You are on page 1of 9

SCHEDULE OF RATES

Schedule of City Power rates for the Installation of MV & LV Electrical Network Infrastructure including
Public Lighting & High Masts
THE PROPOSED RATES WILL BE FIXED FOR A PERIOD OF THREE YEARS (2016 - 2018)

SAP # Short Description QTY UNIT RATES


10 soil_dig, b.fill ,comp hand pickable 500 m3 124.09
20 soil_machine exc_dig, b.fill, comp 500 m3 142.97
30 lose rocks/bldrs_soil_dig, b.fill ,comp 500 m3 168.60
40 lose rocks/bldrs_soil_mac, b.fill ,com 500 m3 226.60
50 rock_ wedge & power drill 500 m3 404.63
60 pole hole_removal of rock 100 m3 314.26
70 rock requiring blasting 50 m3 347.98
80 tar paving 60mm thick_cut,& remove 500 m2 268.41
90 concrete 100mm thick _cut & remove 500 m2 175.34
100 interlock blocks lift & stack 500 m2 86.32
110 lifting & stck of paving bricks 500 m2 72.83
120 concrete slabs lifting & stacking 500 m2 115.99
130 lift & stack preservation of lawn grass 500 m2 90.37
140 reinstate_used inter lock blocks 500 m2 144.31
150 reinstate_new inter lock blocks 500 m2 231.99
160 reinstate_used concrete slabs 100 m2 145.67
170 reinstate_ new concrete slabs 100 m2 203.67
180 reinstate_used paving bricks 500 m2 117.35
190 reinstate_new paving bricks 500 m2 215.80
200 backfill trench & compact only 100 m2 83.62
210 supply dry clean river sand 100 m3 221.20
220 supply acceptable filling soil 100 m3 175.34
230 reinstate lawn 100 m2 64.74
240 Supply and install new lawn 100 m2 72.16
250 reinstate and supply new tar 100 m2 588.06
260 handling and supply ready mix concr 100 m3 1,380.00
270 reinstate concrete (excld trench Crete 20 m2 1,209.84
280 supply & b.fill trench _ ready mix 100 m3 756.66
290 trench on concrete road 500 m3 156.46
300 disposal of rock from excavations 65 m3 242.78
310 rock, rubble, spoil_removal & disposa 100 m3 651.45
320 create walkway over trench 55 ea 1,706.19
330 sign boards _ JRA cop 100 ea 1,019.67
340 Obtain way leave information 55 ea 830.84
350 Install Danger barriers for trenches 55 ea 1,157.24
360 Shoring of trench walls 60 m3 555.69
370 Pumping out flooded trench 60 ea 606.94
380 Location of services by Cable locator 50 Hr 1,387.88
390 Traffic deviation 55 ea 60.69
400 Laying of 300mm x3 MV 3c cable 500 m 49.90
410 Laying of 185mm x3 MV 3c cable 500 m 37.77
420 Laying of 95mm x3 MV 3c cable 500 m 21.58
430 Laying of 20 pair control 500 m 43.16
440 Laying of LV 4core cable 70 to185m 500 m 29.67
450 Laying of LV 4core cable25 to35mm3 500 m 25.63
460 Laying of LV cable 16mm2 500 m 29.67
470 Laying plastic marker tape 495 m 2.70
480 Installation of sleeves 110 mm 500 m 22.05
490 Supply and install110mm steel pipe 100 m 77.82
500 Drawn cable = >95 mm2 through pip 500 m 33.72
510 Drawn cable < 95 mm2 through pipe 500 m 25.63
520 Drawn LV pilot cable<35 mm2 throug 500 m 20.23
530 MV Joint for 300mm x 3core cable 100 ea 1,247.61
540 MV Joint for 185mm x 3core cable 500 ea 1,092.50
550 MV Joint for 95mm x 3core cable 600 ea 960.32
560 LV Joint for 185 x4c cable 500 ea 896.93
570 LV Joint for 120 x4c cable 500 ea 745.87
580 LV Joint for 95 x4c cable 100 ea 652.80
590 LV Joint for 25mm & 35mm x4c cable 200 ea 397.89
600 LV Joint for 16 x4c cable 500 ea 312.91
610 MV_make-off & term. >= 300mm x 3 600 ea 1,042.60
620 MV_make-off & term. >= 185mm x 3 500 ea 880.74
630 MV_make-off & term. >= 95mm x 3 c 600 ea 687.87
640 LV_make-off & term. >= 185mm x 4 c 600 ea 511.18
650 LV_make-off & term. >= 120mm x 4 c 500 ea 496.35
660 LV_make-off & term. >= 95mm x 4 co 100 ea 492.30
670 LV_make-off & term>= 25mm&35mm x 500 ea 323.70
680 LV_make-off & term. >= 16mm x 4 co 500 ea 149.71
690 LV_make-off & term.>= 185mm_singl 800 ea 308.87
700 Seal 300mm MV cable ends 100 ea 99.81
710 Seal 185mm MV cable ends 100 ea 89.02
720 Seal 95mm MV cable ends 100 ea 82.27
730 Seal185mm LV cable ends 100 ea 82.27
740 Earth MVC & MSS install earths incl 500 ea 1,414.86
750 Inst. earth spike& connect incl. CAD 100 ea 312.91
760 supply & install earth spike 100 ea 200.97
770 repair earth mats 100 ea 311.57
780 compl inst MSS (excl cable & mv swg 100 ea 2,147.24
790 fill LV and MV cavities with river sand 100 ea 535.46
800 install precast foundations incl prep g 100 ea 1,060.13
810 Install pole mounted distrib. transf. 100 ea 1,726.42
820 Complete install. of TSS as specified 50 ea 4,665.38
830 position MV transformers 100 ea 957.62
840 install MV swg RMU 100 ea 906.37
850 install mv meter cubicle 100 ea 732.38
860 Installation of MV VCB + meter cubic 100 ea 1,002.13
870 install MV vcb cubicle units 100 ea 794.42
880 backfill ducts with dry clean river san 100 m3 387.10
890 cement. top ducts Supply,intsalll WxL 100 m2 285.94
900 sign write complete MV sub 100 ea 341.24
910 designation of sign writing only 100 ea 144.32
920 design LV compt 100 ea 111.95
930 discon, recon & Test Lv Term (ex LV 50 ea 172.64
940 Discon, recon & test excl. MV taped 50 ea 244.13
950 install chamber light wiring 10 ea 443.74
960 Installation maximum demand meter 10 ea 237.38
970 Installation & connecting of kw/h met 20 ea 374.96
980 Installation of test block and fuses 10 ea 257.61
990 Connect test block and fuses 10 ea 225.24
1000 ints,con_ 3_ kwh meter&80A mcb&< 500 ea 617.73
1010 ints,con_ 3_ kwh meter&80A mcb&< 500 ea 842.98
1020 ints,con_1_ kwh meter&80A mcb&< 500 ea 418.12
1030 ints,con_ 1_ kwh meter&80A mcb&< 200 ea 654.15
1040 500 v megger test between cores and 200 ea 138.92
1050 2 kv megger test 200 ea 195.57
1060 earth line loop impedance test per cir 200 ea 102.51
1070 Fit main CB to MSS or LV distrib. boa 50 ea 447.79
1080 Fit add main isolat to LV distrib. Boar 100 ea 385.75
1090 Install LV distribution board 100 ea 705.40
1100 Install LV DB fuse 200 ea 557.04
1110 Fit additional fuse 200 ea 302.12
1120 Replace LV fuse 100 ea 138.92
1130 Replace LV fuse & carriage 100 ea 138.92
1140 Install LV Pillar Box ( Fibre) & Base 120 ea 542.20
1150 Install LV DB (steel) & plinth 30 ea 557.04
1160 Installation & connection Main CB in D 20 ea 315.61
1170 replace existing low voltage 1f circuit 50 ea 173.99
1180 replace existing low voltage 3f circuit 50 ea 221.20
1190 Reset LV MCB 100 ea 97.11
1200 Repair loose connection 100 ea 74.18
1210 Replace jumpers 100 ea 209.06
1220 Redund. Cable out open trench, rem 100 m 31.02
1230 Deco. Red. Bare OHL cond & rmvl & o 100 m 29.67
1240 Decom_Redund_Pole_remove_load_ 100 ea 376.31
1250 Decom. Redund. Dist B/ Pb remove, l 500 ea 1,321.79
1260 Decom. Redund. MV SWG, remove, lo 100 ea 2,206.58
1270 Decom. Redund. Comp SWG, remove, 100 ea 1,574.01
1280 Decom. Redund. MSS, remove, load, 500 ea 3,986.95
1290 Decom. Redund.Trans, remove, load, 100 ea 2,813.53
1300 Decom_Redund_Pole Trans_remove_ 500 ea 2,338.76
1310 Emergency Call Out 200 ea 693.27
1320 Emergency Call Out - Cancelled 200 ea 474.77
1330 Cleaning veget. & rubble in TSS Serv 100 m2 37.77
1340 Cleaning of tunnels 100 m2 78.23
1350 First line inspection of load centers 100 ea 190.18
1360 Maintaining Load center Transf ( Inc 1 ea 5,046.66
1370 Maintaining Load center MV Switchg 1 ea 5,156.22
1380 Maintaining Load center LV S/g ( Inc 1 ea 3,219.14
1390 Maintaining Load center S/l control 1 ea 1,236.83
1400 prime cost sum for community liaison 1 ea 34,260.01
1410 prime cost sum for special materials 1 ea 69,663.78
1420 Establishment of site camp 1 ea 17,896.88
1430 Transporting of 8/10.5 fibre glass pol 100 ea 187.48
1440 transport steel/wood 5/7.2/9.2/11.5m 50 ea 178.04
1450 transport steel double arm curved s 100 ea 233.34
1460 transport steel 17m straight pole 100 ea 368.21
1470 transport concrete 7 metre, 4 kn pol 100 ea 209.06
1480 transport concrete 7 metre, 10 kn po 100 ea 277.85
1490 transport concrete 7.5 metre, 20 kn p 100 ea 258.96
1500 transport concrete 9 metre, 4 kn pol 100 ea 240.08
1510 transport concrete 9 metre, 7 kn pol 100 ea 252.22
1520 transport concrete 9.3 metre, 17.5 k 100 ea 276.50
1530 transport concrete 10 metre, 8 kn po 100 ea 291.33
1540 transport concrete 11m and 7m "h" p 100 ea 492.30
1550 Install 11.5 D-Curved pole, lmr & La 75 ea 495.00
1560 Install 11.5m Curved pole, lmr & Lam 75 ea 470.72
1570 Install 9.2m Curved pole, lmr & Lamp 75 ea 459.93
1580 Installation of 17m stl pole, lmr & La 75 ea 903.67
1590 Install 11.5m stl pole, lmr & Lamp 75 ea 585.36
1600 Install 7.2/9.2m stl pole, lmr & Lamp 75 ea 424.86
1610 Install 8/10.5m grp pole, lmr & Lamp 75 ea 358.77
1620 plant concrete 7 metre, 4 kn pole 100 ea 316.96
1630 plant concrete 7,5 metre, 20 kn pole 120 ea 298.08
1640 plant concrete 9 metre, 4 kn pole 150 ea 312.91
1650 plant concrete 9 metre, 7 kn pole 100 ea 285.94
1660 plant concrete 9,3 metre, 17,5 kn po 100 ea 287.29
1670 plant concrete 10 metre, 8 kn pole 50 ea 288.64
1680 plant concrete 11 & 7 m pole struct 50 ea 575.92
1690 plant 8/10.5 metre grp pole. 100 ea 358.77
1700 install 7.2/9 m stl pole incl. insul. 120 ea 383.05
1710 install 11.5m stl pole incl. insul. 150 ea 388.44
1720 Poles with more than one lintel 50 ea 364.17
1730 Poles with one lintel 50 ea 233.34
1740 Single strain fittings (120/95/50/25) 40 ea 117.34
1750 Double strain fitting for (120/95/50/25 78 ea 129.48
1760 Single suspension fitting_(120/95/50) 90 ea 114.65
1770 T-off strain fitting for (120/95/50/25) 66 ea 124.09
1780 install abc single strainfit. (120-50) 100 ea 117.34
1790 install abc single suspen fit. (120-50) 100 ea 115.99
1800 install abc double strain fit. (120-50) 100 ea 126.78
1810 install abc t-off strainfit. (120-50) 100 ea 124.09
1820 install IP clamp for tap-off one bolt 100 ea 75.53
1830 install IP clamp for tap-off two bolt 100 ea 76.88
1840 joint abc 120 mm2 x 3 + n + e + s/l 50 ea 295.38
1850 joint abc 95 mm2 x 3 + n/e + s/l 55 ea 250.87
1860 joint abc 70 mm2 x 3 + n/e + s/l 55 ea 226.59
1870 joint abc 50 mm2 x 3 + n/e + s/l 60 ea 210.41
1880 joint abc 25 mm2 x 3 (s/l) 50 ea 176.69
1890 joint abc10 mm2 split concentric LV 55 ea 117.34
1900 terminate abc 120 mm2 x 3 + n + e + 55 ea 380.35
1910 terminate abc 95 mm2 x 3 + n/e + s/l 60 ea 298.08
1920 terminate abc 70 mm2 x 3 + n/e + s/l 90 ea 280.54
1930 terminate abc 50 mm2 x 3 + n/e + s/l 90 ea 257.61
1940 terminate abc 25 mm2 x 3 (s/l) 90 ea 199.62
1950 Inspection of LV overhead lines (per c 100 ea 13.49
1960 Inspection of MV overhead lines (per c 100 ea 13.49
1970 Retentioning of LV conductor ( per cir 120 ea 279.19
1980 Retentioning of MV conductor ( per cir 120 ea 206.31
1990 Splicing & retention snapped conduct 120 ea 356.07
2000 Bandit strap all cables to pole (1 m in 120 ea 56.65
2010 Dressing a double shackle pole incl. 120 ea 279.19
2020 Install of any outreach bracket 85 ea 125.44
2030 Installation of LV stay assembly 100 ea 241.43
2040 Installation of MV stay assembly 100 ea 238.73
2050 Installation of flying stay assembly 65 ea 267.06
2060 Install fly-stay-Pole incl accessories 40 ea 246.82
2070 Install & fix inter-pole incl. all accs 66 ea 268.40
2080 Install & fix Double Shackle pole incl. 120 ea 299.43
2090 Install & fix Terminal-pole incl. accs. 100 ea 264.36
2100 Pole-mounted DB 1&3 phase boxes 66 ea 578.62
2110 Repair earth guards 100 ea 209.06
2120 Replace earth guards 100 ea 279.19
2130 Replace earth mats 100 ea 279.19
2140 Replace MV and LV insulators 120 ea 209.06
2150 Replace & install of X arm incl. insul 120 ea 209.06
2160 Replace surge arrestors 120 ea 314.26
2170 Tree cutting under emergency 120 ea 423.51
2180 Install, Comm street light SDB/SPB on 90 ea 728.33
2190 Install pole-ext- 2,3m (M way) 85 ea 899.63
2200 Installation of lamps only 70 ea 82.27
2210 Cleaning of Luminaire bowls 1 ea 59.35
2220 Install fitting & lamp (Different sizes) 65 ea 180.73
2230 Install stl lmr & 100mm-brack incl La 65 ea 246.82
2240 Remove and replace any size luminai 70 ea 210.41
2250 Install & wire Photocell 45 ea 195.57
2260 Replace photo-electrical cell 75 ea 113.30
2270 Install Streetlight Control circuit in L/ 90 ea 565.30
2280 Remove and install a timer 55 ea 161.85
2290 Remove and install a ripple relay 45 ea 161.85
2300 Replace pole cover only 65 ea 95.76
2310 Straightening of skew poles 65 ea 180.73
2320 Install or replace street light bracket - 55 ea 140.27
2330 Removal of welded covers 65 ea 164.55
2340 Welding of pole covers 65 ea 164.55
2350 Wire any pole size 20 ea 182.08
2360 Numbering of all poles 75 ea 72.83
2370 Painting of all poles ( Any Length) 1 ea 214.04
2380 Sleeving of poles 1 ea 152.09
2390 install pole earths ,incl. all excav. 1 ea 716.19
2400 Install stainless steel wire rope 1 ea 888.84
2410 Install+C315 trailing cable 1 ea 662.24
2420 Install 4-way term block & photocell 1 ea 151.06
2430 Install a by-pass switch for photo cell 1 ea 159.15
2440 convert exist_ inner door to vandalpr 1 ea 511.18
2450 disconnect and lower mast as specifi 1 ea 3,061.70
2460 disconnect & remove-photo elec. swi 1 ea 311.57
2470 inspection and certification of Masts 1 ea 992.69
2480 inspection and report on suspect/faul 1 ea 651.45
2490 inspection, tests and report on masts 1 ea 536.81
2500 install earth leakage isolator_mast D 1 ea 333.15
2510 lowering and raining of sectional pole 1 ea 1,896.37
2520 lowering and raising a luminaries 1 ea 840.28
2530 mech & electrical tests on repairs 1 ea 544.90
2540 painting damaged galvanizing 1 ea 182.08
2550 Lowering and raising a repaired mast 1 ea 2,926.82
2560 replacing a faulty time switch 1 ea 230.64
2570 removing holding down nuts per mast 1 ea 136.23
2580 removing tack welded holding down n 1 ea 188.83
2590 replace 1,5mm² x 3 core silicone insul 1 ea 200.97
2600 replace 16 amp 220 volt switched so 1 ea 233.34
2610 replace 2,5mm² x 5 core training cabl 1 ea 465.32
2620 replace 30 amp triple pole circuit 1 ea 249.52
2630 replace 5 pin male plug top on trailin 1 ea 349.33
2640 replace 5 pin socket outlet in mast 1 ea 250.87
2650 replace 60 amp fusebase, cart and f 1 ea 138.92
2660 replace cable separator 1 ea 323.70
2670 replace complete DB inside mast 1 ea 1,043.95
2680 replace compression glands for abov 1 ea 80.93
2690 replace faulty contactor 1 ea 175.34
2700 replace fiberglass hood/canopy 1 ea 379.00
2710 replace luminaries cable splitter box 1 ea 306.17
2720 replace neutral bar on mast DB. 1 ea 121.39
2730 replace only 400 watt lamp 1 ea 140.27
2740 replace pole cover only 1 ea 183.43
2750 replace pulley& hous. 4 steel wire rop 1 ea 520.62
2760 replace pulleys for trailing cable ( pe 1 ea 612.34
2770 replace steel wire ropes comp. with a 1 ea 813.31
2780 reset any size circuit breaker 1 ea 99.81
2790 replace and reset single pole circuit 1 ea 226.59
2800 replace and reset triple pole circuit 1 ea 238.73
2810 replacing and tack welding a new nut 1 ea 144.32
2820 replacing and tack welding a used nut 1 ea 147.02
2830 Replace street light bracket - all sizes 1 ea 144.32
2840 Install street lighting luminaries-all si 1 ea 155.11
2850 supply and install complete DB 1 ea 2,006.96
2860 supply and mount stubby as specifie 1 ea 1,532.20
2870 supply new vandal proof inner door 1 ea 772.84
2880 touch up paint (per container) 1 ea 195.57
2890 collection of material from stores 1 ea 995.39
2900 compaction certificate (public roads ) 1 ea 965.72
2910 provision of security per 12hr shift 1 ea 272.29
2920 decommissioning of meters 1 ea 677.08
2930 decommissioning of supply 1 ea 345.28
2940 commissioning of supply 1 ea 445.09
2950 Transport material during normal hrs 1 ea 1,203.10
2960 Transport cable and large equipment 1 ea 1,571.31
2970 prep of As-built drwgs electronically 1 ea 1,816.79
2980 preparation of hand over documents 1 ea 1,977.29
2990 Inspect/remove and replace 5 A 1 ph 1 ea 151.06
3000 Inspect/remove & replace polyphase 1 ea 431.61
3010 Second visit to check for tampering 1 ea 205.01
3020 Hand prescribed notice for irregularit 1 ea 120.04
3030 Issue Engineer with cert. of completi 1 ea 1,814.09
3040 Contractor to attend court 1 ea 1,439.13
3050 Install hasp & staple 1 ea 292.68
3060 Make off an connect 2.5mm2 2 x 19 co 1 ea 343.94
3070 Install incl. saddles 2.5mm²/2 x19 core 1 ea 68.79
3080 Site inspect, reporting and cert of ins 1 ea 834.89
3090 Reprogram electronic meter 1 ea 194.22
3100 Replace old meter with new electroni 1 ea 600.20
3110 Provide download from electronic me 1 ea 209.06
3120 Audit prepaid meters 1 ea 122.74
3130 Remove tamper/bridge meter 1 ea 196.92
3140 Revisit/no access/can't locate 1 ea 190.18
3150 install precast foundations incl prep g 1 ea 1,242.21
3160 Complete Refurbish Pillar Box 1 ea 1,089.80
3170 Pillar Box Repair 1 ea 787.68
3180 Painting of Load Centre 1 ea 547.60
3190 Labeling of Load Centre 1 ea 509.83
3200 Repair & Painting of Substation Build 1 m2 1,057.43
3210 Security bars over louvers and wind 1 ea 1,839.72
3220 Repair & Paint_Substation Roof & Cei 1 m2 276.50
3230 Install of 2 m high palisade Fencing 1m 1,708.89
3240 Building work 1 m2 441.05
3250 Concrete work 1 m2 586.71
3260 Repair of Perimeter Fencing and wall 1m 1,425.65
3270 Painting Perimeter Fencing and wall 1m 178.04
3280 Repair Mss/Tss/Load centre door & h 1 ea 477.46
3290 Replace Mss/Tss/Load centre door & 1 ea 1,126.22
3300 Install 8mm cover plate_ trench in su 1 m2 563.78
3310 Install Anti Theft Mss brackets 1 ea 275.15
3320 Install Anti theft cable brackets 1 ea 354.73
3330 Removal of illegal connection 1 ea 528.23
3340 Clean substation & chamber (inside) 1 ea 1,660.33
3350 Reinstate_pole mounted pillar box do 1 ea 1,339.32
3360 LPU site inspection and cert_installat 500 ea 795.77
3370 Install CT's and VT's 500 ea 782.28
3380 Install and commission a modem 500 ea 606.94
3390 install an external antennae 500 ea 701.36
3400 Standby - Special Events(per occasion 498 ea 3,466.33
3410 Standby-Attending to no power compla 500 ea 10,790.13
3420 Standby - Jointing Team(per week)incl 500 ea 8,092.60
3430 Standby - Excavation Team (per week) 85 ea 6,743.83
3440 Supply of 4core x 2.5mm CU PVC S 100 m 43.30
3450 Supply of 4core x 4mm CU PVC SW 100 m 65.82
3460 Supply of 12core x 2.5mm CU PVC 100 m 53.41
3470 Supply of 12core x 4mm CU PVC S 100 m 128.67
3480 Supply of cement 100 ea 103.50
3490 Laying of 4core x 2.5mm CU PVC S 100 m 21.58
3500 Laying of 4core x 4mm CU PVC SW 100 m 25.63
3510 Laying of 12core x 2.5mm CU PVC 100 m 26.98
3520 Laying of 12core x 4mm CU PVC S 100 m 29.67
3530 Pre paid meter Single Phase 100 ea 539.51
3540 Pre paid meter Three Phase 100 ea 809.26
3550 AMR Meter Installation 100 ea 944.14
3560 Protection Structure 100 ea 539.51
3570 Install Locks 100 ea 33.72
3580 Install a 40mm sleeve 100 m 40.46
3590 Install a 24SM HDD in f/c sleeve 100 m 26.98
3600 Installation of 48SM HDD f/c in a sle 100 m 26.98
3610 Fusion splicing per fibre core 100 ea 161.85
3620 Term. of 24 fibre in p/pannel incl. spli 50 ea 4,531.85
3630 Term. of 48 fibre in p/pannel incl. spli 100 ea 8,416.30
3640 Optical testing with light source and 100 ea 13.49
3650 OTDR testing including traces in hard 100 ea 1,359.56
3660 OTDR testing including traces in hard 100 ea 2,719.11
3670 Installation of demand meters 100 ea 816.50
3680 Stringing of ABC 10mm & 16mm ( A 100 m 28.75
3690 String. ABC (new) of 16 to 25mm 2/ 100 m 28.75
3700 String ABC (new) of35mm2(4/5 core 100 m 37.64
3710 String ABC (new) of 50mm²(4/5 core) 100 m 64.70
3720 String ABC (new) of 95mm²(4/5 core 100 m 83.95
3730 String ABC (new) of 120mm²(4/5 co 100 m 92.00
3740 Retentioning of ABC of 35mm²(4 cor 100 m 6.15
3750 Retentioning of ABC of 50mm²(4 cor 100 m 6.86
3760 Retentioning of ABC of 35mm²(4 cor 100 m 9.96
3770 Retentioning of ABC of 50mm²(4 cor 100 m 13.20
3780 Retentioning of ABC of 95mm²(4 cor 100 m 25.84
3790 Retentioning of ABC of 120mm²(4 co 100 m 29.34
3800 Removal of ABC 35mm² 100 m 6.69
3810 Removal of ABC 50mm² 100 m 8.14
3820 Removal of ABC 95mm² 500 m 12.63
3830 Removal of ABC 120mm² 500 m 16.65
3840 Retentioning of Fox per conductor 500 m 4.08
3850 Retentioning of Mink per conductor 500 m 4.85
3860 Retentioning of Hare per conductor 500 m 5.11
3870 Retentioning of Squirrell per conduct 500 m 6.14
3880 Retentioning of Ferret per conductor 500 m 11.95
3890 Stringing of Fox per conductor 500 m 10.85
3900 Stringing of Mink per conductor 500 m 16.17
3910 Stringing of Hare per conductor 500 m 17.26
3920 Removal of Fox per line (Not ABC) 500 m 47.34
3930 Removal of Mink per line (Not ABC) 500 m 5.52
3940 Removal of Hare per line (Not ABC) 500 m 9.49
3950 Cable Fault finding (per cable) 100 ea 964.60
3960 Spotting streetlights ( No Repairs in 100 ea 632.50
3970 Removal and transportation of highm 50 ea 18,975.00
3980 Install a S/P Split Prep Mtr (A) 50 ea 822.83
3990 Install a S/P Split Prep Mtr (B) 50 ea 1,390.93
4000 Install a 3 phase Split Prep Mtr (A) 100 ea 920.00
4010 Install of 3 phase Split Prep Mtr (B) 100 ea 1,547.33
4020 Replc CMK with Anti-V CMK - C 100 ea 2,070.00
4030 Replc SDB with Anti-V CDU (pole mnt 100 ea 1,977.43
4040 Install, test and comm. RAT#s in MSS 100 ea 690.00
4050 Replc. CMK with Prot. Enclo & In (F) 100 ea 2,990.00
4060 Replc SDB with anti-V, pole mntd inc 100 ea 2,001.00
4070 Connecting of kw/h meters 100 ea 319.70
4080 2 kv test ABC between core to earth 100 ea 197.80
4090 Install IP clamp for tap off one bolt 100 ea 64.40
4100 Joint abc 10 mm2 split concentric LV 100 ea 100.05
4110 Retentioning of conductor 100 ea 238.05
4120 Commissioning of supply 100 ea 379.50
4130 Transport of mat. during normal hrs 100 ea 787.18
4140 Preparation of hand over documents 100 ea 63.25
4150 STRINGING ABC 3x120 100 ea 57.50
4160 STRINGING ABC 1x70 100 M 23.00
4170 STRINGING ABC 1x25 100 M 17.25
4180 TERMINATING OF SERVICE CABLE 100 ea 126.50
4190 INSTALL DOUBLE STRAIN FITTING 100 ea 92.00
4200 INSTALL SUSPENSION FITTING 200 ea 46.00
4210 INSTALL IPCS 200 ea 23.00
4220 LV JOINTING 200 ea 138.00
4230 INSTALL BOX 200 ea 460.00
4240 BANDIT STRAPPING 200 ea 28.75
4250 INSTALL CIRCUIT BREAKERS 200 ea 51.75
4260 LABEL SERVICE CABLES 200 ea 23.00
4270 DECOMMISSION EXISTING LV LIN 200 ea 460.00
4280 REMOVAL OF REDUNDANT CABLES 200 M 86.25
4290 TEST ABC 100 ea 287.50
4300 TEST SERVICE CABLES 100 ea 138.00
4310 TEST SERVICE CABLE (LOOP IMP 100 ea 138.00
4320 LIFTING OF PAVING 200 M2 23.00
4330 REINSTATEMENT OF PAVING 200 M2 57.50
4340 INSTALLATION OF STAY PEDESTAL 200 ea 287.50
4350 INSTALLATION OF PLAIN MAST DIS 200 ea 460.00
4360 Numbering of steel poles 200 ea 72.83
4370 Hard hand pickable soil 200 M3 124.09
4380 Hard hand pickable soil with soft rock 200 M3 168.60
4390 Removal of rubble from site 200 M3 651.45
4400 Sign board 200 ea 1,019.67
4410 Traffic deviation 200 ea 60.70
4420 Cutting and removal of tarred pavem 200 M3 268.41
4430 Reinstatement of tar 200 M3 588.06
4440 Remove and replace Luminaries 200 ea 210.40
4450 Install/ replace pole mounted street li 200 ea 578.60
4460 Termination for 95 - 185 mm² x 4 cor 200 ea 511.19
4470 Joints for 95 - 185 mm² x 4 core CU 200 ea 896.93
4480 Termination for ABC up to 120 mm² 200 ea 380.35
4490 Lay 95 - 185 mm2 4 core SWA cable 200 M 29.67
4500 Lay 16 mm2 or less 4 core SWA cab 200 M 2.70
4510 Painting of steel pole 200 ea 214.04