCHORAGES (3/8" - 1/2") NO.
2137 G.I. PIPE 3" DIA LM
2138 STEEL SHEATH CASING M
2139 MOBILIZATION OF PILING EQUIPMENT (UPTO 1.0 m DIA) M
2140 G.M.S SCREW, NUTS, BOLTS AND WASHERS KG
2142 PLANTATION TREES NO.
2143 MOBILIZATION OF PILING EQUIPMENT (UPTO 1.0 m DIA) M
2144 RCC PIPE CLASS IV 310 MM (AASHTO M-170) LM
2145 RCC PIPE CLASS IV 380 MM (AASHTO M-170) LM
2146 RCC PIPE CLASS IV 460 MM (AASHTO M-170) LM
2147 RCC PIPE CLASS IV 610 MM (AASHTO M-170) LM
2148 RCC PIPE CLASS IV 760 MM (AASHTO M-170) LM
2149 RCC PIPE CLASS IV 910 MM (AASHTO M-170) LM
2150 RCC PIPE CLASS IV 1070 MM (AASHTO M-170) LM
2151 RCC PIPE CLASS IV 1220 MM (AASHTO M-170) LM
2152 RCC PIPE CLASS IV 1520 MM (AASHTO M-170) LM
2153 PAVEMENT MARKING NON REFLECTING (TP) KG

(xiv)
CSR-2011
LIST OF MATERIAL CODES

Material
Description Unit
Code No.
2154 PAVEMENT MARKING REFLECTING (TP) KG
2155 GALVANIZED FLAT STEEL FASTENERS & WASHERS KG
2156 GALVANIZED U-BOLT CLAMP WITH 2 NUTS & TIE BOLTS KG
2157 GALVANIZED SUPPORTING HOOKS CAST IN PRECAST
EACH
POSTS
2158 GALVANIZED CHAIN LINK WIRE MESH FABRIC SM
2159 GALVANIZED WIRE 3.76MM Ø TENSION, 3MM Ø STIRRUP KG
2160 PRE-CAST CONCRETE TUFF KERB STONE (K-5) EACH
2162 MS SHEET KG
2164 GALVANIZATION KG
2165 BRIDGE EXPANSION JOINT WITH TWO EXTRUDED
ALUMINIUM ALLOY SECTIONS (50 MM MOVEMENT)- LM
IMPORTED
2166 BRIDGE EXPANSION JOINT WITH CAST ALUMINIUM ALLOY
TRIANGULAR TEETH (110 mm MOVEMENT)-IMPORTED LM

2167 BRIDGE EXPANSION JOINT WITH CAST ALUMINIUM ALLOY


CANTILEVER TEETH (300 mm MOVEMENT) – IMPORTED LM

2168 CEMENTITIOUS GROUT (HIGH STRENGTH) CM


2169 PVC WATER STOP (8") LM
2170 STEEL BLOCK C150x100x5 (LENGTH = 350mm) EACH
2171 STEEL POST C150x100x5 (LENGTH = 1830mm) EACH
2172 W6x15 STEEL POST (LENGTH = 1800mm) EACH
2175 STEEL BACKING PLATE 318x270x12 mm EACH
2176 METAL BEAM RAIL 310mm WIDE LM
2177 METAL RAIL END PIECES EACH
2178 P.C.C (1:2:4) FOR FENCE POST CM
2179 PRECAST PRESTRESSED FENCE POST EACH
2180 PRECAST R.C.C FENCE POST EACH
2181 GALVANIZED WIRE MESH FENCE 10 SWG (50mm x 50mm) SM
2182 STEEL CASING FOR PILES TON
2183 BRIDGE EXPANSION JOINT MONOBLOC TYPE (56 mm
MOVEMENT)-IMPORTED LM
2184 ELASTOMERIC BEARING PAD M-183 (IMPORTED) CCM
2185 WELDING RODS EACH
2186 SHUTTERING (407k) L.S.
2187 SHUTTERING (407l) L.S.

(xv)
CSR-2011
LIST OF EQUIPMENT CODES

Equipment Code Description


3001 BULL-DOZER. 200 H.P.
3002 BULL-DOZER. 120 H.P.
3003 BULL-DOZER. 90 H.P.
3004 FRONT END LOADER. 3.00 CUM.
3005 FRONT END LOADER. 2.50 CUM.
3006 FRONT END LOADER. 1.50 CUM.
3007 GRADER. 165 H.P.
3008 GRADER. 140 H.P.
3011 TANDEM VIBRATORY ROLLER. 10-12 T.
3012 TANDEM VIBRATORY ROLLER 8 T.
3013 TANDEM VIBRATORY ROLLER 6 T.
3014 TANDEM VIBRATORY ROLLER 1.5 T.
3015 COMBINATION ROLLER 18 T.
3016 COMBINATION ROLLER 10-12 T.
3017 COMBINATION ROLLER 8 T.
3018 P.T.R. (9 - WHEELER) 21 T.
3019 P.T.R. (9 - WHEELER) 18 T.
3020 STATIC TANDEM ROLLER 12 T.
3021 STATIC TANDEM ROLLER 8 T.
3022 TRACTOR 80 H.P.
3023 TRACTOR 50 H.P.
3024 WATER TANK BOWSER TYPE 12000 LTR.
3025 WATER TANK TOW TYPE 4000 LTR(INCL TRACTOR)
3031 MOTOR SCRAPER 400 H.P.
3032 DUMPER 18 T.
3033 DUMPER 10 T.
3034 FLAT BODY TRUCK 8 T.
3041 SEDAN CAR 1300 CC.
3042 SEDAN CAR 1000 CC.
3043 PICKUP 2800 CC. 4x4
3044 PICKUP 2200 CC. 4x2
3045 PICKUP 800 CC. 4 x 2
3046 JEEP 1300 CC. 4x4
3047 EXCAVATOR. (TRACK TYPE) 100 H.P.
3048 POWER BROOM.
3051 BITUMEN DIST. TOW TYPE 2000 LTR.

(xvi)
CSR-2011
LIST OF EQUIPMENT CODES

Equipment Code Description

3052 BITUMEN SPRAYER (MANUAL) 250 LTR.


3053 AGGREGATE SPREADER. 4 M WIDE.
3054 ASPHALT PLANT. 120 T.
3055 ASPHALT PLANT. 80 T.
3056 ASPHALT PLANT. 40 T.
3057 ASPHALT PLANT. 20 T.
3058 PAVER 4 M WIDE.
3059 PAVER 2.5 M WIDE.
3061 COMPRESSOR 300 CFM.
3062 ROCK DRILLER.
3071 CONCRETE BATCHING PLANT 30 CUM/H.
3072 CONCRETE STATIC MIXER 1 CUY.
3073 CCONCRETE STATIC MIXER. 1/4 CUY.
3074 CONCRETE TRANSIT MIXER 6 CUM.
3075 CONCRETE TRANSIT MIXER 4 CUM.
3081 TRAILER LOW BED 30 T.
3082 CRANE 45 T.
3083 CRANE 20 T.
3084 COLD MILLING MACHINE 1 M. WIDTH
3085 ROAD MARKING MACHINE.
3086 PUMP 4" DELIVERY (DIESEL)
3087 PUGMILL 40 TONS PER HOUR
3088 CHIPPING SPREADER 3 METER WIDE
3089 SAND BLASTING MACHINE
3120 STRESSING EQUIPMENT
3121 ASPHALT CUTTER
3122 CONCRETE CUTTER
3123 ELECTRIC SAW
3195 TRUCK (3-AXLE).
3196 TRACTER TROLLEY
3198 WELDING PLANT
3199 GENERATOR (DIESEL) 150 KVA.
3200 GENERATOR (DIESEL) 250 KVA.
3202 ROCK CRUSHING & SCREENING (200 T / H
3205 SECONDARY CRUSHER
3206 DIESEL TANKER
3208 JACK HAMME
3209 PILING RIG (Dia. 1m to 2m)

(xvii)
CSR-2011
LIST OF EQUIPMENT CODES

Equipment Code Description

3210 VIBRATOR (POCKER 1.5")


3211 PERCUSSION BORING RIG
3212 FORGOING/SHAPE MACHINE
3214 CONCRETE PUMP
3215 PLATE COMPACTOR
3217 GIRDER LAUNCHER
3218 TRIPOD & CHAIN PULLY (20 TON)
3219 ELECTRIC GENERATOR 50 KVA.
3220 ASPHALT RECYCLING MACHINE
3221 ROAD MARKING MACHINE (TP)
3222 PILING RIG (Dia. up to 1m)

(xviii)
PERFORMA FOR ESTIMATED OWNING AND OPERATING COSTS

Machine & Model: _____________ Code No: ________________

Attachments: ____________________________________

A. Delivered price (including Duties & Taxes in Pakistan).


Front Tire Price: _______________ Rear Tire Price: _______________
Total Tire Price: ______ B _______

C. Delivered Price less Tire: ______A – B_________

D. Trade-in Value or resale Value (Optional) __________________

E. Net Depreciation Value: _______C – D_________

OWNING COSTS:

F. Depreciation Cost:
Depreciation period: _____Y_____ Years
Approx. Annual Use: _____H_____ Hours

Net Depreciation Value E


F= =
Depreciation period in hours (Y x H)

G. Interest, Insurance, Taxes:


Annual Rates (AR): Int. % + Ins. % + Taxes %

Delivered Price x Annual Rates A x AR


G= =
Annual Use in Hours x 100 H x 100

H. Total Owning Costs: = ______F + G_______

OPERATING COSTS:

J. Fuel Cost: Hourly Consumption x Unit Fuel Cost =

K. Maintenance in Percentage = %

Maint. %age x Delivered Price Less Tire Price KxC


L. Maintenance Cost = =
Depreciation Period in Hours x 100 (Y x H) x 100

M. Tire Cost:
Tire Price B
=
Estimated Tire Life N

N. Operators Hourly Wages: ______________


P. Total Operating Cost: ____J + L + M + N____

TOTAL HOURLY OWNING AND OPERATING COST: ________P + H_______

(xix)
Client: Consultant :
National Highway Authority Sampak International (Pvt.) Ltd.
Islamabad. Lahore.
PLANT & EQUIPMENT OWNING OPERATING COST CSR-2011
(NEW EQUIPMENT)

Code Description T-Owning T-Operating T-Hourly O.W.


No. Cost Cost & Opr. Cost

3001 BULL-DOZER. 200 H.P. 2,304.42 2,676.03 4,980.45


3002 BULL-DOZER. 120 H.P. 1,975.22 1,320.45 3,295.66
3003 BULL-DOZER. 90 H.P. 1,728.31 989.15 2,717.46
3004 FRONT END LOADER. 3.00 CUM. 2,039.41 2,097.82 4,137.23
3005 FRONT END LOADER. 2.50 CUM. 1,790.74 1,844.72 3,635.46
3006 FRONT END LOADER. 1.50 CUM. 1,417.73 1,504.24 2,921.97
3007 GRADER. 165 H.P. 1,821.11 2,092.78 3,913.90
3008 GRADER. 140 H.P. 1,722.57 1,655.47 3,378.04
3011 TANDEM VIBRATORY ROLLER. 10-12 T. 988.80 1,248.62 2,237.42
3012 TANDEM VIBRATORY ROLLER 8 T. 865.20 1,082.96 1,948.16
3013 TANDEM VIBRATORY ROLLER 6 T. 741.60 760.64 1,502.24
3014 TANDEM VIBRATORY ROLLER 1.5 T. 309.00 259.16 568.16
3015 COMBINATION ROLLER 18 T. 1,043.40 1,706.42 2,749.82
3016 COMBINATION ROLLER 10-12 T. 957.79 1,300.64 2,258.44
3017 COMBINATION ROLLER 8 T. 799.74 953.11 1,752.86
3018 P.T.R. (9 - WHEELER) 21 T. 729.27 1,347.36 2,076.63
3019 P.T.R. (9 - WHEELER) 18 T. 675.71 1,108.47 1,784.18
3020 STATIC TANDEM ROLLER 12 T. 323.71 707.35 1,031.07
3021 STATIC TANDEM ROLLER 8 T. 264.86 704.50 969.35
3022 TRACTOR 80 H.P. 219.33 906.29 1,125.61
3023 TRACTOR 50 H.P. 152.86 565.53 718.39
3024 WATER TANK BOWSER TYPE 12000 LTR. 540.27 905.21 1,445.48
3025 WATER TANK TOW TYPE 4000 LTR 171.12 558.74 729.86
(INCL TRACTOR)
3031 MOTOR SCRAPER 400 H.P. 1,955.23 7,071.09 9,026.32
3032 DUMPER 18 T. 679.68 1,553.00 2,232.68
3033 DUMPER 10 T. 528.07 1,022.22 1,550.30
3034 FLAT BODY TRUCK 8 T. 389.12 755.82 1,144.95

xx
Client: Consultant :
National Highway Authority Sampak International (Pvt.) Ltd.
Islamabad. Lahore.

PLANT & EQUIPMENT OWNING OPERATING COST CSR-2011


(NEW EQUIPMENT)

Code Description T-Owning T-Operating T-Hourly O.W.


No. Cost Cost & Opr. Cost

3041 SEDAN CAR 1300 CC. 257.82 519.09 776.91


3042 SEDAN CAR 1000 CC. 166.09 436.21 602.29
3043 PICKUP 2800 CC. 4x4 697.62 573.30 1,270.92
3044 PICKUP 2200 CC. 4x2 297.62 553.30 850.92
3045 PICKUP 800 CC. 4 x 2 91.29 359.51 450.79
3046 JEEP 1300 CC. 4x4 341.82 450.33 792.15
3047 EXCAVATOR. (TRACK TYPE) 100 H.P. 1,177.14 1,012.34 2,189.49
3048 POWER BROOM. 169.43 773.44 942.87
3051 BITUMEN DIST. TOW TYPE 2000 LTR. 687.65 100.70 788.35
3052 BITUMEN SPRAYER (MANUAL) 250 LTR. 137.70 63.10 200.80
3053 AGGREGATE SPREADER. 4 M WIDE. 2,383.71 786.88 3,170.60
3054 ASPHALT PLANT. 120 T. 13,104.00 5,626.50 18,730.50
3055 ASPHALT PLANT. 80 T. 11,648.00 4,894.90 16,542.90
3056 ASPHALT PLANT. 40 T. 9,100.00 2,939.00 12,039.00
3057 ASPHALT PLANT. 20 T. 6,500.00 2,332.30 8,832.30
3058 PAVER 4 M WIDE. 2,431.04 801.32 3,232.36
3059 PAVER 2.5 M WIDE. 1,823.28 615.16 2,438.44
3061 COMPRESSOR 300 CFM. 203.43 1,332.57 1,536.00
3062 ROCK DRILLER. 238.00 79.00 317.00
3071 CONCRETE BATCHING 2,336.88 1,672.18 4,009.06
PLANT 30 CUM/H.
3072 CONCRETE STATIC MIXER 1 CUY. 136.00 464.65 600.65
3073 CONCRETE STATIC MIXER. 1/4 CUY. 12.75 300.74 313.49
3074 CONCRETE TRANSIT MIXER 6 CUM. 3,062.28 1,562.07 4,624.35
3075 CONCRETE TRANSIT MIXER 4 CUM. 2,893.85 1,225.63 4,119.48
3081 TRAILER LOW BED 30 T. 1,519.97 1,398.03 2,918.00
3082 CRANE 45 T. 1,621.55 1,425.73 3,047.28
3083 CRANE 20 T. 1,297.93 1,166.93 2,464.86

xxi
Client: Consultant :
National Highway Authority Sampak International (Pvt.) Ltd.
Islamabad. Lahore.

PLANT & EQUIPMENT OWNING OPERATING COST CSR-2011


(NEW EQUIPMENT)

Code Description T-Owning T-Operating T-Hourly O.W.


No. Cost Cost & Opr. Cost

3084 COLD MILLING MACHINE 5,765.08 2,112.54 7,877.62


1 M. WIDTH
3085 ROAD MARKING MACHINE. 264.60 235.09 499.68
3086 PUMP 4" DELIVERY (DIESEL) 116.00 376.32 492.32
3087 PUGMILL 40 TONS PER HOUR 1,950.00 1,537.30 3,487.30
3088 CHIPPING SPREADER 3 METER WIDE 147.14 72.14 219.29
3089 SAND BLASTING MACHINE 176.57 1,017.36 1,193.93
3120 STRESSING EQUIPMENT 335.00 999.50 1,334.50
3121 ASPHALT CUTTER 109.93 223.14 333.08
3122 CONCRETE CUTTER 109.93 233.88 343.82
3123 ELECTRIC SAW 68.00 490.45 558.45
3195 TRUCK (3-AXLE). 824.32 995.10 1,819.42
3196 TRACTER TROLLEY 206.54 623.15 829.69
3198 WELDING PLANT 111.67 495.58 607.25
3199 GENERATOR (DIESEL) 150 KVA. 425.00 2,038.25 2,463.25
3200 GENERATOR (DIESEL) 250 KVA. 510.00 3,218.20 3,728.20
3202 ROCK CRUSHING & 3,090.00 5,237.50 8,327.50
SCREENING (200 T / H)
3205 SECONDARY CRUSHER 119.00 2,131.30 2,250.30
3206 DIESEL TANKER 758.69 774.40 1,533.09
3208 JACK HAMMER 55.83 205.09 260.92
3209 PILING RIG (Dia. 1m to 2m) 5,947.76 1,778.55 7,726.31
3210 VIBRATOR (POCKER 1.5") 11.60 201.92 213.52
3211 PERCUSSION BORING RIG 238.00 392.32 630.32
3212 FORGOING/SHAPE MACHINE 156.33 921.17 1,077.50
3214 CONCRETE PUMP 3,292.90 1,680.01 4,972.91
3215 PLATE COMPACTOR 101.50 209.67 311.17
3217 GIRDER LAUNCHER 2,205.68 1,453.00 3,658.69
3218 TRIPOD & CHAIN PULLY (20 TON) 33.50 137.00 170.50

xxii
Client: Consultant :
National Highway Authority Sampak International (Pvt.) Ltd.
Islamabad. Lahore.

PLANT & EQUIPMENT OWNING OPERATING COST CSR-2011


(NEW EQUIPMENT)

Code Description T-Owning T-Operating T-Hourly O.W.


No. Cost Cost & Opr. Cost

3219 ELECTRIC GENERATOR 50 KVA. 255.00 2,603.50 2,858.50


3220 ASPHALT RECYCLING MACHINE 17,651.31 6,099.91 23,751.22
3221 ROAD MARKING MACHINE (TP) 592.36 286.14 878.50
3222 PILING RIG (Dia. up to 1m) 3,397.76 1,161.90 4,559.66

xxiii
NAME OF PROVINCE: PUNJAB

Serial No. Name of District District Code


1. ATTOCK 02
2. BAHAWAL NAGAR 04
3. BAHAWALPUR 05
4. BHAKKAR 07
5. CHAKWAL 09
6. CHANIOT 09A
7. D.G. KHAN 11
8. FAISALABAD 16
9. GUJRANWALA 17
10. GUJRAT 18
11. HAFIZABAD 20A
12. JHANG 22
13. JHELUM 23
14. KASUR 28
15. KHANEWAL 30
16. KHUSHAB 32
17. LAHORE 37
18. LAYYAH 40
19. LODHRAN 41A
20. MIANWALI 45
21. MULTAN 46
22. MUZAFFARGARH 47
23. MANDI BAHA-UD-DIN 47A
24. NANKANA SAHIB 47E
25. NAROWAL 49A
26. OKARA 50
27. PAKPATTAN 53A
28. RAHIM YAR KHAN 55
29. RAJAN PUR 56
30. RAWALPINDI 57
31. SAHIWAL 58
32. SARGODHA 60
33. SHEIKHUPURA 61
34. SIALKOT 63
35. TOBA TEK SINGH 69
36. VEHARI 71

xxiv
NAME OF PROVINCE: BALUCHISTAN

Serial No. Name of District District Code


1. AWARAN 02A
2. BARKHAN 06A
3. BOLAN 07A
4. CHAGAI 08
5. DERA BUGTI 14
6. GWADAR 19
7. JAFFARABAD 21A
8. JHAL MAGSI 21C
9. KACHHI 24
10. KALAT 25
11. KHARAN 31
12. KHUZDAR 33
13. KOHLU 36
14. LASBELA 39
15. LORALAI 41
16. MASTUNG 47B
17. MUSAKHEL 47C
18. MUSLIM BAGH 47D
19. NASIRABAD 48
20. NUSHKI 49D
21. PANJGUR 51
22. PISHIN 53
23. QUETTA 54
24. QILLA SAIFULLAH 54A
25. QILLA ABDULLAH 54B
26. SIBI 64
27. TURBAT (KECH) 70
28. ZHOB 72
29. ZIARAT 72A

xxv
NAME OF PROVINCE: KHYBER PAKHTUNKHWA

Serial No. Name of District District Code


1. ABBOTTABAD 01
2. BANNU 06
3. BATAGRAM 06B
4. BUNER 07B
5. CHITRAL 10
6. CHARSADDA 10A
7. D.I. KHAN 12
8. DIR (LOWER) 15
9. DIR (UPPER) 15A
10. HANGU 20B
11. HARIPUR 20C
12. KARAK 27
13. KOHAT 34
14. KOHISTAN 35
15. LAKKI MARWAT 37A
16. MALAKAND 42
17. MANSEHRA 43
18. MARDAN 44
19. NOWSHERA 49C
20. PESHAWAR 52
21. SHANGLA 60A
22. SWAT 66
23. SWABI 66A
24. TANK 70A

xxvi
NAME OF PROVINCE: SINDH

Serial No. Name of District District Code


1. BADIN 03
2. DADU 13
3. GHOTKI 16A
4. HYDERABAD 20
5. JACOBABAD 21
6. JAMSHORO 21B
7. KARACHI 26
8. KASHMORE 27A
9. KHAIRPUR 29
10. LARKANA 38
11. MIRPURKHAS 45A
12. NAWABSHAH 49
13. NAUSHAHRO FEROZE 49B
14. QAMBAR 53B
15. SANGHAR 59
16. SHIKARPUR 62
17. SUKKUR 65
18. THARPARKAR 67
19. THATTA 68
20. UMARKOT 70B

xxvii
COMPOSITE SCHEDULE OF RATES CSR 2011
LIST OF QUARRIES - PROVINCE OF SINDH

DISTRICT DISTRICT QUARRY


QUARRY NAME MATERIAL NO.
CODE NAME CODE

26 KARACHI 152 Sokun Nullah Quarry 2017 & 2018


175 Malir Nullah Quarry 2021
2024, 2025, 2026 &
29 KHAIRPUR 528 Kot Diji Quarry
2027
2001, 2008, 2021,
Shadi Shaheed 2022, 2030, 2031,
529
Quarry 2032, 2033, 2034 &
2035

2017, 2018, 2024,


2025, 2027, 2028,
530 Ubban Shah Quarry
2030, 2031, 2032,
2033, 2034 & 2035

2014, 2015, 2023,


531 Ubban Shah Quarry
2024, 2025 & 2027
59 SANGHAR 526 Khadro Soil Quarry 2008 & 202\2

2008, 2021, 2022,


65 SUKKUR 533 Kalri Dudanko 2023, 2024, 2025,
2026, 2027 & 2028

67 THARPARKAR 179 Mithi 2008 & 2022


68 THATTA 166 Baran Nullah Quarry 2021
Dabo Bolari Sand 2017, 2018, 2021 &
167
Dunes 2022
169 J. and R Quarry 2008 & 2022
21B JAMSHORO 168 Goth Akro Quarry 2018
2014, 2015, 2023,
170 Limestone Quarry 2025, 2026, 2027, 2028
& 2035
2001, 2014, 2022,
2024, 2025, 2026,
Borrow Area Near
171 2027, 2030, 2031,
Thana Bula Khan
2032, 2033, 2034 &
2035
Borrow Area Near
172 2021 & 2022
Thana Bula Khan
Thana Bula Khan
173 2035
Lime Stone

xxviii
2014, 2017, 2018,
Noori Abad Lime 2023, 2024, 2025,
174
Stone Quarry 2026, 2027, 2028 &
2035
Indus River Sand
176 2008 & 2022
Dunes
Quarry on SH (28
178 2021
Km from Hyderabad)
2023, 2024, 2025,
182 Luki Borrow Area 2026, 2027, 2028, 2030
& 2035
2018, 2024, 2025, 2026
705 Goth Akro Quarry
& 2028
2014, 2023, 2024,
706 Goth Akro Quarry 2025, 2026, 2027, 2028
& 2035
2024, 2025, 2026, 2027
707 Goth Akro Quarry
& 2028

Quarry on SH (28 2023, 2025, 2026,


708
Km from Hyderabad) 2027, 2028 & 2035

xxix
CONVERSION FACTORS

TO CONVERT INTO MULTIPLY BY

LENGTH

Inch Millimeter 25.4

Millimeter Inch 0.03937

Foot Metre 0.30480

Metre Foot 3.28084

Yard Metre 0.91440

Metre Yard 1.09361

Mile Kilometre 1.60934

Mile Yard 1760

Kilometre Mile 0.62137

Nautical Mile Kilometre 1.852

inch mil 1000

xxx
TO CONVERT INTO MULTIPLY BY

MASS, WEIGHT

Pound Kilogram 0.45359237

Kilogram Pound 2.20462

Ounce Gram 28.3495

Gram Ounce 0.03527

Quintal Kilogram 100

Grain Milligram 64.7989

Hundred Weight Kilogram 50.8023

Tonne Hundred Weight 19.6841

Tonne Kilogram 1000

Ton (Long) Kilogram 1016.0469

Ton (Long) Pound 2240

Ton (Long) Tonne 1.0160469

Tonne Ton (Long) 0.9842065

Seer Kilogram 0.9331

Maund Kilogram 37.324

Tola Gram 11.664

Ton (Long) Ton (Short) 1.12

xxxi
TO CONVERT INTO MULTIPLY BY

CAPACITY VOLUME

Pint (UK) Litre 0.568261

Gallon (Imperial) Litre 4.54609

Gallon (US) Litre 3.78541

Cubic foot Litre 28.3168

Cubic Metre Litre 1000

Litre Cubic Foot 0.0353147

Fluid Ounce Millilitre 28.413

Litre Gallon (Imperial) 0.219969

Cubic Inch Cubic milliliter 16387.1

Cubic Foot Cubic metre 0.0283168

Cubic Metre Cubic foot 35.3147

Cubic Yard Cubic metre 0.764555

Cubic Metre Cubic yard 1.30795

Acre Foot Hectare metre 0.12334

Barrel (Oil) Litre 158.98729

xxxii
TO CONVERT INTO MULTIPLY BY

AREA

Square inch Square milimetre 645.16

Square millimeter Square inch 0.00155

Square foot Square metre 0.0929

Square metre Square foot 10.7639

Square yard Square metre 0.836127

Square metre Square yard 1.19599

Acre Square metre 4046.8564

Acre Hectare 0.40468564

Hectare Acre 2.47105

Hectare Square metre 10000

Square mile Square Kilometre 2.58999

Square Kilometre Square mile 0.386102

Square mile Hectare 258.99

Hectare Square mile 0.00386102

Mass Per Unit Area

Ton per square mile Kilogram per square 392.298


kilometer

Pound per Square foot Kilogram per square 4.88243


metre

Kilogram per square Pound per square foot 0.204816


metre

Mass Per Unit Volume

Ton Per Cubic Foot Kilogram per cubic metre 16.0185

Pound Per Cubic foot Grams per litre 16.0185

Kilogram per Cubic metre Pound per cubic foot 0.062428

Grams per litre Pound per cubic foot 0.062428

xxxiii
TO CONVERT INTO MULTIPLY BY

POWER

Kilo Watt BTU per Hour 3412.1416

Kilo Watt Ton (Refrigeration) 0.28434514

Kilo Watt Kilo calorie per hour 859.84523

HP (British) Watt 745.69987

Ton (Refrigeration) BTU per Hour 12000

PRESSURE

Atmosphere Kilo Pascal 101.325

Atmosphere Foot H2O 33.898538

Atmosphere Pound per sq. inch 14.695949

Atmosphere mm Hg (Torr) 760.0021

Pound per sq. inch Kilo Pascal 6.8947573

Pound per sq. inch Pound per sq. foot 144

Kilogram per sq.cm Pound per sq. inch 14.223343

Pound per sq. inch Kilogram per sq.cm 0.07030696

Bar Kilo Pascal 100

xxxiv
CSR-2011
DISTANCE V/S RATE/CM/KM CHART (SINDH)
10.00

8.00
Rate/CM/Km (Rs.)

6.00

4.00

2.00

0.00
0 100 200 300 400 500 600 700 800

Distance (Km)
CSR-2011
DISTANCE V/S RATE/TON/KM CHART (SINDH)
8.00
Rate/TON/Km (Rs.)

6.00

4.00

2.00

0.00
0 100 200 300 400 500 600 700 800

Distance (Km)
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

SINDH

SAMPAK INTERNATIONAL

Page 1 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

BADIN
(03)

SAMPAK INTERNATIONAL

Page 2 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.94 15.76 0.00 4.17 20.87

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 9.29 262.58 1.88 68.44 342.18

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 26.91 635.47 4.22 166.65 833.25

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 107.63 2,541.89 16.89 666.60 3,333.00

103 STRIPPING CM 3.17 153.65 0.00 39.20 196.02

104 COMPACTION OF NATURAL GROUND SM 0.45 14.95 2.70 4.53 22.63

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.38 227.95 0.00 58.33 291.67

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 21.01 541.85 0.00 140.72 703.58
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 13.92 422.98 0.00 109.23 546.14

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.41 205.65 0.00 52.51 262.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.82 492.05 0.00 128.97 644.83

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 12.01 422.98 0.00 108.75 543.74

107a STRUCTURAL EXCAVATION IN COMMON CM 9.02 221.54 0.00 57.64 288.20


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 80.62 664.63 72.03 204.32 1,021.59


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 132.31 400.09 125.00 164.35 821.76
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 119.08 442.22 0.00 140.32 701.62
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 68.05 316.49 0.00 96.13 480.67
MATERIAL

107d GRANULAR BACKFILL CM 43.03 193.34 901.47 284.46 1,422.28

107e COMMON BACKFILL CM 36.95 110.10 18.00 41.26 206.32

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.53 234.11 18.00 65.16 325.80
EXCAVATION IN COMMON MATERIAL

Page 3 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.95 578.46 144.73 187.04 935.18
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.71 637.82 8.55 166.27 831.36
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 16.63 574.85 8.00 149.87 749.35
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 9.86 119.41 152.97 70.56 352.80
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 7.59 121.79 18.00 36.85 184.23


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 18.23 277.82 10.70 76.69 383.43


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.72 43.86 5.15 12.68 63.41

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.24 30.11 2.73 8.52 42.60
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 12.59 190.72 329.36 133.17 665.85

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.05 23.59 2.80 6.86 34.30

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.59 26.79 2.80 7.79 38.97

201 GRANULAR SUB-BASE CM 10.02 231.80 920.52 290.59 1,452.93

202 AGGREGATE BASE CM 11.65 282.85 944.21 309.68 1,548.40

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 102.22 2,324.40 9,298.43 2,931.26 14,656.31

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 102.22 2,324.40 9,537.59 2,991.05 14,955.27

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 9,289.67 2,956.73 14,783.65
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 9,547.53 3,021.20 15,105.98
(CLASS B)

204b CEMENT STABILIZED BASE CM 35.99 780.07 1,341.19 539.31 2,696.56

204c CEMENT CONTENT TON 150.00 0.00 7,056.00 1,801.50 9,007.50

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,488.27 15,963.21 79,816.07
MC-250

Page 4 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,488.27 15,963.21 79,816.07
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 125.02 188.22 1,144.57 364.45 1,822.25
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 195.31 3,721.78 7,574.44 2,872.88 14,364.42
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 138.14 207.88 1,108.08 363.52 1,817.62
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 2.09 64.78 24.28 22.79 113.93

207b DEEP PATCHING (15-30 cm) SM 2.09 64.78 24.28 22.79 113.93

208 REINSTATEMENT OF ROAD SURFACE SM 2.25 104.50 1.98 27.18 135.91

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.59 373.82 12.00 97.85 489.26
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.12 40.20 2.40 10.93 54.65

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.38 2.36 69.20 17.99 89.93
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.37 2.36 60.31 15.76 78.80
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 27.79 7.20 36.01
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 24.11 6.28 31.41
COAT.

304a SINGLE SURFACE TREATMENT SM 0.98 11.24 149.45 40.42 202.10

304b DOUBLE SURFACE TREATMENT SM 1.43 21.60 283.14 76.54 382.72

304c TRIPLE SURFACE TREATMENT SM 2.41 30.32 329.38 90.53 452.64

304d SEAL COAT SM 0.91 6.38 35.45 10.68 53.42

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,293.29 9,987.32 3,092.72 15,463.58
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,198.28 10,606.03 3,223.64 16,118.21
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 222.00 513.14 7,284.65 2,004.95 10,024.73

307b OPEN GRADED HOT BIT-MAC CM 222.00 513.14 7,005.70 1,935.21 9,676.04

Page 5 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 38.30 1,050.92 3,603.18 1,173.10 5,865.49
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 268.98 1,746.20 61,488.27 15,875.86 79,379.32

309a COLD MILLING, 0-30 mm SM 1.23 52.01 18.08 17.83 89.15

309b COLD MILLING, 0-50 mm SM 2.05 86.68 30.14 29.72 148.58

309c COLD MILLING, 0-70 mm SM 3.07 130.02 45.20 44.57 222.87

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 656.97 2,175.42 3,929.09 1,690.37 8,451.85

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 656.97 2,175.42 4,526.29 1,839.67 9,198.35

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 656.97 2,175.42 4,836.84 1,917.31 9,586.54

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 656.97 2,175.42 4,117.73 1,737.53 8,687.65

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 656.97 2,175.42 4,714.82 1,886.80 9,434.01

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 656.97 2,175.42 5,025.25 1,964.41 9,822.05

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 656.97 2,175.42 4,400.88 1,808.32 9,041.60

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 656.97 2,175.42 4,997.97 1,957.59 9,787.96

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 656.97 2,175.42 5,285.54 2,029.48 10,147.42

401b CONCRETE CLASS B CM 857.36 1,109.69 3,222.82 1,297.47 6,487.35

401ci CONCRETE CLASS C (UNDERGROUND) CM 652.38 2,175.42 3,648.11 1,618.98 8,094.89

401cii CONCRETE CLASS C (ON GROUND) CM 652.38 2,175.42 4,245.20 1,768.25 8,841.25

401ciii CONCRETE CLASS C (ELEVATED) CM 652.38 2,175.42 4,555.75 1,845.89 9,229.44

401d CONCRETE CLASS D1 CM 1,020.27 2,689.24 6,378.11 2,521.90 12,609.52

401e CONCRETE CLASS Y CM 1,426.55 703.81 5,091.66 1,805.51 9,027.53

401f LEAN CONCRETE CM 564.86 759.81 2,734.53 1,014.80 5,073.99

401gi PRECAST CONCRETE, CLASS A1 CM 2,199.33 1,470.83 4,506.46 2,044.15 10,220.77

401gii PRECAST CONCRETE CLASS A3 CM 2,199.33 1,470.83 5,000.23 2,167.60 10,837.99

401giii PRECAST CONCRETE, CLASS B CM 2,199.33 1,470.83 3,841.95 1,878.03 9,390.14

401giv PRECAST CONCRETE CLASS D1 CM 2,199.33 1,470.83 6,385.20 2,513.84 12,569.21

Page 6 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 2,199.33 1,470.83 7,048.49 2,679.66 13,398.32

401gvi PRECAST CONCRETE CLASS D3 CM 2,199.33 1,470.83 7,713.46 2,845.91 14,229.53

401h PLUM CONCRETE CM 957.36 1,109.69 2,557.52 1,156.14 5,780.72

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 71,111.81 18,275.63 91,378.16
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 74,261.81 19,063.13 95,315.66
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,596.60 3,667.20 84,551.40 22,453.80 112,269.00
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,925.66 12,010.50 143,899.49 39,708.91 198,544.56
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 68.10 796.91 0.00 216.25 1,081.26

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 142.79 0.00 1,386.99 382.45 1,912.23
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 142.79 0.00 814.70 239.37 1,196.87
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 11.63 18.40 140.05 42.52 212.60

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 474.00 0.00 82,180.09 20,663.52 103,317.61
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 492.75 0.00 128,711.72 32,301.12 161,505.59
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 549.00 0.00 1,095,460.42 274,002.36 1,370,011.78
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 474.00 0.00 70,250.29 17,681.07 88,405.36
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 123.89 0.00 439.25 140.78 703.92

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.53 0.39 1.94
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.04
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 49.26 0.00 246.95 74.05 370.26

Page 7 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 24.40 48.58 149.56 55.64 278.18

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 288.95 3,155.77 467.37 978.02 4,890.12
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 439.20 4,796.77 629.16 1,466.28 7,331.42
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 439.20 7,330.09 778.88 2,137.04 10,685.22
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 732.00 12,216.82 1,107.16 3,514.00 17,569.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 610.00 10,180.69 970.38 2,940.27 14,701.33
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,098.00 18,325.24 1,517.51 5,235.19 26,175.94
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 30,471.36 86,125.76 115,557.92 58,038.76 290,193.80

407i PILE LOAD TEST UPTO 240 TON EACH 30,471.36 86,125.76 246,802.42 90,849.89 454,249.43

407j PILE LOAD TEST UPTO 360 TON EACH 84,471.36 95,444.48 336,506.40 129,105.56 645,527.80

407k PILE LOAD TEST UPTO 550 TON EACH 124,971.36 119,305.60 537,411.50 195,422.12 977,110.58

407l PILE LOAD TEST UPTO 800 TON EACH 184,998.72 143,166.72 870,304.50 299,617.49 1,498,087.43

407m CONFIRMATORY BORING (NX SIZE) M 228.23 2,639.89 22.50 722.66 3,613.28

407n PERMANENT PILE CASING FOR PILES Ton 299.67 3,993.41 83,635.39 21,982.12 109,910.58

410 BRICK WORK CM 413.22 453.06 3,510.02 1,094.08 5,470.38

411a STONE MASONRY RANDOM DRY CM 437.78 165.94 1,130.43 433.54 2,167.68

411b STONE MASONRY RANDOM WITH MORTAR CM 522.78 263.54 2,208.18 748.62 3,743.11

411c STONE MASONRY DRESSED UNCOURSED DRY CM 602.78 165.94 1,467.15 558.97 2,794.83

411d STONE MASONRY DRESSED UNCOURSED WITH CM 682.78 263.54 2,464.91 852.81 4,264.04
MORTAR

411g ROLL POINTING SM 87.39 19.52 95.69 50.65 253.25

412a STONE MASONARY DRESSED COURSED WITH CM 907.78 419.50 2,464.91 948.05 4,740.23
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 554.74 1,390.10 560.83 2,804.14
DIA 310 mm
Page 8 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 616.97 1,622.39 634.46 3,172.29
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 278.79 1,097.40 2,007.51 845.92 4,229.62
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 294.35 1,377.91 2,618.53 1,072.70 5,363.49
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 340.77 1,772.89 5,400.08 1,878.44 9,392.18
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 420.61 2,187.37 8,720.92 2,832.22 14,161.12
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 544.32 2,171.36 12,652.50 3,842.04 19,210.22
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 643.10 2,636.66 18,326.35 5,401.53 27,007.64
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 758.62 3,076.10 28,197.48 8,008.05 40,040.24
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 298.47 554.74 2,249.59 775.70 3,878.50
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 291.53 616.97 2,551.57 865.02 4,325.08
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 278.79 1,097.40 3,099.29 1,118.87 5,594.35
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 294.35 1,377.91 4,128.45 1,450.18 7,250.89
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 340.77 1,772.89 7,676.57 2,447.56 12,237.79
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 420.61 2,187.37 14,748.97 4,339.24 21,696.18
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 544.32 2,171.36 16,318.88 4,758.64 23,793.20
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 643.10 2,636.66 19,862.22 5,785.49 28,927.47
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 758.62 3,076.10 30,881.18 8,678.97 43,394.87
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 116.94 157.23 905.12 294.82 1,474.12
PIPE CULVERT

Page 9 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 970.13 845.94 3,297.49 1,278.39 6,391.95
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 6.76 0.00 117.40 31.04 155.19

507b ROCK FILL IN GABIONS CM 127.68 0.00 771.86 224.88 1,124.42

508a BRICK PAVING (SINGLE COURSE) SM 140.27 38.19 282.05 115.13 575.64

508b BRICK PAVING (DOUBLE COURSE) SM 250.27 38.19 556.87 211.33 1,056.67

509a RIPRAP, CLASS A CM 602.06 0.00 826.99 357.26 1,786.31

509b RIPRAP, CLASS B CM 425.65 180.10 862.18 366.98 1,834.91

509c RIPRAP, CLASS C CM 414.71 187.60 910.70 378.25 1,891.26

509c1 RIPRAP, CLASS D CM 414.71 225.12 826.99 366.70 1,833.52

509d GROUTED RIPRAP, CLASS A CM 737.59 170.59 2,623.89 883.02 4,415.09

509e GROUTED RIPRAP, CLASS B CM 554.07 316.57 2,475.78 836.61 4,183.03

509f GROUTED RIPRAP, CLASS C CM 531.73 301.33 2,524.97 839.50 4,197.52

509f1 GROUTED RIPRAP, CLASS D CM 531.73 338.85 2,614.86 871.36 4,356.80

509g REINFORCED CONCRETE SLOPE PROTECTION CM 1,016.27 481.58 3,846.74 1,336.15 6,680.73
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 64.38 275.72 903.20 310.82 1,554.12

510 DISMANTLING OF STRUCTURES AND CM 124.82 884.71 0.00 252.38 1,261.90


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 190.80 103.71 134.39 107.22 536.12

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 244.22 132.75 172.01 137.25 686.23

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 564.48 290.40 1,452.02
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 705.60 363.01 1,815.03
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 317.08 228.55 1,142.77
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 396.35 285.69 1,428.46
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 10 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 434.44 1,157.76 5,572.44 1,791.16 8,955.81
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,255.29 782.78 5,561.89 1,899.99 9,499.94
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 33.56 66.38 616.06 179.00 894.98
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 11.26 0.00 42.24 13.38 66.88

604a METAL GUARD RAIL M 83.21 55.31 2,575.39 678.48 3,392.39

604b METAL GUARD RAIL END PIECES EACH 110.93 533.21 2,891.45 883.90 4,419.48

604d STEEL POST FOR METAL GUARD RAIL EACH 124.80 533.21 2,521.44 794.86 3,974.32

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,351.38 1,160.70 12,468.63 3,995.18 19,975.88
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,351.38 801.50 11,635.48 3,697.09 18,485.45
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 294.37 393.19 8,473.02 2,290.14 11,450.71

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 90.00 589.78 10,213.08 2,723.21 13,616.07

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 294.37 844.19 18,237.21 4,843.94 24,219.71

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 1,001.55 921.65 33,603.32 8,881.63 44,408.15

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 200.31 223.78 15,677.84 4,025.48 20,127.42

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 338.88 0.00 2,249.10 647.00 3,234.98

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 338.88 0.00 3,373.65 928.13 4,640.66

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 25.27 8.74 43.72


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 58.94 15.92 79.62


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 33.72 10.86 54.28


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 78.61 20.84 104.21


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 92.81 29.98 244.19 91.74 458.72
PAINT FOR 4.0 M ARROWS

Page 11 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 03 BADIN

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 92.81 52.71 742.76 222.07 1,110.35
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 35.27 11.85 59.26
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 101.75 29.89 149.45
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 47.03 14.79 73.95
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 135.66 38.37 191.84
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 92.81 29.98 340.58 115.84 579.21
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 92.81 52.71 1,282.96 357.12 1,785.59
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 77.81 29.98 162.79 67.64 338.22
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 77.81 52.71 495.92 156.61 783.05
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 77.81 29.98 227.05 83.71 418.55
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 77.81 52.71 856.60 246.78 1,233.89
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 171.99 73.76 368.80
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 202.59 81.41 407.05
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 136.97 182.71 383.17 175.71 878.56

610c KILOMETER POST EACH 808.05 1,321.13 1,901.84 1,007.76 5,038.79

610d TEN KILOMETER POST EACH 1,566.10 2,642.27 3,598.82 1,951.80 9,758.99

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 169.11 66.38 1,236.26 367.94 1,839.69
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 147.32 821.01 2.04 242.59 1,212.96
INCLUDING MAINTENANCE FOR 2 YEARS

Page 12 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

DADU
(13)

SAMPAK INTERNATIONAL

Page 13 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.68 15.76 0.00 4.11 20.54

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 6.96 262.58 1.88 67.85 339.27

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 19.67 635.47 4.22 164.84 824.20

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 78.66 2,541.89 16.89 659.36 3,296.80

103 STRIPPING CM 2.47 153.65 0.00 39.03 195.14

104 COMPACTION OF NATURAL GROUND SM 0.35 14.95 2.70 4.50 22.51

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.77 227.95 0.00 58.18 290.90

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 16.81 541.85 0.00 139.67 698.33
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 11.33 422.98 0.00 108.58 542.90

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.90 205.65 0.00 52.39 261.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.68 492.05 0.00 127.93 639.66

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.61 422.98 0.00 108.15 540.74

107a STRUCTURAL EXCAVATION IN COMMON CM 7.77 221.54 0.00 57.33 286.64


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 65.55 664.63 73.44 200.90 1,004.52


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 109.36 400.09 125.00 158.61 793.06
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 98.42 442.22 0.00 135.16 675.80
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 56.24 316.49 0.00 93.18 465.91
MATERIAL

107d GRANULAR BACKFILL CM 33.12 193.34 997.94 306.10 1,530.50

107e COMMON BACKFILL CM 27.04 110.10 18.00 38.78 193.92

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.05 234.11 18.00 64.79 323.96
EXCAVATION IN COMMON MATERIAL

Page 14 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.89 578.46 144.73 185.77 928.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.92 637.82 8.55 165.32 826.61
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 13.26 574.85 8.00 149.03 745.13
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 7.94 119.41 152.97 70.08 350.40
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.21 121.79 18.00 36.50 182.50


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 14.32 277.82 10.70 75.71 378.55


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.41 43.86 5.15 12.60 63.02

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.02 30.11 2.73 8.46 42.32
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.03 190.72 318.88 129.91 649.54

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.83 23.59 2.80 6.81 34.03

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.28 26.79 2.80 7.72 38.58

201 GRANULAR SUB-BASE CM 8.14 231.80 877.56 279.37 1,396.87

202 AGGREGATE BASE CM 9.69 282.85 1,120.08 353.15 1,765.77

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 76.55 2,324.40 9,314.58 2,928.88 14,644.40

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 76.55 2,324.40 9,512.62 2,978.39 14,891.95

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,305.79 2,953.99 14,769.93
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,522.64 3,008.20 15,041.00
(CLASS B)

204b CEMENT STABILIZED BASE CM 29.16 780.07 1,232.07 510.32 2,551.62

204c CEMENT CONTENT TON 100.00 0.00 7,266.00 1,841.50 9,207.50

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,823.01 16,033.46 80,167.29
MC-250

Page 15 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,823.01 16,033.46 80,167.29
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 87.24 188.22 944.82 305.07 1,525.34
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 150.58 3,721.78 7,637.60 2,877.49 14,387.45
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 95.76 207.88 1,133.54 359.30 1,796.49
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.69 64.78 29.14 23.90 119.52

207b DEEP PATCHING (15-30 cm) SM 1.69 64.78 29.14 23.90 119.52

208 REINSTATEMENT OF ROAD SURFACE SM 1.84 104.50 1.98 27.08 135.40

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.84 373.82 12.00 97.67 488.33
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.97 40.20 2.40 10.89 54.46

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.31 2.36 69.54 18.05 90.27
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.30 2.36 60.65 15.83 79.14
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 27.93 7.23 36.14
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 24.25 6.31 31.54
COAT.

304a SINGLE SURFACE TREATMENT SM 0.82 11.24 150.43 40.62 203.11

304b DOUBLE SURFACE TREATMENT SM 1.20 21.60 285.62 77.10 385.52

304c TRIPLE SURFACE TREATMENT SM 2.02 30.32 332.13 91.12 455.59

304d SEAL COAT SM 0.76 6.38 35.25 10.60 52.99

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,293.29 9,941.85 3,075.93 15,379.64
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,198.28 10,518.12 3,196.24 15,981.21
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 164.80 513.14 7,245.24 1,980.79 9,903.97

307b OPEN GRADED HOT BIT-MAC CM 164.80 513.14 7,015.01 1,923.24 9,616.18

Page 16 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 28.87 1,050.92 3,603.18 1,170.74 5,853.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 218.74 1,746.20 61,823.01 15,946.99 79,734.94

309a COLD MILLING, 0-30 mm SM 1.00 52.01 18.43 17.86 89.30

309b COLD MILLING, 0-50 mm SM 1.67 86.68 30.72 29.77 148.84

309c COLD MILLING, 0-70 mm SM 2.50 130.02 46.08 44.65 223.25

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 537.80 2,175.42 4,007.46 1,680.17 8,400.85

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 537.80 2,175.42 4,616.35 1,832.39 9,161.97

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 537.80 2,175.42 4,932.99 1,911.55 9,557.77

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 537.80 2,175.42 4,239.86 1,738.27 8,691.35

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 537.80 2,175.42 4,848.66 1,890.47 9,452.35

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 537.80 2,175.42 5,165.20 1,969.61 9,848.03

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 537.80 2,175.42 4,510.27 1,805.87 9,029.37

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 537.80 2,175.42 5,119.07 1,958.07 9,790.37

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 537.80 2,175.42 5,416.47 2,032.42 10,162.12

401b CONCRETE CLASS B CM 686.07 1,109.69 3,358.31 1,288.52 6,442.58

401ci CONCRETE CLASS C (UNDERGROUND) CM 519.08 2,175.42 3,726.38 1,605.22 8,026.11

401cii CONCRETE CLASS C (ON GROUND) CM 519.08 2,175.42 4,335.18 1,757.42 8,787.11

401ciii CONCRETE CLASS C (ELEVATED) CM 519.08 2,175.42 4,651.82 1,836.58 9,182.91

401d CONCRETE CLASS D1 CM 835.60 2,689.24 6,521.27 2,511.53 12,557.64

401e CONCRETE CLASS Y CM 1,157.50 703.81 5,165.68 1,756.75 8,783.75

401f LEAN CONCRETE CM 419.89 759.81 2,862.92 1,010.66 5,053.28

401gi PRECAST CONCRETE, CLASS A1 CM 1,711.07 1,470.83 4,592.91 1,943.70 9,718.51

401gii PRECAST CONCRETE CLASS A3 CM 1,711.07 1,470.83 5,125.69 2,076.90 10,384.48

401giii PRECAST CONCRETE, CLASS B CM 1,711.07 1,470.83 3,987.59 1,792.37 8,961.86

401giv PRECAST CONCRETE CLASS D1 CM 1,711.07 1,470.83 6,528.67 2,427.64 12,138.21

Page 17 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,711.07 1,470.83 7,213.85 2,598.94 12,994.69

401gvi PRECAST CONCRETE CLASS D3 CM 1,711.07 1,470.83 7,899.96 2,770.47 13,852.33

401h PLUM CONCRETE CM 752.73 1,109.69 2,644.13 1,126.64 5,633.19

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 71,478.50 18,282.53 91,412.65
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 74,628.50 19,070.03 95,350.15
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,324.94 3,667.20 86,189.40 22,795.39 113,976.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,690.53 40,333.54 201,667.68
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 112.96 0.00 1,413.25 381.55 1,907.75
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 112.96 0.00 829.72 235.67 1,178.35
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 9.41 18.40 138.65 41.61 208.07

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 391.60 0.00 83,791.46 21,045.77 105,228.83
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 404.10 0.00 131,235.48 32,909.90 164,549.48
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 441.60 0.00 1,116,940.03 279,345.41 1,396,727.04
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 391.60 0.00 71,627.74 18,004.84 90,024.18
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 97.50 0.00 447.87 136.34 681.71

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 40.83 0.00 250.94 72.94 364.72

Page 18 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 19.16 48.58 148.68 54.11 270.53

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 258.21 3,155.77 466.33 970.08 4,850.39
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 392.48 4,796.77 627.57 1,454.21 7,271.04
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 392.48 7,330.09 777.12 2,124.92 10,624.62
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 654.13 12,216.82 1,104.23 3,493.80 17,468.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 545.11 10,180.69 967.93 2,923.43 14,617.16
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 981.20 18,325.24 1,513.11 5,204.89 26,024.43
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 21,124.26 86,125.76 130,393.44 59,410.87 297,054.33

407i PILE LOAD TEST UPTO 240 TON EACH 21,124.26 86,125.76 276,781.04 96,007.77 480,038.83

407j PILE LOAD TEST UPTO 360 TON EACH 57,124.26 95,444.48 380,813.60 133,345.59 666,727.93

407k PILE LOAD TEST UPTO 550 TON EACH 84,124.26 119,305.60 609,369.00 203,199.72 1,015,998.58

407l PILE LOAD TEST UPTO 800 TON EACH 124,498.92 143,166.72 985,927.00 313,398.16 1,566,990.80

407m CONFIRMATORY BORING (NX SIZE) M 179.16 2,639.89 22.50 710.39 3,551.94

407n PERMANENT PILE CASING FOR PILES Ton 234.70 3,993.41 85,275.46 22,375.89 111,879.46

410 BRICK WORK CM 328.50 453.06 3,387.65 1,042.30 5,211.51

411a STONE MASONRY RANDOM DRY CM 345.00 165.94 1,081.80 398.18 1,990.92

411b STONE MASONRY RANDOM WITH MORTAR CM 407.50 263.54 2,241.23 728.07 3,640.33

411c STONE MASONRY DRESSED UNCOURSED DRY CM 472.50 165.94 1,644.11 570.64 2,853.18

411d STONE MASONRY DRESSED UNCOURSED WITH CM 537.50 263.54 2,707.63 877.17 4,385.83
MORTAR

411g ROLL POINTING SM 70.25 19.52 98.62 47.10 235.49

412a STONE MASONARY DRESSED COURSED WITH CM 705.00 419.50 2,707.63 958.03 4,790.15
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 554.74 1,417.94 546.76 2,733.81
DIA 310 mm
Page 19 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 616.97 1,667.42 624.69 3,123.45
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 205.41 1,097.40 2,073.76 844.14 4,220.71
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.01 1,377.91 2,727.02 1,079.73 5,398.66
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 249.42 1,772.89 5,613.06 1,908.84 9,544.21
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 311.73 2,187.37 9,039.06 2,884.54 14,422.69
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 403.41 2,171.36 12,970.82 3,886.40 19,431.99
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 473.79 2,636.66 18,659.56 5,442.50 27,212.50
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 563.17 3,076.10 29,468.82 8,277.02 41,385.11
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.37 554.74 2,277.44 761.64 3,808.19
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 208.12 616.97 2,596.60 855.42 4,277.11
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 205.41 1,097.40 3,165.54 1,117.09 5,585.44
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.01 1,377.91 4,236.93 1,457.21 7,286.05
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 249.42 1,772.89 7,889.55 2,477.96 12,389.82
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 311.73 2,187.37 15,067.11 4,391.55 21,957.76
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 403.41 2,171.36 16,637.21 4,803.00 24,014.98
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 473.79 2,636.66 20,195.43 5,826.47 29,132.34
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 563.17 3,076.10 32,152.53 8,947.95 44,739.74
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 85.41 157.23 992.68 308.83 1,544.16
PIPE CULVERT

Page 20 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 775.89 845.94 3,435.20 1,264.26 6,321.29
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.49 0.00 117.81 30.82 154.12

507b ROCK FILL IN GABIONS CM 90.41 0.00 720.92 202.83 1,014.17

508a BRICK PAVING (SINGLE COURSE) SM 108.04 38.19 267.22 103.36 516.81

508b BRICK PAVING (DOUBLE COURSE) SM 193.04 38.19 525.65 189.22 946.10

509a RIPRAP, CLASS A CM 470.10 0.00 772.41 310.63 1,553.14

509b RIPRAP, CLASS B CM 348.08 180.10 842.85 342.76 1,713.79

509c RIPRAP, CLASS C CM 341.73 187.60 926.89 364.06 1,820.28

509c1 RIPRAP, CLASS D CM 341.73 225.12 1,004.13 392.74 1,963.72

509d GROUTED RIPRAP, CLASS A CM 574.58 170.59 2,645.35 847.63 4,238.15

509e GROUTED RIPRAP, CLASS B CM 449.66 316.57 2,524.57 822.70 4,113.51

509f GROUTED RIPRAP, CLASS C CM 433.05 301.33 2,611.26 836.41 4,182.04

509f1 GROUTED RIPRAP, CLASS D CM 433.05 338.85 2,870.71 910.65 4,553.27

509g REINFORCED CONCRETE SLOPE PROTECTION CM 774.64 481.58 3,970.41 1,306.66 6,533.29
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 46.27 275.72 1,002.58 331.14 1,655.71

510 DISMANTLING OF STRUCTURES AND CM 98.33 884.71 0.00 245.76 1,228.80


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 147.65 103.71 125.52 94.22 471.10

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 189.00 132.75 160.66 120.60 603.01

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 578.31 277.05 1,385.27
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 722.89 346.32 1,731.59
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 322.27 213.05 1,065.23
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 402.84 266.31 1,331.53
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 21 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 356.58 1,157.76 5,636.00 1,787.58 8,937.91
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 980.99 782.78 5,623.52 1,846.82 9,234.11
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 26.00 66.38 591.25 170.91 854.53
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 8.56 0.00 38.40 11.74 58.70

604a METAL GUARD RAIL M 65.55 55.31 2,600.42 680.32 3,401.61

604b METAL GUARD RAIL END PIECES EACH 85.83 533.21 2,919.35 884.60 4,423.00

604d STEEL POST FOR METAL GUARD RAIL EACH 98.32 533.21 2,548.20 794.93 3,974.67

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,731.23 1,160.70 12,530.22 3,855.54 19,277.68
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,731.23 801.50 11,692.98 3,556.43 17,782.13
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 225.27 393.19 8,635.83 2,313.57 11,567.85

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 68.75 589.78 10,408.34 2,766.72 13,833.58

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 225.27 844.19 18,683.94 4,938.35 24,691.74

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 722.90 921.65 34,395.91 9,010.12 45,050.58

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 144.58 223.78 16,041.77 4,102.53 20,512.66

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 287.48 0.00 2,293.20 645.17 3,225.85

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 287.48 0.00 3,439.80 931.82 4,659.10

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 25.77 8.64 43.22


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 60.10 16.14 80.69


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 34.38 10.80 53.99


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 80.16 21.15 105.76


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 78.62 29.98 248.98 89.40 446.98
PAINT FOR 4.0 M ARROWS

Page 22 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 13 DADU

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 78.62 52.71 757.33 222.17 1,110.83
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 35.97 11.74 58.72
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 103.74 30.11 150.54
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 47.95 14.74 73.71
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 138.32 38.75 193.77
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 78.62 29.98 347.26 113.97 569.83
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 78.62 52.71 1,308.11 359.86 1,799.31
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 65.12 29.98 165.98 65.27 326.36
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 65.12 52.71 505.65 155.87 779.35
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 65.12 29.98 231.50 81.65 408.26
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 65.12 52.71 873.39 247.81 1,239.03
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 175.46 74.00 370.02
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 206.66 81.80 409.02
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 97.60 182.71 383.72 166.01 830.04

610c KILOMETER POST EACH 618.74 1,321.13 1,904.69 961.14 4,805.71

610d TEN KILOMETER POST EACH 1,192.48 2,642.27 3,608.37 1,860.78 9,303.90

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 127.00 66.38 1,395.94 397.33 1,986.64
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 113.83 821.01 3.00 234.46 1,172.30
INCLUDING MAINTENANCE FOR 2 YEARS

Page 23 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

GHOTKI
(16A)

SAMPAK INTERNATIONAL

Page 24 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 752.50 245.74 1,228.70

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 25 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 289.22 122.72 613.62

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 755.90 249.12 1,245.58

202 AGGREGATE BASE CM 10.26 282.85 978.24 317.84 1,589.19

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 9,105.32 2,879.33 14,396.63

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 9,485.26 2,974.31 14,871.56

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,096.51 2,904.55 14,522.74
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,495.36 3,004.26 15,021.30
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 1,125.30 484.21 2,421.05

204c CEMENT CONTENT TON 125.00 0.00 7,704.48 1,957.37 9,786.85

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,323.25 16,162.69 80,813.43
MC-250

Page 26 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,323.25 16,162.69 80,813.43
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 834.15 281.91 1,409.57
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,493.68 2,846.01 14,230.05
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 845.01 292.26 1,461.32
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 21.18 21.95 109.73

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 21.18 21.95 109.73

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 70.04 18.18 90.92
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 61.15 15.96 79.79
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.13 7.28 36.40
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.45 6.36 31.80
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 149.59 40.43 202.13

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 282.33 76.30 381.50

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 328.35 90.20 450.99

304d SEAL COAT SM 0.80 6.38 35.39 10.64 53.21

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 9,819.40 3,047.58 15,237.88
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 10,386.75 3,165.66 15,828.31
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 7,145.84 1,962.19 9,810.97

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 6,842.32 1,886.31 9,431.57

Page 27 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,323.25 16,076.21 80,381.07

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 3,990.42 1,685.46 8,427.29

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,599.30 1,837.68 9,188.40

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 4,915.94 1,916.84 9,584.20

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 4,186.61 1,734.51 8,672.53

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,795.41 1,886.71 9,433.53

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 5,111.96 1,965.84 9,829.22

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 4,455.42 1,801.71 9,008.54

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 5,064.22 1,953.91 9,769.54

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 5,362.70 2,028.53 10,142.65

401b CONCRETE CLASS B CM 747.18 1,109.69 3,338.06 1,298.73 6,493.66

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,734.78 1,619.47 8,097.37

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 4,343.58 1,771.67 8,858.37

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,660.22 1,850.83 9,254.17

401d CONCRETE CLASS D1 CM 894.63 2,689.24 6,607.42 2,547.82 12,739.11

401e CONCRETE CLASS Y CM 1,247.78 703.81 5,212.20 1,790.95 8,954.74

401f LEAN CONCRETE CM 483.09 759.81 2,804.58 1,011.87 5,059.34

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,577.88 1,987.86 9,939.30

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 5,073.07 2,111.66 10,558.29

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 3,975.26 1,837.21 9,186.03

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 6,614.29 2,496.96 12,484.81

Page 28 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 7,355.12 2,682.17 13,410.85

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 8,097.13 2,867.67 14,338.36

401h PLUM CONCRETE CM 830.51 1,109.69 2,629.81 1,142.50 5,712.51

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 71,993.45 18,436.27 92,181.34
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 75,143.45 19,223.77 96,118.84
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,731.29 40,343.73 201,718.64
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,413.79 384.46 1,922.32
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.27 238.58 1,192.92
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.43 73.69 368.46

Page 29 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 108,031.76 54,945.45 274,727.23

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 232,057.68 85,951.93 429,759.63

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 313,728.56 119,949.33 599,746.63

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 500,101.70 180,945.39 904,726.95

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 810,591.10 277,064.19 1,385,320.93

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,602.27 1,103.71 5,518.53

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 1,065.44 402.84 2,014.22

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 2,173.33 722.34 3,611.71

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,591.47 569.98 2,849.88

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,625.74 870.44 4,352.22
MORTAR

411g ROLL POINTING SM 76.25 19.52 98.17 48.49 242.43

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,625.74 957.56 4,787.78
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,454.37 565.56 2,827.78
DIA 310 mm
Page 30 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,728.48 649.64 3,248.21
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,165.45 875.19 4,375.95
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,880.61 1,127.22 5,636.11
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 5,922.02 1,996.31 9,981.55
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,502.23 3,012.26 15,061.32
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,434.48 4,017.75 20,088.77
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 19,142.86 5,582.08 27,910.38
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 31,351.71 8,769.10 43,845.49
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,313.86 780.43 3,902.14
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,657.66 880.38 4,401.88
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,257.23 1,148.13 5,740.67
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,390.53 1,504.70 7,523.51
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,198.51 2,565.43 12,827.16
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,530.28 4,519.28 22,596.39
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 17,100.87 4,934.35 24,671.76
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,678.73 5,966.04 29,830.21
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 34,035.41 9,440.02 47,200.12
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 755.03 252.96 1,264.81
PIPE CULVERT

Page 31 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 3,419.59 1,277.72 6,388.58
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 756.00 215.98 1,079.89

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 282.76 110.50 552.49

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 559.28 203.38 1,016.89

509a RIPRAP, CLASS A CM 521.35 0.00 756.05 319.35 1,596.75

509b RIPRAP, CLASS B CM 373.08 180.10 750.00 325.79 1,628.97

509c RIPRAP, CLASS C CM 364.23 187.60 960.61 378.11 1,890.56

509c1 RIPRAP, CLASS D CM 364.23 225.12 1,017.24 401.65 2,008.24

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,610.35 854.82 4,274.09

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,414.89 804.03 4,020.15

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,630.93 849.45 4,247.26

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 2,866.18 917.64 4,588.22

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 3,918.17 1,318.60 6,592.99
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 754.22 271.14 1,355.68

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 122.86 97.85 489.26

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 157.26 125.25 626.26

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 559.46 278.84 1,394.21
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 699.33 348.55 1,742.77
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 313.86 217.44 1,087.21
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 392.32 271.80 1,359.01
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 32 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,648.86 1,796.94 8,984.72
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,637.46 1,876.87 9,384.36
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 602.46 174.46 872.29
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 43.20 13.22 66.11

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 12,601.49 3,942.10 19,710.51
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,758.11 3,641.46 18,207.30
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,636.84 2,320.91 11,604.53

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,409.86 2,769.28 13,846.42

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,660.05 4,939.46 24,697.29

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,360.07 9,033.03 45,165.15

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 16,034.60 4,107.12 20,535.58

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 33 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 16A GHOTKI

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.54 74.26 371.29
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.74 82.06 410.29
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 383.88 170.63 853.16

610c KILOMETER POST EACH 696.24 1,321.13 1,905.26 980.66 4,903.29

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,610.26 1,900.00 9,500.01

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,315.56 381.73 1,908.67
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 34 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

HYDERABAD
(20)

SAMPAK INTERNATIONAL

Page 35 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.94 15.76 0.00 4.17 20.87

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 9.29 262.58 1.88 68.44 342.18

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 26.91 635.47 4.22 166.65 833.25

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 107.63 2,541.89 16.89 666.60 3,333.00

103 STRIPPING CM 3.17 153.65 0.00 39.20 196.02

104 COMPACTION OF NATURAL GROUND SM 0.45 14.95 2.70 4.53 22.63

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.38 227.95 0.00 58.33 291.67

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 21.01 541.85 0.00 140.72 703.58
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 13.92 422.98 0.00 109.23 546.14

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.41 205.65 0.00 52.51 262.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.82 492.05 0.00 128.97 644.83

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 12.01 422.98 0.00 108.75 543.74

107a STRUCTURAL EXCAVATION IN COMMON CM 9.02 221.54 0.00 57.64 288.20


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 80.62 664.63 72.03 204.32 1,021.59


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 132.31 400.09 125.00 164.35 821.76
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 119.08 442.22 0.00 140.32 701.62
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 68.05 316.49 0.00 96.13 480.67
MATERIAL

107d GRANULAR BACKFILL CM 43.03 193.34 591.78 207.04 1,035.18

107e COMMON BACKFILL CM 36.95 110.10 18.00 41.26 206.32

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.53 234.11 18.00 65.16 325.80
EXCAVATION IN COMMON MATERIAL

Page 36 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.95 578.46 144.73 187.04 935.18
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.71 637.82 8.55 166.27 831.36
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 16.63 574.85 8.00 149.87 749.35
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 9.86 119.41 152.97 70.56 352.80
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 7.59 121.79 18.00 36.85 184.23


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 18.23 277.82 10.70 76.69 383.43


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.72 43.86 5.15 12.68 63.41

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.24 30.11 2.73 8.52 42.60
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 12.59 190.72 315.96 129.82 649.09

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.05 23.59 2.80 6.86 34.30

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.59 26.79 2.80 7.79 38.97

201 GRANULAR SUB-BASE CM 10.02 231.80 865.56 276.84 1,384.22

202 AGGREGATE BASE CM 11.65 282.85 1,156.60 362.78 1,813.88

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 102.22 2,324.40 9,036.74 2,865.84 14,329.20

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 102.22 2,324.40 9,239.93 2,916.64 14,583.19

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 9,028.03 2,891.32 14,456.60
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 9,249.86 2,946.78 14,733.89
(CLASS B)

204b CEMENT STABILIZED BASE CM 35.99 780.07 1,133.66 487.43 2,437.15

204c CEMENT CONTENT TON 150.00 0.00 6,300.00 1,612.50 8,062.50

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,322.51 15,921.77 79,608.87
MC-250

Page 37 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,322.51 15,921.77 79,608.87
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 125.02 188.22 790.27 275.88 1,379.38
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 195.31 3,721.78 7,275.92 2,798.25 13,991.27
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 138.14 207.88 1,070.34 354.09 1,770.45
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 2.09 64.78 12.35 19.80 99.02

207b DEEP PATCHING (15-30 cm) SM 2.09 64.78 12.35 19.80 99.02

208 REINSTATEMENT OF ROAD SURFACE SM 2.25 104.50 1.98 27.18 135.91

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.59 373.82 12.00 97.85 489.26
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.12 40.20 2.40 10.93 54.65

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.38 2.36 69.04 17.94 89.72
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.37 2.36 60.15 15.72 78.59
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 27.73 7.19 35.93
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 24.05 6.27 31.33
COAT.

304a SINGLE SURFACE TREATMENT SM 0.98 11.24 147.56 39.95 199.73

304b DOUBLE SURFACE TREATMENT SM 1.43 21.60 277.54 75.14 375.72

304c TRIPLE SURFACE TREATMENT SM 2.41 30.32 323.00 88.93 444.66

304d SEAL COAT SM 0.91 6.38 35.20 10.62 53.11

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,293.29 9,689.99 3,018.38 15,091.91
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,198.28 10,283.61 3,143.04 15,715.18
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 222.00 513.14 7,078.49 1,953.40 9,767.02

307b OPEN GRADED HOT BIT-MAC CM 222.00 513.14 6,755.42 1,872.64 9,363.19

Page 38 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 38.30 1,050.92 3,603.18 1,173.10 5,865.49
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 268.98 1,746.20 61,322.51 15,834.42 79,172.12

309a COLD MILLING, 0-30 mm SM 1.23 52.01 18.08 17.83 89.15

309b COLD MILLING, 0-50 mm SM 2.05 86.68 30.14 29.72 148.58

309c COLD MILLING, 0-70 mm SM 3.07 130.02 45.20 44.57 222.87

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 656.97 2,175.42 3,396.81 1,557.30 7,786.51

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 656.97 2,175.42 3,994.01 1,706.60 8,533.01

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 656.97 2,175.42 4,304.56 1,784.24 8,921.19

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 656.97 2,175.42 3,535.02 1,591.85 7,959.27

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 656.97 2,175.42 4,132.11 1,741.13 8,705.63

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 656.97 2,175.42 4,442.58 1,818.74 9,093.72

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 656.97 2,175.42 3,807.98 1,660.09 8,300.47

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 656.97 2,175.42 4,405.07 1,809.37 9,046.83

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 656.97 2,175.42 4,693.44 1,881.46 9,407.29

401b CONCRETE CLASS B CM 857.36 1,109.69 2,680.74 1,161.95 5,809.75

401ci CONCRETE CLASS C (UNDERGROUND) CM 652.38 2,175.42 3,101.97 1,482.44 7,412.21

401cii CONCRETE CLASS C (ON GROUND) CM 652.38 2,175.42 3,699.06 1,631.71 8,158.57

401ciii CONCRETE CLASS C (ELEVATED) CM 652.38 2,175.42 4,009.61 1,709.35 8,546.76

401d CONCRETE CLASS D1 CM 1,020.27 2,689.24 5,700.14 2,352.41 11,762.07

401e CONCRETE CLASS Y CM 1,426.55 703.81 4,561.31 1,672.92 8,364.59

401f LEAN CONCRETE CM 564.86 759.81 2,228.02 888.17 4,440.85

401gi PRECAST CONCRETE, CLASS A1 CM 2,199.33 1,470.83 3,985.48 1,913.91 9,569.56

401gii PRECAST CONCRETE CLASS A3 CM 2,199.33 1,470.83 4,405.88 2,019.01 10,095.05

401giii PRECAST CONCRETE, CLASS B CM 2,199.33 1,470.83 3,284.69 1,738.71 8,693.56

401giv PRECAST CONCRETE CLASS D1 CM 2,199.33 1,470.83 5,706.76 2,344.23 11,721.15

Page 39 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 2,199.33 1,470.83 6,311.85 2,495.50 12,477.52

401gvi PRECAST CONCRETE CLASS D3 CM 2,199.33 1,470.83 6,918.56 2,647.18 13,235.91

401h PLUM CONCRETE CM 957.36 1,109.69 2,151.20 1,054.56 5,272.82

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 70,941.18 18,232.97 91,164.86
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 74,091.18 19,020.47 95,102.36
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,596.60 3,667.20 84,551.40 22,453.80 112,269.00
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,925.66 12,010.50 143,792.36 39,682.13 198,410.64
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 68.10 796.91 0.00 216.25 1,081.26

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 142.79 0.00 1,386.81 382.40 1,912.00
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 142.79 0.00 814.52 239.33 1,196.64
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 11.63 18.40 140.05 42.52 212.60

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 474.00 0.00 82,180.09 20,663.52 103,317.61
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 492.75 0.00 128,711.72 32,301.12 161,505.59
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 549.00 0.00 1,095,460.42 274,002.36 1,370,011.78
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 474.00 0.00 70,250.29 17,681.07 88,405.36
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 123.89 0.00 439.25 140.78 703.92

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.53 0.39 1.94
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.04
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 49.26 0.00 246.79 74.01 370.06

Page 40 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 24.40 48.58 149.56 55.64 278.18

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 288.95 3,155.77 467.37 978.02 4,890.12
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 439.20 4,796.77 629.16 1,466.28 7,331.42
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 439.20 7,330.09 778.88 2,137.04 10,685.22
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 732.00 12,216.82 1,107.16 3,514.00 17,569.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 610.00 10,180.69 970.38 2,940.27 14,701.33
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,098.00 18,325.24 1,517.51 5,235.19 26,175.94
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 30,471.36 86,125.76 82,054.56 49,662.92 248,314.60

407i PILE LOAD TEST UPTO 240 TON EACH 30,471.36 86,125.76 179,795.70 74,098.21 370,491.03

407j PILE LOAD TEST UPTO 360 TON EACH 84,471.36 95,444.48 235,996.32 103,978.04 519,890.20

407k PILE LOAD TEST UPTO 550 TON EACH 124,971.36 119,305.60 373,701.90 154,494.72 772,473.58

407l PILE LOAD TEST UPTO 800 TON EACH 184,998.72 143,166.72 607,607.70 233,943.29 1,169,716.43

407m CONFIRMATORY BORING (NX SIZE) M 228.23 2,639.89 22.50 722.66 3,613.28

407n PERMANENT PILE CASING FOR PILES Ton 299.67 3,993.41 83,635.39 21,982.12 109,910.58

410 BRICK WORK CM 413.22 453.06 2,808.99 918.82 4,594.09

411a STONE MASONRY RANDOM DRY CM 437.78 165.94 1,116.94 430.16 2,150.82

411b STONE MASONRY RANDOM WITH MORTAR CM 522.78 263.54 1,999.91 696.56 3,482.79

411c STONE MASONRY DRESSED UNCOURSED DRY CM 602.78 165.94 1,483.33 563.01 2,815.05

411d STONE MASONRY DRESSED UNCOURSED WITH CM 682.78 263.54 2,318.81 816.28 4,081.40
MORTAR

411g ROLL POINTING SM 87.39 19.52 91.72 49.66 248.29

412a STONE MASONARY DRESSED COURSED WITH CM 907.78 419.50 2,318.81 911.52 4,557.60
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 554.74 1,370.25 555.87 2,779.33
DIA 310 mm
Page 41 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 616.97 1,592.83 627.07 3,135.35
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 278.79 1,097.40 1,966.55 835.68 4,178.42
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 294.35 1,377.91 2,555.08 1,056.84 5,284.18
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 340.77 1,772.89 5,283.02 1,849.17 9,245.85
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 420.61 2,187.37 8,549.01 2,789.25 13,946.24
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 544.32 2,171.36 12,479.85 3,798.88 18,994.41
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 643.10 2,636.66 18,143.14 5,355.72 26,778.62
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 758.62 3,076.10 27,546.64 7,845.34 39,226.69
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 298.47 554.74 2,229.74 770.74 3,853.69
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 291.53 616.97 2,522.01 857.63 4,288.14
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 278.79 1,097.40 3,058.34 1,108.63 5,543.16
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 294.35 1,377.91 4,065.00 1,434.32 7,171.58
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 340.77 1,772.89 7,559.51 2,418.29 12,091.46
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 420.61 2,187.37 14,577.06 4,296.26 21,481.31
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 544.32 2,171.36 16,146.24 4,715.48 23,577.40
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 643.10 2,636.66 19,679.00 5,739.69 28,698.45
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 758.62 3,076.10 30,230.34 8,516.26 42,581.32
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 116.94 157.23 611.61 221.45 1,107.23
PIPE CULVERT

Page 42 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 970.13 845.94 2,747.41 1,140.87 5,704.35
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 6.76 0.00 117.40 31.04 155.19

507b ROCK FILL IN GABIONS CM 127.68 0.00 759.27 221.74 1,108.69

508a BRICK PAVING (SINGLE COURSE) SM 140.27 38.19 206.52 96.24 481.22

508b BRICK PAVING (DOUBLE COURSE) SM 250.27 38.19 409.61 174.52 872.59

509a RIPRAP, CLASS A CM 602.06 0.00 813.50 353.89 1,769.45

509b RIPRAP, CLASS B CM 425.65 180.10 853.12 364.72 1,823.58

509c RIPRAP, CLASS C CM 414.71 187.60 906.50 377.20 1,886.01

509c1 RIPRAP, CLASS D CM 414.71 225.12 952.99 398.20 1,991.02

509d GROUTED RIPRAP, CLASS A CM 737.59 170.59 2,465.27 843.36 4,216.81

509e GROUTED RIPRAP, CLASS B CM 554.07 316.57 2,336.91 801.89 4,009.43

509f GROUTED RIPRAP, CLASS C CM 531.73 301.33 2,379.55 803.15 4,015.75

509f1 GROUTED RIPRAP, CLASS D CM 531.73 338.85 2,582.21 863.20 4,315.98

509g REINFORCED CONCRETE SLOPE PROTECTION CM 1,016.27 481.58 3,245.43 1,185.82 5,929.09
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 64.38 275.72 587.93 232.01 1,160.04

510 DISMANTLING OF STRUCTURES AND CM 124.82 884.71 0.00 252.38 1,261.90


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 190.80 103.71 132.19 106.68 533.38

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 244.22 132.75 169.21 136.54 682.72

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 511.58 277.18 1,385.90
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 639.48 346.47 1,732.37
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 283.04 220.04 1,100.22
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 353.80 275.05 1,375.27
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 43 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 434.44 1,157.76 5,281.90 1,718.52 8,592.62
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,255.29 782.78 5,277.36 1,828.86 9,144.28
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 33.56 66.38 568.84 167.19 835.97
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 11.26 0.00 32.64 10.98 54.88

604a METAL GUARD RAIL M 83.21 55.31 2,551.61 672.53 3,362.67

604b METAL GUARD RAIL END PIECES EACH 110.93 533.21 2,865.70 877.46 4,387.30

604d STEEL POST FOR METAL GUARD RAIL EACH 124.80 533.21 2,497.50 788.88 3,944.39

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,351.38 1,160.70 11,940.20 3,863.07 19,315.35
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,351.38 801.50 11,109.09 3,565.49 17,827.46
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 294.37 393.19 8,402.73 2,272.57 11,362.86

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 90.00 589.78 10,107.65 2,696.86 13,484.29

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 294.37 844.19 18,009.59 4,787.03 23,935.17

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 1,001.55 921.65 33,261.88 8,796.27 43,981.35

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 200.31 223.78 15,609.55 4,008.41 20,042.06

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 338.88 0.00 2,249.10 647.00 3,234.98

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 338.88 0.00 3,373.65 928.13 4,640.66

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 25.27 8.74 43.72


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 58.94 15.92 79.62


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 33.72 10.86 54.28


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 78.61 20.84 104.21


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 92.81 29.98 244.19 91.74 458.72
PAINT FOR 4.0 M ARROWS

Page 44 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 20 HYDERABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 92.81 52.71 742.76 222.07 1,110.35
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 35.27 11.85 59.26
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 101.75 29.89 149.45
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 47.03 14.79 73.95
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 135.66 38.37 191.84
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 92.81 29.98 340.58 115.84 579.21
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 92.81 52.71 1,282.96 357.12 1,785.59
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 77.81 29.98 162.79 67.64 338.22
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 77.81 52.71 495.92 156.61 783.05
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 77.81 29.98 227.05 83.71 418.55
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 77.81 52.71 856.60 246.78 1,233.89
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 171.49 73.64 368.18
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 202.09 81.29 406.43
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 136.97 182.71 340.66 165.09 825.43

610c KILOMETER POST EACH 808.05 1,321.13 1,761.39 972.64 4,863.22

610d TEN KILOMETER POST EACH 1,566.10 2,642.27 3,375.30 1,895.92 9,479.60

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 169.11 66.38 1,158.32 348.45 1,742.26
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 147.32 821.01 2.04 242.59 1,212.96
INCLUDING MAINTENANCE FOR 2 YEARS

Page 45 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

JACOBABAD
(21)

SAMPAK INTERNATIONAL

Page 46 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 806.73 259.30 1,296.48

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 47 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 319.40 130.27 651.35

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 879.66 280.06 1,400.28

202 AGGREGATE BASE CM 10.26 282.85 1,092.87 346.50 1,732.48

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 9,145.90 2,889.47 14,447.36

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 9,350.35 2,940.58 14,702.92

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,137.10 2,914.70 14,573.48
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,360.54 2,970.56 14,852.78
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 1,012.40 455.98 2,279.92

204c CEMENT CONTENT TON 125.00 0.00 7,413.00 1,884.50 9,422.50

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,380.23 16,176.93 80,884.66
MC-250

Page 48 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,380.23 16,176.93 80,884.66
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 751.64 261.29 1,306.44
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,479.69 2,842.51 14,212.56
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 908.50 308.14 1,540.68
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 21.09 21.92 109.61

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 21.09 21.92 109.61

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 70.10 18.20 90.99
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 61.20 15.97 79.86
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.15 7.29 36.43
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.47 6.37 31.83
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 150.60 40.68 203.38

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 284.92 76.95 384.73

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 331.29 90.94 454.68

304d SEAL COAT SM 0.80 6.38 35.13 10.58 52.89

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 9,778.10 3,037.25 15,186.25
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 10,362.24 3,159.53 15,797.67
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 7,119.48 1,955.60 9,778.01

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 6,889.27 1,898.05 9,490.25

Page 49 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,380.23 16,090.46 80,452.31

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 3,838.39 1,647.45 8,237.25

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,447.26 1,799.67 8,998.34

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 4,763.90 1,878.83 9,394.14

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 4,083.74 1,708.79 8,543.95

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,692.54 1,860.99 9,304.95

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 5,009.11 1,940.13 9,700.65

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 4,352.16 1,775.89 8,879.47

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 4,960.96 1,928.09 9,640.47

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 5,262.69 2,003.53 10,017.64

401b CONCRETE CLASS B CM 747.18 1,109.69 3,156.53 1,253.35 6,266.74

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,574.68 1,579.45 7,897.25

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 4,183.48 1,731.65 8,658.25

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,500.12 1,810.81 9,054.05

401d CONCRETE CLASS D1 CM 894.63 2,689.24 6,393.57 2,494.36 12,471.80

401e CONCRETE CLASS Y CM 1,247.78 703.81 5,000.68 1,738.07 8,690.34

401f LEAN CONCRETE CM 483.09 759.81 2,637.73 970.16 4,850.79

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,423.12 1,949.17 9,745.86

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 4,972.41 2,086.49 10,432.47

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 3,782.03 1,788.90 8,944.49

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 6,400.69 2,443.56 12,217.82

Page 50 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 7,114.79 2,622.09 13,110.45

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 7,829.77 2,800.83 14,004.17

401h PLUM CONCRETE CM 830.51 1,109.69 2,510.36 1,112.64 5,563.20

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 71,979.09 18,432.68 92,163.38
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 75,129.09 19,220.18 96,100.88
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,696.46 40,335.02 201,675.09
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,413.85 384.48 1,922.40
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.33 238.60 1,193.00
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.49 73.71 368.53

Page 51 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 107,773.04 54,880.77 274,403.83

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 231,540.24 85,822.57 429,112.83

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 312,952.40 119,755.29 598,776.43

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 498,837.50 180,629.34 903,146.70

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 808,562.50 276,557.04 1,382,785.18

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,570.79 1,095.84 5,479.19

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 1,179.68 431.40 2,157.01

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 2,248.38 741.10 3,705.52

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,714.85 600.82 3,004.10

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,713.47 892.38 4,461.89
MORTAR

411g ROLL POINTING SM 76.25 19.52 97.24 48.25 241.26

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,713.47 979.49 4,897.46
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,451.56 564.85 2,824.27
DIA 310 mm
Page 52 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,724.62 648.68 3,243.39
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,160.51 873.95 4,369.77
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,873.46 1,125.43 5,627.17
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 5,909.88 1,993.27 9,966.37
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,485.04 3,007.97 15,039.84
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,416.99 4,013.38 20,066.92
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 19,123.85 5,577.32 27,886.62
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 31,292.72 8,754.35 43,771.75
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,311.05 779.73 3,898.63
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,653.80 879.41 4,397.05
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,252.30 1,146.90 5,734.51
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,383.38 1,502.91 7,514.57
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,186.37 2,562.40 12,811.99
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,513.09 4,514.98 22,574.90
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 17,083.38 4,929.98 24,649.90
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,659.72 5,961.29 29,806.45
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 33,976.43 9,425.28 47,126.39
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 813.78 267.65 1,338.24
PIPE CULVERT

Page 53 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 3,234.97 1,231.56 6,157.81
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 812.27 230.05 1,150.23

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 282.61 110.46 552.30

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 559.01 203.31 1,016.55

509a RIPRAP, CLASS A CM 521.35 0.00 870.29 347.91 1,739.55

509b RIPRAP, CLASS B CM 373.08 180.10 863.33 354.13 1,770.63

509c RIPRAP, CLASS C CM 364.23 187.60 1,074.85 406.67 2,033.36

509c1 RIPRAP, CLASS D CM 364.23 225.12 1,131.48 430.21 2,151.04

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,691.08 875.00 4,374.99

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,498.27 824.88 4,124.38

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,711.66 869.64 4,348.18

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 2,943.18 936.90 4,684.48

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 3,801.98 1,289.55 6,447.74
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 807.22 284.39 1,421.93

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 141.42 102.49 512.47

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 181.02 131.19 655.96

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 568.98 281.22 1,406.12
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 711.23 351.53 1,757.64
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 323.32 219.81 1,099.03
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 404.15 274.76 1,373.79
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 54 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,567.33 1,776.56 8,882.81
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,554.48 1,856.13 9,280.64
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 587.62 170.75 853.74
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 43.20 13.22 66.11

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 12,398.35 3,891.32 19,456.59
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,555.14 3,590.72 17,953.58
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,625.50 2,318.07 11,590.35

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,392.84 2,765.03 13,825.15

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,620.69 4,929.62 24,648.09

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,301.04 9,018.27 45,091.36

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 16,022.80 4,104.16 20,520.82

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 55 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21 JACOBABAD

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.40 74.22 371.11
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.60 82.02 410.11
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 367.80 166.61 833.06

610c KILOMETER POST EACH 696.24 1,321.13 1,852.65 967.51 4,837.54

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,526.84 1,879.15 9,395.74

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,400.81 403.05 2,015.23
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 56 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

JAMSHORO
(21B)

SAMPAK INTERNATIONAL

Page 57 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.94 15.76 0.00 4.17 20.87

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 9.29 262.58 1.88 68.44 342.18

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 26.91 635.47 4.22 166.65 833.25

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 107.63 2,541.89 16.89 666.60 3,333.00

103 STRIPPING CM 3.17 153.65 0.00 39.20 196.02

104 COMPACTION OF NATURAL GROUND SM 0.45 14.95 2.70 4.53 22.63

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.38 227.95 0.00 58.33 291.67

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 21.01 541.85 0.00 140.72 703.58
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 13.92 422.98 0.00 109.23 546.14

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.41 205.65 0.00 52.51 262.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 135.84 360.08 125.00 155.23 776.15

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.82 492.05 0.00 128.97 644.83

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 12.01 422.98 0.00 108.75 543.74

107a STRUCTURAL EXCAVATION IN COMMON CM 9.02 221.54 0.00 57.64 288.20


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 80.62 664.63 72.03 204.32 1,021.59


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 132.31 400.09 125.00 164.35 821.76
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 119.08 442.22 0.00 140.32 701.62
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 68.05 316.49 0.00 96.13 480.67
MATERIAL

107d GRANULAR BACKFILL CM 43.03 193.34 446.37 170.68 853.42

107e COMMON BACKFILL CM 36.95 110.10 18.00 41.26 206.32

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.53 234.11 18.00 65.16 325.80
EXCAVATION IN COMMON MATERIAL

Page 58 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.95 578.46 144.73 187.04 935.18
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.71 637.82 8.55 166.27 831.36
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 16.63 574.85 8.00 149.87 749.35
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 9.86 119.41 152.97 70.56 352.80
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 7.59 121.79 18.00 36.85 184.23


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 18.23 277.82 10.70 76.69 383.43


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.72 43.86 5.15 12.68 63.41

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.24 30.11 2.73 8.52 42.60
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 12.59 190.72 222.65 106.49 532.46

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.05 23.59 2.80 6.86 34.30

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.59 26.79 2.80 7.79 38.97

201 GRANULAR SUB-BASE CM 10.02 231.80 482.93 181.19 905.93

202 AGGREGATE BASE CM 11.65 282.85 666.04 240.14 1,200.68

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 102.22 2,324.40 8,768.36 2,798.75 13,993.73

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 102.22 2,324.40 9,032.81 2,864.86 14,324.30

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 8,759.65 2,824.23 14,121.13
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 109.55 2,427.71 9,042.76 2,895.00 14,475.01
(CLASS B)

204b CEMENT STABILIZED BASE CM 35.99 780.07 798.12 403.55 2,017.73

204c CEMENT CONTENT TON 150.00 0.00 6,615.00 1,691.25 8,456.25

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,191.36 15,888.99 79,444.93
MC-250

Page 59 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 304.09 2,060.49 61,191.36 15,888.99 79,444.93
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 125.02 188.22 790.27 275.88 1,379.38
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 195.31 3,721.78 7,193.66 2,777.69 13,888.45
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 138.14 207.88 692.72 259.68 1,298.42
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 2.09 64.78 13.56 20.11 100.54

207b DEEP PATCHING (15-30 cm) SM 2.09 64.78 13.56 20.11 100.54

208 REINSTATEMENT OF ROAD SURFACE SM 2.25 104.50 1.98 27.18 135.91

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.59 373.82 12.00 97.85 489.26
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.12 40.20 2.40 10.93 54.65

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.38 2.36 68.91 17.91 89.56
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.37 2.36 60.02 15.69 78.43
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 27.67 7.17 35.86
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.15 0.86 23.99 6.25 31.26
COAT.

304a SINGLE SURFACE TREATMENT SM 0.98 11.24 146.68 39.73 198.63

304b DOUBLE SURFACE TREATMENT SM 1.43 21.60 276.41 74.86 374.30

304c TRIPLE SURFACE TREATMENT SM 2.41 30.32 321.28 88.50 442.52

304d SEAL COAT SM 0.91 6.38 34.10 10.35 51.73

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,293.29 9,445.57 2,957.28 14,786.40
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 90.26 2,198.28 10,082.84 3,092.85 15,464.23
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 222.00 513.14 6,824.05 1,889.80 9,448.98

307b OPEN GRADED HOT BIT-MAC CM 222.00 513.14 6,605.05 1,835.05 9,175.23

Page 60 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 38.30 1,050.92 3,603.18 1,173.10 5,865.49
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 268.98 1,746.20 61,191.36 15,801.64 79,008.18

309a COLD MILLING, 0-30 mm SM 1.23 52.01 18.08 17.83 89.15

309b COLD MILLING, 0-50 mm SM 2.05 86.68 30.14 29.72 148.58

309c COLD MILLING, 0-70 mm SM 3.07 130.02 45.20 44.57 222.87

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 656.97 2,175.42 3,358.98 1,547.84 7,739.21

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 656.97 2,175.42 3,956.11 1,697.13 8,485.63

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 656.97 2,175.42 4,266.66 1,774.76 8,873.81

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 656.97 2,175.42 3,599.67 1,608.02 8,040.08

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 656.97 2,175.42 4,196.76 1,757.29 8,786.45

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 656.97 2,175.42 4,507.23 1,834.91 9,174.53

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 656.97 2,175.42 3,854.40 1,671.70 8,358.50

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 656.97 2,175.42 4,451.49 1,820.97 9,104.86

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 656.97 2,175.42 4,753.12 1,896.38 9,481.89

401b CONCRETE CLASS B CM 857.36 1,109.69 2,764.30 1,182.84 5,914.19

401ci CONCRETE CLASS C (UNDERGROUND) CM 652.38 2,175.42 3,155.49 1,495.82 7,479.11

401cii CONCRETE CLASS C (ON GROUND) CM 652.38 2,175.42 3,752.58 1,645.09 8,225.47

401ciii CONCRETE CLASS C (ELEVATED) CM 652.38 2,175.42 4,063.13 1,722.73 8,613.66

401d CONCRETE CLASS D1 CM 1,020.27 2,689.24 5,771.50 2,370.25 11,851.26

401e CONCRETE CLASS Y CM 1,426.55 703.81 4,459.30 1,647.42 8,237.08

401f LEAN CONCRETE CM 564.86 759.81 2,289.62 903.57 4,517.85

401gi PRECAST CONCRETE, CLASS A1 CM 2,199.33 1,470.83 3,932.23 1,900.60 9,502.99

401gii PRECAST CONCRETE CLASS A3 CM 2,199.33 1,470.83 4,466.87 2,034.26 10,171.30

401giii PRECAST CONCRETE, CLASS B CM 2,199.33 1,470.83 3,368.25 1,759.60 8,798.02

401giv PRECAST CONCRETE CLASS D1 CM 2,199.33 1,470.83 5,778.10 2,362.07 11,810.33

Page 61 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 2,199.33 1,470.83 6,422.90 2,523.27 12,616.33

401gvi PRECAST CONCRETE CLASS D3 CM 2,199.33 1,470.83 7,068.58 2,684.69 13,423.43

401h PLUM CONCRETE CM 957.36 1,109.69 2,124.08 1,047.78 5,238.91

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 70,806.17 18,199.22 90,996.10
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,990.71 0.00 73,956.17 18,986.72 94,933.60
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,596.60 3,667.20 84,551.40 22,453.80 112,269.00
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,925.66 12,010.50 143,831.61 39,691.94 198,459.71
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 68.10 796.91 0.00 216.25 1,081.26

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 142.79 0.00 1,386.67 382.36 1,911.82
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 142.79 0.00 814.38 239.29 1,196.46
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 11.63 18.40 140.05 42.52 212.60

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 474.00 0.00 80,649.01 20,280.75 101,403.76
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 492.75 0.00 128,711.72 32,301.12 161,505.59
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 549.00 0.00 1,095,460.42 274,002.36 1,370,011.78
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 474.00 0.00 70,250.29 17,681.07 88,405.36
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 123.89 0.00 439.25 140.78 703.92

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.53 0.39 1.94
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.04
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 49.26 0.00 246.66 73.98 369.90

Page 62 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 24.40 48.58 149.56 55.64 278.18

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 288.95 3,155.77 467.37 978.02 4,890.12
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 439.20 4,796.77 629.16 1,466.28 7,331.42
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 439.20 7,330.09 778.88 2,137.04 10,685.22
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 732.00 12,216.82 1,107.16 3,514.00 17,569.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 610.00 10,180.69 970.38 2,940.27 14,701.33
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,098.00 18,325.24 1,517.51 5,235.19 26,175.94
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 30,471.36 86,125.76 85,473.36 50,517.62 252,588.10

407i PILE LOAD TEST UPTO 240 TON EACH 30,471.36 86,125.76 186,633.30 75,807.61 379,038.03

407j PILE LOAD TEST UPTO 360 TON EACH 84,471.36 95,444.48 246,252.72 106,542.14 532,710.70

407k PILE LOAD TEST UPTO 550 TON EACH 124,971.36 119,305.60 390,407.40 158,671.09 793,355.45

407l PILE LOAD TEST UPTO 800 TON EACH 184,998.72 143,166.72 634,414.20 240,644.91 1,203,224.55

407m CONFIRMATORY BORING (NX SIZE) M 228.23 2,639.89 22.50 722.66 3,613.28

407n PERMANENT PILE CASING FOR PILES Ton 299.67 3,993.41 83,635.39 21,982.12 109,910.58

410 BRICK WORK CM 413.22 453.06 3,154.42 1,005.18 5,025.88

411a STONE MASONRY RANDOM DRY CM 437.78 165.94 768.40 343.03 1,715.15

411b STONE MASONRY RANDOM WITH MORTAR CM 522.78 263.54 1,681.55 616.97 3,084.83

411c STONE MASONRY DRESSED UNCOURSED DRY CM 602.78 165.94 1,106.91 468.91 2,344.53

411d STONE MASONRY DRESSED UNCOURSED WITH CM 682.78 263.54 1,971.76 729.52 3,647.60
MORTAR

411g ROLL POINTING SM 87.39 19.52 92.52 49.86 249.29

412a STONE MASONARY DRESSED COURSED WITH CM 907.78 419.50 1,971.76 824.76 4,123.79
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 554.74 1,362.03 553.81 2,769.06
DIA 310 mm
Page 63 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 298.47 616.97 1,578.42 623.47 3,117.33
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 278.79 1,097.40 1,944.16 830.09 4,150.44
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 294.35 1,377.91 2,516.88 1,047.29 5,236.43
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 340.77 1,772.89 5,204.82 1,829.62 9,148.11
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 420.61 2,187.37 8,430.77 2,759.69 13,798.43
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 544.32 2,171.36 12,361.93 3,769.40 18,847.02
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 643.10 2,636.66 18,020.85 5,325.15 26,625.76
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 758.62 3,076.10 27,058.15 7,723.22 38,616.08
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 298.47 554.74 2,221.52 768.68 3,843.42
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 291.53 616.97 2,507.60 854.02 4,270.12
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 278.79 1,097.40 3,035.95 1,103.04 5,515.18
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 294.35 1,377.91 4,026.79 1,424.76 7,123.81
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 340.77 1,772.89 7,481.30 2,398.74 11,993.71
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 420.61 2,187.37 14,458.82 4,266.70 21,333.49
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 544.32 2,171.36 16,028.31 4,686.00 23,429.99
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 643.10 2,636.66 19,556.71 5,709.12 28,545.58
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 758.62 3,076.10 29,741.86 8,394.14 41,970.72
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 116.94 157.23 450.81 181.25 906.23
PIPE CULVERT

Page 64 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 970.13 845.94 2,834.30 1,162.59 5,812.96
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 6.76 0.00 117.40 31.04 155.19

507b ROCK FILL IN GABIONS CM 127.68 0.00 433.97 140.41 702.06

508a BRICK PAVING (SINGLE COURSE) SM 140.27 38.19 242.36 105.20 526.02

508b BRICK PAVING (DOUBLE COURSE) SM 250.27 38.19 480.91 192.34 961.71

509a RIPRAP, CLASS A CM 602.06 0.00 464.96 266.76 1,333.78

509b RIPRAP, CLASS B CM 425.65 180.10 507.37 278.28 1,391.39

509c RIPRAP, CLASS C CM 414.71 187.60 557.96 290.07 1,450.34

509c1 RIPRAP, CLASS D CM 414.71 225.12 604.45 311.07 1,555.35

509d GROUTED RIPRAP, CLASS A CM 737.59 170.59 2,145.34 763.38 3,816.90

509e GROUTED RIPRAP, CLASS B CM 554.07 316.57 2,016.69 721.83 3,609.17

509f GROUTED RIPRAP, CLASS C CM 531.73 301.33 2,060.11 723.29 3,616.45

509f1 GROUTED RIPRAP, CLASS D CM 531.73 338.85 2,265.79 784.09 3,920.45

509g REINFORCED CONCRETE SLOPE PROTECTION CM 1,016.27 481.58 3,361.30 1,214.79 6,073.93
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 64.38 275.72 446.78 196.72 983.60

510 DISMANTLING OF STRUCTURES AND CM 124.82 884.71 0.00 252.38 1,261.90


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 190.80 103.71 75.56 92.52 462.58

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 244.22 132.75 96.71 118.42 592.10

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 468.52 266.41 1,332.07
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 585.65 333.02 1,665.09
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 308.22 288.91 238.58 208.93 1,044.64
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 385.28 361.14 298.22 261.16 1,305.80
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 65 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 434.44 1,157.76 5,255.97 1,712.04 8,560.22
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,255.29 782.78 5,243.27 1,820.33 9,101.66
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 33.56 66.38 569.02 167.24 836.18
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 11.26 0.00 38.40 12.42 62.08

604a METAL GUARD RAIL M 83.21 55.31 2,551.61 672.53 3,362.67

604b METAL GUARD RAIL END PIECES EACH 110.93 533.21 2,865.70 877.46 4,387.30

604d STEEL POST FOR METAL GUARD RAIL EACH 124.80 533.21 2,497.50 788.88 3,944.39

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,351.38 1,160.70 11,811.50 3,830.89 19,154.47
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,351.38 801.50 10,981.99 3,533.72 17,668.59
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 294.37 393.19 8,418.73 2,276.57 11,382.86

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 90.00 589.78 10,131.65 2,702.86 13,514.29

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 294.37 844.19 18,052.40 4,797.74 23,988.69

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 1,001.55 921.65 33,326.10 8,812.33 44,061.63

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 200.31 223.78 15,622.40 4,011.62 20,058.11

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 338.88 0.00 2,249.10 647.00 3,234.98

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 338.88 0.00 3,373.65 928.13 4,640.66

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 25.27 8.74 43.72


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 58.94 15.92 79.62


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.71 6.00 33.72 10.86 54.28


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.24 3.51 78.61 20.84 104.21


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 92.81 29.98 244.19 91.74 458.72
PAINT FOR 4.0 M ARROWS

Page 66 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 21B JAMSHORO

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 92.81 52.71 742.76 222.07 1,110.35
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 35.27 11.85 59.26
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 101.75 29.89 149.45
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.64 7.50 47.03 14.79 73.95
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.64 13.18 135.66 38.37 191.84
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 92.81 29.98 340.58 115.84 579.21
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 92.81 52.71 1,282.96 357.12 1,785.59
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 77.81 29.98 162.79 67.64 338.22
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 77.81 52.71 495.92 156.61 783.05
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 77.81 29.98 227.05 83.71 418.55
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 77.81 52.71 856.60 246.78 1,233.89
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 171.64 73.67 368.36
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 11.88 111.18 202.24 81.32 406.61
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 136.97 182.71 332.01 162.92 814.62

610c KILOMETER POST EACH 808.05 1,321.13 1,726.67 963.96 4,819.82

610d TEN KILOMETER POST EACH 1,566.10 2,642.27 3,317.57 1,881.49 9,407.43

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 169.11 66.38 1,199.97 358.86 1,794.32
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 147.32 821.01 2.04 242.59 1,212.96
INCLUDING MAINTENANCE FOR 2 YEARS

Page 67 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

KARACHI
(26)

SAMPAK INTERNATIONAL

Page 68 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 1.06 15.76 0.00 4.21 21.03

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 10.78 262.58 1.88 68.81 344.04

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 30.76 635.47 4.22 167.61 838.06

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 123.02 2,541.89 16.89 670.45 3,352.25

103 STRIPPING CM 3.76 153.65 0.00 39.35 196.76

104 COMPACTION OF NATURAL GROUND SM 0.54 14.95 2.70 4.55 22.74

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 6.93 227.95 0.00 58.72 293.60

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 166.84 360.08 125.00 162.98 814.91

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 25.37 541.85 0.00 141.80 709.02
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 16.99 422.98 0.00 109.99 549.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 5.67 205.65 0.00 52.83 264.14

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 166.84 360.08 125.00 162.98 814.91

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 29.34 492.05 0.00 130.35 651.73

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 14.49 422.98 0.00 109.37 546.85

107a STRUCTURAL EXCAVATION IN COMMON CM 11.40 221.54 0.00 58.24 291.18


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 98.30 664.63 70.62 208.39 1,041.94


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 162.98 400.09 125.00 172.02 860.10
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 146.69 442.22 0.00 147.23 736.13
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 83.82 316.49 0.00 100.08 500.38
MATERIAL

107d GRANULAR BACKFILL CM 50.74 193.34 686.74 232.70 1,163.52

107e COMMON BACKFILL CM 42.26 110.10 18.00 42.59 212.96

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 10.51 234.11 18.00 65.66 328.28
EXCAVATION IN COMMON MATERIAL

Page 69 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 30.05 578.46 144.73 188.31 941.55
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 22.54 637.82 8.55 167.23 836.14
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 20.03 574.85 8.00 150.72 753.60
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 11.96 119.41 152.97 71.08 355.42
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 9.29 121.79 18.00 37.27 186.36


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 21.76 277.82 10.70 77.57 387.85


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 2.10 43.86 5.15 12.78 63.89

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.53 30.11 2.73 8.59 42.95
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 15.16 190.72 245.98 112.96 564.82

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.26 23.59 2.80 6.91 34.56

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.92 26.79 2.80 7.88 39.39

201 GRANULAR SUB-BASE CM 12.21 231.80 578.58 205.65 1,028.24

202 AGGREGATE BASE CM 14.41 282.85 643.89 235.29 1,176.43

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 118.55 2,324.40 8,767.17 2,802.53 14,012.65

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 118.55 2,324.40 9,010.39 2,863.33 14,316.67

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 127.43 2,427.71 8,758.52 2,828.41 14,142.07
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 127.43 2,427.71 9,020.12 2,893.82 14,469.08
(CLASS B)

204b CEMENT STABILIZED BASE CM 43.79 780.07 857.28 420.28 2,101.42

204c CEMENT CONTENT TON 162.52 0.00 6,195.00 1,589.38 7,946.90

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 373.66 2,060.49 60,313.62 15,686.94 78,434.71
MC-250

Page 70 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 373.66 2,060.49 60,313.62 15,686.94 78,434.71
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 139.06 188.22 806.84 283.53 1,417.65
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 230.52 3,721.78 7,208.33 2,790.16 13,950.78
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 153.08 207.88 907.02 316.99 1,584.97
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 2.54 64.78 21.81 22.28 111.42

207b DEEP PATCHING (15-30 cm) SM 2.54 64.78 21.81 22.28 111.42

208 REINSTATEMENT OF ROAD SURFACE SM 2.75 104.50 1.98 27.31 136.54

209a BREAKING OF EXISTING ROAD PAVEMENT CM 7.09 373.82 12.00 98.23 491.14
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.42 40.20 2.40 11.00 55.02

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.46 2.36 68.03 17.71 88.57
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.45 2.36 59.14 15.49 77.44
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.19 0.86 27.32 7.09 35.47
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.19 0.86 23.64 6.17 30.87
COAT.

304a SINGLE SURFACE TREATMENT SM 1.22 11.24 145.28 39.43 197.17

304b DOUBLE SURFACE TREATMENT SM 1.78 21.60 274.28 74.41 372.07

304c TRIPLE SURFACE TREATMENT SM 2.99 30.32 318.79 88.03 440.13

304d SEAL COAT SM 1.13 6.38 33.76 10.32 51.58

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 105.58 2,293.29 9,421.94 2,955.20 14,776.02
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 105.58 2,198.28 10,037.85 3,085.43 15,427.14
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 256.11 513.14 6,781.67 1,887.73 9,438.65

307b OPEN GRADED HOT BIT-MAC CM 256.11 513.14 6,577.57 1,836.70 9,183.52

Page 71 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 44.59 1,050.92 3,603.18 1,174.67 5,873.36
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 328.02 1,746.20 60,313.62 15,596.96 77,984.80

309a COLD MILLING, 0-30 mm SM 1.50 52.01 17.73 17.81 89.05

309b COLD MILLING, 0-50 mm SM 2.50 86.68 29.55 29.68 148.41

309c COLD MILLING, 0-70 mm SM 3.75 130.02 44.33 44.52 222.62

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 804.44 2,175.42 3,289.99 1,567.46 7,837.31

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 804.44 2,175.42 3,875.42 1,713.82 8,569.10

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 804.44 2,175.42 4,179.88 1,789.93 8,949.67

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 804.44 2,175.42 3,523.93 1,625.95 8,129.73

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 804.44 2,175.42 4,109.31 1,772.29 8,861.46

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 804.44 2,175.42 4,413.68 1,848.39 9,241.93

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 804.44 2,175.42 3,768.59 1,687.11 8,435.57

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 804.44 2,175.42 4,353.97 1,833.46 9,167.29

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 804.44 2,175.42 4,648.32 1,907.05 9,535.23

401b CONCRETE CLASS B CM 1,035.17 1,109.69 2,743.53 1,222.10 6,110.50

401ci CONCRETE CLASS C (UNDERGROUND) CM 784.93 2,175.42 3,085.05 1,511.35 7,556.76

401cii CONCRETE CLASS C (ON GROUND) CM 784.93 2,175.42 3,670.43 1,657.70 8,288.49

401ciii CONCRETE CLASS C (ELEVATED) CM 784.93 2,175.42 3,974.89 1,733.81 8,669.06

401d CONCRETE CLASS D1 CM 1,249.66 2,689.24 5,590.85 2,382.44 11,912.19

401e CONCRETE CLASS Y CM 1,737.22 703.81 4,348.45 1,697.37 8,486.86

401f LEAN CONCRETE CM 652.21 759.81 2,304.97 929.25 4,646.23

401gi PRECAST CONCRETE, CLASS A1 CM 2,610.12 1,470.83 3,853.68 1,983.66 9,918.29

401gii PRECAST CONCRETE CLASS A3 CM 2,610.12 1,470.83 4,366.82 2,111.94 10,559.71

401giii PRECAST CONCRETE, CLASS B CM 2,610.12 1,470.83 3,345.31 1,856.56 9,282.82

401giv PRECAST CONCRETE CLASS D1 CM 2,610.12 1,470.83 5,597.61 2,419.64 12,098.19

Page 72 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 2,610.12 1,470.83 6,194.36 2,568.83 12,844.14

401gvi PRECAST CONCRETE CLASS D3 CM 2,610.12 1,470.83 6,791.81 2,718.19 13,590.95

401h PLUM CONCRETE CM 1,143.52 1,109.69 2,180.63 1,108.46 5,542.29

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 2,457.99 0.00 69,880.50 18,084.62 90,423.12
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 2,457.99 0.00 73,030.50 18,872.12 94,360.62
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,971.64 3,667.20 82,913.40 22,138.06 110,690.30
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 3,803.34 12,010.50 140,945.15 39,189.75 195,948.73
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 88.53 796.91 0.00 221.36 1,106.80

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 171.19 0.00 1,359.83 382.76 1,913.78
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 171.19 0.00 798.76 242.49 1,212.44
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 14.13 18.40 133.69 41.56 207.78

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 583.72 0.00 80,568.71 20,288.11 101,440.54
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 604.04 0.00 126,187.96 31,698.00 158,489.99
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 664.98 0.00 1,073,980.80 268,661.45 1,343,307.23
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 583.72 0.00 68,872.82 17,364.14 86,820.68
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 148.06 0.00 430.64 144.67 723.37

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.03 0.00 1.50 0.38 1.91
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.15 0.79 3.97
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 60.79 0.00 242.14 75.73 378.66

Page 73 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 29.13 48.58 145.56 55.82 279.09

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 373.92 3,155.77 465.01 998.67 4,993.37
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 568.36 4,796.77 625.56 1,497.67 7,488.37
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 568.36 7,330.09 774.88 2,168.33 10,841.67
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 947.27 12,216.82 1,100.49 3,566.15 17,830.73
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 789.39 10,180.69 964.82 2,983.72 14,918.62
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,420.90 18,325.24 1,507.51 5,313.41 26,567.06
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 33,766.38 86,125.76 107,460.56 56,838.18 284,190.88

407i PILE LOAD TEST UPTO 240 TON EACH 33,766.38 86,125.76 230,300.12 87,548.07 437,740.33

407j PILE LOAD TEST UPTO 360 TON EACH 92,273.58 95,444.48 312,413.68 125,032.94 625,164.68

407k PILE LOAD TEST UPTO 550 TON EACH 136,153.98 119,305.60 498,379.10 188,459.67 942,298.35

407l PILE LOAD TEST UPTO 800 TON EACH 201,522.36 143,166.72 807,515.30 288,051.10 1,440,255.48

407m CONFIRMATORY BORING (NX SIZE) M 272.34 2,639.89 22.50 733.68 3,668.41

407n PERMANENT PILE CASING FOR PILES Ton 357.09 3,993.41 81,995.58 21,586.52 107,932.60

410 BRICK WORK CM 496.91 453.06 3,438.69 1,097.17 5,485.83

411a STONE MASONRY RANDOM DRY CM 523.64 165.94 1,026.13 428.93 2,144.63

411b STONE MASONRY RANDOM WITH MORTAR CM 621.14 263.54 1,955.58 710.06 3,550.32

411c STONE MASONRY DRESSED UNCOURSED DRY CM 718.65 165.94 1,354.99 559.89 2,799.46

411d STONE MASONRY DRESSED UNCOURSED WITH CM 816.15 263.54 2,223.07 825.69 4,128.45
MORTAR

411g ROLL POINTING SM 105.81 19.52 91.04 54.09 270.46

412a STONE MASONARY DRESSED COURSED WITH CM 1,076.17 419.50 2,223.07 929.68 4,648.42
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 337.67 554.74 1,296.47 547.22 2,736.10
DIA 310 mm
Page 74 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 337.67 616.97 1,469.30 605.98 3,029.92
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 320.20 1,097.40 1,780.79 799.60 3,998.00
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 335.41 1,377.91 2,244.56 989.47 4,947.36
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 389.86 1,772.89 4,660.00 1,705.69 8,528.44
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 484.78 2,187.37 7,614.17 2,571.58 12,857.90
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 627.37 2,171.36 11,544.89 3,585.90 17,929.52
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 738.59 2,636.66 17,168.58 5,135.96 25,679.78
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 875.23 3,076.10 23,749.44 6,925.19 34,625.96
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 337.67 554.74 2,155.96 762.09 3,810.46
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 328.64 616.97 2,398.48 836.02 4,180.12
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 320.20 1,097.40 2,872.58 1,072.55 5,362.73
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 335.41 1,377.91 3,754.48 1,366.95 6,834.76
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 389.86 1,772.89 6,936.49 2,274.81 11,374.05
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 484.78 2,187.37 13,642.22 4,078.59 20,392.97
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 627.37 2,171.36 15,211.27 4,502.50 22,512.50
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 738.59 2,636.66 18,704.45 5,519.92 27,599.61
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 875.23 3,076.10 26,433.14 7,596.12 37,980.58
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 133.62 157.23 682.04 243.22 1,216.12
PIPE CULVERT

Page 75 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 1,170.94 845.94 2,809.09 1,206.49 6,032.47
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 8.23 0.00 115.34 30.89 154.46

507b ROCK FILL IN GABIONS CM 143.25 0.00 680.06 205.83 1,029.14

508a BRICK PAVING (SINGLE COURSE) SM 165.46 38.19 283.77 121.85 609.27

508b BRICK PAVING (DOUBLE COURSE) SM 295.47 38.19 561.09 223.69 1,118.44

509a RIPRAP, CLASS A CM 716.09 0.00 728.64 361.18 1,805.91

509b RIPRAP, CLASS B CM 520.86 180.10 764.62 366.39 1,831.97

509c RIPRAP, CLASS C CM 509.88 187.60 812.35 377.46 1,887.29

509c1 RIPRAP, CLASS D CM 509.88 225.12 728.64 365.91 1,829.55

509d GROUTED RIPRAP, CLASS A CM 876.04 170.59 2,388.81 858.86 4,294.29

509e GROUTED RIPRAP, CLASS B CM 674.82 316.57 2,255.91 811.82 4,059.12

509f GROUTED RIPRAP, CLASS C CM 649.02 301.33 2,294.75 811.28 4,056.38

509f1 GROUTED RIPRAP, CLASS D CM 649.02 338.85 2,369.54 839.35 4,196.76

509g REINFORCED CONCRETE SLOPE PROTECTION CM 1,191.22 481.58 3,299.69 1,243.12 6,215.62
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 72.87 275.72 690.47 259.76 1,298.81

510 DISMANTLING OF STRUCTURES AND CM 149.27 884.71 0.00 258.49 1,292.47


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 225.71 103.71 118.40 111.96 559.78

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 288.90 132.75 151.56 143.30 716.51

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 366.91 288.91 516.87 293.17 1,465.87
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 458.63 361.14 646.09 366.47 1,832.33
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 366.91 288.91 277.39 233.30 1,166.52
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 458.63 361.14 346.74 291.63 1,458.14
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 76 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 532.83 1,157.76 5,173.60 1,716.05 8,580.24
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,493.82 782.78 5,162.03 1,859.65 9,298.27
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 39.72 66.38 593.38 174.87 874.35
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 13.18 0.00 43.20 14.10 70.48

604a METAL GUARD RAIL M 99.51 55.31 2,487.34 660.54 3,302.70

604b METAL GUARD RAIL END PIECES EACH 131.21 533.21 2,794.10 864.63 4,323.16

604d STEEL POST FOR METAL GUARD RAIL EACH 149.25 533.21 2,434.20 779.17 3,895.83

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,699.51 1,160.70 11,624.11 3,871.08 19,355.39
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,699.51 801.50 10,805.36 3,576.59 17,882.96
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 345.87 393.19 8,248.42 2,246.87 11,234.34

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 105.63 589.78 9,925.13 2,655.13 13,275.67

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 345.87 844.19 17,781.29 4,742.83 23,714.17

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 1,136.37 921.65 32,796.93 8,713.74 43,568.69

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 227.27 223.78 15,369.56 3,955.15 19,775.77

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 424.30 0.00 2,205.00 657.33 3,286.63

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 424.30 0.00 3,307.50 932.95 4,664.75

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.33 6.00 24.78 8.78 43.88


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.44 3.51 57.79 15.69 78.43


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.33 6.00 33.06 10.85 54.24


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.44 3.51 77.07 20.51 102.54


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 116.10 29.98 239.40 96.37 481.85
PAINT FOR 4.0 M ARROWS

Page 77 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 26 KARACHI

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 116.10 52.71 728.20 224.25 1,121.26
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.42 7.50 34.58 11.87 59.37
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.42 13.18 99.75 29.59 147.93
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.42 7.50 46.11 14.76 73.78
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.42 13.18 133.00 37.90 189.49
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 116.10 29.98 333.90 120.00 599.98
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 116.10 52.71 1,257.80 356.65 1,783.26
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 96.60 29.98 159.60 71.55 357.73
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 96.60 52.71 486.20 158.88 794.39
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 96.60 29.98 222.60 87.30 436.48
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 96.60 52.71 839.80 247.28 1,236.39
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 14.22 111.18 168.22 73.40 367.02
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 14.22 111.18 198.22 80.90 404.52
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 154.24 182.71 326.44 165.85 829.24

610c KILOMETER POST EACH 949.78 1,321.13 1,703.45 993.59 4,967.95

610d TEN KILOMETER POST EACH 1,834.56 2,642.27 3,273.19 1,937.50 9,687.52

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 196.46 66.38 1,274.34 384.29 1,921.47
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 174.11 821.01 2.00 249.28 1,246.40
INCLUDING MAINTENANCE FOR 2 YEARS

Page 78 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

KASHMORE
(27A)

SAMPAK INTERNATIONAL

Page 79 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 1,005.55 309.00 1,545.02

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 80 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 363.59 141.32 706.59

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 1,060.87 325.36 1,626.79

202 AGGREGATE BASE CM 10.26 282.85 1,260.72 388.46 1,942.29

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 9,473.38 2,971.34 14,856.71

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 9,845.50 3,064.37 15,321.86

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,464.52 2,996.55 14,982.76
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,855.61 3,094.32 15,471.61
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 1,463.12 568.66 2,843.32

204c CEMENT CONTENT TON 125.00 0.00 7,434.00 1,889.75 9,448.75

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,545.61 16,218.28 81,091.38
MC-250

Page 81 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,545.61 16,218.28 81,091.38
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 1,128.17 355.42 1,777.10
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,819.38 2,927.44 14,637.18
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 1,153.37 369.35 1,846.77
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 25.96 23.14 115.70

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 25.96 23.14 115.70

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 70.26 18.24 91.19
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 61.37 16.01 80.07
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.22 7.30 36.51
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.54 6.38 31.91
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 151.78 40.97 204.86

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 288.14 77.75 388.75

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 335.15 91.90 459.50

304d SEAL COAT SM 0.80 6.38 36.09 10.82 54.09

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 10,188.73 3,139.91 15,699.54
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 10,752.53 3,257.11 16,285.53
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 7,435.72 2,034.66 10,173.31

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 7,131.10 1,958.51 9,792.54

Page 82 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,545.61 16,131.80 80,659.02

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 4,111.52 1,715.73 8,578.67

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,720.44 1,867.96 9,339.82

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 5,037.08 1,947.12 9,735.62

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 4,294.29 1,761.43 8,807.14

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,903.09 1,913.63 9,568.14

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 5,219.61 1,992.76 9,963.79

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 4,581.94 1,833.34 9,166.69

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 5,190.74 1,985.54 9,927.69

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 5,482.72 2,058.53 10,292.67

401b CONCRETE CLASS B CM 747.18 1,109.69 3,522.20 1,344.77 6,723.84

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,890.39 1,658.38 8,291.88

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 4,499.19 1,810.58 9,052.88

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,815.83 1,889.74 9,448.68

401d CONCRETE CLASS D1 CM 894.63 2,689.24 6,650.59 2,558.62 12,793.08

401e CONCRETE CLASS Y CM 1,247.78 703.81 5,320.43 1,818.01 9,090.03

401f LEAN CONCRETE CM 483.09 759.81 3,021.15 1,066.01 5,330.06

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,700.76 2,018.58 10,092.90

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 5,192.35 2,141.48 10,707.40

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 4,165.83 1,884.85 9,424.24

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 6,657.82 2,507.85 12,539.23

Page 83 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 7,357.10 2,682.67 13,413.33

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 8,058.08 2,857.91 14,289.56

401h PLUM CONCRETE CM 830.51 1,109.69 2,832.50 1,193.17 5,965.87

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 72,154.03 18,476.41 92,382.06
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 75,304.03 19,263.91 96,319.56
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,705.95 40,337.39 201,686.96
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,414.03 384.53 1,922.63
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.51 238.64 1,193.22
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.65 73.75 368.73

Page 84 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 121,451.76 58,300.45 291,502.23

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 258,897.68 92,661.93 463,309.63

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 353,988.56 130,014.33 650,071.63

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 565,676.70 197,339.14 986,695.70

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 915,816.10 303,370.44 1,516,852.18

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,622.73 1,108.82 5,544.11

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 1,346.95 473.22 2,366.11

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 2,480.23 799.07 3,995.33

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,895.51 645.98 3,229.92

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,943.01 949.76 4,748.81
MORTAR

411g ROLL POINTING SM 76.25 19.52 98.34 48.53 242.64

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,943.01 1,036.88 5,184.38
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,466.24 568.53 2,842.63
DIA 310 mm
Page 85 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,748.15 654.56 3,272.80
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,194.97 882.57 4,412.85
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,929.47 1,139.44 5,697.19
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 6,018.95 2,020.54 10,102.71
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,647.87 3,048.67 15,243.37
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,579.83 4,054.09 20,270.46
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 19,294.49 5,619.98 28,099.92
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 31,939.90 8,916.15 44,580.73
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,325.73 783.40 3,916.99
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,677.33 885.29 4,426.46
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,286.76 1,155.52 5,777.58
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,439.39 1,516.92 7,584.59
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,295.44 2,589.66 12,948.32
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,675.92 4,555.69 22,778.43
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 17,246.21 4,970.69 24,853.44
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,830.36 6,003.95 30,019.75
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 34,623.60 9,587.07 47,935.35
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 1,011.62 317.11 1,585.54
PIPE CULVERT

Page 86 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 3,600.87 1,323.04 6,615.18
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 968.39 269.08 1,345.38

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 290.38 112.40 562.02

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 573.00 206.81 1,034.04

509a RIPRAP, CLASS A CM 521.35 0.00 1,037.56 389.73 1,948.64

509b RIPRAP, CLASS B CM 373.08 180.10 1,029.26 395.61 1,978.05

509c RIPRAP, CLASS C CM 364.23 187.60 1,242.13 448.49 2,242.45

509c1 RIPRAP, CLASS D CM 364.23 225.12 1,298.75 472.03 2,360.13

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,899.36 927.07 4,635.34

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,700.95 875.54 4,377.72

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,917.37 921.06 4,605.31

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 3,154.31 989.68 4,948.38

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 4,040.93 1,349.29 6,746.43
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 1,006.82 334.29 1,671.43

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 168.60 109.29 546.45

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 215.81 139.89 699.45

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 610.88 291.70 1,458.49
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 763.60 364.62 1,823.11
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 357.17 228.27 1,141.35
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 446.46 285.34 1,426.69
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 87 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,720.17 1,814.77 9,073.86
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,709.70 1,894.93 9,474.65
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 617.08 178.11 890.57
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 43.20 13.22 66.11

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 12,777.55 3,986.12 19,930.60
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,932.27 3,685.00 18,424.99
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,650.88 2,324.42 11,622.08

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,430.92 2,774.55 13,872.74

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,710.83 4,952.15 24,760.77

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,436.25 9,052.07 45,260.37

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 16,049.84 4,110.92 20,554.62

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 88 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 27A KASHMORE

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.48 74.24 371.22
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.68 82.04 410.22
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 398.12 174.19 870.96

610c KILOMETER POST EACH 696.24 1,321.13 1,959.09 994.12 4,970.58

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,698.63 1,922.10 9,610.48

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,400.81 403.05 2,015.23
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 89 of 221
NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

KHAIRPUR
(29)

SAMPAK INTERNATIONAL

Page 90 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 483.17 178.41 892.04

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 91 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 230.57 108.06 540.31

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 515.40 188.99 944.95

202 AGGREGATE BASE CM 10.26 282.85 773.17 266.57 1,332.85

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 8,770.58 2,795.64 13,978.21

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 9,149.95 2,890.48 14,452.42

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 8,761.81 2,820.87 14,104.37
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,160.03 2,920.43 14,602.15
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 808.77 405.08 2,025.38

204c CEMENT CONTENT TON 125.00 0.00 7,421.40 1,886.60 9,433.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,154.24 16,120.43 80,602.17
MC-250

Page 92 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,154.24 16,120.43 80,602.17
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 555.29 212.20 1,061.00
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,194.61 2,771.24 13,856.21
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 552.57 219.15 1,095.76
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 14.49 20.27 101.36

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 14.49 20.27 101.36

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 69.87 18.14 90.71
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 60.98 15.92 79.58
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.06 7.26 36.32
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.38 6.34 31.72
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 147.62 39.93 199.65

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 277.00 74.97 374.83

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 322.10 88.64 443.18

304d SEAL COAT SM 0.80 6.38 34.74 10.48 52.40

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 9,477.16 2,962.02 14,810.08
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 10,047.50 3,080.85 15,404.24
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 6,878.08 1,895.25 9,476.26

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 6,574.52 1,819.36 9,096.81

Page 93 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,154.24 16,033.96 80,169.82

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 3,625.91 1,594.33 7,971.66

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,234.77 1,746.55 8,732.73

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 4,551.41 1,825.71 9,128.53

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 3,824.27 1,643.92 8,219.61

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,433.07 1,796.12 8,980.61

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 4,749.65 1,875.27 9,376.34

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 4,076.91 1,707.08 8,535.41

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 4,685.71 1,859.28 9,296.41

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 4,990.36 1,935.45 9,677.23

401b CONCRETE CLASS B CM 747.18 1,109.69 2,981.44 1,209.58 6,047.88

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,377.54 1,530.16 7,650.82

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 3,986.34 1,682.36 8,411.82

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,302.98 1,761.52 8,807.62

401d CONCRETE CLASS D1 CM 894.63 2,689.24 6,210.90 2,448.69 12,243.46

401e CONCRETE CLASS Y CM 1,247.78 703.81 4,834.91 1,696.62 8,483.12

401f LEAN CONCRETE CM 483.09 759.81 2,452.89 923.95 4,619.73

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,215.04 1,897.15 9,485.76

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 4,699.99 2,018.39 10,091.94

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 3,604.97 1,744.63 8,723.16

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 6,217.36 2,397.73 11,988.65

Page 94 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 6,946.79 2,580.09 12,900.44

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 7,677.05 2,762.65 13,813.27

401h PLUM CONCRETE CM 830.51 1,109.69 2,281.90 1,055.52 5,277.62

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 71,819.48 18,392.77 91,963.87
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 74,969.48 19,180.27 95,901.37
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,687.98 40,332.90 201,664.49
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,413.61 384.42 1,922.09
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.08 238.54 1,192.69
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.27 73.65 368.25

Page 95 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 89,235.84 50,246.47 251,232.33

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 194,465.84 76,553.97 382,769.83

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 257,340.80 105,852.39 529,261.93

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 408,258.00 157,984.47 789,922.33

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 663,214.00 240,219.91 1,201,099.55

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,404.26 1,054.21 5,271.03

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 798.45 336.10 1,680.48

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 1,788.56 626.15 3,130.74

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,303.13 497.89 2,489.45

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,242.98 774.75 3,873.77
MORTAR

411g ROLL POINTING SM 76.25 19.52 95.93 47.93 239.63

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,242.98 861.87 4,309.34
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,437.59 561.36 2,806.81
DIA 310 mm
Page 96 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,702.47 643.14 3,215.70
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,128.27 865.89 4,329.47
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,821.43 1,112.43 5,562.13
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 5,809.37 1,968.15 9,840.74
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,335.16 2,970.50 14,852.48
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,267.14 3,975.92 19,879.60
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 18,966.59 5,538.01 27,690.05
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 30,700.43 8,606.28 43,031.39
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,297.08 776.23 3,881.17
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,631.65 873.87 4,369.37
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,220.05 1,138.84 5,694.20
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,331.35 1,489.91 7,449.53
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,085.86 2,537.27 12,686.35
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,363.21 4,477.51 22,387.54
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 16,933.53 4,892.52 24,462.59
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,502.46 5,921.98 29,609.88
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 33,384.13 9,277.20 46,386.02
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 487.36 186.04 930.21
PIPE CULVERT

Page 97 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 3,059.97 1,187.81 5,939.06
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 456.46 141.09 705.47

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 260.78 105.00 525.01

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 517.45 192.92 964.61

509a RIPRAP, CLASS A CM 521.35 0.00 489.06 252.60 1,263.01

509b RIPRAP, CLASS B CM 373.08 180.10 485.15 259.58 1,297.91

509c RIPRAP, CLASS C CM 364.23 187.60 693.63 311.36 1,556.82

509c1 RIPRAP, CLASS D CM 364.23 225.12 750.25 334.90 1,674.51

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,260.99 767.48 3,837.38

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,076.31 719.39 3,596.93

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,284.90 762.94 3,814.72

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 2,509.88 828.57 4,142.85

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 3,555.46 1,227.92 6,139.59
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 483.74 203.52 1,017.58

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 79.47 87.01 435.03

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 101.73 111.37 556.84

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 491.42 261.83 1,309.16
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 614.27 327.29 1,636.45
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 256.66 203.14 1,015.72
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 320.83 253.93 1,269.65
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 98 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,447.44 1,746.59 8,732.95
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,436.94 1,826.74 9,133.71
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 569.84 166.30 831.52
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 41.28 12.74 63.71

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 12,202.71 3,842.41 19,212.04
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,361.40 3,542.28 17,711.42
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,596.12 2,310.73 11,553.63

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,348.78 2,754.01 13,770.07

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,522.78 4,905.14 24,525.70

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,154.17 8,981.56 44,907.78

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 15,993.42 4,096.82 20,484.10

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 99 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 29 KHAIRPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.30 74.20 370.99
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.50 82.00 409.99
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 352.22 162.72 813.58

610c KILOMETER POST EACH 696.24 1,321.13 1,797.08 953.61 4,768.07

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,436.70 1,856.61 9,283.06

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,206.94 354.58 1,772.89
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 100 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

LARKANA
(38)

SAMPAK INTERNATIONAL

Page 101 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.81 15.76 0.00 4.14 20.71

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 8.19 262.58 1.88 68.16 340.81

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 23.33 635.47 4.22 165.76 828.79

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.34 2,541.89 16.89 663.03 3,315.14

103 STRIPPING CM 2.87 153.65 0.00 39.13 195.64

104 COMPACTION OF NATURAL GROUND SM 0.41 14.95 2.70 4.52 22.58

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.32 227.95 0.00 58.32 291.59

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 127.59 360.08 125.00 153.17 765.85

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 19.36 541.85 0.00 140.30 701.52
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.98 422.98 0.00 108.99 544.96

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.36 205.65 0.00 52.50 262.50

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 127.59 360.08 125.00 153.17 765.85

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 22.44 492.05 0.00 128.62 643.11

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.06 422.98 0.00 108.51 542.56

107a STRUCTURAL EXCAVATION IN COMMON CM 8.75 221.54 0.00 57.57 287.86


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 75.12 664.63 73.44 203.30 1,016.48


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 124.68 400.09 125.00 162.44 812.22
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 112.21 442.22 0.00 138.61 693.04
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 64.12 316.49 0.00 95.15 475.76
MATERIAL

107d GRANULAR BACKFILL CM 38.63 193.34 796.92 257.22 1,286.10

107e COMMON BACKFILL CM 32.07 110.10 18.00 40.04 200.21

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.04 234.11 18.00 65.04 325.19
EXCAVATION IN COMMON MATERIAL

Page 102 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 22.93 578.46 144.73 186.53 932.66
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.20 637.82 8.55 165.89 829.47
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 15.29 574.85 8.00 149.53 747.67
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 9.13 119.41 152.97 70.38 351.89
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 7.11 121.79 18.00 36.72 183.62


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 16.59 277.82 10.70 76.28 381.39


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.61 43.86 5.15 12.65 63.27

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.17 30.11 2.73 8.50 42.51
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 11.57 190.72 289.22 122.88 614.38

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.96 23.59 2.80 6.84 34.19

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.47 26.79 2.80 7.76 38.82

201 GRANULAR SUB-BASE CM 9.33 231.80 755.90 249.26 1,246.29

202 AGGREGATE BASE CM 11.03 282.85 978.24 318.03 1,590.15

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 90.09 2,324.40 9,097.91 2,878.10 14,390.50

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 90.09 2,324.40 9,477.51 2,973.00 14,865.00

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 96.87 2,427.71 9,089.10 2,903.42 14,517.10
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 96.87 2,427.71 9,487.58 3,003.04 15,015.20
(CLASS B)

204b CEMENT STABILIZED BASE CM 33.46 780.07 1,125.30 484.71 2,423.53

204c CEMENT CONTENT TON 122.52 0.00 7,701.54 1,956.02 9,780.08

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 285.77 2,060.49 62,244.42 16,147.67 80,738.35
MC-250

Page 103 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 285.77 2,060.49 62,244.42 16,147.67 80,738.35
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.17 188.22 834.15 281.88 1,409.42
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 175.53 3,721.78 7,488.39 2,846.43 14,232.13
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 115.71 207.88 845.01 292.15 1,460.76
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.94 64.78 23.04 22.44 112.20

207b DEEP PATCHING (15-30 cm) SM 1.94 64.78 23.04 22.44 112.20

208 REINSTATEMENT OF ROAD SURFACE SM 2.10 104.50 1.98 27.15 135.73

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.44 373.82 12.00 97.82 489.08
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.09 40.20 2.40 10.92 54.61

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.36 2.36 69.96 18.17 90.85
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.34 2.36 61.07 15.94 79.72
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.14 0.86 28.10 7.28 36.38
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.14 0.86 24.42 6.36 31.78
COAT.

304a SINGLE SURFACE TREATMENT SM 0.93 11.24 149.42 40.40 201.99

304b DOUBLE SURFACE TREATMENT SM 1.36 21.60 282.00 76.24 381.20

304c TRIPLE SURFACE TREATMENT SM 2.29 30.32 327.96 90.14 450.72

304d SEAL COAT SM 0.86 6.38 35.35 10.65 53.24

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 80.32 2,293.29 9,811.10 3,046.18 15,230.88
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 80.32 2,198.28 10,377.66 3,164.06 15,820.32
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 194.52 513.14 7,138.89 1,961.63 9,808.17

307b OPEN GRADED HOT BIT-MAC CM 194.52 513.14 6,835.75 1,885.85 9,429.25

Page 104 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 33.90 1,050.92 3,603.18 1,172.00 5,860.00
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 250.66 1,746.20 62,244.42 16,060.32 80,301.61

309a COLD MILLING, 0-30 mm SM 1.15 52.01 18.43 17.90 89.48

309b COLD MILLING, 0-50 mm SM 1.91 86.68 30.72 29.83 149.14

309c COLD MILLING, 0-70 mm SM 2.86 130.02 46.08 44.74 223.71

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 614.99 2,175.42 4,008.71 1,699.78 8,498.90

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 614.99 2,175.42 4,617.60 1,852.00 9,260.01

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 614.99 2,175.42 4,934.24 1,931.16 9,655.81

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 614.99 2,175.42 4,204.13 1,748.63 8,743.17

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 614.99 2,175.42 4,812.93 1,900.83 9,504.17

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 614.99 2,175.42 5,129.48 1,979.97 9,899.86

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 614.99 2,175.42 4,470.16 1,815.14 9,075.71

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 614.99 2,175.42 5,078.96 1,967.34 9,836.71

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 614.99 2,175.42 5,377.44 2,041.96 10,209.82

401b CONCRETE CLASS B CM 790.19 1,109.69 3,357.18 1,314.27 6,571.33

401ci CONCRETE CLASS C (UNDERGROUND) CM 598.94 2,175.42 3,744.24 1,629.65 8,148.26

401cii CONCRETE CLASS C (ON GROUND) CM 598.94 2,175.42 4,353.04 1,781.85 8,909.26

401ciii CONCRETE CLASS C (ELEVATED) CM 598.94 2,175.42 4,669.68 1,861.01 9,305.06

401d CONCRETE CLASS D1 CM 955.38 2,689.24 6,626.05 2,567.67 12,838.35

401e CONCRETE CLASS Y CM 1,327.32 703.81 5,231.47 1,815.65 9,078.25

401f LEAN CONCRETE CM 495.39 759.81 2,825.97 1,020.29 5,101.46

401gi PRECAST CONCRETE, CLASS A1 CM 1,988.65 1,470.83 4,595.75 2,013.81 10,069.04

401gii PRECAST CONCRETE CLASS A3 CM 1,988.65 1,470.83 5,087.76 2,136.81 10,684.05

401giii PRECAST CONCRETE, CLASS B CM 1,988.65 1,470.83 3,994.47 1,863.49 9,317.44

401giv PRECAST CONCRETE CLASS D1 CM 1,988.65 1,470.83 6,632.86 2,523.09 12,615.43

Page 105 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,988.65 1,470.83 7,372.13 2,707.90 13,539.51

401gvi PRECAST CONCRETE CLASS D3 CM 1,988.65 1,470.83 8,112.50 2,893.00 14,464.98

401h PLUM CONCRETE CM 871.87 1,109.69 2,631.07 1,153.16 5,765.79

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,880.79 0.00 71,912.31 18,448.28 92,241.38
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,880.79 0.00 75,062.31 19,235.78 96,178.88
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,508.66 3,667.20 86,189.40 22,841.32 114,206.58
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,925.66 12,010.50 146,733.61 40,417.44 202,087.21
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 68.10 796.91 0.00 216.25 1,081.26

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 130.58 0.00 1,413.70 386.07 1,930.35
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 130.58 0.00 830.18 240.19 1,200.95
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.80 18.40 138.65 41.96 209.81

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 446.52 0.00 83,791.46 21,059.50 105,297.48
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 461.84 0.00 131,235.48 32,924.33 164,621.64
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 507.78 0.00 1,116,940.03 279,361.95 1,396,809.76
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 446.52 0.00 71,627.74 18,018.57 90,092.83
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 112.90 0.00 447.87 140.19 700.95

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.40 1.98
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 46.51 0.00 251.36 74.47 372.33

Page 106 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 22.21 48.58 148.68 54.87 274.33

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 287.50 3,155.77 466.33 977.40 4,887.01
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 437.00 4,796.77 627.57 1,465.34 7,326.69
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 437.00 7,330.09 777.12 2,136.05 10,680.27
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 728.34 12,216.82 1,104.23 3,512.35 17,561.74
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 606.95 10,180.69 967.93 2,938.89 14,694.46
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,092.51 18,325.24 1,513.11 5,232.71 26,163.57
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,524.96 86,125.76 113,259.84 56,227.64 281,138.20

407i PILE LOAD TEST UPTO 240 TON EACH 25,524.96 86,125.76 242,513.84 88,541.14 442,705.70

407j PILE LOAD TEST UPTO 360 TON EACH 69,632.16 95,444.48 329,412.80 123,622.36 618,111.80

407k PILE LOAD TEST UPTO 550 TON EACH 102,712.56 119,305.60 525,648.00 186,916.54 934,582.70

407l PILE LOAD TEST UPTO 800 TON EACH 152,022.72 143,166.72 851,584.00 286,693.36 1,433,466.80

407m CONFIRMATORY BORING (NX SIZE) M 207.62 2,639.89 22.50 717.50 3,587.51

407n PERMANENT PILE CASING FOR PILES Ton 272.19 3,993.41 85,275.46 22,385.26 111,926.31

410 BRICK WORK CM 379.15 453.06 3,370.97 1,050.79 5,253.97

411a STONE MASONRY RANDOM DRY CM 399.30 165.94 1,065.44 407.67 2,038.35

411b STONE MASONRY RANDOM WITH MORTAR CM 473.31 263.54 2,192.06 732.23 3,661.14

411c STONE MASONRY DRESSED UNCOURSED DRY CM 547.82 165.94 1,591.47 576.31 2,881.53

411d STONE MASONRY DRESSED UNCOURSED WITH CM 622.32 263.54 2,639.72 881.39 4,406.97
MORTAR

411g ROLL POINTING SM 80.79 19.52 98.48 49.70 248.49

412a STONE MASONARY DRESSED COURSED WITH CM 819.84 419.50 2,639.72 969.76 4,848.81
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 255.88 554.74 1,449.09 564.93 2,824.63
DIA 310 mm
Page 107 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 255.88 616.97 1,719.40 648.06 3,240.31
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 243.06 1,097.40 2,151.60 873.02 4,365.08
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 254.38 1,377.91 2,857.14 1,122.36 5,611.78
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 295.81 1,772.89 5,874.22 1,985.73 9,928.64
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 368.15 2,187.37 9,430.32 2,996.46 14,982.30
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 476.43 2,171.36 13,362.57 4,002.59 20,012.94
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 560.66 2,636.66 19,068.09 5,566.35 27,831.76
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 664.73 3,076.10 31,056.62 8,699.36 43,496.80
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 255.88 554.74 2,308.58 779.80 3,898.99
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 248.93 616.97 2,648.58 878.62 4,393.11
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 243.06 1,097.40 3,243.39 1,145.96 5,729.82
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 254.38 1,377.91 4,367.05 1,499.83 7,499.17
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 295.81 1,772.89 8,150.71 2,554.85 12,774.26
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 368.15 2,187.37 15,458.37 4,503.47 22,517.36
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 476.43 2,171.36 17,028.95 4,919.18 24,595.92
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 560.66 2,636.66 20,603.96 5,950.32 29,751.59
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 664.73 3,076.10 33,740.32 9,370.29 46,851.43
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 101.37 157.23 796.62 263.81 1,319.03
PIPE CULVERT

Page 108 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 893.80 845.94 3,438.68 1,294.60 6,473.02
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 6.29 0.00 117.81 31.02 155.12

507b ROCK FILL IN GABIONS CM 108.45 0.00 705.65 203.52 1,017.62

508a BRICK PAVING (SINGLE COURSE) SM 125.98 38.19 257.48 105.41 527.06

508b BRICK PAVING (DOUBLE COURSE) SM 224.99 38.19 508.12 192.83 964.13

509a RIPRAP, CLASS A CM 545.72 0.00 756.05 325.44 1,627.22

509b RIPRAP, CLASS B CM 398.17 180.10 750.00 332.07 1,660.33

509c RIPRAP, CLASS C CM 389.97 187.60 960.61 384.55 1,922.73

509c1 RIPRAP, CLASS D CM 389.97 225.12 1,017.24 408.08 2,040.42

509d GROUTED RIPRAP, CLASS A CM 667.52 170.59 2,621.97 865.02 4,325.09

509e GROUTED RIPRAP, CLASS B CM 515.60 316.57 2,425.30 814.37 4,071.83

509f GROUTED RIPRAP, CLASS C CM 496.00 301.33 2,641.74 859.77 4,298.84

509f1 GROUTED RIPRAP, CLASS D CM 496.00 338.85 2,878.55 928.35 4,641.75

509g REINFORCED CONCRETE SLOPE PROTECTION CM 906.35 481.58 3,937.74 1,331.42 6,657.08
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 55.22 275.72 799.58 282.63 1,413.15

510 DISMANTLING OF STRUCTURES AND CM 113.82 884.71 0.00 249.63 1,248.16


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 171.91 103.71 122.86 99.62 498.09

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 220.04 132.75 157.26 127.51 637.56

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 279.64 288.91 564.83 283.35 1,416.73
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 349.55 361.14 706.04 354.18 1,770.92
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 279.64 288.91 316.65 221.30 1,106.51
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 349.55 361.14 395.82 276.63 1,383.14
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 109 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 407.42 1,157.76 5,655.14 1,805.08 9,025.40
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,138.48 782.78 5,643.51 1,891.19 9,455.96
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 30.26 66.38 609.91 176.64 883.18
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 10.03 0.00 38.40 12.11 60.53

604a METAL GUARD RAIL M 75.88 55.31 2,600.42 682.90 3,414.52

604b METAL GUARD RAIL END PIECES EACH 99.94 533.21 2,919.35 888.12 4,440.62

604d STEEL POST FOR METAL GUARD RAIL EACH 113.81 533.21 2,548.20 798.81 3,994.03

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,049.10 1,160.70 12,608.81 3,954.65 19,773.26
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,049.10 801.50 11,766.40 3,654.25 18,271.25
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 263.22 393.19 8,636.69 2,323.27 11,616.37

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 80.38 589.78 10,409.64 2,769.95 13,849.75

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 263.22 844.19 18,666.77 4,943.55 24,717.73

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 861.40 921.65 34,370.16 9,038.30 45,191.52

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 172.28 223.78 16,036.62 4,108.17 20,540.85

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 325.14 0.00 2,293.20 654.59 3,272.93

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 325.14 0.00 3,439.80 941.24 4,706.18

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.30 6.00 25.77 8.76 43.82


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.10 3.51 60.10 16.18 80.89


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.30 6.00 34.38 10.92 54.59


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.10 3.51 80.16 21.19 105.96


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 88.96 29.98 248.98 91.98 459.89
PAINT FOR 4.0 M ARROWS

Page 110 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 38 LARKANA

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 88.96 52.71 757.33 224.75 1,123.75
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.12 7.50 35.97 11.90 59.48
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.12 13.18 103.74 30.26 151.30
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.12 7.50 47.95 14.89 74.46
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.12 13.18 138.32 38.90 194.52
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 88.96 29.98 347.26 116.55 582.74
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 88.96 52.71 1,308.11 362.45 1,812.23
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 73.96 29.98 165.98 67.48 337.40
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 73.96 52.71 505.65 158.08 790.40
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 73.96 29.98 231.50 83.86 419.30
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 73.96 52.71 873.39 250.02 1,250.08
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.84 111.18 175.56 74.40 371.99
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.84 111.18 206.76 82.20 410.99
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 116.82 182.71 385.26 171.20 855.99

610c KILOMETER POST EACH 722.86 1,321.13 1,909.30 988.32 4,941.62

610d TEN KILOMETER POST EACH 1,395.73 2,642.27 3,616.33 1,913.58 9,567.91

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 149.33 66.38 1,327.74 385.86 1,929.31
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 132.60 821.01 3.00 239.15 1,195.76
INCLUDING MAINTENANCE FOR 2 YEARS

Page 111 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

MIRPURKHAS
(45A)

SAMPAK INTERNATIONAL

Page 112 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.75 15.76 0.00 4.13 20.63

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.63 262.58 1.88 68.02 340.10

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 21.66 635.47 4.22 165.34 826.70

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 86.66 2,541.89 16.89 661.36 3,306.79

103 STRIPPING CM 2.68 153.65 0.00 39.08 195.41

104 COMPACTION OF NATURAL GROUND SM 0.38 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.05 227.95 0.00 58.25 291.25

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.16 541.85 0.00 140.00 700.02
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.20 422.98 0.00 108.80 543.98

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.13 205.65 0.00 52.44 262.22

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.13 492.05 0.00 128.29 641.47

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.38 422.98 0.00 108.34 541.70

107a STRUCTURAL EXCAVATION IN COMMON CM 8.27 221.54 0.00 57.45 287.27


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.59 664.63 72.03 201.81 1,009.06


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 117.37 400.09 125.00 160.62 803.08
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 105.63 442.22 0.00 136.96 684.81
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 60.36 316.49 0.00 94.21 471.06
MATERIAL

107d GRANULAR BACKFILL CM 36.08 193.34 756.68 246.52 1,232.62

107e COMMON BACKFILL CM 29.78 110.10 18.00 39.47 197.35

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.57 234.11 18.00 64.92 324.60
EXCAVATION IN COMMON MATERIAL

Page 113 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.50 578.46 144.73 186.17 930.87
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.13 637.82 8.55 165.63 828.13
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.34 574.85 8.00 149.30 746.48
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.57 119.41 152.97 70.24 351.19
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.68 121.79 18.00 36.62 183.09


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.53 277.82 10.70 76.01 380.06


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.10 30.11 2.73 8.48 42.42
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.84 190.72 304.75 126.58 632.89

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.90 23.59 2.80 6.82 34.11

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.38 26.79 2.80 7.74 38.70

201 GRANULAR SUB-BASE CM 8.77 231.80 819.58 265.04 1,325.19

202 AGGREGATE BASE CM 10.39 282.85 977.87 317.78 1,588.88

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 83.88 2,324.40 9,149.56 2,889.46 14,447.29

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 83.88 2,324.40 9,401.98 2,952.56 14,762.82

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,140.79 2,914.68 14,573.42
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,411.97 2,982.48 14,912.40
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.42 780.07 1,121.42 483.23 2,416.13

204c CEMENT CONTENT TON 112.52 0.00 6,993.00 1,776.38 8,881.90

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,519.11 15,962.13 79,810.63
MC-250

Page 114 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,519.11 15,962.13 79,810.63
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 97.11 188.22 1,059.05 336.10 1,680.48
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 163.96 3,721.78 7,550.25 2,859.00 14,294.99
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 106.77 207.88 1,016.97 332.90 1,664.52
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 20.14 21.69 108.43

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 20.14 21.69 108.43

208 REINSTATEMENT OF ROAD SURFACE SM 1.98 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.15 373.82 12.00 97.74 488.71
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.03 40.20 2.40 10.91 54.54

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 69.23 17.98 89.91
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 60.34 15.76 78.79
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 27.81 7.20 36.00
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.13 6.28 31.40
COAT.

304a SINGLE SURFACE TREATMENT SM 0.88 11.24 149.21 40.33 201.66

304b DOUBLE SURFACE TREATMENT SM 1.28 21.60 283.09 76.49 382.47

304c TRIPLE SURFACE TREATMENT SM 2.16 30.32 329.07 90.39 451.94

304d SEAL COAT SM 0.81 6.38 34.78 10.49 52.46

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,293.29 9,814.87 3,045.76 15,228.82
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,198.28 10,442.00 3,178.79 15,893.97
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 180.91 513.14 7,106.27 1,950.08 9,750.40

307b OPEN GRADED HOT BIT-MAC CM 180.91 513.14 6,900.14 1,898.55 9,492.74

Page 115 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 31.59 1,050.92 3,603.18 1,171.42 5,857.10
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.55 1,746.20 61,519.11 15,875.22 79,376.08

309a COLD MILLING, 0-30 mm SM 1.08 52.01 18.08 17.79 88.96

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.14 29.65 148.26

309c COLD MILLING, 0-70 mm SM 2.69 130.02 45.20 44.48 222.39

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 578.34 2,175.42 3,764.25 1,629.50 8,147.51

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 578.34 2,175.42 4,361.41 1,778.79 8,893.96

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 578.34 2,175.42 4,671.96 1,856.43 9,282.15

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 578.34 2,175.42 4,015.24 1,692.25 8,461.25

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 578.34 2,175.42 4,612.33 1,841.52 9,207.61

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 578.34 2,175.42 4,922.77 1,919.13 9,595.66

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 578.34 2,175.42 4,286.69 1,760.11 8,800.57

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 578.34 2,175.42 4,883.78 1,909.39 9,546.93

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 578.34 2,175.42 5,179.76 1,983.38 9,916.90

401b CONCRETE CLASS B CM 741.23 1,109.69 3,185.87 1,259.20 6,295.98

401ci CONCRETE CLASS C (UNDERGROUND) CM 561.48 2,175.42 3,564.62 1,575.38 7,876.90

401cii CONCRETE CLASS C (ON GROUND) CM 561.48 2,175.42 4,161.71 1,724.65 8,623.27

401ciii CONCRETE CLASS C (ELEVATED) CM 561.48 2,175.42 4,472.26 1,802.29 9,011.45

401d CONCRETE CLASS D1 CM 898.51 2,689.24 6,225.93 2,453.42 12,267.09

401e CONCRETE CLASS Y CM 1,247.02 703.81 4,871.81 1,705.66 8,528.30

401f LEAN CONCRETE CM 460.84 759.81 2,701.21 980.46 4,902.32

401gi PRECAST CONCRETE, CLASS A1 CM 1,859.59 1,470.83 4,334.81 1,916.31 9,581.53

401gii PRECAST CONCRETE CLASS A3 CM 1,859.59 1,470.83 4,894.57 2,056.25 10,281.23

401giii PRECAST CONCRETE, CLASS B CM 1,859.59 1,470.83 3,796.24 1,781.67 8,908.33

401giv PRECAST CONCRETE CLASS D1 CM 1,859.59 1,470.83 6,233.12 2,390.88 11,954.42

Page 116 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,859.59 1,470.83 6,898.47 2,557.22 12,786.11

401gvi PRECAST CONCRETE CLASS D3 CM 1,859.59 1,470.83 7,565.00 2,723.85 13,619.27

401h PLUM CONCRETE CM 816.24 1,109.69 2,517.91 1,110.96 5,554.80

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 71,142.82 18,228.54 91,142.69
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 74,292.82 19,016.04 95,080.19
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,420.89 3,667.20 84,551.40 22,409.87 112,049.36
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,779.19 12,010.50 143,886.04 39,668.93 198,344.66
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 64.69 796.91 0.00 215.40 1,077.00

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.33 0.00 1,387.03 377.34 1,886.70
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 122.33 0.00 814.74 234.27 1,171.33
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.14 18.40 140.05 42.15 210.74

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 420.32 0.00 82,180.09 20,650.10 103,250.51
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 434.39 0.00 128,711.72 32,286.53 161,432.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 476.58 0.00 1,095,460.42 273,984.25 1,369,921.25
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 420.32 0.00 70,250.29 17,667.65 88,338.26
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 105.71 0.00 439.25 136.24 681.19

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.53 0.39 1.94
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.03
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.80 0.00 246.98 72.70 363.48

Page 117 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 20.79 48.58 149.56 54.73 273.66

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 272.91 3,155.77 467.37 974.01 4,870.07
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 414.82 4,796.77 629.16 1,460.19 7,300.94
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 414.82 7,330.09 778.88 2,130.95 10,654.74
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 691.36 12,216.82 1,107.16 3,503.84 17,519.18
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 576.13 10,180.69 970.38 2,931.80 14,659.00
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,037.04 18,325.24 1,517.51 5,219.95 26,099.74
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 23,551.38 86,125.76 103,932.24 53,402.35 267,011.73

407i PILE LOAD TEST UPTO 240 TON EACH 23,551.38 86,125.76 223,551.06 83,307.05 416,535.25

407j PILE LOAD TEST UPTO 360 TON EACH 64,058.58 95,444.48 301,629.36 115,283.11 576,415.53

407k PILE LOAD TEST UPTO 550 TON EACH 94,438.98 119,305.60 480,604.20 173,587.20 867,935.98

407l PILE LOAD TEST UPTO 800 TON EACH 139,772.76 143,166.72 779,148.60 265,522.02 1,327,610.10

407m CONFIRMATORY BORING (NX SIZE) M 194.33 2,639.89 22.50 714.18 3,570.89

407n PERMANENT PILE CASING FOR PILES Ton 254.71 3,993.41 83,635.39 21,970.88 109,854.38

410 BRICK WORK CM 355.40 453.06 2,911.14 929.90 4,649.51

411a STONE MASONRY RANDOM DRY CM 373.93 165.94 1,079.17 404.76 2,023.79

411b STONE MASONRY RANDOM WITH MORTAR CM 442.69 263.54 2,124.47 707.68 3,538.38

411c STONE MASONRY DRESSED UNCOURSED DRY CM 512.70 165.94 1,442.53 530.29 2,651.46

411d STONE MASONRY DRESSED UNCOURSED WITH CM 582.71 263.54 2,414.61 815.21 4,076.07
MORTAR

411g ROLL POINTING SM 75.83 19.52 95.09 47.61 238.05

412a STONE MASONARY DRESSED COURSED WITH CM 766.48 419.50 2,414.61 900.15 4,500.74
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 554.74 1,395.05 546.72 2,733.59
DIA 310 mm
Page 118 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 616.97 1,631.17 621.31 3,106.53
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 225.88 1,097.40 2,021.16 836.11 4,180.55
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 236.03 1,377.91 2,642.05 1,064.00 5,319.98
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 274.68 1,772.89 5,448.65 1,874.06 9,370.28
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 342.35 2,187.37 8,794.28 2,831.00 14,154.99
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 443.04 2,171.36 12,725.79 3,835.05 19,175.24
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 521.01 2,636.66 18,402.33 5,390.00 26,949.99
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 618.26 3,076.10 28,501.79 8,049.04 40,245.19
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.08 554.74 2,254.54 761.59 3,807.96
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 230.48 616.97 2,560.35 851.95 4,259.76
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 225.88 1,097.40 3,112.94 1,109.06 5,545.28
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 236.03 1,377.91 4,151.96 1,441.47 7,207.36
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 274.68 1,772.89 7,725.14 2,443.18 12,215.89
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 342.35 2,187.37 14,822.33 4,338.01 21,690.05
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 443.04 2,171.36 16,392.18 4,751.64 23,758.22
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 521.01 2,636.66 19,938.20 5,773.96 28,869.82
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 618.26 3,076.10 31,185.50 8,719.97 43,599.83
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 94.11 157.23 763.05 253.60 1,267.99
PIPE CULVERT

Page 119 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 838.37 845.94 3,259.87 1,236.05 6,180.23
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.40 30.83 154.13

507b ROCK FILL IN GABIONS CM 100.31 0.00 724.01 206.08 1,030.41

508a BRICK PAVING (SINGLE COURSE) SM 117.67 38.19 213.30 92.29 461.45

508b BRICK PAVING (DOUBLE COURSE) SM 210.18 38.19 420.68 167.26 836.32

509a RIPRAP, CLASS A CM 510.52 0.00 775.73 321.56 1,607.80

509b RIPRAP, CLASS B CM 374.40 180.10 815.65 342.54 1,712.69

509c RIPRAP, CLASS C CM 367.01 187.60 868.73 355.83 1,779.17

509c1 RIPRAP, CLASS D CM 367.01 225.12 915.21 376.84 1,884.18

509d GROUTED RIPRAP, CLASS A CM 624.29 170.59 2,550.41 836.32 4,181.60

509e GROUTED RIPRAP, CLASS B CM 484.42 316.57 2,409.35 802.58 4,012.92

509f GROUTED RIPRAP, CLASS C CM 466.19 301.33 2,461.77 807.32 4,036.61

509f1 GROUTED RIPRAP, CLASS D CM 466.19 338.85 2,679.06 871.02 4,355.12

509g REINFORCED CONCRETE SLOPE PROTECTION CM 845.56 481.58 3,777.85 1,276.25 6,381.24
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 51.17 275.72 757.26 271.04 1,355.18

510 DISMANTLING OF STRUCTURES AND CM 106.58 884.71 0.00 247.82 1,239.11


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 160.65 103.71 126.06 97.60 488.02

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 205.64 132.75 161.35 124.93 624.67

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 545.76 274.08 1,370.40
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 682.20 342.60 1,713.00
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 304.59 213.79 1,068.93
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 380.74 267.23 1,336.17
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 120 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 383.25 1,157.76 5,486.02 1,756.76 8,783.78
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,065.13 782.78 5,471.86 1,829.94 9,149.71
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 28.28 66.38 581.89 169.14 845.68
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.35 0.00 31.68 10.26 51.29

604a METAL GUARD RAIL M 71.05 55.31 2,551.61 669.49 3,347.47

604b METAL GUARD RAIL END PIECES EACH 93.39 533.21 2,865.70 873.07 4,365.37

604d STEEL POST FOR METAL GUARD RAIL EACH 106.57 533.21 2,497.50 784.32 3,921.60

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,904.08 1,160.70 12,254.93 3,829.93 19,149.63
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,904.08 801.50 11,421.42 3,531.75 17,658.74
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 245.67 393.19 8,465.45 2,276.08 11,380.38

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 75.01 589.78 10,201.72 2,716.63 13,583.13

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 245.67 844.19 18,206.67 4,824.13 24,120.66

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 798.58 921.65 33,557.50 8,819.43 44,097.17

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 159.72 223.78 15,668.68 4,013.04 20,065.22

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 306.96 0.00 2,249.10 639.02 3,195.08

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 306.96 0.00 3,373.65 920.15 4,600.76

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 25.27 8.59 42.93


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 58.94 15.87 79.35


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 33.72 10.70 53.49


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 78.61 20.79 103.94


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 83.97 29.98 244.19 89.54 447.68
PAINT FOR 4.0 M ARROWS

Page 121 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 45A MIRPURKHAS

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 83.97 52.71 742.76 219.86 1,099.31
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 35.27 11.65 58.26
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 101.75 29.69 148.46
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 47.03 14.59 72.96
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 135.66 38.17 190.85
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 83.97 29.98 340.58 113.63 568.17
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 83.97 52.71 1,282.96 354.91 1,774.55
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 69.72 29.98 162.79 65.62 328.12
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 69.72 52.71 495.92 154.59 772.95
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 69.72 29.98 227.05 81.69 408.44
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 69.72 52.71 856.60 244.76 1,223.79
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 171.93 73.32 366.58
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 202.53 80.97 404.83
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 108.14 182.71 365.95 164.20 820.99

610c KILOMETER POST EACH 674.74 1,321.13 1,843.18 959.76 4,798.81

610d TEN KILOMETER POST EACH 1,301.97 2,642.27 3,505.00 1,862.31 9,311.55

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 139.07 66.38 1,348.54 388.50 1,942.48
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 123.89 821.01 2.04 236.74 1,183.68
INCLUDING MAINTENANCE FOR 2 YEARS

Page 122 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

NAUSHAHRO FEROZE
(49B)

SAMPAK INTERNATIONAL

Page 123 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.68 15.76 0.00 4.11 20.54

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 6.96 262.58 1.88 67.85 339.27

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 19.67 635.47 4.22 164.84 824.20

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 78.66 2,541.89 16.89 659.36 3,296.80

103 STRIPPING CM 2.47 153.65 0.00 39.03 195.14

104 COMPACTION OF NATURAL GROUND SM 0.35 14.95 2.70 4.50 22.51

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.77 227.95 0.00 58.18 290.90

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 16.81 541.85 0.00 139.67 698.33
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 11.33 422.98 0.00 108.58 542.90

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.90 205.65 0.00 52.39 261.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.68 492.05 0.00 127.93 639.66

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.61 422.98 0.00 108.15 540.74

107a STRUCTURAL EXCAVATION IN COMMON CM 7.77 221.54 0.00 57.33 286.64


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 65.55 664.63 73.44 200.90 1,004.52


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 109.36 400.09 125.00 158.61 793.06
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 98.42 442.22 0.00 135.16 675.80
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 56.24 316.49 0.00 93.18 465.91
MATERIAL

107d GRANULAR BACKFILL CM 33.12 193.34 870.57 274.26 1,371.28

107e COMMON BACKFILL CM 27.04 110.10 18.00 38.78 193.92

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.05 234.11 18.00 64.79 323.96
EXCAVATION IN COMMON MATERIAL

Page 124 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.89 578.46 144.73 185.77 928.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.92 637.82 8.55 165.32 826.61
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 13.26 574.85 8.00 149.03 745.13
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 7.94 119.41 152.97 70.08 350.40
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.21 121.79 18.00 36.50 182.50


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 14.32 277.82 10.70 75.71 378.55


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.41 43.86 5.15 12.60 63.02

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.02 30.11 2.73 8.46 42.32
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.03 190.72 316.85 129.40 646.99

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.83 23.59 2.80 6.81 34.03

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.28 26.79 2.80 7.72 38.58

201 GRANULAR SUB-BASE CM 8.14 231.80 869.20 277.29 1,386.43

202 AGGREGATE BASE CM 9.69 282.85 1,083.19 343.93 1,719.66

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 76.55 2,324.40 9,200.08 2,900.26 14,501.29

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 76.55 2,324.40 9,575.16 2,994.03 14,970.14

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,191.28 2,925.36 14,626.80
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,585.16 3,023.83 15,119.14
(CLASS B)

204b CEMENT STABILIZED BASE CM 29.16 780.07 1,250.81 515.01 2,575.04

204c CEMENT CONTENT TON 100.00 0.00 7,205.31 1,826.33 9,131.64

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,959.38 16,067.55 80,337.76
MC-250

Page 125 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,959.38 16,067.55 80,337.76
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 87.24 188.22 943.38 304.71 1,523.55
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 150.58 3,721.78 7,584.74 2,864.28 14,321.38
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 95.76 207.88 964.99 317.16 1,585.80
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.69 64.78 23.96 22.61 113.04

207b DEEP PATCHING (15-30 cm) SM 1.69 64.78 23.96 22.61 113.04

208 REINSTATEMENT OF ROAD SURFACE SM 1.84 104.50 1.98 27.08 135.40

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.84 373.82 12.00 97.67 488.33
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.97 40.20 2.40 10.89 54.46

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.31 2.36 69.68 18.09 90.44
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.30 2.36 60.78 15.86 79.31
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 27.98 7.24 36.21
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 24.30 6.32 31.61
COAT.

304a SINGLE SURFACE TREATMENT SM 0.82 11.24 149.42 40.37 201.85

304b DOUBLE SURFACE TREATMENT SM 1.20 21.60 282.62 76.36 381.78

304c TRIPLE SURFACE TREATMENT SM 2.02 30.32 328.70 90.26 451.30

304d SEAL COAT SM 0.76 6.38 35.43 10.64 53.21

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,293.29 9,909.61 3,067.87 15,339.33
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,198.28 10,471.12 3,184.49 15,922.46
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 164.80 513.14 7,214.14 1,973.02 9,865.09

307b OPEN GRADED HOT BIT-MAC CM 164.80 513.14 6,912.40 1,897.58 9,487.92

Page 126 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 28.87 1,050.92 3,603.18 1,170.74 5,853.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 218.74 1,746.20 61,959.38 15,981.08 79,905.41

309a COLD MILLING, 0-30 mm SM 1.00 52.01 18.43 17.86 89.30

309b COLD MILLING, 0-50 mm SM 1.67 86.68 30.72 29.77 148.84

309c COLD MILLING, 0-70 mm SM 2.50 130.02 46.08 44.65 223.25

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 537.80 2,175.42 3,894.51 1,651.93 8,259.67

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 537.80 2,175.42 4,503.41 1,804.16 9,020.79

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 537.80 2,175.42 4,820.05 1,883.32 9,416.59

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 537.80 2,175.42 4,076.48 1,697.43 8,487.13

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 537.80 2,175.42 4,685.28 1,849.63 9,248.13

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 537.80 2,175.42 5,001.82 1,928.76 9,643.81

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 537.80 2,175.42 4,348.00 1,765.31 8,826.53

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 537.80 2,175.42 4,956.80 1,917.51 9,587.53

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 537.80 2,175.42 5,252.87 1,991.52 9,957.61

401b CONCRETE CLASS B CM 686.07 1,109.69 3,308.72 1,276.12 6,380.60

401ci CONCRETE CLASS C (UNDERGROUND) CM 519.08 2,175.42 3,661.57 1,589.02 7,945.09

401cii CONCRETE CLASS C (ON GROUND) CM 519.08 2,175.42 4,270.37 1,741.22 8,706.09

401ciii CONCRETE CLASS C (ELEVATED) CM 519.08 2,175.42 4,587.01 1,820.38 9,101.89

401d CONCRETE CLASS D1 CM 835.60 2,689.24 6,406.13 2,482.74 12,413.71

401e CONCRETE CLASS Y CM 1,157.50 703.81 5,093.04 1,738.59 8,692.95

401f LEAN CONCRETE CM 419.89 759.81 2,815.45 998.79 4,993.93

401gi PRECAST CONCRETE, CLASS A1 CM 1,711.07 1,470.83 4,485.11 1,916.75 9,583.76

401gii PRECAST CONCRETE CLASS A3 CM 1,711.07 1,470.83 4,961.86 2,035.94 10,179.70

401giii PRECAST CONCRETE, CLASS B CM 1,711.07 1,470.83 3,948.29 1,782.55 8,912.74

401giv PRECAST CONCRETE CLASS D1 CM 1,711.07 1,470.83 6,413.17 2,398.77 11,993.83

Page 127 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,711.07 1,470.83 7,098.48 2,570.09 12,850.46

401gvi PRECAST CONCRETE CLASS D3 CM 1,711.07 1,470.83 7,785.10 2,741.75 13,708.75

401h PLUM CONCRETE CM 752.73 1,109.69 2,630.64 1,123.27 5,616.33

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 71,618.88 18,317.63 91,588.13
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 74,768.88 19,105.13 95,525.63
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,324.94 3,667.20 86,189.40 22,795.39 113,976.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,675.86 40,329.87 201,649.35
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 112.96 0.00 1,413.39 381.59 1,907.94
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 112.96 0.00 829.87 235.71 1,178.54
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 9.41 18.40 138.65 41.61 208.07

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 391.60 0.00 83,791.46 21,045.77 105,228.83
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 404.10 0.00 131,235.48 32,909.90 164,549.48
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 441.60 0.00 1,116,940.03 279,345.41 1,396,727.04
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 391.60 0.00 71,627.74 18,004.84 90,024.18
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 97.50 0.00 447.87 136.34 681.71

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 40.83 0.00 251.08 72.98 364.88

Page 128 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 19.16 48.58 148.68 54.11 270.53

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 258.21 3,155.77 466.33 970.08 4,850.39
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 392.48 4,796.77 627.57 1,454.21 7,271.04
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 392.48 7,330.09 777.12 2,124.92 10,624.62
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 654.13 12,216.82 1,104.23 3,493.80 17,468.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 545.11 10,180.69 967.93 2,923.43 14,617.16
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 981.20 18,325.24 1,513.11 5,204.89 26,024.43
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 21,124.26 86,125.76 115,848.80 55,774.71 278,873.53

407i PILE LOAD TEST UPTO 240 TON EACH 21,124.26 86,125.76 247,691.76 88,735.45 443,677.23

407j PILE LOAD TEST UPTO 360 TON EACH 57,124.26 95,444.48 337,179.68 122,437.11 612,185.53

407k PILE LOAD TEST UPTO 550 TON EACH 84,124.26 119,305.60 538,298.60 185,432.12 927,160.58

407l PILE LOAD TEST UPTO 800 TON EACH 124,498.92 143,166.72 871,883.80 284,887.36 1,424,436.80

407m CONFIRMATORY BORING (NX SIZE) M 179.16 2,639.89 22.50 710.39 3,551.94

407n PERMANENT PILE CASING FOR PILES Ton 234.70 3,993.41 85,275.46 22,375.89 111,879.46

410 BRICK WORK CM 328.50 453.06 3,128.40 977.49 4,887.45

411a STONE MASONRY RANDOM DRY CM 345.00 165.94 1,176.48 421.85 2,109.26

411b STONE MASONRY RANDOM WITH MORTAR CM 407.50 263.54 2,262.85 733.47 3,667.36

411c STONE MASONRY DRESSED UNCOURSED DRY CM 472.50 165.94 1,711.39 587.46 2,937.28

411d STONE MASONRY DRESSED UNCOURSED WITH CM 537.50 263.54 2,718.82 879.96 4,399.82
MORTAR

411g ROLL POINTING SM 70.25 19.52 97.34 46.78 233.89

412a STONE MASONARY DRESSED COURSED WITH CM 705.00 419.50 2,718.82 960.83 4,804.14
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 554.74 1,425.69 548.70 2,743.50
DIA 310 mm
Page 129 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 616.97 1,681.44 628.20 3,140.98
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 205.41 1,097.40 2,095.79 849.65 4,248.24
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.01 1,377.91 2,765.36 1,089.32 5,446.59
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 249.42 1,772.89 5,693.15 1,928.87 9,644.33
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 311.73 2,187.37 9,160.14 2,914.81 14,574.05
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 403.41 2,171.36 13,091.87 3,916.66 19,583.30
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 473.79 2,636.66 18,784.82 5,473.82 27,369.08
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 563.17 3,076.10 29,974.54 8,403.45 42,017.26
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.37 554.74 2,285.18 763.57 3,817.87
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 208.12 616.97 2,610.62 858.93 4,294.64
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 205.41 1,097.40 3,187.57 1,122.59 5,612.97
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.01 1,377.91 4,275.28 1,466.80 7,333.99
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 249.42 1,772.89 7,969.64 2,497.99 12,489.94
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 311.73 2,187.37 15,188.19 4,421.82 22,109.12
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 403.41 2,171.36 16,758.26 4,833.26 24,166.29
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 473.79 2,636.66 20,320.69 5,857.78 29,288.91
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 563.17 3,076.10 32,658.25 9,074.38 45,371.89
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 85.41 157.23 872.88 278.88 1,394.41
PIPE CULVERT

Page 130 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 775.89 845.94 3,384.97 1,251.70 6,258.50
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.49 0.00 117.81 30.82 154.12

507b ROCK FILL IN GABIONS CM 90.41 0.00 809.28 224.92 1,124.62

508a BRICK PAVING (SINGLE COURSE) SM 108.04 38.19 236.35 95.65 478.23

508b BRICK PAVING (DOUBLE COURSE) SM 193.04 38.19 465.57 174.20 871.00

509a RIPRAP, CLASS A CM 470.10 0.00 867.09 334.30 1,671.48

509b RIPRAP, CLASS B CM 348.08 180.10 860.15 347.08 1,735.41

509c RIPRAP, CLASS C CM 341.73 187.60 1,071.65 400.25 2,001.23

509c1 RIPRAP, CLASS D CM 341.73 225.12 1,128.28 423.78 2,118.91

509d GROUTED RIPRAP, CLASS A CM 574.58 170.59 2,692.49 859.41 4,297.07

509e GROUTED RIPRAP, CLASS B CM 449.66 316.57 2,499.30 816.38 4,081.91

509f GROUTED RIPRAP, CLASS C CM 433.05 301.33 2,711.19 861.39 4,306.96

509f1 GROUTED RIPRAP, CLASS D CM 433.05 338.85 2,943.85 928.94 4,644.69

509g REINFORCED CONCRETE SLOPE PROTECTION CM 774.64 481.58 3,825.36 1,270.39 6,351.97
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 46.27 275.72 872.63 298.66 1,493.28

510 DISMANTLING OF STRUCTURES AND CM 98.33 884.71 0.00 245.76 1,228.80


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 147.65 103.71 140.90 98.07 490.33

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 189.00 132.75 180.35 125.53 627.63

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 573.30 275.80 1,379.01
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 716.63 344.75 1,723.77
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 324.72 213.66 1,068.28
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 405.90 267.07 1,335.35
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 131 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 356.58 1,157.76 5,581.87 1,774.05 8,870.25
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 980.99 782.78 5,572.13 1,833.97 9,169.87
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 26.00 66.38 584.07 169.11 845.56
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 8.56 0.00 34.56 10.78 53.90

604a METAL GUARD RAIL M 65.55 55.31 2,583.90 676.19 3,380.95

604b METAL GUARD RAIL END PIECES EACH 85.83 533.21 2,901.46 880.13 4,400.64

604d STEEL POST FOR METAL GUARD RAIL EACH 98.32 533.21 2,531.57 790.78 3,953.88

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,731.23 1,160.70 12,489.09 3,845.25 19,226.27
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,731.23 801.50 11,650.17 3,545.73 17,728.63
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 225.27 393.19 8,621.81 2,310.06 11,550.32

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 68.75 589.78 10,387.31 2,761.46 13,807.30

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 225.27 844.19 18,627.44 4,924.22 24,621.12

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 722.90 921.65 34,311.16 8,988.93 44,944.64

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 144.58 223.78 16,024.82 4,098.30 20,491.48

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 287.48 0.00 2,293.20 645.17 3,225.85

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 287.48 0.00 3,439.80 931.82 4,659.10

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 25.77 8.64 43.22


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 60.10 16.14 80.69


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 34.38 10.80 53.99


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 80.16 21.15 105.76


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 78.62 29.98 248.98 89.40 446.98
PAINT FOR 4.0 M ARROWS

Page 132 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49B NAUSHAHRO FEROZE

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 78.62 52.71 757.33 222.17 1,110.83
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 35.97 11.74 58.72
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 103.74 30.11 150.54
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 47.95 14.74 73.71
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 138.32 38.75 193.77
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 78.62 29.98 347.26 113.97 569.83
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 78.62 52.71 1,308.11 359.86 1,799.31
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 65.12 29.98 165.98 65.27 326.36
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 65.12 52.71 505.65 155.87 779.35
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 65.12 29.98 231.50 81.65 408.26
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 65.12 52.71 873.39 247.81 1,239.03
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 175.35 73.98 369.88
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 206.55 81.78 408.88
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 97.60 182.71 378.79 164.78 823.89

610c KILOMETER POST EACH 618.74 1,321.13 1,889.63 957.38 4,786.88

610d TEN KILOMETER POST EACH 1,192.48 2,642.27 3,585.16 1,854.98 9,274.90

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 127.00 66.38 1,318.00 377.84 1,889.22
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 113.83 821.01 3.00 234.46 1,172.30
INCLUDING MAINTENANCE FOR 2 YEARS

Page 133 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

NAWABSHAH
(49)

SAMPAK INTERNATIONAL

Page 134 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.68 15.76 0.00 4.11 20.54

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 6.96 262.58 1.88 67.85 339.27

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 19.67 635.47 4.22 164.84 824.20

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 78.66 2,541.89 16.89 659.36 3,296.80

103 STRIPPING CM 2.47 153.65 0.00 39.03 195.14

104 COMPACTION OF NATURAL GROUND SM 0.35 14.95 2.70 4.50 22.51

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.77 227.95 0.00 58.18 290.90

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 16.81 541.85 0.00 139.67 698.33
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 11.33 422.98 0.00 108.58 542.90

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.90 205.65 0.00 52.39 261.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.68 492.05 0.00 127.93 639.66

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.61 422.98 0.00 108.15 540.74

107a STRUCTURAL EXCAVATION IN COMMON CM 7.77 221.54 0.00 57.33 286.64


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 65.55 664.63 73.44 200.90 1,004.52


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 109.36 400.09 125.00 158.61 793.06
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 98.42 442.22 0.00 135.16 675.80
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 56.24 316.49 0.00 93.18 465.91
MATERIAL

107d GRANULAR BACKFILL CM 33.12 193.34 1,031.07 314.38 1,571.91

107e COMMON BACKFILL CM 27.04 110.10 18.00 38.78 193.92

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.05 234.11 18.00 64.79 323.96
EXCAVATION IN COMMON MATERIAL

Page 135 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.89 578.46 144.73 185.77 928.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.92 637.82 8.55 165.32 826.61
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 13.26 574.85 8.00 149.03 745.13
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 7.94 119.41 152.97 70.08 350.40
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.21 121.79 18.00 36.50 182.50


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 14.32 277.82 10.70 75.71 378.55


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.41 43.86 5.15 12.60 63.02

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.02 30.11 2.73 8.46 42.32
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.03 190.72 355.83 139.14 695.72

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.83 23.59 2.80 6.81 34.03

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.28 26.79 2.80 7.72 38.58

201 GRANULAR SUB-BASE CM 8.14 231.80 1,029.05 317.25 1,586.23

202 AGGREGATE BASE CM 9.69 282.85 1,231.25 380.95 1,904.73

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 76.55 2,324.40 9,364.40 2,941.34 14,706.68

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 76.55 2,324.40 9,734.04 3,033.75 15,168.74

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,355.59 2,966.44 14,832.19
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,743.97 3,063.53 15,317.66
(CLASS B)

204b CEMENT STABILIZED BASE CM 29.16 780.07 1,427.87 559.27 2,796.37

204c CEMENT CONTENT TON 100.00 0.00 6,405.00 1,626.25 8,131.25

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,771.74 16,020.64 80,103.21
MC-250

Page 136 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 61,771.74 16,020.64 80,103.21
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 87.24 188.22 1,097.49 343.24 1,716.18
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 150.58 3,721.78 7,735.06 2,901.85 14,509.27
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 95.76 207.88 1,125.74 357.35 1,786.73
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.69 64.78 27.63 23.53 117.63

207b DEEP PATCHING (15-30 cm) SM 1.69 64.78 27.63 23.53 117.63

208 REINSTATEMENT OF ROAD SURFACE SM 1.84 104.50 1.98 27.08 135.40

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.84 373.82 12.00 97.67 488.33
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.97 40.20 2.40 10.89 54.46

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.31 2.36 69.49 18.04 90.20
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.30 2.36 60.60 15.82 79.08
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 27.91 7.22 36.12
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 24.23 6.30 31.52
COAT.

304a SINGLE SURFACE TREATMENT SM 0.82 11.24 149.90 40.49 202.45

304b DOUBLE SURFACE TREATMENT SM 1.20 21.60 284.40 76.80 383.99

304c TRIPLE SURFACE TREATMENT SM 2.02 30.32 330.78 90.78 453.90

304d SEAL COAT SM 0.76 6.38 35.65 10.70 53.49

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,293.29 10,071.15 3,108.25 15,541.27
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,198.28 10,627.73 3,223.65 16,118.23
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 164.80 513.14 7,339.23 2,004.29 10,021.46

307b OPEN GRADED HOT BIT-MAC CM 164.80 513.14 7,038.41 1,929.09 9,645.43

Page 137 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 28.87 1,050.92 3,603.18 1,170.74 5,853.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 218.74 1,746.20 61,771.74 15,934.17 79,670.86

309a COLD MILLING, 0-30 mm SM 1.00 52.01 18.43 17.86 89.30

309b COLD MILLING, 0-50 mm SM 1.67 86.68 30.72 29.77 148.84

309c COLD MILLING, 0-70 mm SM 2.50 130.02 46.08 44.65 223.25

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 537.80 2,175.42 3,717.56 1,607.70 8,038.48

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 537.80 2,175.42 4,326.48 1,759.92 8,799.62

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 537.80 2,175.42 4,643.12 1,839.08 9,195.42

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 537.80 2,175.42 3,877.49 1,647.68 8,238.39

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 537.80 2,175.42 4,486.29 1,799.88 8,999.39

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 537.80 2,175.42 4,802.81 1,879.01 9,395.05

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 537.80 2,175.42 4,152.77 1,716.50 8,582.50

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 537.80 2,175.42 4,761.57 1,868.70 9,343.50

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 537.80 2,175.42 5,054.23 1,941.86 9,709.32

401b CONCRETE CLASS B CM 686.07 1,109.69 3,236.30 1,258.01 6,290.06

401ci CONCRETE CLASS C (UNDERGROUND) CM 519.08 2,175.42 3,522.48 1,554.25 7,771.23

401cii CONCRETE CLASS C (ON GROUND) CM 519.08 2,175.42 4,131.28 1,706.45 8,532.23

401ciii CONCRETE CLASS C (ELEVATED) CM 519.08 2,175.42 4,447.92 1,785.61 8,928.03

401d CONCRETE CLASS D1 CM 835.60 2,689.24 6,061.75 2,396.65 11,983.24

401e CONCRETE CLASS Y CM 1,157.50 703.81 4,878.84 1,685.04 8,425.19

401f LEAN CONCRETE CM 419.89 759.81 2,806.18 996.47 4,982.35

401gi PRECAST CONCRETE, CLASS A1 CM 1,711.07 1,470.83 4,313.19 1,873.77 9,368.85

401gii PRECAST CONCRETE CLASS A3 CM 1,711.07 1,470.83 4,761.03 1,985.73 9,928.66

401giii PRECAST CONCRETE, CLASS B CM 1,711.07 1,470.83 3,879.21 1,765.28 8,826.38

401giv PRECAST CONCRETE CLASS D1 CM 1,711.07 1,470.83 6,069.02 2,312.73 11,563.64

Page 138 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,711.07 1,470.83 6,666.80 2,462.17 12,310.86

401gvi PRECAST CONCRETE CLASS D3 CM 1,711.07 1,470.83 7,266.08 2,612.00 13,059.98

401h PLUM CONCRETE CM 752.73 1,109.69 2,625.92 1,122.09 5,610.43

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 71,425.73 18,269.34 91,346.68
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 74,575.73 19,056.84 95,284.18
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,324.94 3,667.20 86,189.40 22,795.39 113,976.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,585.86 40,307.37 201,536.85
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 112.96 0.00 1,413.19 381.54 1,907.68
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 112.96 0.00 829.67 235.66 1,178.28
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 9.41 18.40 138.65 41.61 208.07

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 391.60 0.00 83,791.46 21,045.77 105,228.83
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 404.10 0.00 131,235.48 32,909.90 164,549.48
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 441.60 0.00 1,116,940.03 279,345.41 1,396,727.04
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 391.60 0.00 71,627.74 18,004.84 90,024.18
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 97.50 0.00 447.87 136.34 681.71

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 40.83 0.00 250.89 72.93 364.66

Page 139 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 19.16 48.58 148.68 54.11 270.53

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 258.21 3,155.77 466.33 970.08 4,850.39
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 392.48 4,796.77 627.57 1,454.21 7,271.04
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 392.48 7,330.09 777.12 2,124.92 10,624.62
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 654.13 12,216.82 1,104.23 3,493.80 17,468.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 545.11 10,180.69 967.93 2,923.43 14,617.16
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 981.20 18,325.24 1,513.11 5,204.89 26,024.43
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 21,124.26 86,125.76 126,163.28 58,353.33 291,766.63

407i PILE LOAD TEST UPTO 240 TON EACH 21,124.26 86,125.76 268,320.72 93,892.69 469,463.43

407j PILE LOAD TEST UPTO 360 TON EACH 57,124.26 95,444.48 368,123.12 130,172.97 650,864.83

407k PILE LOAD TEST UPTO 550 TON EACH 84,124.26 119,305.60 588,698.90 198,032.19 990,160.95

407l PILE LOAD TEST UPTO 800 TON EACH 124,498.92 143,166.72 952,758.70 305,106.09 1,525,530.43

407m CONFIRMATORY BORING (NX SIZE) M 179.16 2,639.89 22.50 710.39 3,551.94

407n PERMANENT PILE CASING FOR PILES Ton 234.70 3,993.41 85,275.46 22,375.89 111,879.46

410 BRICK WORK CM 328.50 453.06 3,082.06 965.91 4,829.53

411a STONE MASONRY RANDOM DRY CM 345.00 165.94 1,322.99 458.48 2,292.41

411b STONE MASONRY RANDOM WITH MORTAR CM 407.50 263.54 2,364.79 758.96 3,794.78

411c STONE MASONRY DRESSED UNCOURSED DRY CM 472.50 165.94 1,869.63 627.01 3,135.07

411d STONE MASONRY DRESSED UNCOURSED WITH CM 537.50 263.54 2,826.47 906.88 4,534.39
MORTAR

411g ROLL POINTING SM 70.25 19.52 95.84 46.40 232.01

412a STONE MASONARY DRESSED COURSED WITH CM 705.00 419.50 2,826.47 987.74 4,938.70
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 554.74 1,409.40 544.63 2,723.13
DIA 310 mm
Page 140 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 616.97 1,655.67 621.75 3,108.76
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 205.41 1,097.40 2,058.68 840.37 4,201.86
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.01 1,377.91 2,705.10 1,074.25 5,371.27
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 249.42 1,772.89 5,575.70 1,899.50 9,497.51
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 311.73 2,187.37 8,986.03 2,871.28 14,356.41
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 403.41 2,171.36 12,916.93 3,872.93 19,364.63
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 473.79 2,636.66 18,601.05 5,427.87 27,139.36
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 563.17 3,076.10 29,285.90 8,231.29 41,156.46
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.37 554.74 2,268.89 759.50 3,797.49
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 208.12 616.97 2,584.85 852.49 4,262.43
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 205.41 1,097.40 3,150.47 1,113.32 5,566.60
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.01 1,377.91 4,215.02 1,451.73 7,258.67
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 249.42 1,772.89 7,852.19 2,468.62 12,343.12
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 311.73 2,187.37 15,014.08 4,378.30 21,891.48
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 403.41 2,171.36 16,583.32 4,789.52 23,947.62
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 473.79 2,636.66 20,136.92 5,811.84 29,059.20
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 563.17 3,076.10 31,969.60 8,902.22 44,511.09
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 85.41 157.23 1,033.46 319.03 1,595.14
PIPE CULVERT

Page 141 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 775.89 845.94 3,304.07 1,231.48 6,157.38
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.49 0.00 117.81 30.82 154.12

507b ROCK FILL IN GABIONS CM 90.41 0.00 946.03 259.11 1,295.55

508a BRICK PAVING (SINGLE COURSE) SM 108.04 38.19 242.21 97.11 485.55

508b BRICK PAVING (DOUBLE COURSE) SM 193.04 38.19 476.12 176.84 884.19

509a RIPRAP, CLASS A CM 470.10 0.00 1,013.60 370.92 1,854.62

509b RIPRAP, CLASS B CM 348.08 180.10 1,005.49 383.42 1,917.09

509c RIPRAP, CLASS C CM 341.73 187.60 1,218.16 436.87 2,184.37

509c1 RIPRAP, CLASS D CM 341.73 225.12 1,274.79 460.41 2,302.05

509d GROUTED RIPRAP, CLASS A CM 574.58 170.59 2,786.37 882.88 4,414.42

509e GROUTED RIPRAP, CLASS B CM 449.66 316.57 2,597.72 840.99 4,204.94

509f GROUTED RIPRAP, CLASS C CM 433.05 301.33 2,802.48 884.21 4,421.07

509f1 GROUTED RIPRAP, CLASS D CM 433.05 338.85 3,030.16 950.51 4,752.57

509g REINFORCED CONCRETE SLOPE PROTECTION CM 774.64 481.58 3,653.37 1,227.40 6,136.98
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 46.27 275.72 1,033.50 338.87 1,694.36

510 DISMANTLING OF STRUCTURES AND CM 98.33 884.71 0.00 245.76 1,228.80


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 147.65 103.71 164.71 104.02 520.09

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 189.00 132.75 210.83 133.14 665.72

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 589.63 279.88 1,399.42
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 737.03 349.86 1,749.28
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 336.08 216.50 1,082.49
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 420.10 270.62 1,353.11
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 142 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 356.58 1,157.76 5,479.48 1,748.45 8,742.27
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 980.99 782.78 5,472.41 1,809.04 9,045.22
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 26.00 66.38 574.41 166.69 833.47
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 8.56 0.00 34.56 10.78 53.90

604a METAL GUARD RAIL M 65.55 55.31 2,600.42 680.32 3,401.61

604b METAL GUARD RAIL END PIECES EACH 85.83 533.21 2,919.35 884.60 4,423.00

604d STEEL POST FOR METAL GUARD RAIL EACH 98.32 533.21 2,548.20 794.93 3,974.67

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,731.23 1,160.70 12,328.91 3,805.21 19,026.05
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,731.23 801.50 11,492.29 3,506.26 17,531.28
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 225.27 393.19 8,595.71 2,303.54 11,517.70

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 68.75 589.78 10,348.17 2,751.67 13,758.37

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 225.27 844.19 18,566.50 4,908.99 24,544.94

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 722.90 921.65 34,219.75 8,966.07 44,830.37

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 144.58 223.78 16,006.54 4,093.72 20,468.62

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 287.48 0.00 2,293.20 645.17 3,225.85

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 287.48 0.00 3,439.80 931.82 4,659.10

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 25.77 8.64 43.22


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 60.10 16.14 80.69


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 34.38 10.80 53.99


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 80.16 21.15 105.76


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 78.62 29.98 248.98 89.40 446.98
PAINT FOR 4.0 M ARROWS

Page 143 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 49 NAWABSHAH

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 78.62 52.71 757.33 222.17 1,110.83
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 35.97 11.74 58.72
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 103.74 30.11 150.54
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 47.95 14.74 73.71
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 138.32 38.75 193.77
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 78.62 29.98 347.26 113.97 569.83
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 78.62 52.71 1,308.11 359.86 1,799.31
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 65.12 29.98 165.98 65.27 326.36
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 65.12 52.71 505.65 155.87 779.35
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 65.12 29.98 231.50 81.65 408.26
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 65.12 52.71 873.39 247.81 1,239.03
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 175.03 73.90 369.48
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 206.23 81.70 408.48
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 97.60 182.71 368.99 162.33 811.63

610c KILOMETER POST EACH 618.74 1,321.13 1,862.72 950.65 4,753.24

610d TEN KILOMETER POST EACH 1,192.48 2,642.27 3,544.08 1,844.71 9,223.54

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 127.00 66.38 1,342.35 383.93 1,919.66
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 113.83 821.01 3.00 234.46 1,172.30
INCLUDING MAINTENANCE FOR 2 YEARS

Page 144 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

QAMBAR
(53B)

SAMPAK INTERNATIONAL

Page 145 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.81 15.76 0.00 4.14 20.71

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 8.19 262.58 1.88 68.16 340.81

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 23.33 635.47 4.22 165.76 828.79

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.34 2,541.89 16.89 663.03 3,315.14

103 STRIPPING CM 2.87 153.65 0.00 39.13 195.64

104 COMPACTION OF NATURAL GROUND SM 0.41 14.95 2.70 4.52 22.58

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.32 227.95 0.00 58.32 291.59

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 127.59 360.08 125.00 153.17 765.85

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 19.36 541.85 0.00 140.30 701.52
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.98 422.98 0.00 108.99 544.96

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.36 205.65 0.00 52.50 262.50

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 127.59 360.08 125.00 153.17 765.85

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 22.44 492.05 0.00 128.62 643.11

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.06 422.98 0.00 108.51 542.56

107a STRUCTURAL EXCAVATION IN COMMON CM 8.75 221.54 0.00 57.57 287.86


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 75.12 664.63 73.44 203.30 1,016.48


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 124.68 400.09 125.00 162.44 812.22
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 112.21 442.22 0.00 138.61 693.04
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 64.12 316.49 0.00 95.15 475.76
MATERIAL

107d GRANULAR BACKFILL CM 38.63 193.34 879.41 277.84 1,389.22

107e COMMON BACKFILL CM 32.07 110.10 18.00 40.04 200.21

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.04 234.11 18.00 65.04 325.19
EXCAVATION IN COMMON MATERIAL

Page 146 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 22.93 578.46 144.73 186.53 932.66
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.20 637.82 8.55 165.89 829.47
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 15.29 574.85 8.00 149.53 747.67
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 9.13 119.41 152.97 70.38 351.89
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 7.11 121.79 18.00 36.72 183.62


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 16.59 277.82 10.70 76.28 381.39


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.61 43.86 5.15 12.65 63.27

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.17 30.11 2.73 8.50 42.51
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 11.57 190.72 310.76 128.26 641.31

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.96 23.59 2.80 6.84 34.19

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.47 26.79 2.80 7.76 38.82

201 GRANULAR SUB-BASE CM 9.33 231.80 844.24 271.34 1,356.72

202 AGGREGATE BASE CM 11.03 282.85 1,060.07 338.49 1,692.44

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 90.09 2,324.40 9,201.35 2,903.96 14,519.80

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 90.09 2,324.40 9,578.54 2,998.26 14,991.29

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 96.87 2,427.71 9,192.54 2,929.28 14,646.40
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 96.87 2,427.71 9,588.61 3,028.30 15,141.48
(CLASS B)

204b CEMENT STABILIZED BASE CM 33.46 780.07 1,223.16 509.17 2,545.85

204c CEMENT CONTENT TON 122.52 0.00 7,701.54 1,956.02 9,780.08

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 285.77 2,060.49 62,275.05 16,155.33 80,776.64
MC-250

Page 147 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 285.77 2,060.49 62,275.05 16,155.33 80,776.64
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.17 188.22 919.32 303.18 1,515.89
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 175.53 3,721.78 7,580.48 2,869.45 14,347.23
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 115.71 207.88 610.71 233.58 1,167.88
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.94 64.78 24.81 22.88 114.41

207b DEEP PATCHING (15-30 cm) SM 1.94 64.78 24.81 22.88 114.41

208 REINSTATEMENT OF ROAD SURFACE SM 2.10 104.50 1.98 27.15 135.73

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.44 373.82 12.00 97.82 489.08
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.09 40.20 2.40 10.92 54.61

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.36 2.36 69.99 18.18 90.89
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.34 2.36 61.10 15.95 79.76
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.14 0.86 28.11 7.28 36.39
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.14 0.86 24.43 6.36 31.79
COAT.

304a SINGLE SURFACE TREATMENT SM 0.93 11.24 149.98 40.54 202.69

304b DOUBLE SURFACE TREATMENT SM 1.36 21.60 283.54 76.63 383.13

304c TRIPLE SURFACE TREATMENT SM 2.29 30.32 329.77 90.60 452.98

304d SEAL COAT SM 0.86 6.38 35.54 10.69 53.47

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 80.32 2,293.29 9,914.53 3,072.03 15,360.17
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 80.32 2,198.28 10,479.72 3,189.58 15,947.89
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 194.52 513.14 7,219.88 1,981.88 9,909.41

307b OPEN GRADED HOT BIT-MAC CM 194.52 513.14 6,916.59 1,906.06 9,530.30

Page 148 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 33.90 1,050.92 3,603.18 1,172.00 5,860.00
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 250.66 1,746.20 62,275.05 16,067.98 80,339.90

309a COLD MILLING, 0-30 mm SM 1.15 52.01 18.43 17.90 89.48

309b COLD MILLING, 0-50 mm SM 1.91 86.68 30.72 29.83 149.14

309c COLD MILLING, 0-70 mm SM 2.86 130.02 46.08 44.74 223.71

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 614.99 2,175.42 4,081.90 1,718.08 8,590.38

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 614.99 2,175.42 4,690.79 1,870.30 9,351.50

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 614.99 2,175.42 5,007.43 1,949.46 9,747.30

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 614.99 2,175.42 4,274.90 1,766.33 8,831.63

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 614.99 2,175.42 4,883.70 1,918.53 9,592.63

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 614.99 2,175.42 5,200.24 1,997.66 9,988.31

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 614.99 2,175.42 4,545.90 1,834.08 9,170.39

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 614.99 2,175.42 5,154.70 1,986.28 9,931.39

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 614.99 2,175.42 5,451.30 2,060.43 10,302.14

401b CONCRETE CLASS B CM 790.19 1,109.69 3,439.85 1,334.93 6,674.67

401ci CONCRETE CLASS C (UNDERGROUND) CM 598.94 2,175.42 3,820.78 1,648.79 8,243.93

401cii CONCRETE CLASS C (ON GROUND) CM 598.94 2,175.42 4,429.58 1,800.99 9,004.93

401ciii CONCRETE CLASS C (ELEVATED) CM 598.94 2,175.42 4,746.22 1,880.15 9,400.73

401d CONCRETE CLASS D1 CM 955.38 2,689.24 6,692.12 2,584.19 12,920.93

401e CONCRETE CLASS Y CM 1,327.32 703.81 5,304.55 1,833.92 9,169.60

401f LEAN CONCRETE CM 495.39 759.81 2,912.96 1,042.04 5,210.20

401gi PRECAST CONCRETE, CLASS A1 CM 1,988.65 1,470.83 4,668.96 2,032.11 10,160.55

401gii PRECAST CONCRETE CLASS A3 CM 1,988.65 1,470.83 5,161.61 2,155.27 10,776.37

401giii PRECAST CONCRETE, CLASS B CM 1,988.65 1,470.83 4,078.99 1,884.62 9,423.10

401giv PRECAST CONCRETE CLASS D1 CM 1,988.65 1,470.83 6,699.04 2,539.63 12,698.16

Page 149 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,988.65 1,470.83 7,433.54 2,723.26 13,616.28

401gvi PRECAST CONCRETE CLASS D3 CM 1,988.65 1,470.83 8,169.27 2,907.19 14,535.95

401h PLUM CONCRETE CM 871.87 1,109.69 2,716.34 1,174.48 5,872.38

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,880.79 0.00 71,943.84 18,456.16 92,280.79
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,880.79 0.00 75,093.84 19,243.66 96,218.29
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,508.66 3,667.20 86,189.40 22,841.32 114,206.58
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,925.66 12,010.50 146,736.16 40,418.08 202,090.39
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 68.10 796.91 0.00 216.25 1,081.26

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 130.58 0.00 1,413.74 386.08 1,930.39
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 130.58 0.00 830.22 240.20 1,200.99
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.80 18.40 138.65 41.96 209.81

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 446.52 0.00 83,791.46 21,059.50 105,297.48
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 461.84 0.00 131,235.48 32,924.33 164,621.64
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 507.78 0.00 1,116,940.03 279,361.95 1,396,809.76
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 446.52 0.00 71,627.74 18,018.57 90,092.83
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 112.90 0.00 447.87 140.19 700.95

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.40 1.98
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 46.51 0.00 251.39 74.47 372.37

Page 150 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 22.21 48.58 148.68 54.87 274.33

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 287.50 3,155.77 466.33 977.40 4,887.01
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 437.00 4,796.77 627.57 1,465.34 7,326.69
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 437.00 7,330.09 777.12 2,136.05 10,680.27
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 728.34 12,216.82 1,104.23 3,512.35 17,561.74
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 606.95 10,180.69 967.93 2,938.89 14,694.46
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,092.51 18,325.24 1,513.11 5,232.71 26,163.57
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,524.96 86,125.76 118,229.20 57,469.98 287,349.90

407i PILE LOAD TEST UPTO 240 TON EACH 25,524.96 86,125.76 252,452.56 91,025.82 455,129.10

407j PILE LOAD TEST UPTO 360 TON EACH 69,632.16 95,444.48 344,320.88 127,349.38 636,746.90

407k PILE LOAD TEST UPTO 550 TON EACH 102,712.56 119,305.60 549,930.10 192,987.07 964,935.33

407l PILE LOAD TEST UPTO 800 TON EACH 152,022.72 143,166.72 890,548.30 296,434.44 1,482,172.18

407m CONFIRMATORY BORING (NX SIZE) M 207.62 2,639.89 22.50 717.50 3,587.51

407n PERMANENT PILE CASING FOR PILES Ton 272.19 3,993.41 85,275.46 22,385.26 111,926.31

410 BRICK WORK CM 379.15 453.06 3,389.04 1,055.31 5,276.56

411a STONE MASONRY RANDOM DRY CM 399.30 165.94 761.72 331.74 1,658.70

411b STONE MASONRY RANDOM WITH MORTAR CM 473.31 263.54 1,910.92 661.94 3,309.71

411c STONE MASONRY DRESSED UNCOURSED DRY CM 547.82 165.94 1,263.45 494.30 2,471.50

411d STONE MASONRY DRESSED UNCOURSED WITH CM 622.32 263.54 2,328.63 803.62 4,018.12
MORTAR

411g ROLL POINTING SM 80.79 19.52 98.86 49.79 248.97

412a STONE MASONARY DRESSED COURSED WITH CM 819.84 419.50 2,328.63 891.99 4,459.96
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 255.88 554.74 1,452.07 565.67 2,828.36
DIA 310 mm
Page 151 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 255.88 616.97 1,724.04 649.22 3,246.11
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 243.06 1,097.40 2,158.29 874.69 4,373.44
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 254.38 1,377.91 2,867.78 1,125.02 5,625.09
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 295.81 1,772.89 5,894.49 1,990.80 9,953.99
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 368.15 2,187.37 9,460.47 3,004.00 15,019.99
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 476.43 2,171.36 13,392.70 4,010.12 20,050.61
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 560.66 2,636.66 19,099.81 5,574.28 27,871.41
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 664.73 3,076.10 31,174.39 8,728.80 43,644.02
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 255.88 554.74 2,311.56 780.54 3,902.72
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 248.93 616.97 2,653.22 879.78 4,398.90
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 243.06 1,097.40 3,250.07 1,147.63 5,738.17
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 254.38 1,377.91 4,377.70 1,502.50 7,512.49
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 295.81 1,772.89 8,170.97 2,559.92 12,799.59
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 368.15 2,187.37 15,488.52 4,511.01 22,555.05
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 476.43 2,171.36 17,059.09 4,926.72 24,633.60
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 560.66 2,636.66 20,635.68 5,958.25 29,791.24
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 664.73 3,076.10 33,858.09 9,399.73 46,998.64
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 101.37 157.23 879.55 284.54 1,422.70
PIPE CULVERT

Page 152 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 893.80 845.94 3,521.35 1,315.27 6,576.36
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 6.29 0.00 117.81 31.02 155.12

507b ROCK FILL IN GABIONS CM 108.45 0.00 787.97 224.10 1,120.52

508a BRICK PAVING (SINGLE COURSE) SM 125.98 38.19 260.30 106.12 530.59

508b BRICK PAVING (DOUBLE COURSE) SM 224.99 38.19 513.21 194.10 970.48

509a RIPRAP, CLASS A CM 545.72 0.00 452.33 249.51 1,247.56

509b RIPRAP, CLASS B CM 398.17 180.10 448.71 256.74 1,283.71

509c RIPRAP, CLASS C CM 389.97 187.60 656.89 308.62 1,543.08

509c1 RIPRAP, CLASS D CM 389.97 225.12 713.51 332.15 1,660.76

509d GROUTED RIPRAP, CLASS A CM 667.52 170.59 2,332.36 792.62 3,963.08

509e GROUTED RIPRAP, CLASS B CM 515.60 316.57 2,136.65 742.20 3,711.02

509f GROUTED RIPRAP, CLASS C CM 496.00 301.33 2,351.19 787.13 3,935.65

509f1 GROUTED RIPRAP, CLASS D CM 496.00 338.85 2,589.88 856.18 4,280.91

509g REINFORCED CONCRETE SLOPE PROTECTION CM 906.35 481.58 4,010.91 1,349.71 6,748.55
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 55.22 275.72 882.15 303.27 1,516.35

510 DISMANTLING OF STRUCTURES AND CM 113.82 884.71 0.00 249.63 1,248.16


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 171.91 103.71 73.50 87.28 436.40

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 220.04 132.75 94.08 111.72 558.59

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 279.64 288.91 527.30 273.96 1,369.82
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 349.55 361.14 659.13 342.46 1,712.28
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 279.64 288.91 276.30 211.22 1,056.08
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 349.55 361.14 345.38 264.02 1,320.09
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 153 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 407.42 1,157.76 5,695.44 1,815.15 9,075.77
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,138.48 782.78 5,683.82 1,901.27 9,506.34
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 30.26 66.38 617.07 178.42 892.12
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 10.03 0.00 38.40 12.11 60.53

604a METAL GUARD RAIL M 75.88 55.31 2,600.42 682.90 3,414.52

604b METAL GUARD RAIL END PIECES EACH 99.94 533.21 2,919.35 888.12 4,440.62

604d STEEL POST FOR METAL GUARD RAIL EACH 113.81 533.21 2,548.20 798.81 3,994.03

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,049.10 1,160.70 12,693.16 3,975.74 19,878.69
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,049.10 801.50 11,850.37 3,675.24 18,376.21
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 263.22 393.19 8,644.74 2,325.29 11,626.43

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 80.38 589.78 10,421.71 2,772.97 13,864.83

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 263.22 844.19 18,695.03 4,950.61 24,753.05

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 861.40 921.65 34,412.55 9,048.90 45,244.51

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 172.28 223.78 16,045.10 4,110.29 20,551.45

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 325.14 0.00 2,293.20 654.59 3,272.93

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 325.14 0.00 3,439.80 941.24 4,706.18

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.30 6.00 25.77 8.76 43.82


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.10 3.51 60.10 16.18 80.89


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.30 6.00 34.38 10.92 54.59


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.10 3.51 80.16 21.19 105.96


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 88.96 29.98 248.98 91.98 459.89
PAINT FOR 4.0 M ARROWS

Page 154 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 53B QAMBAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 88.96 52.71 757.33 224.75 1,123.75
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.12 7.50 35.97 11.90 59.48
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.12 13.18 103.74 30.26 151.30
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.12 7.50 47.95 14.89 74.46
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.12 13.18 138.32 38.90 194.52
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 88.96 29.98 347.26 116.55 582.74
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 88.96 52.71 1,308.11 362.45 1,812.23
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 73.96 29.98 165.98 67.48 337.40
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 73.96 52.71 505.65 158.08 790.40
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 73.96 29.98 231.50 83.86 419.30
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 73.96 52.71 873.39 250.02 1,250.08
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.84 111.18 175.59 74.40 372.02
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.84 111.18 206.79 82.20 411.02
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 116.82 182.71 392.15 172.92 864.60

610c KILOMETER POST EACH 722.86 1,321.13 1,933.46 994.37 4,971.83

610d TEN KILOMETER POST EACH 1,395.73 2,642.27 3,655.31 1,923.33 9,616.64

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 149.33 66.38 1,327.74 385.86 1,929.31
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 132.60 821.01 3.00 239.15 1,195.76
INCLUDING MAINTENANCE FOR 2 YEARS

Page 155 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

SANGHAR
(59)

SAMPAK INTERNATIONAL

Page 156 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.75 15.76 0.00 4.13 20.63

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.63 262.58 1.88 68.02 340.10

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 21.66 635.47 4.22 165.34 826.70

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 86.66 2,541.89 16.89 661.36 3,306.79

103 STRIPPING CM 2.68 153.65 0.00 39.08 195.41

104 COMPACTION OF NATURAL GROUND SM 0.38 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.05 227.95 0.00 58.25 291.25

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.16 541.85 0.00 140.00 700.02
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.20 422.98 0.00 108.80 543.98

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.13 205.65 0.00 52.44 262.22

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.13 492.05 0.00 128.29 641.47

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.38 422.98 0.00 108.34 541.70

107a STRUCTURAL EXCAVATION IN COMMON CM 8.27 221.54 0.00 57.45 287.27


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.59 664.63 72.74 201.99 1,009.95


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 117.37 400.09 125.00 160.62 803.08
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 105.63 442.22 0.00 136.96 684.81
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 60.36 316.49 0.00 94.21 471.06
MATERIAL

107d GRANULAR BACKFILL CM 36.08 193.34 886.05 278.87 1,394.33

107e COMMON BACKFILL CM 29.78 110.10 18.00 39.47 197.35

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.57 234.11 18.00 64.92 324.60
EXCAVATION IN COMMON MATERIAL

Page 157 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.50 578.46 144.73 186.17 930.87
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.13 637.82 8.55 165.63 828.13
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.34 574.85 8.00 149.30 746.48
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.57 119.41 152.97 70.24 351.19
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.68 121.79 18.00 36.62 183.09


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.53 277.82 10.70 76.01 380.06


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.10 30.11 2.73 8.48 42.42
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.84 190.72 383.05 146.15 730.77

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.90 23.59 2.80 6.82 34.11

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.38 26.79 2.80 7.74 38.70

201 GRANULAR SUB-BASE CM 8.77 231.80 1,140.70 345.32 1,726.58

202 AGGREGATE BASE CM 10.39 282.85 1,275.30 392.13 1,960.66

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 83.88 2,324.40 9,564.18 2,993.11 14,965.57

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 83.88 2,324.40 9,811.84 3,055.03 15,275.14

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,555.36 3,018.33 15,091.64
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,821.82 3,084.94 15,424.71
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.42 780.07 1,526.73 584.56 2,922.78

204c CEMENT CONTENT TON 112.52 0.00 7,287.00 1,849.88 9,249.40

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,691.87 16,005.32 80,026.58
MC-250

Page 158 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,691.87 16,005.32 80,026.58
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 97.11 188.22 1,424.43 427.44 2,137.20
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 163.96 3,721.78 7,897.55 2,945.82 14,729.11
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 106.77 207.88 1,357.79 418.11 2,090.55
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 19.42 21.51 107.53

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 19.42 21.51 107.53

208 REINSTATEMENT OF ROAD SURFACE SM 1.98 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.15 373.82 12.00 97.74 488.71
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.03 40.20 2.40 10.91 54.54

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 69.41 18.03 90.13
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 60.52 15.80 79.00
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 27.87 7.22 36.09
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.19 6.30 31.49
COAT.

304a SINGLE SURFACE TREATMENT SM 0.88 11.24 151.44 40.89 204.45

304b DOUBLE SURFACE TREATMENT SM 1.28 21.60 289.02 77.97 389.87

304c TRIPLE SURFACE TREATMENT SM 2.16 30.32 336.06 92.13 460.67

304d SEAL COAT SM 0.81 6.38 35.62 10.70 53.52

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,293.29 10,244.35 3,153.13 15,765.67
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,198.28 10,874.18 3,286.84 16,434.19
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 180.91 513.14 7,459.70 2,038.44 10,192.19

307b OPEN GRADED HOT BIT-MAC CM 180.91 513.14 7,238.25 1,983.07 9,915.37

Page 159 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 31.59 1,050.92 3,603.18 1,171.42 5,857.10
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.55 1,746.20 61,691.87 15,918.41 79,592.03

309a COLD MILLING, 0-30 mm SM 1.08 52.01 18.26 17.84 89.18

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.43 29.73 148.63

309c COLD MILLING, 0-70 mm SM 2.69 130.02 45.64 44.59 222.94

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 578.34 2,175.42 4,189.29 1,735.76 8,678.81

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 578.34 2,175.42 4,792.34 1,886.52 9,432.62

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 578.34 2,175.42 5,105.93 1,964.92 9,824.61

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 578.34 2,175.42 4,426.31 1,795.02 8,975.09

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 578.34 2,175.42 5,029.25 1,945.75 9,728.77

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 578.34 2,175.42 5,342.69 2,024.11 10,120.57

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 578.34 2,175.42 4,720.35 1,868.53 9,342.64

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 578.34 2,175.42 5,323.29 2,019.26 10,096.31

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 578.34 2,175.42 5,613.93 2,091.92 10,459.61

401b CONCRETE CLASS B CM 741.23 1,109.69 3,590.70 1,360.41 6,802.03

401ci CONCRETE CLASS C (UNDERGROUND) CM 561.48 2,175.42 3,973.01 1,677.48 8,387.39

401cii CONCRETE CLASS C (ON GROUND) CM 561.48 2,175.42 4,575.95 1,828.21 9,141.07

401ciii CONCRETE CLASS C (ELEVATED) CM 561.48 2,175.42 4,889.54 1,906.61 9,533.06

401d CONCRETE CLASS D1 CM 898.51 2,689.24 6,690.32 2,569.52 12,847.59

401e CONCRETE CLASS Y CM 1,247.02 703.81 5,328.34 1,819.79 9,098.96

401f LEAN CONCRETE CM 460.84 759.81 3,102.19 1,080.71 5,403.54

401gi PRECAST CONCRETE, CLASS A1 CM 1,859.59 1,470.83 4,764.64 2,023.76 10,118.82

401gii PRECAST CONCRETE CLASS A3 CM 1,859.59 1,470.83 5,326.45 2,164.22 10,821.08

401giii PRECAST CONCRETE, CLASS B CM 1,859.59 1,470.83 4,214.23 1,886.16 9,430.80

401giv PRECAST CONCRETE CLASS D1 CM 1,859.59 1,470.83 6,697.90 2,507.08 12,535.39

Page 160 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,859.59 1,470.83 7,372.21 2,675.66 13,378.28

401gvi PRECAST CONCRETE CLASS D3 CM 1,859.59 1,470.83 8,048.25 2,844.67 14,223.33

401h PLUM CONCRETE CM 816.24 1,109.69 2,896.47 1,205.60 6,028.00

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 71,332.45 18,275.95 91,379.73
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 74,482.45 19,063.45 95,317.23
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,420.89 3,667.20 85,370.40 22,614.62 113,073.11
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,779.19 12,010.50 145,239.17 40,007.21 200,036.07
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 64.69 796.91 0.00 215.40 1,077.00

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.33 0.00 1,400.16 380.62 1,903.12
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 122.33 0.00 822.25 236.15 1,180.73
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.14 18.40 140.05 42.15 210.74

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 420.32 0.00 82,985.78 20,851.53 104,257.63
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 434.39 0.00 129,973.61 32,602.00 163,009.99
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 476.58 0.00 1,106,200.23 276,669.20 1,383,346.01
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 420.32 0.00 70,939.01 17,839.83 89,199.16
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 105.71 0.00 443.55 137.31 686.57

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.55 0.39 1.96
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.24 0.81 4.07
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.80 0.00 248.98 73.19 365.97

Page 161 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 20.79 48.58 149.56 54.73 273.66

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 272.91 3,155.77 467.37 974.01 4,870.07
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 414.82 4,796.77 629.16 1,460.19 7,300.94
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 414.82 7,330.09 778.88 2,130.95 10,654.74
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 691.36 12,216.82 1,107.16 3,503.84 17,519.18
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 576.13 10,180.69 970.38 2,931.80 14,659.00
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,037.04 18,325.24 1,517.51 5,219.95 26,099.74
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 23,551.38 86,125.76 102,514.36 53,047.88 265,239.38

407i PILE LOAD TEST UPTO 240 TON EACH 23,551.38 86,125.76 220,869.09 82,636.56 413,182.79

407j PILE LOAD TEST UPTO 360 TON EACH 64,058.58 95,444.48 297,276.04 114,194.78 570,973.88

407k PILE LOAD TEST UPTO 550 TON EACH 94,438.98 119,305.60 473,408.80 171,788.35 858,941.73

407l PILE LOAD TEST UPTO 800 TON EACH 139,772.76 143,166.72 767,680.40 262,654.97 1,313,274.85

407m CONFIRMATORY BORING (NX SIZE) M 194.33 2,639.89 22.50 714.18 3,570.89

407n PERMANENT PILE CASING FOR PILES Ton 254.71 3,993.41 84,455.43 22,175.88 110,879.42

410 BRICK WORK CM 355.40 453.06 2,987.62 949.02 4,745.11

411a STONE MASONRY RANDOM DRY CM 373.93 165.94 1,378.55 479.60 2,398.02

411b STONE MASONRY RANDOM WITH MORTAR CM 442.69 263.54 2,552.31 814.63 4,073.17

411c STONE MASONRY DRESSED UNCOURSED DRY CM 512.70 165.94 1,765.63 611.07 3,055.33

411d STONE MASONRY DRESSED UNCOURSED WITH CM 582.71 263.54 2,840.35 921.65 4,608.24
MORTAR

411g ROLL POINTING SM 75.83 19.52 98.20 48.39 241.94

412a STONE MASONARY DRESSED COURSED WITH CM 766.48 419.50 2,840.35 1,006.58 5,032.91
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 554.74 1,415.97 551.95 2,759.74
DIA 310 mm
Page 162 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 616.97 1,663.89 629.49 3,147.43
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 225.88 1,097.40 2,068.26 847.89 4,239.43
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 236.03 1,377.91 2,717.53 1,082.87 5,414.33
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 274.68 1,772.89 5,593.41 1,910.25 9,551.23
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 342.35 2,187.37 9,009.39 2,884.78 14,423.88
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 443.04 2,171.36 12,941.17 3,888.89 19,444.46
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 521.01 2,636.66 18,628.84 5,446.63 27,233.13
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 618.26 3,076.10 29,345.56 8,259.98 41,299.90
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.08 554.74 2,275.46 766.82 3,834.10
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 230.48 616.97 2,593.07 860.13 4,300.66
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 225.88 1,097.40 3,160.05 1,120.83 5,604.17
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 236.03 1,377.91 4,227.45 1,460.35 7,301.73
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 274.68 1,772.89 7,869.90 2,479.37 12,396.84
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 342.35 2,187.37 15,037.44 4,391.79 21,958.95
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 443.04 2,171.36 16,607.56 4,805.49 24,027.45
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 521.01 2,636.66 20,164.71 5,830.59 29,152.97
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 618.26 3,076.10 32,029.26 8,930.91 44,654.53
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 94.11 157.23 904.87 289.05 1,445.27
PIPE CULVERT

Page 163 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 838.37 845.94 3,667.82 1,338.03 6,690.16
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.40 30.83 154.13

507b ROCK FILL IN GABIONS CM 100.31 0.00 1,000.66 275.24 1,376.22

508a BRICK PAVING (SINGLE COURSE) SM 117.67 38.19 217.81 93.42 467.08

508b BRICK PAVING (DOUBLE COURSE) SM 210.18 38.19 429.93 169.58 847.88

509a RIPRAP, CLASS A CM 510.52 0.00 1,072.14 395.66 1,978.32

509b RIPRAP, CLASS B CM 374.40 180.10 1,109.69 416.05 2,080.24

509c RIPRAP, CLASS C CM 367.01 187.60 1,165.14 429.94 2,149.68

509c1 RIPRAP, CLASS D CM 367.01 225.12 1,211.63 450.94 2,254.69

509d GROUTED RIPRAP, CLASS A CM 624.29 170.59 2,944.90 934.94 4,674.72

509e GROUTED RIPRAP, CLASS B CM 484.42 316.57 2,791.21 898.05 4,490.25

509f GROUTED RIPRAP, CLASS C CM 466.19 301.33 2,850.80 904.58 4,522.90

509f1 GROUTED RIPRAP, CLASS D CM 466.19 338.85 3,079.96 971.25 4,856.25

509g REINFORCED CONCRETE SLOPE PROTECTION CM 845.56 481.58 4,186.74 1,378.47 6,892.35
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 51.17 275.72 883.22 302.53 1,512.63

510 DISMANTLING OF STRUCTURES AND CM 106.58 884.71 0.00 247.82 1,239.11


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 160.65 103.71 174.22 109.65 548.23

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 205.64 132.75 223.00 140.35 701.74

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 608.35 289.73 1,448.63
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 760.44 362.16 1,810.79
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 367.66 229.55 1,147.77
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 459.58 286.94 1,434.71
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 164 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 383.25 1,157.76 5,723.44 1,816.11 9,080.56
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,065.13 782.78 5,708.69 1,889.15 9,445.75
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 28.28 66.38 619.83 178.62 893.10
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.35 0.00 32.64 10.50 52.49

604a METAL GUARD RAIL M 71.05 55.31 2,571.22 674.40 3,371.98

604b METAL GUARD RAIL END PIECES EACH 93.39 533.21 2,887.95 878.64 4,393.19

604d STEEL POST FOR METAL GUARD RAIL EACH 106.57 533.21 2,516.55 789.08 3,945.41

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,904.08 1,160.70 12,742.88 3,951.91 19,759.57
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,904.08 801.50 11,907.24 3,653.21 18,266.03
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 245.67 393.19 8,589.63 2,307.12 11,535.62

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 75.01 589.78 10,363.53 2,757.08 13,785.39

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 245.67 844.19 18,487.54 4,894.35 24,471.75

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 798.58 921.65 34,040.06 8,940.08 44,700.38

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 159.72 223.78 15,838.69 4,055.55 20,277.74

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 306.96 0.00 2,271.15 644.53 3,222.64

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 306.96 0.00 3,406.73 928.42 4,642.11

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 25.52 8.65 43.24


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 59.52 16.01 80.07


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 34.05 10.78 53.90


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 79.39 20.98 104.90


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 83.97 29.98 246.58 90.13 450.67
PAINT FOR 4.0 M ARROWS

Page 165 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 59 SANGHAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 83.97 52.71 750.05 221.68 1,108.41
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 35.62 11.74 58.70
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 102.74 29.94 149.70
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 47.49 14.71 73.54
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 136.99 38.50 192.51
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 83.97 29.98 343.92 114.47 572.34
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 83.97 52.71 1,295.53 358.05 1,790.27
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 69.72 29.98 164.39 66.02 330.11
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 69.72 52.71 500.79 155.80 779.02
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 69.72 29.98 229.28 82.25 411.23
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 69.72 52.71 864.99 246.86 1,234.28
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 173.84 73.79 368.97
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 204.74 81.52 407.59
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 108.14 182.71 404.17 173.76 868.78

610c KILOMETER POST EACH 674.74 1,321.13 1,974.02 992.47 4,962.36

610d TEN KILOMETER POST EACH 1,301.97 2,642.27 3,716.95 1,915.30 9,576.48

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 139.07 66.38 1,300.40 376.46 1,882.30
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 123.89 821.01 2.06 236.74 1,183.71
INCLUDING MAINTENANCE FOR 2 YEARS

Page 166 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

SHIKARPUR
(62)

SAMPAK INTERNATIONAL

Page 167 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 610.71 210.29 1,051.47

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 168 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 279.97 120.41 602.07

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 717.99 239.64 1,198.20

202 AGGREGATE BASE CM 10.26 282.85 943.14 309.06 1,545.31

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 8,884.78 2,824.19 14,120.95

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 9,095.21 2,876.80 14,383.99

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 8,876.00 2,849.42 14,247.11
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 9,105.40 2,906.77 14,533.85
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 767.00 394.63 1,973.17

204c CEMENT CONTENT TON 125.00 0.00 6,867.00 1,748.00 8,740.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,285.18 16,153.17 80,765.84
MC-250

Page 169 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,285.18 16,153.17 80,765.84
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 538.05 207.89 1,039.45
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,247.54 2,784.48 13,922.38
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 737.61 265.42 1,327.08
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 15.96 20.64 103.21

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 15.96 20.64 103.21

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 70.00 18.17 90.87
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 61.11 15.95 79.74
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.11 7.28 36.38
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.43 6.36 31.78
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 149.16 40.32 201.58

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 280.98 75.96 379.81

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 326.68 89.78 448.91

304d SEAL COAT SM 0.80 6.38 34.65 10.46 52.29

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 9,516.81 2,971.93 14,859.64
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 10,104.20 3,095.02 15,475.12
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 6,914.77 1,904.43 9,522.13

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 6,685.03 1,846.99 9,234.95

Page 170 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,285.18 16,066.70 80,333.49

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 3,429.13 1,545.14 7,725.69

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,037.98 1,697.35 8,486.75

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 4,354.62 1,776.51 8,882.55

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 3,668.97 1,605.10 8,025.48

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,277.77 1,757.30 8,786.48

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 4,594.36 1,836.44 9,182.22

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 3,923.21 1,668.66 8,343.29

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 4,532.01 1,820.86 9,104.29

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 4,838.47 1,897.47 9,487.36

401b CONCRETE CLASS B CM 747.18 1,109.69 2,783.48 1,160.09 5,800.44

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,185.35 1,482.12 7,410.58

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 3,794.15 1,634.32 8,171.58

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,110.79 1,713.48 8,567.38

401d CONCRETE CLASS D1 CM 894.63 2,689.24 5,896.11 2,370.00 11,849.98

401e CONCRETE CLASS Y CM 1,247.78 703.81 4,566.38 1,629.49 8,147.47

401f LEAN CONCRETE CM 483.09 759.81 2,290.98 883.47 4,417.34

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,017.20 1,847.69 9,238.45

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 4,546.72 1,980.07 9,900.36

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 3,404.35 1,694.48 8,472.39

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 5,902.92 2,319.12 11,595.60

Page 171 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 6,576.00 2,487.39 12,436.95

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 7,249.69 2,655.81 13,279.07

401h PLUM CONCRETE CM 830.51 1,109.69 2,198.87 1,034.77 5,173.84

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 71,878.19 18,407.45 92,037.26
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 75,028.19 19,194.95 95,974.76
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,624.10 40,316.93 201,584.64
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,413.75 384.45 1,922.27
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.23 238.57 1,192.87
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.40 73.68 368.41

Page 172 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 93,376.24 51,281.57 256,407.83

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 202,746.64 78,624.17 393,120.83

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 269,762.00 108,957.69 544,788.43

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 428,489.50 163,042.34 815,211.70

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 695,678.50 248,336.04 1,241,680.18

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,461.24 1,068.45 5,342.25

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 1,038.42 396.09 1,980.44

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 1,979.28 673.83 3,369.14

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,562.28 562.68 2,813.40

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,453.33 827.34 4,136.71
MORTAR

411g ROLL POINTING SM 76.25 19.52 94.58 47.59 237.94

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,453.33 914.46 4,572.28
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,439.23 561.77 2,808.86
DIA 310 mm
Page 173 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,706.44 644.13 3,220.66
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,135.52 867.71 4,338.54
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,835.02 1,115.82 5,579.12
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 5,839.52 1,975.69 9,878.43
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,382.01 2,982.21 14,911.04
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,313.43 3,987.49 19,937.47
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 19,013.72 5,549.79 27,748.95
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 30,905.81 8,657.62 43,288.12
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,298.72 776.65 3,883.23
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,635.62 874.87 4,374.33
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,227.31 1,140.66 5,703.28
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,344.94 1,493.30 7,466.52
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,116.01 2,544.81 12,724.04
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,410.06 4,489.22 22,446.10
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 16,979.82 4,904.09 24,520.45
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,549.59 5,933.76 29,668.79
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 33,589.51 9,328.55 46,642.74
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 619.83 219.16 1,095.81
PIPE CULVERT

Page 174 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 2,856.15 1,136.86 5,684.28
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 680.42 197.08 985.42

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 274.43 108.42 542.08

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 544.29 199.63 998.15

509a RIPRAP, CLASS A CM 521.35 0.00 729.03 312.59 1,562.97

509b RIPRAP, CLASS B CM 373.08 180.10 723.19 319.09 1,595.46

509c RIPRAP, CLASS C CM 364.23 187.60 933.59 371.36 1,856.78

509c1 RIPRAP, CLASS D CM 364.23 225.12 990.21 394.89 1,974.46

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,453.01 815.48 4,077.41

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,271.57 768.20 3,841.01

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,475.89 810.69 4,053.46

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 2,695.89 875.07 4,375.36

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 3,396.14 1,188.09 5,940.45
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 610.12 235.11 1,175.55

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 118.47 96.75 483.77

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 151.64 123.85 619.23

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 519.20 268.78 1,343.88
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 649.00 335.97 1,679.85
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 281.72 209.41 1,047.04
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 352.15 261.76 1,308.80
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 175 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,345.21 1,721.03 8,605.17
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,334.15 1,801.05 9,005.23
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 552.90 162.07 810.35
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 43.20 13.22 66.11

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 11,976.53 3,785.86 18,929.32
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,134.53 3,485.56 17,427.82
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,577.59 2,306.09 11,530.46

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,320.98 2,747.06 13,735.32

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,468.53 4,891.58 24,457.89

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,072.79 8,961.21 44,806.05

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 15,977.15 4,092.75 20,463.76

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 176 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 62 SHIKARPUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.05 74.14 370.68
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.25 81.94 409.68
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 334.31 158.24 791.20

610c KILOMETER POST EACH 696.24 1,321.13 1,741.76 939.78 4,698.92

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,350.34 1,835.02 9,175.11

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,327.74 384.78 1,923.90
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 177 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

SUKKUR
(65)

SAMPAK INTERNATIONAL

Page 178 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.80 15.76 0.00 4.14 20.70

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.96 262.58 1.88 68.10 340.52

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 22.92 635.47 4.22 165.65 828.26

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 91.66 2,541.89 16.89 662.61 3,313.05

103 STRIPPING CM 2.74 153.65 0.00 39.10 195.49

104 COMPACTION OF NATURAL GROUND SM 0.39 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.82 227.95 0.00 58.19 290.97

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.31 541.85 0.00 140.04 700.20
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.19 422.98 0.00 108.79 543.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.95 205.65 0.00 52.40 261.99

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.25 360.08 125.00 151.08 755.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.93 492.05 0.00 128.25 641.23

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.46 422.98 0.00 108.36 541.81

107a STRUCTURAL EXCAVATION IN COMMON CM 8.02 221.54 0.00 57.39 286.95


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.55 664.63 73.44 202.15 1,010.77


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 116.30 400.09 125.00 160.35 801.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 104.67 442.22 0.00 136.72 683.61
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 59.81 316.49 0.00 94.07 470.37
MATERIAL

107d GRANULAR BACKFILL CM 37.12 193.34 469.88 175.09 875.43

107e COMMON BACKFILL CM 31.48 110.10 18.00 39.90 199.48

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.50 234.11 18.00 64.90 324.51
EXCAVATION IN COMMON MATERIAL

Page 179 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 578.46 144.73 186.23 931.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 637.82 8.55 165.67 828.33
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.48 574.85 8.00 149.33 746.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.61 119.41 152.97 70.25 351.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.66 121.79 18.00 36.61 183.06


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.81 277.82 10.70 76.08 380.41


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.09 30.11 2.73 8.48 42.41
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.96 190.72 235.22 109.23 546.13

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 23.59 2.80 6.83 34.13

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.39 26.79 2.80 7.74 38.72

201 GRANULAR SUB-BASE CM 8.77 231.80 534.49 193.76 968.82

202 AGGREGATE BASE CM 10.26 282.85 773.17 266.57 1,332.85

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 87.59 2,324.40 8,759.95 2,792.98 13,964.92

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 87.59 2,324.40 8,973.05 2,846.26 14,231.29

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 8,751.19 2,818.22 14,091.10
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 93.98 2,427.71 8,983.23 2,876.23 14,381.15
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.47 780.07 652.30 365.96 1,829.79

204c CEMENT CONTENT TON 125.00 0.00 7,518.00 1,910.75 9,553.75

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,211.28 16,134.69 80,673.47
MC-250

Page 180 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 267.00 2,060.49 62,211.28 16,134.69 80,673.47
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 105.29 188.22 438.22 182.93 914.66
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 168.58 3,721.78 7,137.06 2,756.86 13,784.28
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 116.16 207.88 717.31 260.34 1,301.70
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 13.56 20.04 100.21

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 13.56 20.04 100.21

208 REINSTATEMENT OF ROAD SURFACE SM 1.97 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.98 373.82 12.00 97.70 488.49
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.00 40.20 2.40 10.90 54.49

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 69.93 18.16 90.78
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 61.04 15.93 79.65
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 28.08 7.27 36.35
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.40 6.35 31.75
COAT.

304a SINGLE SURFACE TREATMENT SM 0.86 11.24 148.42 40.13 200.66

304b DOUBLE SURFACE TREATMENT SM 1.26 21.60 279.02 75.47 377.35

304c TRIPLE SURFACE TREATMENT SM 2.12 30.32 324.37 89.21 446.03

304d SEAL COAT SM 0.80 6.38 34.41 10.40 51.99

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,293.29 9,391.57 2,940.62 14,703.09
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 77.61 2,198.28 9,980.19 3,064.02 15,320.10
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 189.80 513.14 6,816.49 1,879.85 9,399.27

307b OPEN GRADED HOT BIT-MAC CM 189.80 513.14 6,587.10 1,822.51 9,112.54

Page 181 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 32.87 1,050.92 3,603.18 1,171.74 5,858.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.41 1,746.20 62,211.28 16,048.22 80,241.11

309a COLD MILLING, 0-30 mm SM 1.07 52.01 18.43 17.88 89.39

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.72 29.80 148.99

309c COLD MILLING, 0-70 mm SM 2.69 130.02 46.08 44.70 223.49

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 575.99 2,175.42 3,595.89 1,586.83 7,934.13

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 575.99 2,175.42 4,204.73 1,739.04 8,695.18

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 575.99 2,175.42 4,521.37 1,818.20 9,090.98

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 575.99 2,175.42 3,852.90 1,651.08 8,255.40

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 575.99 2,175.42 4,461.70 1,803.28 9,016.40

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 575.99 2,175.42 4,778.30 1,882.43 9,412.15

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 575.99 2,175.42 4,105.46 1,714.22 8,571.09

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 575.99 2,175.42 4,714.26 1,866.42 9,332.09

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 575.99 2,175.42 5,022.92 1,943.59 9,717.93

401b CONCRETE CLASS B CM 747.18 1,109.69 2,868.03 1,181.23 5,906.13

401ci CONCRETE CLASS C (UNDERGROUND) CM 567.69 2,175.42 3,321.91 1,516.26 7,581.28

401cii CONCRETE CLASS C (ON GROUND) CM 567.69 2,175.42 3,930.71 1,668.46 8,342.28

401ciii CONCRETE CLASS C (ELEVATED) CM 567.69 2,175.42 4,247.35 1,747.62 8,738.08

401d CONCRETE CLASS D1 CM 894.63 2,689.24 6,196.96 2,445.21 12,226.04

401e CONCRETE CLASS Y CM 1,247.78 703.81 4,763.41 1,678.75 8,393.75

401f LEAN CONCRETE CM 483.09 759.81 2,325.48 892.09 4,460.47

401gi PRECAST CONCRETE, CLASS A1 CM 1,902.73 1,470.83 4,179.88 1,888.36 9,441.80

401gii PRECAST CONCRETE CLASS A3 CM 1,902.73 1,470.83 4,732.96 2,026.63 10,133.15

401giii PRECAST CONCRETE, CLASS B CM 1,902.73 1,470.83 3,486.73 1,715.07 8,575.37

401giv PRECAST CONCRETE CLASS D1 CM 1,902.73 1,470.83 6,203.62 2,394.29 11,971.47

Page 182 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,902.73 1,470.83 6,946.42 2,580.00 12,899.98

401gvi PRECAST CONCRETE CLASS D3 CM 1,902.73 1,470.83 7,689.71 2,765.82 13,829.09

401h PLUM CONCRETE CM 830.51 1,109.69 2,208.17 1,037.09 5,185.46

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 71,878.19 18,407.45 92,037.26
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,751.62 0.00 75,028.19 19,194.95 95,974.76
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,404.94 3,667.20 86,189.40 22,815.39 114,076.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,698.16 40,335.44 201,677.22
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.07 0.00 1,413.67 384.43 1,922.17
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 124.07 0.00 830.15 238.55 1,192.77
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.16 18.40 138.65 41.80 209.02

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 416.60 0.00 83,791.46 21,052.02 105,260.08
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 432.23 0.00 131,235.48 32,916.93 164,584.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 479.10 0.00 1,116,940.03 279,354.78 1,396,773.91
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 416.60 0.00 71,627.74 18,011.09 90,055.43
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 107.50 0.00 447.87 138.84 694.21

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.33 0.00 251.32 73.66 368.32

Page 183 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 21.16 48.58 148.68 54.61 273.03

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 259.53 3,155.77 466.33 970.41 4,852.04
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 394.48 4,796.77 627.57 1,454.71 7,273.54
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 394.48 7,330.09 777.12 2,125.42 10,627.12
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 657.47 12,216.82 1,104.23 3,494.63 17,473.15
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 547.89 10,180.69 967.93 2,924.13 14,620.63
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 986.20 18,325.24 1,513.11 5,206.14 26,030.68
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 25,624.26 86,125.76 86,646.88 49,599.23 247,996.13

407i PILE LOAD TEST UPTO 240 TON EACH 25,624.26 86,125.76 189,287.92 75,259.49 376,297.43

407j PILE LOAD TEST UPTO 360 TON EACH 70,624.26 95,444.48 249,573.92 103,910.67 519,553.33

407k PILE LOAD TEST UPTO 550 TON EACH 104,374.26 119,305.60 395,607.40 154,821.82 774,109.08

407l PILE LOAD TEST UPTO 800 TON EACH 154,498.92 143,166.72 642,914.20 235,144.96 1,175,724.80

407m CONFIRMATORY BORING (NX SIZE) M 197.91 2,639.89 22.50 715.08 3,575.38

407n PERMANENT PILE CASING FOR PILES Ton 259.70 3,993.41 85,275.46 22,382.14 111,910.71

410 BRICK WORK CM 359.50 453.06 3,504.97 1,079.38 5,396.91

411a STONE MASONRY RANDOM DRY CM 380.00 165.94 1,043.03 397.24 1,986.20

411b STONE MASONRY RANDOM WITH MORTAR CM 452.50 263.54 2,027.70 685.93 3,429.67

411c STONE MASONRY DRESSED UNCOURSED DRY CM 522.50 165.94 1,577.12 566.39 2,831.94

411d STONE MASONRY DRESSED UNCOURSED WITH CM 592.50 263.54 2,514.98 842.75 4,213.76
MORTAR

411g ROLL POINTING SM 76.25 19.52 95.93 47.93 239.63

412a STONE MASONARY DRESSED COURSED WITH CM 785.00 419.50 2,514.98 929.87 4,649.33
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 554.74 1,441.84 562.42 2,812.12
DIA 310 mm
Page 184 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 253.12 616.97 1,709.55 644.91 3,224.56
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.91 1,097.40 2,138.84 868.54 4,342.68
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 250.37 1,377.91 2,839.09 1,116.84 5,584.21
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 290.33 1,772.89 5,844.83 1,977.01 9,885.06
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 359.46 2,187.37 9,388.20 2,983.76 14,918.79
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 465.18 2,171.36 13,320.30 3,989.21 19,946.05
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 548.79 2,636.66 19,022.06 5,551.88 27,759.38
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 648.59 3,076.10 30,915.54 8,660.06 43,300.28
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 253.12 554.74 2,301.33 777.30 3,886.49
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 246.87 616.97 2,638.73 875.64 4,378.22
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.91 1,097.40 3,230.63 1,141.48 5,707.42
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 250.37 1,377.91 4,349.01 1,494.32 7,471.61
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 290.33 1,772.89 8,121.32 2,546.13 12,730.67
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 359.46 2,187.37 15,416.25 4,490.77 22,453.85
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 465.18 2,171.36 16,986.69 4,905.81 24,529.04
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 548.79 2,636.66 20,557.93 5,935.84 29,679.21
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 648.59 3,076.10 33,599.24 9,330.98 46,654.91
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 99.58 157.23 476.14 183.24 916.20
PIPE CULVERT

Page 185 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 845.33 845.94 2,947.59 1,159.72 5,798.58
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.81 30.93 154.65

507b ROCK FILL IN GABIONS CM 107.91 0.00 514.90 155.70 778.51

508a BRICK PAVING (SINGLE COURSE) SM 121.04 38.19 270.61 107.46 537.30

508b BRICK PAVING (DOUBLE COURSE) SM 216.04 38.19 537.41 197.91 989.55

509a RIPRAP, CLASS A CM 521.35 0.00 733.64 313.75 1,568.73

509b RIPRAP, CLASS B CM 373.08 180.10 800.54 338.43 1,692.15

509c RIPRAP, CLASS C CM 364.23 187.60 880.36 358.05 1,790.25

509c1 RIPRAP, CLASS D CM 364.23 225.12 953.73 385.77 1,928.85

509d GROUTED RIPRAP, CLASS A CM 638.33 170.59 2,505.16 828.52 4,142.59

509e GROUTED RIPRAP, CLASS B CM 484.66 316.57 2,391.32 798.14 3,990.68

509f GROUTED RIPRAP, CLASS C CM 465.55 301.33 2,471.99 809.72 4,048.59

509f1 GROUTED RIPRAP, CLASS D CM 465.55 338.85 2,713.41 879.45 4,397.26

509g REINFORCED CONCRETE SLOPE PROTECTION CM 874.64 481.58 3,558.86 1,228.77 6,143.85
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 54.61 275.72 469.80 200.03 1,000.16

510 DISMANTLING OF STRUCTURES AND CM 108.33 884.71 0.00 248.26 1,241.30


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 164.84 103.71 119.22 96.94 484.71

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 211.00 132.75 152.60 124.09 620.43

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 524.98 270.22 1,351.11
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 656.23 337.78 1,688.89
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 267.00 288.91 291.43 211.84 1,059.18
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 333.75 361.14 364.29 264.80 1,323.98
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 186 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 381.16 1,157.76 5,433.96 1,743.22 8,716.10
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,087.25 782.78 5,420.73 1,822.69 9,113.45
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 29.00 66.38 562.99 164.59 822.96
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.69 0.00 43.20 13.22 66.11

604a METAL GUARD RAIL M 72.22 55.31 2,600.42 681.99 3,409.94

604b METAL GUARD RAIL END PIECES EACH 95.83 533.21 2,919.35 887.10 4,435.50

604d STEEL POST FOR METAL GUARD RAIL EACH 108.32 533.21 2,548.20 797.43 3,987.17

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,006.23 1,160.70 12,114.65 3,820.39 19,101.97
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,006.23 801.50 11,272.65 3,520.09 17,600.47
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 253.60 393.19 8,601.22 2,312.00 11,560.01

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 77.50 589.78 10,356.43 2,755.93 13,779.64

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 253.60 844.19 18,526.86 4,906.16 24,530.80

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 850.40 921.65 34,160.29 8,983.09 44,915.43

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 170.08 223.78 15,994.65 4,097.13 20,485.63

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 299.98 0.00 2,293.20 648.30 3,241.48

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 299.98 0.00 3,439.80 934.95 4,674.73

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 25.77 8.74 43.69


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 60.10 16.17 80.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.19 6.00 34.38 10.89 54.46


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.06 3.51 80.16 21.18 105.92


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 82.12 29.98 248.98 90.27 451.35
PAINT FOR 4.0 M ARROWS

Page 187 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 65 SUKKUR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 82.12 52.71 757.33 223.04 1,115.20
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 35.97 11.86 59.31
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 103.74 30.23 151.13
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.98 7.50 47.95 14.86 74.29
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.98 13.18 138.32 38.87 194.35
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 82.12 29.98 347.26 114.84 574.20
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 82.12 52.71 1,308.11 360.74 1,803.68
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 68.62 29.98 165.98 66.15 330.74
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 68.62 52.71 505.65 156.75 783.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 68.62 29.98 231.50 82.53 412.64
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 68.62 52.71 873.39 248.68 1,243.41
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 175.33 74.20 371.02
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.31 111.18 206.53 82.00 410.02
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 115.94 182.71 344.24 160.72 803.61

610c KILOMETER POST EACH 696.24 1,321.13 1,768.92 946.57 4,732.87

610d TEN KILOMETER POST EACH 1,347.48 2,642.27 3,391.39 1,845.29 9,226.43

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 145.00 66.38 1,268.07 369.86 1,849.31
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 127.22 821.01 3.00 237.81 1,189.04
INCLUDING MAINTENANCE FOR 2 YEARS

Page 188 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

THARPARKAR
(67)

SAMPAK INTERNATIONAL

Page 189 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.68 15.76 0.00 4.11 20.54

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 6.96 262.58 1.88 67.85 339.27

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 19.67 635.47 4.22 164.84 824.20

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 78.66 2,541.89 16.89 659.36 3,296.80

103 STRIPPING CM 2.47 153.65 0.00 39.03 195.14

104 COMPACTION OF NATURAL GROUND SM 0.35 14.95 2.70 4.50 22.51

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.77 227.95 0.00 58.18 290.90

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 16.81 541.85 0.00 139.67 698.33
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 11.33 422.98 0.00 108.58 542.90

106c EXCAVATE SURPLUS COMMON MATERIAL CM 3.90 205.65 0.00 52.39 261.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 111.75 360.08 125.00 149.21 746.05

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.68 492.05 0.00 127.93 639.66

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.61 422.98 0.00 108.15 540.74

107a STRUCTURAL EXCAVATION IN COMMON CM 7.77 221.54 0.00 57.33 286.64


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 65.55 664.63 73.44 200.90 1,004.52


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 109.36 400.09 125.00 158.61 793.06
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 98.42 442.22 0.00 135.16 675.80
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 56.24 316.49 0.00 93.18 465.91
MATERIAL

107d GRANULAR BACKFILL CM 33.12 193.34 1,036.55 315.75 1,578.76

107e COMMON BACKFILL CM 27.04 110.10 18.00 38.78 193.92

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.05 234.11 18.00 64.79 323.96
EXCAVATION IN COMMON MATERIAL

Page 190 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.89 578.46 144.73 185.77 928.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.92 637.82 8.55 165.32 826.61
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 13.26 574.85 8.00 149.03 745.13
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 7.94 119.41 152.97 70.08 350.40
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.21 121.79 18.00 36.50 182.50


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 14.32 277.82 10.70 75.71 378.55


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.41 43.86 5.15 12.60 63.02

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.02 30.11 2.73 8.46 42.32
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.03 190.72 395.22 148.99 744.96

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.83 23.59 2.80 6.81 34.03

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.28 26.79 2.80 7.72 38.58

201 GRANULAR SUB-BASE CM 8.14 231.80 1,190.60 357.63 1,788.17

202 AGGREGATE BASE CM 9.69 282.85 1,321.52 403.51 2,017.57

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 76.55 2,324.40 9,670.80 3,017.94 15,089.69

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 76.55 2,324.40 9,919.34 3,080.07 15,400.36

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,661.94 3,043.02 15,215.12
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 82.45 2,427.71 9,929.44 3,109.90 15,549.49
(CLASS B)

204b CEMENT STABILIZED BASE CM 29.16 780.07 1,582.01 597.81 2,989.05

204c CEMENT CONTENT TON 100.00 0.00 8,967.00 2,266.75 11,333.75

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 62,221.69 16,133.13 80,665.65
MC-250

Page 191 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 250.34 2,060.49 62,221.69 16,133.13 80,665.65
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 87.24 188.22 1,472.54 437.00 2,184.99
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 150.58 3,721.78 7,983.93 2,964.07 14,820.36
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 95.76 207.88 1,408.25 427.97 2,139.86
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.69 64.78 24.78 22.81 114.06

207b DEEP PATCHING (15-30 cm) SM 1.69 64.78 24.78 22.81 114.06

208 REINSTATEMENT OF ROAD SURFACE SM 1.84 104.50 1.98 27.08 135.40

209a BREAKING OF EXISTING ROAD PAVEMENT CM 4.84 373.82 12.00 97.67 488.33
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.97 40.20 2.40 10.89 54.46

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.31 2.36 69.94 18.15 90.76
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.30 2.36 61.05 15.93 79.64
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 28.09 7.27 36.34
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.12 0.86 24.41 6.35 31.74
COAT.

304a SINGLE SURFACE TREATMENT SM 0.82 11.24 152.88 41.24 206.18

304b DOUBLE SURFACE TREATMENT SM 1.20 21.60 292.03 78.71 393.53

304c TRIPLE SURFACE TREATMENT SM 2.02 30.32 339.58 92.98 464.90

304d SEAL COAT SM 0.76 6.38 35.98 10.78 53.90

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,293.29 10,356.73 3,179.65 15,898.24
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 68.57 2,198.28 10,990.97 3,314.46 16,572.28
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 164.80 513.14 7,559.27 2,059.30 10,296.51

307b OPEN GRADED HOT BIT-MAC CM 164.80 513.14 7,335.22 2,003.29 10,016.44

Page 192 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 28.87 1,050.92 3,603.18 1,170.74 5,853.71
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 218.74 1,746.20 62,221.69 16,046.66 80,233.30

309a COLD MILLING, 0-30 mm SM 1.00 52.01 18.43 17.86 89.30

309b COLD MILLING, 0-50 mm SM 1.67 86.68 30.72 29.77 148.84

309c COLD MILLING, 0-70 mm SM 2.50 130.02 46.08 44.65 223.25

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 537.80 2,175.42 4,898.78 1,903.00 9,515.00

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 537.80 2,175.42 5,507.69 2,055.23 10,276.14

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 537.80 2,175.42 5,824.33 2,134.39 10,671.94

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 537.80 2,175.42 5,170.74 1,970.99 9,854.96

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 537.80 2,175.42 5,779.54 2,123.19 10,615.96

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 537.80 2,175.42 6,096.03 2,202.31 11,011.56

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 537.80 2,175.42 5,475.59 2,047.20 10,236.02

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 537.80 2,175.42 6,084.39 2,199.40 10,997.02

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 537.80 2,175.42 6,377.01 2,272.56 11,362.79

401b CONCRETE CLASS B CM 686.07 1,109.69 4,121.16 1,479.23 7,396.14

401ci CONCRETE CLASS C (UNDERGROUND) CM 519.08 2,175.42 4,609.71 1,826.05 9,130.27

401cii CONCRETE CLASS C (ON GROUND) CM 519.08 2,175.42 5,218.51 1,978.25 9,891.27

401ciii CONCRETE CLASS C (ELEVATED) CM 519.08 2,175.42 5,535.15 2,057.41 10,287.07

401d CONCRETE CLASS D1 CM 835.60 2,689.24 7,730.19 2,813.76 14,068.79

401e CONCRETE CLASS Y CM 1,157.50 703.81 6,123.95 1,996.32 9,981.58

401f LEAN CONCRETE CM 419.89 759.81 3,519.07 1,174.69 5,873.46

401gi PRECAST CONCRETE, CLASS A1 CM 1,711.07 1,470.83 5,469.78 2,162.92 10,814.60

401gii PRECAST CONCRETE CLASS A3 CM 1,711.07 1,470.83 6,091.05 2,318.24 11,591.18

401giii PRECAST CONCRETE, CLASS B CM 1,711.07 1,470.83 4,751.53 1,983.36 9,916.78

401giv PRECAST CONCRETE CLASS D1 CM 1,711.07 1,470.83 7,737.90 2,729.95 13,649.74

Page 193 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,711.07 1,470.83 8,574.05 2,938.99 14,694.93

401gvi PRECAST CONCRETE CLASS D3 CM 1,711.07 1,470.83 9,411.99 3,148.47 15,742.36

401h PLUM CONCRETE CM 752.73 1,109.69 3,284.40 1,286.71 6,433.53

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 71,888.91 18,385.13 91,925.66
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,651.62 0.00 75,038.91 19,172.63 95,863.16
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,324.94 3,667.20 86,189.40 22,795.39 113,976.93
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,633.12 12,010.50 146,793.31 40,359.23 201,796.16
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 61.29 796.91 0.00 214.55 1,072.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 112.96 0.00 1,413.68 381.66 1,908.30
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 112.96 0.00 830.16 235.78 1,178.89
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 9.41 18.40 140.05 41.96 209.82

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 391.60 0.00 83,791.46 21,045.77 105,228.83
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 404.10 0.00 131,235.48 32,909.90 164,549.48
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 441.60 0.00 1,116,940.03 279,345.41 1,396,727.04
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 391.60 0.00 71,627.74 18,004.84 90,024.18
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 97.50 0.00 447.87 136.34 681.71

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.56 0.39 1.97
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.28 0.82 4.12
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 40.83 0.00 251.33 73.04 365.21

Page 194 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 19.16 48.58 151.56 54.83 274.13

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 258.21 3,155.77 469.74 970.93 4,854.66
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 392.48 4,796.77 632.76 1,455.50 7,277.52
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 392.48 7,330.09 782.88 2,126.36 10,631.82
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 654.13 12,216.82 1,113.83 3,496.20 17,480.98
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 545.11 10,180.69 975.93 2,925.43 14,627.16
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 981.20 18,325.24 1,527.51 5,208.49 26,042.43
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 21,124.26 86,125.76 118,137.68 56,346.93 281,734.63

407i PILE LOAD TEST UPTO 240 TON EACH 21,124.26 86,125.76 252,269.52 89,879.89 449,399.43

407j PILE LOAD TEST UPTO 360 TON EACH 57,124.26 95,444.48 344,046.32 124,153.77 620,768.83

407k PILE LOAD TEST UPTO 550 TON EACH 84,124.26 119,305.60 549,482.90 188,228.19 941,140.95

407l PILE LOAD TEST UPTO 800 TON EACH 124,498.92 143,166.72 889,830.70 289,374.09 1,446,870.43

407m CONFIRMATORY BORING (NX SIZE) M 179.16 2,639.89 22.50 710.39 3,551.94

407n PERMANENT PILE CASING FOR PILES Ton 234.70 3,993.41 85,275.46 22,375.89 111,879.46

410 BRICK WORK CM 328.50 453.06 3,821.28 1,150.71 5,753.55

411a STONE MASONRY RANDOM DRY CM 345.00 165.94 1,427.59 484.63 2,423.16

411b STONE MASONRY RANDOM WITH MORTAR CM 407.50 263.54 2,808.09 869.78 4,348.91

411c STONE MASONRY DRESSED UNCOURSED DRY CM 472.50 165.94 1,818.35 614.20 3,070.98

411d STONE MASONRY DRESSED UNCOURSED WITH CM 537.50 263.54 3,084.13 971.29 4,856.45
MORTAR

411g ROLL POINTING SM 70.25 19.52 103.93 48.42 242.12

412a STONE MASONARY DRESSED COURSED WITH CM 705.00 419.50 3,084.13 1,052.15 5,260.77
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 554.74 1,433.26 550.59 2,752.96
DIA 310 mm
Page 195 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.37 616.97 1,688.15 629.87 3,149.37
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 205.41 1,097.40 2,099.98 850.70 4,253.49
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 214.01 1,377.91 2,764.62 1,089.13 5,445.67
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 249.42 1,772.89 5,676.00 1,924.58 9,622.89
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 311.73 2,187.37 9,127.65 2,906.69 14,533.43
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 403.41 2,171.36 13,061.13 3,908.98 19,544.89
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 473.79 2,636.66 18,758.17 5,467.15 27,335.76
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 563.17 3,076.10 29,766.91 8,351.54 41,757.72
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.37 554.74 2,292.75 765.46 3,827.32
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 208.12 616.97 2,617.33 860.61 4,303.04
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 205.41 1,097.40 3,191.77 1,123.64 5,618.22
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 214.01 1,377.91 4,274.53 1,466.61 7,333.05
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 249.42 1,772.89 7,952.49 2,493.70 12,468.50
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 311.73 2,187.37 15,155.70 4,413.70 22,068.49
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 403.41 2,171.36 16,727.52 4,825.58 24,127.88
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 473.79 2,636.66 20,294.03 5,851.12 29,255.60
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 563.17 3,076.10 32,450.61 9,022.47 45,112.34
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 85.41 157.23 1,049.00 322.91 1,614.56
PIPE CULVERT

Page 196 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 775.89 845.94 4,216.05 1,459.47 7,297.34
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.49 0.00 117.40 30.72 153.60

507b ROCK FILL IN GABIONS CM 90.41 0.00 1,043.65 283.52 1,417.58

508a BRICK PAVING (SINGLE COURSE) SM 108.04 38.19 294.15 110.10 550.48

508b BRICK PAVING (DOUBLE COURSE) SM 193.04 38.19 580.91 203.04 1,015.18

509a RIPRAP, CLASS A CM 470.10 0.00 1,118.20 397.07 1,985.37

509b RIPRAP, CLASS B CM 348.08 180.10 1,155.38 420.89 2,104.45

509c RIPRAP, CLASS C CM 341.73 187.60 1,211.20 435.13 2,175.67

509c1 RIPRAP, CLASS D CM 341.73 225.12 1,257.69 456.14 2,280.68

509d GROUTED RIPRAP, CLASS A CM 574.58 170.59 3,181.96 981.78 4,908.91

509e GROUTED RIPRAP, CLASS B CM 449.66 316.57 3,007.56 943.45 4,717.24

509f GROUTED RIPRAP, CLASS C CM 433.05 301.33 3,086.63 955.25 4,776.26

509f1 GROUTED RIPRAP, CLASS D CM 433.05 338.85 3,336.46 1,027.09 5,135.45

509g REINFORCED CONCRETE SLOPE PROTECTION CM 774.64 481.58 4,885.16 1,535.34 7,676.72
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 46.27 275.72 1,035.98 339.49 1,697.46

510 DISMANTLING OF STRUCTURES AND CM 98.33 884.71 0.00 245.76 1,228.80


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 147.65 103.71 181.71 108.27 541.34

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 189.00 132.75 232.59 138.58 692.92

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 662.47 298.09 1,490.47
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 828.08 372.62 1,863.09
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 241.00 288.91 411.71 235.40 1,177.02
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 301.25 361.14 514.63 294.26 1,471.28
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 197 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 356.58 1,157.76 6,127.85 1,910.55 9,552.73
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 980.99 782.78 6,107.67 1,967.86 9,839.30
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 26.00 66.38 662.96 188.83 944.17
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 8.56 0.00 44.16 13.18 65.90

604a METAL GUARD RAIL M 65.55 55.31 2,590.83 677.93 3,389.63

604b METAL GUARD RAIL END PIECES EACH 85.83 533.21 2,910.20 882.31 4,411.56

604d STEEL POST FOR METAL GUARD RAIL EACH 98.32 533.21 2,535.60 791.78 3,958.92

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,731.23 1,160.70 13,474.20 4,091.53 20,457.65
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,731.23 801.50 12,632.06 3,791.20 18,955.99
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 225.27 393.19 8,756.37 2,343.71 11,718.53

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 68.75 589.78 10,589.16 2,811.92 14,059.61

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 225.27 844.19 18,867.11 4,984.14 24,920.71

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 722.90 921.65 34,670.67 9,078.81 45,394.03

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 144.58 223.78 16,038.31 4,101.67 20,508.34

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 287.48 0.00 2,293.20 645.17 3,225.85

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 287.48 0.00 3,439.80 931.82 4,659.10

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 25.77 8.64 43.22


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 60.10 16.14 80.69


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 2.81 6.00 34.38 10.80 53.99


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 0.94 3.51 80.16 21.15 105.76


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 78.62 29.98 248.98 89.40 446.98
PAINT FOR 4.0 M ARROWS

Page 198 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 67 THARPARKAR

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 78.62 52.71 757.33 222.17 1,110.83
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 35.97 11.74 58.72
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 103.74 30.11 150.54
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.52 7.50 47.95 14.74 73.71
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.52 13.18 138.32 38.75 193.77
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 78.62 29.98 347.26 113.97 569.83
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 78.62 52.71 1,308.11 359.86 1,799.31
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 65.12 29.98 165.98 65.27 326.36
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 65.12 52.71 505.65 155.87 779.35
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 65.12 29.98 231.50 81.65 408.26
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 65.12 52.71 873.39 247.81 1,239.03
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 176.30 74.21 371.07
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 9.38 111.18 207.50 82.01 410.07
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 97.60 182.71 456.35 184.17 920.83

610c KILOMETER POST EACH 618.74 1,321.13 2,141.24 1,020.28 5,101.40

610d TEN KILOMETER POST EACH 1,192.48 2,642.27 3,983.78 1,954.63 9,773.16

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 127.00 66.38 1,532.33 431.43 2,157.13
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 113.83 821.01 2.08 234.23 1,171.15
INCLUDING MAINTENANCE FOR 2 YEARS

Page 199 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

THATTA
(68)

SAMPAK INTERNATIONAL

Page 200 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 1.06 15.76 0.00 4.21 21.03

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 10.78 262.58 1.88 68.81 344.04

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 30.76 635.47 4.22 167.61 838.06

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 123.02 2,541.89 16.89 670.45 3,352.25

103 STRIPPING CM 3.76 153.65 0.00 39.35 196.76

104 COMPACTION OF NATURAL GROUND SM 0.54 14.95 2.70 4.55 22.74

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 6.93 227.95 0.00 58.72 293.60

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 166.84 360.08 125.00 162.98 814.91

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 25.37 541.85 0.00 141.80 709.02
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 16.99 422.98 0.00 109.99 549.97

106c EXCAVATE SURPLUS COMMON MATERIAL CM 5.67 205.65 0.00 52.83 264.14

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 166.84 360.08 125.00 162.98 814.91

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 29.34 492.05 0.00 130.35 651.73

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 14.49 422.98 0.00 109.37 546.85

107a STRUCTURAL EXCAVATION IN COMMON CM 11.40 221.54 0.00 58.24 291.18


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 98.30 664.63 72.03 208.74 1,043.70


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 162.98 400.09 125.00 172.02 860.10
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 146.69 442.22 0.00 147.23 736.13
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 83.82 316.49 0.00 100.08 500.38
MATERIAL

107d GRANULAR BACKFILL CM 50.74 193.34 494.38 184.61 923.07

107e COMMON BACKFILL CM 42.26 110.10 18.00 42.59 212.96

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 10.51 234.11 18.00 65.66 328.28
EXCAVATION IN COMMON MATERIAL

Page 201 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 30.05 578.46 144.73 188.31 941.55
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 22.54 637.82 8.55 167.23 836.14
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 20.03 574.85 8.00 150.72 753.60
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 11.96 119.41 152.97 71.08 355.42
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 9.29 121.79 18.00 37.27 186.36


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 21.76 277.82 10.70 77.57 387.85


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 2.10 43.86 5.15 12.78 63.89

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.53 30.11 2.73 8.59 42.95
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 15.16 190.72 235.62 110.37 551.87

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.26 23.59 2.80 6.91 34.56

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.92 26.79 2.80 7.88 39.39

201 GRANULAR SUB-BASE CM 12.21 231.80 536.10 195.03 975.14

202 AGGREGATE BASE CM 14.41 282.85 555.29 213.14 1,065.68

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 118.55 2,324.40 8,795.58 2,809.63 14,048.16

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 118.55 2,324.40 9,046.29 2,872.31 14,361.55

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 127.43 2,427.71 8,786.90 2,835.51 14,177.54
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 127.43 2,427.71 9,056.17 2,902.83 14,514.13
(CLASS B)

204b CEMENT STABILIZED BASE CM 43.79 780.07 876.07 424.98 2,124.91

204c CEMENT CONTENT TON 162.52 0.00 6,195.00 1,589.38 7,946.90

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 373.66 2,060.49 61,108.47 15,885.65 79,428.27
MC-250

Page 202 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 373.66 2,060.49 61,108.47 15,885.65 79,428.27
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 139.06 188.22 739.74 266.76 1,333.78
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 230.52 3,721.78 7,121.06 2,768.34 13,841.70
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 153.08 207.88 683.52 261.12 1,305.59
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 2.54 64.78 14.56 20.47 102.35

207b DEEP PATCHING (15-30 cm) SM 2.54 64.78 14.56 20.47 102.35

208 REINSTATEMENT OF ROAD SURFACE SM 2.75 104.50 1.98 27.31 136.54

209a BREAKING OF EXISTING ROAD PAVEMENT CM 7.09 373.82 12.00 98.23 491.14
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.42 40.20 2.40 11.00 55.02

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.46 2.36 68.82 17.91 89.56
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.45 2.36 59.93 15.69 78.43
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.19 0.86 27.64 7.17 35.86
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.19 0.86 23.96 6.25 31.26
COAT.

304a SINGLE SURFACE TREATMENT SM 1.22 11.24 146.29 39.69 198.43

304b DOUBLE SURFACE TREATMENT SM 1.78 21.60 274.84 74.55 372.77

304c TRIPLE SURFACE TREATMENT SM 2.99 30.32 319.66 88.24 441.22

304d SEAL COAT SM 1.13 6.38 34.44 10.49 52.43

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 105.58 2,293.29 9,490.59 2,972.37 14,861.83
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 105.58 2,198.28 10,109.10 3,103.24 15,516.21
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 256.11 513.14 6,897.69 1,916.73 9,583.67

307b OPEN GRADED HOT BIT-MAC CM 256.11 513.14 6,615.94 1,846.30 9,231.49

Page 203 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 44.59 1,050.92 3,603.18 1,174.67 5,873.36
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 328.02 1,746.20 61,108.47 15,795.67 78,978.36

309a COLD MILLING, 0-30 mm SM 1.50 52.01 18.08 17.90 89.49

309b COLD MILLING, 0-50 mm SM 2.50 86.68 30.14 29.83 149.14

309c COLD MILLING, 0-70 mm SM 3.75 130.02 45.20 44.74 223.71

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 804.44 2,175.42 3,261.42 1,560.32 7,801.60

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 804.44 2,175.42 3,858.58 1,709.61 8,548.05

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 804.44 2,175.42 4,169.13 1,787.25 8,936.24

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 804.44 2,175.42 3,442.10 1,605.49 8,027.45

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 804.44 2,175.42 4,039.19 1,754.76 8,773.81

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 804.44 2,175.42 4,349.66 1,832.38 9,161.90

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 804.44 2,175.42 3,694.33 1,668.55 8,342.73

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 804.44 2,175.42 4,291.42 1,817.82 9,089.10

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 804.44 2,175.42 4,587.94 1,891.95 9,459.76

401b CONCRETE CLASS B CM 1,035.17 1,109.69 2,603.67 1,187.13 5,935.66

401ci CONCRETE CLASS C (UNDERGROUND) CM 784.93 2,175.42 2,992.86 1,488.30 7,441.52

401cii CONCRETE CLASS C (ON GROUND) CM 784.93 2,175.42 3,589.95 1,637.58 8,187.88

401ciii CONCRETE CLASS C (ELEVATED) CM 784.93 2,175.42 3,900.50 1,715.21 8,576.07

401d CONCRETE CLASS D1 CM 1,249.66 2,689.24 5,578.54 2,379.36 11,896.80

401e CONCRETE CLASS Y CM 1,737.22 703.81 4,384.59 1,706.41 8,532.03

401f LEAN CONCRETE CM 652.21 759.81 2,154.96 891.74 4,458.72

401gi PRECAST CONCRETE, CLASS A1 CM 2,610.12 1,470.83 3,844.02 1,981.24 9,906.21

401gii PRECAST CONCRETE CLASS A3 CM 2,610.12 1,470.83 4,300.29 2,095.31 10,476.55

401giii PRECAST CONCRETE, CLASS B CM 2,610.12 1,470.83 3,213.96 1,823.73 9,118.63

401giv PRECAST CONCRETE CLASS D1 CM 2,610.12 1,470.83 5,585.12 2,416.52 12,082.59

Page 204 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 2,610.12 1,470.83 6,185.42 2,566.59 12,832.96

401gvi PRECAST CONCRETE CLASS D3 CM 2,610.12 1,470.83 6,786.74 2,716.92 13,584.61

401h PLUM CONCRETE CM 1,143.52 1,109.69 2,002.07 1,063.82 5,319.10

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 2,457.99 0.00 70,720.83 18,294.71 91,473.53
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 2,457.99 0.00 73,870.83 19,082.21 95,411.03
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,971.64 3,667.20 84,551.40 22,547.56 112,737.80
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 3,803.34 12,010.50 143,783.04 39,899.22 199,496.09
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 88.53 796.91 0.00 221.36 1,106.80

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 171.19 0.00 1,386.58 389.44 1,947.21
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 171.19 0.00 814.29 246.37 1,231.85
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 14.13 18.40 140.05 43.15 215.73

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 583.72 0.00 80,649.01 20,308.18 101,540.91
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 604.04 0.00 128,711.72 32,328.94 161,644.69
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 664.98 0.00 1,095,460.42 274,031.35 1,370,156.75
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 583.72 0.00 70,250.29 17,708.50 88,542.51
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 148.06 0.00 439.25 146.83 734.14

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.03 0.00 1.53 0.39 1.95
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.04
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 60.79 0.00 246.58 76.84 384.21

Page 205 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 29.13 48.58 149.56 56.82 284.09

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 373.92 3,155.77 467.37 999.27 4,996.33
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 568.36 4,796.77 629.16 1,498.57 7,492.87
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 568.36 7,330.09 778.88 2,169.33 10,846.67
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 947.27 12,216.82 1,107.16 3,567.81 17,839.07
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 789.39 10,180.69 970.38 2,985.11 14,925.57
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,420.90 18,325.24 1,517.51 5,315.91 26,579.56
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 33,766.38 86,125.76 88,270.88 52,040.76 260,203.78

407i PILE LOAD TEST UPTO 240 TON EACH 33,766.38 86,125.76 192,228.34 78,030.12 390,150.60

407j PILE LOAD TEST UPTO 360 TON EACH 92,273.58 95,444.48 254,645.28 110,590.84 552,954.18

407k PILE LOAD TEST UPTO 550 TON EACH 136,153.98 119,305.60 404,077.10 164,884.17 824,420.85

407l PILE LOAD TEST UPTO 800 TON EACH 201,522.36 143,166.72 656,349.30 250,259.60 1,251,297.98

407m CONFIRMATORY BORING (NX SIZE) M 272.34 2,639.89 22.50 733.68 3,668.41

407n PERMANENT PILE CASING FOR PILES Ton 357.09 3,993.41 83,635.39 21,996.47 109,982.36

410 BRICK WORK CM 496.91 453.06 3,320.59 1,067.64 5,338.21

411a STONE MASONRY RANDOM DRY CM 523.64 165.94 742.83 358.10 1,790.50

411b STONE MASONRY RANDOM WITH MORTAR CM 621.14 263.54 1,632.71 629.35 3,146.74

411c STONE MASONRY DRESSED UNCOURSED DRY CM 718.65 165.94 1,048.55 483.28 2,416.41

411d STONE MASONRY DRESSED UNCOURSED WITH CM 816.15 263.54 1,886.96 741.66 3,708.31
MORTAR

411g ROLL POINTING SM 105.81 19.52 91.74 54.27 271.33

412a STONE MASONARY DRESSED COURSED WITH CM 1,076.17 419.50 1,886.96 845.66 4,228.28
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 337.67 554.74 1,354.35 561.69 2,808.44
DIA 310 mm
Page 206 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 337.67 616.97 1,566.33 630.24 3,151.21
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 320.20 1,097.40 1,926.83 836.11 4,180.54
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 335.41 1,377.91 2,488.82 1,050.54 5,252.68
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 389.86 1,772.89 5,150.32 1,828.27 9,141.33
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 484.78 2,187.37 8,350.09 2,755.56 13,777.80
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 627.37 2,171.36 12,280.82 3,769.89 18,849.44
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 738.59 2,636.66 17,935.55 5,327.70 26,638.49
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 875.23 3,076.10 26,740.07 7,672.85 38,364.25
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 337.67 554.74 2,213.84 776.56 3,882.80
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 328.64 616.97 2,495.51 860.28 4,301.40
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 320.20 1,097.40 3,018.62 1,109.06 5,545.28
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 335.41 1,377.91 3,998.74 1,428.02 7,140.08
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 389.86 1,772.89 7,426.81 2,397.39 11,986.94
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 484.78 2,187.37 14,378.14 4,262.57 21,312.86
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 627.37 2,171.36 15,947.20 4,686.48 23,432.41
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 738.59 2,636.66 19,471.42 5,711.67 28,558.33
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 875.23 3,076.10 29,423.79 8,343.78 41,718.89
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 133.62 157.23 499.19 197.51 987.55
PIPE CULVERT

Page 207 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 1,170.94 845.94 2,669.22 1,171.53 5,857.63
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 8.23 0.00 117.40 31.41 157.04

507b ROCK FILL IN GABIONS CM 143.25 0.00 410.10 138.34 691.68

508a BRICK PAVING (SINGLE COURSE) SM 165.46 38.19 266.55 117.55 587.75

508b BRICK PAVING (DOUBLE COURSE) SM 295.47 38.19 528.97 215.66 1,078.28

509a RIPRAP, CLASS A CM 716.09 0.00 439.39 288.87 1,444.35

509b RIPRAP, CLASS B CM 520.86 180.10 477.69 294.66 1,473.30

509c RIPRAP, CLASS C CM 509.88 187.60 523.10 305.15 1,525.73

509c1 RIPRAP, CLASS D CM 509.88 225.12 439.39 293.60 1,467.99

509d GROUTED RIPRAP, CLASS A CM 876.04 170.59 2,092.23 784.71 3,923.57

509e GROUTED RIPRAP, CLASS B CM 674.82 316.57 1,962.46 738.46 3,692.31

509f GROUTED RIPRAP, CLASS C CM 649.02 301.33 1,996.35 736.67 3,683.36

509f1 GROUTED RIPRAP, CLASS D CM 649.02 338.85 2,069.22 764.27 3,821.36

509g REINFORCED CONCRETE SLOPE PROTECTION CM 1,191.22 481.58 3,184.47 1,214.32 6,071.59
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 72.87 275.72 494.80 210.84 1,054.22

510 DISMANTLING OF STRUCTURES AND CM 149.27 884.71 0.00 258.49 1,292.47


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 225.71 103.71 71.40 100.20 501.02

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 288.90 132.75 91.39 128.26 641.31

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 366.91 288.91 460.98 279.20 1,396.01
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 458.63 361.14 576.23 349.00 1,745.01
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 366.91 288.91 229.80 221.41 1,107.03
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 458.63 361.14 287.26 276.76 1,383.79
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 208 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 532.83 1,157.76 5,200.43 1,722.76 8,613.78
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,493.82 782.78 5,192.68 1,867.32 9,336.60
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 39.72 66.38 587.00 173.27 866.37
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 13.18 0.00 42.24 13.86 69.28

604a METAL GUARD RAIL M 99.51 55.31 2,551.61 676.61 3,383.04

604b METAL GUARD RAIL END PIECES EACH 131.21 533.21 2,865.70 882.53 4,412.66

604d STEEL POST FOR METAL GUARD RAIL EACH 149.25 533.21 2,497.50 794.99 3,974.95

605a CONCRETE BEAM GUARDRAIL (INCL. CM 2,699.51 1,160.70 11,746.04 3,901.56 19,507.80
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 2,699.51 801.50 10,917.55 3,604.64 18,023.19
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 345.87 393.19 8,391.04 2,282.52 11,412.62

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 105.63 589.78 10,090.12 2,696.38 13,481.91

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 345.87 844.19 17,986.61 4,794.16 23,970.82

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 1,136.37 921.65 33,227.41 8,821.36 44,106.79

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 227.27 223.78 15,602.66 4,013.43 20,067.14

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 424.30 0.00 2,249.10 668.35 3,341.75

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 424.30 0.00 3,373.65 949.49 4,747.44

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.33 6.00 25.27 8.90 44.50


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.44 3.51 58.94 15.98 79.88


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.33 6.00 33.72 11.01 55.06


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.44 3.51 78.61 20.89 104.47


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 116.10 29.98 244.19 97.57 487.84
PAINT FOR 4.0 M ARROWS

Page 209 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 68 THATTA

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 116.10 52.71 742.76 227.89 1,139.47
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.42 7.50 35.27 12.05 60.23
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.42 13.18 101.75 30.08 150.42
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.42 7.50 47.03 14.99 74.93
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.42 13.18 135.66 38.56 192.82
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 116.10 29.98 340.58 121.66 608.32
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 116.10 52.71 1,282.96 362.94 1,814.71
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 96.60 29.98 162.79 72.34 361.72
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 96.60 52.71 495.92 161.31 806.54
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 96.60 29.98 227.05 88.41 442.04
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 96.60 52.71 856.60 251.48 1,257.38
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 14.22 111.18 171.47 74.22 371.08
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 14.22 111.18 202.07 81.87 409.33
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 154.24 182.71 327.53 166.12 830.61

610c KILOMETER POST EACH 949.78 1,321.13 1,715.01 996.48 4,982.40

610d TEN KILOMETER POST EACH 1,834.56 2,642.27 3,300.06 1,944.22 9,721.10

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 196.46 66.38 1,274.96 384.45 1,922.25
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 174.11 821.01 2.04 249.29 1,246.45
INCLUDING MAINTENANCE FOR 2 YEARS

Page 210 of 221


NATIONAL HIGHWAY AUTHORITY
COMPOSITE SCHEDULE OF RATES

January- 2011

UMARKOT
(70B)

SAMPAK INTERNATIONAL

Page 211 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

101 CLEARING AND GRUBBING SM 0.75 15.76 0.00 4.13 20.63

102a REMOVAL OF TREES 150-300 mm GIRTH EACH 7.63 262.58 1.88 68.02 340.10

102b REMOVAL OF TREES 301-600 mm GIRTH EACH 21.66 635.47 4.22 165.34 826.70

102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 86.66 2,541.89 16.89 661.36 3,306.79

103 STRIPPING CM 2.68 153.65 0.00 39.08 195.41

104 COMPACTION OF NATURAL GROUND SM 0.38 14.95 2.70 4.51 22.55

106a EXCAVATE UNSUITABLE COMMON MATERIAL CM 5.05 227.95 0.00 58.25 291.25

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106bii EXCAVATE UNSUITBALE MEDIUM ROCK CM 18.16 541.85 0.00 140.00 700.02
MATERIAL

106biii EXCAVATE UNSUITBALE SOFT ROCK MATERIAL CM 12.20 422.98 0.00 108.80 543.98

106c EXCAVATE SURPLUS COMMON MATERIAL CM 4.13 205.65 0.00 52.44 262.22

106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 120.05 360.08 125.00 151.28 756.42

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.13 492.05 0.00 128.29 641.47

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.38 422.98 0.00 108.34 541.70

107a STRUCTURAL EXCAVATION IN COMMON CM 8.27 221.54 0.00 57.45 287.27


MATERIAL

107b STRUCTURAL EXCAVATION IN COMMON CM 70.59 664.63 72.03 201.81 1,009.06


MATERIAL BELOW WATER LEVEL

107ci STRUCTURAL EXCAVATION IN HARD ROCK CM 117.37 400.09 125.00 160.62 803.08
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK CM 105.63 442.22 0.00 136.96 684.81
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK CM 60.36 316.49 0.00 94.21 471.06
MATERIAL

107d GRANULAR BACKFILL CM 36.08 193.34 1,016.29 311.43 1,557.13

107e COMMON BACKFILL CM 29.78 110.10 18.00 39.47 197.35

108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.57 234.11 18.00 64.92 324.60
EXCAVATION IN COMMON MATERIAL

Page 212 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.50 578.46 144.73 186.17 930.87
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.13 637.82 8.55 165.63 828.13
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMAITON OF EMBANKMENT FROM ROADWAY CM 14.34 574.85 8.00 149.30 746.48
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW CM 8.57 119.41 152.97 70.24 351.19
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM CM 6.68 121.79 18.00 36.62 183.09


STRUCTURAL EXCAVATION IN COMMON
MATERIAL

108e FORMATION OF EMBANKMENT FROM CM 15.53 277.82 10.70 76.01 380.06


STRUCTURAL EXCAVATION IN ANY TYPE OF
ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT SM 1.51 43.86 5.15 12.63 63.15

109bi SUBGRADE PREPARATION IN EXISTING ROAD SM 1.10 30.11 2.73 8.48 42.42
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE CM 10.84 190.72 367.55 142.28 711.40

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.90 23.59 2.80 6.82 34.11

114b DRESSING OF BERM WITH EXTRA MATERIAL SM 1.38 26.79 2.80 7.74 38.70

201 GRANULAR SUB-BASE CM 8.77 231.80 1,077.13 329.43 1,647.13

202 AGGREGATE BASE CM 10.39 282.85 1,216.42 377.41 1,887.07

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS A) CM 83.88 2,324.40 9,495.62 2,975.97 14,879.87

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS B) CM 83.88 2,324.40 9,745.29 3,038.39 15,191.96

203c ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,486.81 3,001.19 15,005.95
(CLASS A)

203d ASPHALTIC LEVELLING COURSE PLANT MIX CM 90.24 2,427.71 9,755.29 3,068.31 15,341.55
(CLASS B)

204b CEMENT STABILIZED BASE CM 31.42 780.07 1,456.32 566.95 2,834.77

204c CEMENT CONTENT TON 112.52 0.00 6,993.00 1,776.38 8,881.90

204d LIQUID ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,732.27 16,015.42 80,077.08
MC-250

Page 213 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE TON 268.90 2,060.49 61,732.27 16,015.42 80,077.08
SS-1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF CM 97.11 188.22 1,363.15 412.12 2,060.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK CM 163.96 3,721.78 7,835.48 2,930.31 14,651.53
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE CM 106.77 207.88 1,293.52 402.04 2,010.21
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) SM 1.83 64.78 26.10 23.17 115.87

207b DEEP PATCHING (15-30 cm) SM 1.83 64.78 26.10 23.17 115.87

208 REINSTATEMENT OF ROAD SURFACE SM 1.98 104.50 1.98 27.11 135.57

209a BREAKING OF EXISTING ROAD PAVEMENT CM 5.15 373.82 12.00 97.74 488.71
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 1.03 40.20 2.40 10.91 54.54

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME SM 0.33 2.36 69.45 18.04 90.18
COAT

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME SM 0.32 2.36 60.56 15.81 79.05
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 27.89 7.22 36.11
COAT.

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK SM 0.13 0.86 24.21 6.30 31.51
COAT.

304a SINGLE SURFACE TREATMENT SM 0.88 11.24 151.17 40.82 204.12

304b DOUBLE SURFACE TREATMENT SM 1.28 21.60 288.17 77.76 388.81

304c TRIPLE SURFACE TREATMENT SM 2.16 30.32 335.06 91.89 459.43

304d SEAL COAT SM 0.81 6.38 35.52 10.68 53.39

305a ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,293.29 10,176.50 3,136.17 15,680.86
(CLASS A)

305b ASPHALTIC CONCRETE FOR WEARING COURSE CM 74.90 2,198.28 10,807.95 3,270.28 16,351.41
(CLASS B)

307a DENSE GRADED HOT BIT-MAC CM 180.91 513.14 7,398.34 2,023.10 10,115.49

307b OPEN GRADED HOT BIT-MAC CM 180.91 513.14 7,176.68 1,967.68 9,838.42

Page 214 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

308a RECYCLING OF ASPHALT CONCRETE (0-60 mm CM 31.59 1,050.92 3,603.18 1,171.42 5,857.10
THICK)

308b BITUMEN BINDER GRADE (40-50, 60-70, 80-100) TON 235.55 1,746.20 61,732.27 15,928.51 79,642.53

309a COLD MILLING, 0-30 mm SM 1.08 52.01 18.08 17.79 88.96

309b COLD MILLING, 0-50 mm SM 1.79 86.68 30.14 29.65 148.26

309c COLD MILLING, 0-70 mm SM 2.69 130.02 45.20 44.48 222.39

401a1i CONCRETE CLASS A1 (UNDERGROUND) CM 578.34 2,175.42 4,015.47 1,692.31 8,461.54

401a1ii CONCRETE CLASS A1 (ON GROUND) CM 578.34 2,175.42 4,612.66 1,841.61 9,208.03

401a1iii CONCRETE CLASS A1 (ELEVATED) CM 578.34 2,175.42 4,923.21 1,919.24 9,596.22

401a2i CONCRETAE CLASS A2 (UNDERGROUND) CM 578.34 2,175.42 4,247.67 1,750.36 8,751.79

401a2ii CONCRETAE CLASS A2 (ON GROUND) CM 578.34 2,175.42 4,844.76 1,899.63 9,498.16

401a2iii CONCRETAE CLASS A2 (ELEVATED) CM 578.34 2,175.42 5,155.17 1,977.23 9,886.16

401a3i CONCRETAE CLASS A3 (UNDERGROUND) CM 578.34 2,175.42 4,536.03 1,822.45 9,112.24

401a3ii CONCRETE CLASS A3 (ON GROUND) CM 578.34 2,175.42 5,133.12 1,971.72 9,858.60

401a3iii CONCRETAE CLASS A3 (ELEVATED) CM 578.34 2,175.42 5,422.07 2,043.96 10,219.79

401b CONCRETE CLASS B CM 741.23 1,109.69 3,442.86 1,323.44 6,617.21

401ci CONCRETE CLASS C (UNDERGROUND) CM 561.48 2,175.42 3,811.31 1,637.05 8,185.27

401cii CONCRETE CLASS C (ON GROUND) CM 561.48 2,175.42 4,408.40 1,786.33 8,931.63

401ciii CONCRETE CLASS C (ELEVATED) CM 561.48 2,175.42 4,718.95 1,863.96 9,319.82

401d CONCRETE CLASS D1 CM 898.51 2,689.24 6,453.88 2,510.41 12,552.04

401e CONCRETE CLASS Y CM 1,247.02 703.81 5,132.64 1,770.87 8,854.34

401f LEAN CONCRETE CM 460.84 759.81 2,971.88 1,048.13 5,240.66

401gi PRECAST CONCRETE, CLASS A1 CM 1,859.59 1,470.83 4,586.56 1,979.24 9,896.22

401gii PRECAST CONCRETE CLASS A3 CM 1,859.59 1,470.83 5,136.80 2,116.80 10,584.02

401giii PRECAST CONCRETE, CLASS B CM 1,859.59 1,470.83 4,059.25 1,847.42 9,237.09

401giv PRECAST CONCRETE CLASS D1 CM 1,859.59 1,470.83 6,461.31 2,447.93 12,239.66

Page 215 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

401gv PRECAST CONCRETE CLASS D2 CM 1,859.59 1,470.83 7,110.24 2,610.17 13,050.83

401gvi PRECAST CONCRETE CLASS D3 CM 1,859.59 1,470.83 7,760.84 2,772.81 13,864.06

401h PLUM CONCRETE CM 816.24 1,109.69 2,773.80 1,174.93 5,874.66

404a REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 71,362.98 18,283.58 91,417.90
40

404b REINFORCEMENT AS PER AASHTO M. 31 GRADE TON 1,771.34 0.00 74,512.98 19,071.08 95,355.40
60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS TON 1,420.89 3,667.20 84,551.40 22,409.87 112,049.36
PER ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8"-1/2" DIA TON 2,779.19 12,010.50 143,894.60 39,671.07 198,355.36
COMPLETE IN ALL RESPECT.

405b LAUNCHING OF GIRDER TON 64.69 796.91 0.00 215.40 1,077.00

406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.33 0.00 1,387.26 377.40 1,886.99
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK SM 122.33 0.00 814.97 234.33 1,171.63
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (Local) KG 10.14 18.40 140.05 42.15 210.74

406cii STEEL EXPANSION JOINT WITH TWO EXTRUDED M 420.32 0.00 80,649.01 20,267.33 101,336.66
ALUMINIUM ALLOY SECTIONS FOR 50mm
MOVEMENT (IMPORTED)

406ciii STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 434.39 0.00 128,711.72 32,286.53 161,432.63
ALLOY TRIANGULAR TEETH FOR 110mm
MOVEMENT (IMPORTED)

406civ STEEL EXPANSION JOINT WITH CAST ALUMINIUM M 476.58 0.00 1,095,460.42 273,984.25 1,369,921.25
ALLOY CANTILEVER TEETH FOR 300mm
MOVEMENT (IMPORTED)

406cv STEEL EXPANSION JOINT MONOBLOC TYPE FOR M 420.32 0.00 70,250.29 17,667.65 88,338.26
65mm MOVEMENT (IMPORTED)

406dii PVC WATER STOP 8" SIZE M 105.71 0.00 439.25 136.24 681.19

406e ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 1.53 0.39 1.94
SIZE AND THICKNESS) - LOCAL

406ei ELASTOMERIC BEARING PADS (ACCORDING TO c.cm 0.02 0.00 3.21 0.81 4.03
SIZE AND THICKNESS) - IMPORTED

406f ASPHALT FELT (3 PLY) SM 43.80 0.00 247.19 72.75 363.74

Page 216 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

406g STEEL OR METAL BEARING DEVICES KG 20.79 48.58 149.56 54.73 273.66

407d1 CAST IN PLACE PILES UPTO 1.00 M DIA IN M 272.91 3,155.77 467.37 974.01 4,870.07
NORMAL SOIL (BORING ONLY)

407d2 CAST IN PLACE PILES UPTO 1. 00 M DIA IN M 414.82 4,796.77 629.16 1,460.19 7,300.94
GRAVEL STRATA (BORING ONLY)

407d3 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN NORMAL M 414.82 7,330.09 778.88 2,130.95 10,654.74
SOIL (BORING ONLY)

407d4 CAST IN PLACE PILES 1.1 - 1.5 M DIA IN GRAVEL M 691.36 12,216.82 1,107.16 3,503.84 17,519.18
STRATA (BORING ONLY)

407d5 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN NORMAL M 576.13 10,180.69 970.38 2,931.80 14,659.00
SOIL (BORING ONLY)

407d6 CAST IN PLACE PILES 1.6 - 2.0 M DIA IN GRAVEL M 1,037.04 18,325.24 1,517.51 5,219.95 26,099.74
STRATA (BORING ONLY)

407h PILE LOAD TEST UPTO 120 TON EACH 23,551.38 86,125.76 120,668.96 57,586.53 287,932.63

407i PILE LOAD TEST UPTO 240 TON EACH 23,551.38 86,125.76 257,024.50 91,675.41 458,377.05

407j PILE LOAD TEST UPTO 360 TON EACH 64,058.58 95,444.48 351,839.52 127,835.65 639,178.23

407k PILE LOAD TEST UPTO 550 TON EACH 94,438.98 119,305.60 562,385.90 194,032.62 970,163.10

407l PILE LOAD TEST UPTO 800 TON EACH 139,772.76 143,166.72 910,379.70 298,329.80 1,491,648.98

407m CONFIRMATORY BORING (NX SIZE) M 194.33 2,639.89 22.50 714.18 3,570.89

407n PERMANENT PILE CASING FOR PILES Ton 254.71 3,993.41 83,635.39 21,970.88 109,854.38

410 BRICK WORK CM 355.40 453.06 3,322.00 1,032.62 5,163.08

411a STONE MASONRY RANDOM DRY CM 373.93 165.94 1,316.90 464.19 2,320.97

411b STONE MASONRY RANDOM WITH MORTAR CM 442.69 263.54 2,438.29 786.13 3,930.65

411c STONE MASONRY DRESSED UNCOURSED DRY CM 512.70 165.94 1,699.29 594.48 2,972.41

411d STONE MASONRY DRESSED UNCOURSED WITH CM 582.71 263.54 2,728.42 893.67 4,468.34
MORTAR

411g ROLL POINTING SM 75.83 19.52 96.37 47.93 239.64

412a STONE MASONARY DRESSED COURSED WITH CM 766.48 419.50 2,728.42 978.60 4,893.00
MORTAR

501a R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 554.74 1,409.49 550.33 2,751.64
DIA 310 mm
Page 217 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

501b R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 237.08 616.97 1,654.12 627.04 3,135.22
DIA 380 mm

501c R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 225.88 1,097.40 2,054.64 844.48 4,222.40
DIA 460 mm

501d R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 236.03 1,377.91 2,696.19 1,077.53 5,387.65
DIA 610 mm

501e R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 274.68 1,772.89 5,553.48 1,900.26 9,501.32
DIA 760 mm

501f R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 342.35 2,187.37 8,950.66 2,870.10 14,350.48
DIA 910 mm

501g R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 443.04 2,171.36 12,882.15 3,874.14 19,370.69
DIA 1070 mm

501h R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 521.01 2,636.66 18,566.35 5,431.00 27,155.02
DIA 1220 mm

501i R.C.C. PIPE CULVERT AASHTO M 170 CLASS II M 618.26 3,076.10 29,120.83 8,203.80 41,018.98
DIA 1520 mm

501j R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 237.08 554.74 2,268.98 765.20 3,826.00
DIA 310 mm

501k R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 230.48 616.97 2,583.30 857.69 4,288.45
DIA 380 mm

501l R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 225.88 1,097.40 3,146.42 1,117.43 5,587.13
DIA 460 mm

501m R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 236.03 1,377.91 4,206.11 1,455.01 7,275.05
DIA 610 mm

501n R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 274.68 1,772.89 7,829.97 2,469.39 12,346.93
DIA 760 mm

501o R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 342.35 2,187.37 14,978.71 4,377.11 21,885.54
DIA 910 mm

501p R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 443.04 2,171.36 16,548.54 4,790.74 23,953.68
DIA 1070 mm

501q R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 521.01 2,636.66 20,102.22 5,814.97 29,074.85
DIA 1220 mm

501r R.C.C. PIPE CULVERT AASHTO M 170 CLASS IV M 618.26 3,076.10 31,804.53 8,874.72 44,373.61
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE CM 94.11 157.23 1,022.72 318.52 1,592.58
PIPE CULVERT

Page 218 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

502b CONCRETE CLASS B IN BEDDING AND CM 838.37 845.94 3,516.86 1,300.29 6,501.46
ENCASEMENT OF CONCRETE PIPE CULVERT

507a STEEL WIRE MESH FOR GABIONS KG 5.91 0.00 117.40 30.83 154.13

507b ROCK FILL IN GABIONS CM 100.31 0.00 945.90 261.55 1,307.77

508a BRICK PAVING (SINGLE COURSE) SM 117.67 38.19 262.36 104.55 522.77

508b BRICK PAVING (DOUBLE COURSE) SM 210.18 38.19 516.90 191.32 956.59

509a RIPRAP, CLASS A CM 510.52 0.00 1,013.46 380.99 1,904.97

509b RIPRAP, CLASS B CM 374.40 180.10 1,051.48 401.50 2,007.48

509c RIPRAP, CLASS C CM 367.01 187.60 1,106.46 415.27 2,076.34

509c1 RIPRAP, CLASS D CM 367.01 225.12 1,152.95 436.27 2,181.35

509d GROUTED RIPRAP, CLASS A CM 624.29 170.59 2,835.69 907.64 4,538.20

509e GROUTED RIPRAP, CLASS B CM 484.42 316.57 2,687.79 872.19 4,360.97

509f GROUTED RIPRAP, CLASS C CM 466.19 301.33 2,743.88 877.85 4,389.25

509f1 GROUTED RIPRAP, CLASS D CM 466.19 338.85 2,967.52 943.14 4,715.69

509g REINFORCED CONCRETE SLOPE PROTECTION CM 845.56 481.58 4,015.38 1,335.63 6,678.15
20 cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL CM 51.17 275.72 1,017.47 336.09 1,680.44

510 DISMANTLING OF STRUCTURES AND CM 106.58 884.71 0.00 247.82 1,239.11


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) SM 160.65 103.71 164.69 107.26 536.31

511a2 DRY STONE PITCHING (20-25 cm THICK) SM 205.64 132.75 210.80 137.30 686.48

511b1 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 601.29 287.96 1,439.81
WITH BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 751.61 359.95 1,799.76
WITH BITUMEN JOINTS

511b3 GROUTED STONE PITCHING (15-20 cm THICK) SM 261.64 288.91 350.24 225.20 1,125.99
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS

511b4 GROUTED STONE PITCHING (20-25 cm THICK) SM 327.05 361.14 437.80 281.50 1,407.49
WITHIN PCC BANDS (PAID SEPERATELY) W/O
BITUMEN JOINTS
Page 219 of 221
CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

601ai RCC NEW JERSY BARRIER (IN-SITU) FOR M 383.25 1,157.76 5,629.11 1,792.53 8,962.65
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601di RCC NEW JERSY BARRIER (PRECAST) FOR M 1,065.13 782.78 5,615.22 1,865.78 9,328.91
MEDIAN DOUBLE FACE (INCL. REINFORCEMENT)

601dii PRECAST CURB IN CONCRETE CLASS A-1 OF M 28.28 66.38 605.35 175.00 875.00
SIZE 450X150 mm INCL. BEDDING & HAUNCHING

603 BRICK EDGING M 9.35 0.00 38.40 11.94 59.69

604a METAL GUARD RAIL M 71.05 55.31 2,551.61 669.49 3,347.47

604b METAL GUARD RAIL END PIECES EACH 93.39 533.21 2,865.70 873.07 4,365.37

604d STEEL POST FOR METAL GUARD RAIL EACH 106.57 533.21 2,497.50 784.32 3,921.60

605a CONCRETE BEAM GUARDRAIL (INCL. CM 1,904.08 1,160.70 12,567.69 3,908.12 19,540.58
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL. CM 1,904.08 801.50 11,731.55 3,609.28 18,046.42
REINFORCEMENT)

607a TRAFFIC ROAD SIGNS CATEGORY 1 EACH 245.67 393.19 8,492.05 2,282.73 11,413.64

607b TRAFFIC ROAD SIGNS CATEGORY 2 EACH 75.01 589.78 10,241.63 2,726.60 13,633.02

607c TRAFFIC ROAD SIGNS CATEGORY 3 (a) EACH 245.67 844.19 18,301.39 4,847.81 24,239.07

607d TRAFFIC ROAD SIGNS CATEGORY 3 (b) EACH 798.58 921.65 33,699.59 8,854.96 44,274.78

607e TRAFFIC ROAD SIGNS CATEGORY 3 (c) SM 159.72 223.78 15,697.10 4,020.15 20,100.74

607f ADDITIONAL PANEL SIZE 60 cm x 30 cm. EACH 306.96 0.00 2,249.10 639.02 3,195.08

607g ADDITIONAL PANEL SIZE 90 cm x 30 cm. EACH 306.96 0.00 3,373.65 920.15 4,600.76

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 25.27 8.59 42.93


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 58.94 15.87 79.35


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.07 6.00 33.72 10.70 53.49


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 1.02 3.51 78.61 20.79 103.94


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 83.97 29.98 244.19 89.54 447.68
PAINT FOR 4.0 M ARROWS

Page 220 of 221


CLIENT: CSR - 2011 CONSULTANT:

NATIONAL HIGHWAY AUTHORITY SAMPAK INTERNATIONAL (Pvt.) LTD


ISLAMABAD LAHORE
Rate Analysis Summary (Construction)
Province SINDH

Dcode 70B UMARKOT

Code Description Unit Manpower Equipment Material OH-Profit Rate

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 83.97 52.71 742.76 219.86 1,099.31
PAINT FOR 4.0 M ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 35.27 11.65 58.26
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 101.75 29.69 148.46
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 3.84 7.50 47.03 14.59 72.96
OF 20 cm WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 3.84 13.18 135.66 38.17 190.85
OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 83.97 29.98 340.58 113.63 568.17
FOR 4.0 M ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 83.97 52.71 1,282.96 354.91 1,774.55
FOR 4.0 M ARROWS

608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR EACH 69.72 29.98 162.79 65.62 328.12
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP EACH 69.72 52.71 495.92 154.59 772.95
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT EACH 69.72 29.98 227.05 81.69 408.44
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT EACH 69.72 52.71 856.60 244.76 1,223.79
FOR STOP

609c REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 172.02 73.34 366.70
PROFILE TYPE - SINGLE)

609d REFLECTORISED PAVEMENT STUD (RAISED EACH 10.16 111.18 202.62 80.99 404.95
PROFILE TYPE - DOUBLE)

610b RIGHT OF WAY MARKER (0.20 x 0.20 x 1.2) M EACH 108.14 182.71 390.59 170.36 851.80

610c KILOMETER POST EACH 674.74 1,321.13 1,930.64 981.63 4,908.13

610d TEN KILOMETER POST EACH 1,301.97 2,642.27 3,646.63 1,897.72 9,488.59

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 139.07 66.38 1,292.52 374.49 1,872.46
PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M-2
STANDARD

612a FURNISHING AND PLANTING OF TREES EACH 123.89 821.01 2.04 236.74 1,183.68
INCLUDING MAINTENANCE FOR 2 YEARS

Page 221 of 221


PATRONAGE (NHA – Client)
Senior Executives of National Highway Authority, whose patronage and
support contributed towards successful accomplishment of the assignment:

National Highway Authority

Engr. Raja Nosherwan


Member (Planning)

Engr. Sabir Hassan


Member (BOT)

Engr. Asim Amin


General Manager (Design-I)

Engr. Nand Kumar Soofi


Director (QS)

Engr. Atta-ul-Mohsin
Deputy Director (QS)

i
SERVICES (Sampak International)
Sampak Team Members, whose dedicated services contributed towards
successful accomplishment of the assignment:

Engr. S. M. A. Shirazi
Team Leader

Engr. S. Hasan A. Shirazi


Project Incharge

Mr. Mubashar Hussain


I. T. Expert

Engr. Muneeb Ahmad Qureshi


Cost Engineer

Engr. Agha Zafar Ali


Field / Cost Engineer

Engr. Hasan Murtajiz Khan


Field / Cost Engineer

Mr. Rana Afzaal Ahmad


Field Work Supervisor

ii
REFERENCES

• "General Specifications" National Highway Authority Ministry of Communications (1998).

• "Manual of Quarry Materials" Vol 1-9, Sampak International (Pvt.) Ltd., Lahore.

• "Civil Engineering Estimating & Costing" V.N. Vazirani, S.P. Chandola Khanna Publisher.

• "Practical Civil Engineers Handbook" Khanna Publisher.

• "Machinery Performance Handbook Edition-12" Komatsu Japan.

• "Machinery Performance Handbook Edition-37" Caterpillar USA.

• Composite Schedule of Rates, National Highway Authority (2009).

• Composite Schedule of Rates, National Highway Authority (2000).

iii
NATIONAL HIGHWAY AUTHORITY
NHA HQ, 27, Mauve Area, G-9/1
Islamabad
UAN: 111-000-642
Web: www.nha.gov.pk
Email: info@nha.gov.pk

PREPARED BY:
SAMPAK INTERNATIONAL (PVT) LTD.

You might also like