1. Pump down the refrigerant in to the cooling condenser, Replaced the liquid line, suction line filter and compressor oil with new. 2. Cooling condenser descaling. 3. Found the compressor – 01 discharge line valve not controlling released the refrigerant and nitrogen pressure hold completed, evacuation done for 12 Hours. 4. Charged the new refrigerant in the refrigeration system - 01. 5. Checked the performance of the system found all the parameters OK.
物品损耗表/COMPONENTS CONSUMED LIST (附件/ MORE ENCLOSED □ 是/YES √ 否/NO )
NO. 名称和规格/NAME AND SPECIFICATION 数量/QUANTITY 备注 / REMARK 1 Filter D48, H48, compressor oil RL32H 04, 02, 6L For both refrigeration systems. 2 Refrigerant R404 A 9 KG For both refrigeration systems. 付费方/PAYER □TOFFLON □ 费用 /CHARGE □ 已付/YES PAID □待付/NOT PAID 服务时间 / SERVICE DURATION 到达/ ARRIVAL14 Jul 2017 完成/DEPARTURE 18 Jul 2017 服务结论/GENERAL CONCLUTION (附件/ MORE ENCLOSED □ 是/YES □ 否/NO ) 本 次 问 题 已 经 得 到 圆 满 解 决 , 服 务 成 功 / ALL THE ISSUES ARE RESOLVED, HENCE CURRENT SERVICE IS SUCCESSFULLY. □ 是/YES □ 否/NO
Career objective- To seek a challenging position as Electrical &Instrumentation -Maintenance Engineer in a dynamic environment...utilize my knowledge, potential and technical skills to prove to be an asset for its effective functioning and be a team .docx