Major Expressway proposals as per NCR Regional Plan-2021

1. Eastern Peripheral Expressway (Kundli- Ghaziabad- Palwal)


This project aims to construct a 105 km access controlled high speed six-lane (expandable
upto 8 in future) Kundli-Ghaziabad-Palwal (KGP) Expressway, of which 86.4 km passes
through towns like Khekara, Ghaziabad and Greater Noida in UP Sub-region. Land
acquisition for the project has been completed and the RFPs for the project have been
invited. It will form a third Ring Road around Delhi along with Western Peripheral
Expressway Kundli- Manesar- Palwal (KMP) Expressway to decongest Delhi, Ghaziabad,
etc from traffic entering and bypassing the city through National Highways. The complete
peripheral road including Western Peripheral Expressway will connect following radial
highways: NH-1, 2, 8, 10, 24, 58, 91, SH-57, Yamuna expressway, proposed Ganga
expressway among others.

The details of this project are mentioned below:


i. Construction cost - 1612.6 crores
ii. Land acquisition - 677.4 crores
iii. Total project cost - 2290 crores

This project will be implemented by National Highway Authority of India (NHAI). Presently, the
land acquisition is in progress.

2. Ghaziabad- Meerut Expressway (Meerut – Dasna)


This NHDP project aims to construct a 65 km access controlled high speed expressway. It
will help to relieve the traffic from the road connecting Ghaziabad and Meerut. This
Expressway has beenproposed as a 100m-wide ROW from Dasna to Meerut city Bypass.
It is expected to be completed by the end of 2014. The preparation of Detailed Project
Report is in progress.