Your Task

Task

Prepare a clear and structured planning schedule with any planning software for the fabrication and installation for the drawings on the next
two pages.

Assumptions:

Foreman: 1
Labours: 6
Working Hours/day: 9
CNC Machines: 3
CNC Square Metre Output/Hr per Machine: 2

Submit the planning schedule in pdf-format within the next 48 hours to hr@abiya.ae
900 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 400
Notes:
600

600

600
600
600
THIS DRAWING IS THE PROPERTY OF
N10-1 N10a-1
900 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 400 ABIYA Building Material Trading FZE
RAK Free Trade Zone, BC 4 Business Park
P.O. Box: 16111, Ras al-Khaimah, UAE

IT IS NOT ALLOWED TO REPRODUCE IT'S CONTENTS IN ANY


FORM EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2100

2100

2100
2100

2100
THIS DRAWING IS NOT TO BE SCALED,
STATED DIMENSIONS ONLY ARE TO BE CONSIDERED.

ANY DISCREPANCIES ARE TO BE BROUGHT TO THE


N10 N10a
ATTENTION OF THE ENGINEER AND RESOLVED
BEFORE COMMENCEMENT OF ANY WORK.
Typical Panel
MEG_ABM_N10_02 THIS DRAWING IS GENERATED BY
SOLIDWORKS Premium 2016
400 1200 900 900 1200 900 900 1200 1200 1200 1200 900
600

600

600
N10b-1 N10a-1
400 1200 900 900 1200 900 900 1200 1200 1200 1200 900
2100
2100

2100
N10b N10a

900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900
600

600
600

900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900
2100

2100
2100

ELEVATION 7 (C-D BLOCK)_Panels N10, N10-1, N10a, N10a-, N10b, N10b-1


SCALE 1:50

900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900
600

600
600

900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900

2100
2100

2100

RIXOS SAADIYAT ISLAND


900 1200 1200 1200 1200 900 900 1200 900 900 1200 400
600

600
600

900 1200 1200 1200 1200 900 900 1200 900 900 1200 400
2100

2100

2100

Ras al-Khaimah, UAE


contact@abiya-mashrabiya.com
www.abiya-mashrabiya.com
400 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 900
600

600

600
600

600

ELEVATION 7 (C-D BLOCK)


ELEVATION 7 (E-F BLOCK)
400 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 1200 1200 1200 900 900 1200 900 Panels N10, N10-1, N10a, N10a-, N10b, N10b-1

Dragan Beljan 13.9.2017. 0


2100

2100
2100
2100

2100

1:50 A1 1

For Approval

ELEVATION 7 (E-F BLOCK)_Panels N10, N10-1, N10a, N10a-, N10b, N10b-1 MEG_ABM_N10_01
SCALE 1:50
A
1200 Notes:
Building
ACP AREA ACP AREA

400
Structure

400
by others by others THIS DRAWING IS THE PROPERTY OF

50
ABIYA Building Material Trading FZE
EIFS RAK Free Trade Zone, BC 4 Business Park
P.O. Box: 16111, Ras al-Khaimah, UAE

600
600
3.80 IT IS NOT ALLOWED TO REPRODUCE IT'S CONTENTS IN ANY
50 FORM EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.

THIS DRAWING IS NOT TO BE SCALED,


STATED DIMENSIONS ONLY ARE TO BE CONSIDERED.
ACP AREA ACP AREA

400

400
80
by others by others
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

DETAIL 2 ATTENTION OF THE ENGINEER AND RESOLVED


BEFORE COMMENCEMENT OF ANY WORK.
100 THIS DRAWING IS GENERATED BY
SOLIDWORKS Premium 2016
50

3.80

50

Window

2100
2100

DETAIL 1
1
ACP AREA ACP AREA
350

350
by others by others

EIFS
Building
Structure

FRONT ELEVATION_Typical Panel SECTION A-A


SCALE 1 : 20 SCALE 1 : 20

50
3.80
ALU SHS 50x50x3
Main Frame
Window

Mashrabiya panel
Alu 3.8mm

ALU SHS 50x50x3


100 Main Frame

220
RIXOS SAADIYAT ISLAND
GI Rivet Nut M12

ALU SHS 50x50x3 Anchor bolt by contractor


Spacer
50
6

110
GI C Chanel
By contractor
GI BOLT M12

GI C Chanel
By contractor

GI BOLT M12
Building
110

Structure

6
ALU SHS 50x50x3

50
Spacer

GI Rivet Nut M12


100
Ras al-Khaimah, UAE
contact@abiya-mashrabiya.com
Anchor bolt by contractor
www.abiya-mashrabiya.com
ALU SHS 50x50x3
Main Frame

220 Mashrabiya panel


Alu 3.8mm
N10, N10-1, N10a, N10a-1, N10b, N10b-1
3.80 Panel, Sections, Details
50

Dragan Beljan 13.9.2017. 0

1:20 1:2 A1 2

DETAIL 1 DETAIL 2 For Approval

SCALE 1 : 2 SCALE 1 : 2
MEG_ABM_N10_02

You might also like