You are on page 1of 3

1-800-COLUMNS

PULTRUDED FIBERGLASS COLUMNS – INSTALLATION


STEP 1 STEP 2 STEP 3

Slip base over top of the column


Measure opening in four places: Use an abrasive saw (masonry or shaft & allow it to slide to base of
front, back, left & right of the carbide tip blade). Fine trim top and the shaft. Slip cap over column shaft
column (see drawing). Mark column bottom with rasp to assure flat & allow it to rest on neck molding.
accordingly. If column is too long, surface contact. Some sanding may be required.
shorten length from bottom.

STEP 4 STEP 5 STEP 6

Apply construction adhesive to top Put assembly in place and plumb. Mark and drill holes in floor and
and bottom surfaces of column. Make sure load is centered over the column shaft for corner/angle
Use a non-acetone based exterior column shaft and evenly distributed brackets (not included).
grade construction adhesive. around the bearing surface.

CHADSWORTH INCORPORATED
277 NORTH FRONT STREET ▪ HISTORIC WILMINGTON, NC 28401 ▪ PHONE: 1.800.486.2118 ▪ FACSIMILE: 1.910.763.3191 ▪ E-MAIL: sales@columns.com
PULTRUDED FIBERGLASS COLUMNS – INSTALLATION

STEP 7 STEP 8 STEP 9

Mark location for supplied neck


Apply construction adhesive to top Apply construction adhesive to molding to a 45° angle. Apply
of capital, press against structure, and bottom of base and nail or screw to construction adhesive and put neck
screw or nail into place. Use a non- floor. Use a non-acetone based mold in place. Use a non-acetone
acetone based exterior grade exterior grade construction based exterior grade construction
construction adhesive. adhesive. Design – 1 Design – 2
adhesive.

STEP 10 STEP 11 PAINTING TIPS

Follow the paint manufacturer’s


instructions for priming and
finishing fiberglass composite
column and polyurethane capital
and base molding / plinth.

Do not paint using dark colors


(dark colors are considered any
color that falls within the “L”
Pre-drill holes through neck mold values of 56 to 0). “L” is a measure
into column. Screw neck mold in Set screws or nails and use caulk to of the lightness of an object, and
place or pre-drill and use finish nails. cover the holes. ranges from “0” (black) to “100”
(white).

WARRANTY IS VOID IF INSTALLATION INSTRUCTIONS ARE NOT FOLLOWED

www.COLUMNS.com
CHADSWORTH INCORPORATED
277 NORTH FRONT STREET ▪ HISTORIC WILMINGTON, NC 28401 ▪ PHONE: 1.800.486.2118 ▪ FACSIMILE: 1.910.763.3191 ▪ E-MAIL: sales@columns.com
PULTRUDED FIBERGLASS COLUMNS – INSTALLATION
INSTALLATION NOTES AND TIPS

NOTE 1: NOTE 2:
DECORATIVE CAPITALS REQUIRED LOADING

When installing a round Fiberglass Ensure concentric loading of the


column with a decorative capital, column. 100% of the bottom must
subtract the “T” dimension (distance contact substrate and 75% of top
from top of the ornament to the top must contact soffit.
of the neck molding) and add the
height of the decorative capital – this
can lengthen or shorten the height of
the column.

NOTE 3: NOTE 4: NOTE 5:


HAND RAILS CAPITAL AND BASE

When attaching hand rails or corner Light sanding may be needed for Columns are not designed to be set
irons to round or square columns, correct fitting of the base. into masonry.
holes must be pre-drilled.

NOTE 6: NOTE 7: NOTE 8:

Do not fill with concrete. Concrete Columns are not designed to be used
can be used with a barrier such as in a free standing application. If
sonotube. Leave a minimum ½” gap used in free standing applications, a Split columns are no longer
to allow for expansion and structural support must be utilized. weight bearing.
contraction of the concrete.

www.COLUMNS.com
CHADSWORTH INCORPORATED
277 NORTH FRONT STREET ▪ HISTORIC WILMINGTON, NC 28401 ▪ PHONE: 1.800.486.2118 ▪ FACSIMILE: 1.910.763.3191 ▪ E-MAIL: sales@columns.com

You might also like