You are on page 1of 8

REPUBLIC OF THE PHILIPPINES

TABLE OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL

OF
CONTENTS
DISTRICT/CITY/MUNICIPALITY

ARCHITECTURAL LAND USE & ZONING

A-1 PERSPECTIVE VIEW, TABLE OF


CONTENTS

A-2 FLOOR, REFLECTED CEILING, ROOF


PLAN, ELEVATIONS, AND SECTIONS

A-3 SCHEDULE OF DOOR & WINDOWS, LINE & GRADE


BAY SECTION, DETAIL SECTION,
LOUVER BLOCK VENT., RAMP
DETAIL

A-4 CABINET, COUNTER & TOILET


DETAILS

ARCHITECTURAL

1 PERSPECTIVE VIEW
A-1 SCALE: NTS

STRUCTURAL

S-1 FOUNDATION PLAN, ROOF


FRAMING PLAN FOOTING DETAIL, STRUCTURAL
COLUMN DETAIL, WF-1, RAMP
DETAIL

S-2 ELEVATIONS TYPICAL


CONNECTION DETAIL

SANITARY

ELECTRICAL

E-1 ELECTRICAL LAYOUT PLAN, RISER


DIAGRAM, LOAD SCHEDULE, GEN.
NOTES

ELECTRICAL

SANITARY

MECHANICAL

REPUBLIC OF THE PHILIPPINES PREPARED BY : CHECKED BY : RECOMMENDING APPROVAL : APPROVED BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: NQM


DEPARTMENT OF EDUCATION
ONE STOREY
SCIENCE LABORATORY ENCODED BY: MMC DepED A-1
MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
BUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

4
S
CHECKED BY: LGP
S
IE

ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


INEERING D

PDO III ARCHITECT III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY PERSPECTIVE VIEW, TABLE OF CONTENTS
AL
IC

PFSED-DepED
IV

SI
I

YS

MERALCO AVENUE, PASIG CITY


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p .

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


A B C 1 2 3 4 5
GA#26 PLAIN GI RIDGE
9000 9000
7000 ROLL PAINT

1200 3500 3500 1500 600


4500 4500 4500 4500
600 C B A 300x300mm EXT.
CONC. LOUVER
GA.#26 CORR. G.I. ROOFING
BLOCKS
SHEET (PAINT FINISH)
7000 GA.#26 CORR. G.I.
GA#26 G.I. FLASHING ON 1500 3500 3500 1200 ROOFING SHEET
12x300mm FIBER CEMENT TOP OF TRUSS
APEX OF ROOF (PAINT FINISH)
FASCIA BOARD (PAINT
6mm THK. PLYWOOD
FINISH) 16 50
53 00 CEILING ON 50X50mm

1780

1780
SLOPE CEILING JOIST SP.
300x300mm EXTERIOR BASKET STRAINER
@600mm O.C.
CONC. LOUVER BLOCKS TOP OF BEAM
TOP OF ROOF BEAM BOTHWAYS (PAINT
490 W-4 W-4
GA#26 PLAIN G.I. FINISH)
W-4 W-4
GUTTER PAINT FIN.
12x300mm FIBER
12x300mm FIBER CONC. 75mm PVC DOWN CEMENT FASCIA

3000

3000
FACIA BOARD (PAINT FIN.) SPOUT
D-1
BOARD (PAINT FIN.)
50mm HANDRAIL w/32mm
150 mm THK. CHB WALL WITH CLASSROOM FIN. LAB. 6mm THK MARINE
FLOOR LINE
RAILING @150mm OC BW
PLAIN CEMENT PLASTER PLYWOOD ON
W-1 W-1 W-1
(PAINT FIN.) CORR. RAMP CLASSROOM FLR. FIN. LN. CORR. SHE HE STO. 50x50mm CEILING
TOILET FIN. FLOOR

400
JOIST @600mm O.C.

400
400

LINE FIN GRD. LN.


BW. (OPTIONAL)
FIN. GRADE LINE
150 mm THK. CHB
WALL WITH PLAIN
3 LEFT SIDE ELEVATION 4 REAR ELEVATION 7 CROSS SECTION CEMENT PLASTER
(PAINT FIN.)
A-2 SCALE: 1:100 M
A-2 SCALE : 1:00 M.
A-2 SCALE : 1:00 M.

1 2 3 4 5
C B A
9000 9000
FRAMED CLEAR
475 4500 4500 4500 4500 475
7000
5 4 3 GLASS COVER 2 1
1500 3500 3500 1200
GA.#26 CORR. G.I. ROOFING 9000 9000
SHEET (PAINT FINISH)
475 4500 4500 4500 4500 475
GA#26 G.I. FLASHING ON
TOP OF TRUSS TOP OF TRUSS 12x300mm FIBER CEMENT
PLAIN CEMENT
FASCIA BOARD (PAINT PLASTER/PAINT FIN.
FINISH)
1780

SLOPE
300x300mm EXTERIOR

1780
TOP OF BEAM TOP OF BEAM CONC. LOUVER BLOCKS SEE ROOF FRAMING DETAIL

W-3 W-3

12x300mm FIBER CONC.


3000

FACIA BOARD (PAINT FIN.)


D-1 W-4

2800
CLASSROOM FIN. CLASSROOM FIN. 150 mm THK. CHB WALL WITH
FLOOR LINE FLOOR LINE PLAIN CEMENT PLASTER
W-1 D-1 W-3 W-3 D-1
CORRIDOR FIN. CORRIDOR FIN. RAMP CORR. (PAINT FIN.)
25

200x200mm VITRIFIED
375

50
FLOOR LINE

400
FLOOR LINE
WALL TILES(GLAZED)
FIN. GRADE LINE FIN. GRADE LINE

400
20mm THK PLYWOOD COVER w/DECO MOULDING PAINT

2 RIGHT SIDE ELEVATION


100mm THK
FRONT ELEVATION
WITH EPOXY OR ANTI-ACID PAINT
5 CONCRETE SLAB
GRAVEL BEDDING

POLYETHELENE 8 LONGITUDINAL SECTION


FROMM SELECTED

A-2 SCALE : 1:00 M. A-2 SCALE: 1:100 M


SHEET FOR
BACKFILLING
MATERIALS
DAMPROOFING
A-2 SCALE : 1:00 M.

6mm THK. ORD.

1 2 3 4 5 PLYWOOD CEILING
GA#26 G.I. GUTTER ON
GA#26 G.I. FLASHING

1 2 3 4 5
CEILING VENT. BOARD ON 50x50mm GA#26 CORR. G.I. GA#26 G.I. RIDGE ON 12x300mm FIBER

9000 9000
1 SEE DETAIL 2 LIGHTING
FIXTURE
3 12x300mm FIBER
CEMENT FASCIA
4 CEILING JOIST 5 ROOFING PAINT FIN. ROLL PAINT FIN.
12x300mm FIBER
CEMENT FASCIA
CEMENT FASCIA
BOARD PAINT FIN.
BOARD PAINT FIN. @600mm O.C. BW BOARD PAINT FIN.
9000 9000
475 4500 4500 4500 4500 475 9000 9000 (PAINT FIN.)
4500 4500 4500 4500
3000 1500 4500 4500 4500 4500
150mm THK CHB WALL
150mm THK CHB WALL ROOF LINE ABOVE WITH PLAIN CEMENT
WITH PLAIN CEMENT
PASTER (PAINT FIN)
1000

PASTER (PAINT FIN) W-3 W-2 W-2

A
1000

LAB. CABINET

A A
CONTROL
2200

ROOM

2200
D
2200

3 2 2 2 2 2
1300

D SLOPE
3

1300
STORAGE
1300
7000

B 2000
CLASSROOM

7000
B
900

7000

B
FL-1
2 2 2 2 2

900
900
1000

W-4 D
HE

1000
4 SLOPE
1000

D
9 SHE 2
1600

A-2 D W W-1 2 2 2 2 2

1600
D-1 D-1
1600

W-4 1 1
C
200x200mm VITRIFIED
15mm
DEP. W-1 CORRIDOR
FL-2
15mm
DEP. W-3 W-3
15mm
DEP.
C C
UNGLAZED FLOOR TILES 200x200mm VITRIFIED
UNGLAZED FLOOR TILES
RAMP UP

1300
1200

6
LANDING
A-2 FL-3

6mm THK. MARINE PLYWOOD SCHED. OF FLOOR FIN.

4500 1200 1500 CEILING BOARD ON 50x50mm


PLAIN CEMENT FLR. FIN.
CEILING JOIST @600mm O.C. FL-1

6 REFLECTED CEILING PLAN BW PAINT FIN.


9 ROOF PLAN
1 FLOOR PLAN A-2 SCALE: 1:100 M A-2 SCALE:
1:100m FL-2
PLAIN CEMENT FLR. FIN.

A-2 SCALE: 1 : 100 M


PLAIN CEMENT FLR.
FL-3
FIN. W/ GROOVE (ROUGH)

REPUBLIC OF THE PHILIPPINES DESIGNER BY :


PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: NQM


DEPARTMENT OF EDUCATION
EMMANUEL P. CUNTAPAY
ONE STOREY
CHIEF, ARCHITECTURAL DIV.
DPWH
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI
SCIENCE LABORATORY ENCODED BY: MMC MAX C DepED A-2
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN UNDERSECRETARY & CHAIRMAN UNDERSECRETARY
MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
DEPATMENT OF EDUCATIONBUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

4
S
DPWH DPWH DPWH, TASK FORCE IN SCHOOL BUILDING CHECKED BY: LGP
(DepED)
S
IE

ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


INEERING D

PDO III ARCHITECT III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY GROUND FLOOR, REFLECTED CEILING PLAN,
AL
IC

PFSED-DepED
IV

SI
I

YS

MERALCO AVENUE, PASIG CITY ROOF PLAN, ELEVATIONS AND SECTIONS


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p .

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


STL. PURLINS (SEE
STRUCTURAL DET.)
600 TECKSCREW

300 325 50 GA#26 CORR. ROOFING SHEET


(PAINT FIN.) TECK SCREW
275

25x25 mm WOOD SAG ROD (SEE DETAIL)


20x2mm THK. FLAT
VENT PROVIDE FULLY WELD
BAR GUTTER STRAP
INSECT SCREEN 4.8mm THK. FIBER CEMENT ON RAFTER
CEILING BOARD ON 50x50mm
NAILERS @600mm OC BW
(PAINT FIN) GA#26 PLAIN G.I.
LOUVER BLOCKS
GUTTER PAINT FIN.
(CONCRETE) 6mm THK. ORD. CLNG. PLY 6mm GROOVE

CEILING ON 50X50 CLNG. FR. 25x75mm WD.FRAME 2-16mm M. BOLTS

600
JOISTS SP. @600mm O.C. BW ( S4S KD TANG. 10mm THK. PLATE 12x300mm FIBER CEMENT
PAINT FIN. ) FASCIA BOARD w/ 20x20x2mm
150x300x10mm THK.
ANGULAR BAR FRAME AND
BASE PLATE
INSIDE VERT. MEMBER @ 600mm ON

300
50 25 25 25
4-16x300mm LONG

300
SECTION (SCALE:1:10m)
425 CENTER PAINT FIN.
BENT ANCHOR BOLTS

VENTILLATION W/ 25x25x2mm FLAT BAR


4.8mm THK. FIBER
WIRE MESH GUTTER HANGER
575 575 CEMENT CEILING
GA#26 PLAIN 27 @1200mm OC PAINT
BOARD. ON
GI. FLASHING GA#26 CORR. GI. FIN.
50x50mm CLG. JST.
ELEVATION 173 ROOF
@600mm O.C. BW.

275
OUTSIDE C-PURLIN SEE
20x20x2mm ANGULAR BAR
STRUCTURAL 12x300mm FIBER CEMENT
FOR FASCIA BD. FRAME
DET. FASCIA BOARD w/20x20x2mm
WELD TO RAFTERS AND

50
PLAN 25x25mm WOOD VENT ANGULAR BAR FRAME AND
PURLINS

SECTION

150
PROVIDE INSECT SCREEN VERTICAL MEMBER @600mm
OC. PAINT FIN. DOME TYPE BASKET
9 LOUVER BLOCKS DETAIL
PLAN (SCALE:1:20m) STRAINER

6
50
75mm PVC

A-3 SCALE : 1:10M DOWNSPOUT

CONCRETE SLAB
RAFTER SEE 10 EAVES, VENT. & INT CEILING DETAIL
POLYETHYLENE SHEET STRUCTURAL

DAMPROOFING
20x20x2mm ANGULAR BAR @600mm OC
DET.
A-3 SCALE : AS SHOWN
GA#26 PLAIN G.I.
GRAVEL BEDDING
VERT. MEMBER FOR FRAME OF DOWNSPOUT TIES
12x300mm FIBER CEMENT FASCIA
BOARD

6mm THK. MARINE PLYWOOD CEILING


BOARD w/50x50mm CEILING JOIST
DETAIL (SCALE:1:5m)
@600mm OC.BW. PAINT FIN.
7 EAVES DETAIL
8 DAMP PROOFING DET.

200
2-32mm G.I. PIPE HANDRAIL
A-3 SCALE : 1:10M w/32mm VERT. SUPPORT

A-3 NOT TO SCALE


10mm SAG RODS
@150mm OC (PAINT FIN.)

A
GA#26 CORR. G.I. SHEET 1242
ROOFING PAINT FIN.

900
1100

C-PURLIN (SEE 2-32mm G.I. PIPE HANDRAIL


12mM STEEL DOWEL
STRUCTURAL DET.) w/32mm VERT. SUPPORT @600mm

700
GA#26 CORR. G.I. EMBEDD IN CONC.
O.C.(PAINT FIN.)
ROOFING SHEET NON-SKID PLAIN
7 NON-SKID PLAIN CEMENT
CEMENT FLOOR FINISH
(PAINT FIN.)

23°
A-3 FLOOR FIN. w/ GROOVE

200
w/GROOVE LINES
STEEL RAFTER (SEE LINES

100
STRUCTURAL DET.) SEE STRUCTURAL

900
200
TOP OF ROOF BEAM TOP OF ROOF BEAM

700
DETAIL

1275
6mm THK. ORD. PLYWOOD
CORRIDOR

900
6
6

700
INT. CEILING ON 50x50mm 4
CONC.

375
400
CEILING JOIST @600mm OC A-3
BOTHWAYS PROVIDE 50x50mm BEAM 12x300mm FIBER

(150X400) HANGER @1200mm OC. BW. CEMENT FASCIA


VENT. w/WIREMESH INSECT (PAINT FIN.) BOARD (PAINT FIN.)
SCREEN (SEE DEAIL)
300

6mm THK. ORD.


6 DET. ELEVATION OF RAMP 5 DETAIL SECTION
SCALE 1:50 M
6mm THK. MARINE PLYWOOD
PLYWOOD CEILING
BOARD ON 50x50mm
6mm THK. MARINE PLYWOOD A-3 A-3 SCALE 1:10 M

ON 50x50mm CLG. JST. @600mm INT. CEILING w/6MM GROOVE ON


CEILING JOIST SPACE
O.C. BW. (OPTIONAL) 50x50mm CEILING JOIST @600mm
@600mm OC. BW. OC BOTHWAYS (PAINT FIN.)
12x300mm FIBER PAINT FIN.
CEMENT FASCIA
BOARD (PAINT VENT. (SEE DETAIL)
FIN.) 2 3
3000

3000

1500 W-1

CORRIDOR 100

1500
FL-1
2216

100x100mm CONCRETE
150mm THK. CHB WALL
SKIRTING
PLAIN CEM. PLASTER (PAINT FIN.)
C
D-1 32mm G.I. PIPE VERTICAL
12

150 mm THK. CHB WALL


SUPPORT @600mm ON

1300
UP

1200
WITH PLAIN CEMENT LANDING CENTER PROVIDE 12mm
RAMP UP

100
PLASTER (PAINT FIN.) STEEL DOWELS PAINT FIN.
1

150
CORRIDOR PART OF A-4
800

300
CLASSROOM PART OF
NON-SKID PLAIN
CEMENT FLOOR
FINISH w/GROOVE UP
1500 CLASSROOM LINES 4500 1500 300
25

FIN. FLOOR LINE


FIN. FLOOR LINE TOTAL RUN OF RAMP
32mm G.I. PIPE HANDRAIL
1
VAR.

VAR.

w/32mm VERT. SUPPORT


FIN. GRADE LINE
FIN. GRADE LINE
@150mm O.C. (PAINT FIN.)
A-4 4 SPOT DETAIL
3 DET. PLAN OF RAMP ENTRY
A-3 SCALE 1:5 M

A-3 SCALE 1:50 M

1 DETAIL SECTION 2 BAY SECTION


A-3 SCALE: 1:20 mts. A-3 SCALE: 1 : 20 M

REPUBLIC OF THE PHILIPPINES DESIGNER BY :


PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: NQM


DEPARTMENT OF EDUCATION
EMMANUEL P. CUNTAPAY
ONE STOREY
CHIEF, ARCHITECTURAL DIV.
DPWH
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI
SCIENCE LABORATORY ENCODED BY: MMC MAX C DepED A-3
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN UNDERSECRETARY & CHAIRMAN UNDERSECRETARY
MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
DEPATMENT OF EDUCATIONBUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

4
S
DPWH DPWH DPWH, TASK FORCE IN SCHOOL BUILDING CHECKED BY: LGP
(DepED)
S
IE

ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


INEERING D

PDO III ARCHITECT III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
BAY & DETAIL SECTION, EAVES DET.,
AL
IC

PFSED-DepED
IV

SI

LOUVER BLOCKS DET., VENT & RAMP DET.


I

YS

MERALCO AVENUE, PASIG CITY


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p .

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


6 EQ. PARTS= 6 EQ. PARTS= 3 EQ. PARTS= 563
1000
3600 3600 1778
900 700 700
F F F F F F F 200x200mm

400
400
400

300
WAINSCOAT MOSAIC
WALL TILES REINF. CONC.
WORKING TABLE
1700
±617
(7-BLADES)

±877

±1225
±1225

2500
2500
2500
2500

STAINLESS

(14-BLADES)
(10-BLADES)
(14-BLADES)

2150
2150
2150
STEEL KICKING

2100
2100
2100
2100
2100
100

PLATE
±1484

±1223

LABORATORY SINK

±875
±875
900
800

D-1 D-2 D-3 D-4 W-1 W-2 W-3 W-4


PANEL DOOR TYPE HINGED FLUSH HOLLOW CORE ONE FLUSH HOLLOW CORE TWO FLUSH HOLLOW CORE ONE JALOUSIE WINDOW W/ CLEAR GLASS SAME AS W-1 SAME AS W-1 SAME AS W-1
DOOR & FIXED CLEAR FACE MARINE PLYWOOD, FACE ORDINARY PLYWOOD, FACE MARINE PLYWOOD, BLADES ON STD. ALUM. HOUSING &
GLASS TRANSOM ON TYPE HINGED DOOR ON TYPE HINGED DOOR ON TYPE HINGED DOOR ON FIXED CLEAR GLASS TRANSOMS ON
50x150mm WOOD JAMB 50x100mm WOOD JAMB 50x100mm WOOD JAMB 50x100mm WOOD JAMB 100 100 1300 100 100
50x150mm WD. JAMBS/FRAMES
PROVIDE STAINLESS STEEL
KICKING PLATE
25x50mm WOOD 8 WORKING TABLE DETAIL
STOPPER
1 LEFT ELEVATION A-4 SCALE: 1 : 40M
SCALE: 1:100 M
A-4
SEE STRUCTURAL SEE STRUCTURAL
DETAIL DETAIL
TOP OF ROOF BEAM TOP OF ROOF BEAM
3mm THK CLEAR

±1180
GLASS
150mm THK. CHB WALL 150mm THK. CHB WALL
w/PLAIN CEMENT w/PLAIN CEMENT
PLASTER PAINT FIN. PLASTER PAINT FIN.
W-4 200X200mm VITRIFIED 200X200mm VITRIFIED 20mm THK. PLYWOOD
WALL TILES (GLAZED) WALL TILES (GLAZED) 20mmTHK. PLYWD. FOR
SIDING
COVER & SHELVES

3025
3025
360

D
4 110x110 GLAZED TILES
38x50mm WOOD

1500
1500
FRAMING
12mm WOOD 100THK. CONC. COUNTER
CLASSROOM FLR. FIN. LINE CLASSROOM FLR. FIN. LINE

705
705
355

MOULDING
1110

360
360
TOILET FLR. FIN. LINE TOILET FLR. FIN. LINE 25x25mm WOOD FR 50x75 S4S KD TANG.
TRIMMING CAB. FRAME

400
400

375
375
FIN. GRADE LINE FIN. GRADE LINE W-3
100mm THK. CONCRETE 100mm THK. CONCRETE 20THK PLYWOOD
357

±600 ±600
SLAB SLAB 12mm WOOD
FOR COVER AND SHELVES
MOULDING QUARTER
POLYETHELENE SHEET POLYETHELENE SHEET
ROUND
DAMPROOFING DAMPROOFING
FR. 38x50mm S4S KD
GRAVEL BEDDING GRAVEL BEDDING
TANG. FRAMING
FROM SELECTED FROM SELECTED
FILLING MATERIALS FILLING MATERIALS 3mm THK CLEAR
GLASS
7 DETAIL SECTION
600

A-4 SCALE: 1:50m


3 DETAIL SECTION 4 DETAIL SECTION
CLEAR GLASS ON 20mm THK. PLYWOOD COVER WITH
A-4 SCALE: 1:50m A-4 SCALE: 1:50m
7
DECORATIVE FRAME 25x25mm TRIMMING PAINT IN ANTI-ACID
100

COVER. A-4 PAINT


W-3 W-3
1200

2000
800

625

W-4
75

1000
HE
4 4
A-3

2600
SHE
W-4 D

1600
2
ELEVATION S E C T I O N
6 6
200x200mm VITRIFIED 4 A-4
A-4 SCALE: 1 : 20M
FLOOR TILES
A-4
(UNGLAZED)
W-3 W-3
2 PLAN DETAIL (TOILET)
A-4 SCALE: 1:50m LAB. CABINET
PLAN
5 DETAIL OF LAB. CABINET
A-4 SCALE: 1:50m
REPUBLIC OF THE PHILIPPINES DESIGNER BY :
PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
DESIGNED BY: NQM
EMMANUEL P. CUNTAPAY DEPARTMENT OF EDUCATION
ONE STOREY
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI ENCODED BY: MAX C
CHIEF, ARCHITECTURAL DIV. MMC DepED A-4
DPWH SCIENCE LABORATORY
D SCHO
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN & CHAIRMAN UNDERSECRETARY
AN OL MAXIMO M. CALBANG OLIVER R. HERNANDEZ RAMONUNDERSECRETARY
C. BACANI SHEET CONTENTS :

S
S
NATHANIEL Q. MENDOZA

IE
DEPARTMENT OF EDUCATION LUIS G. PURISIMA, Jr. DPWH DPWH CHECKED BY: LGP

ENG
DPWH, TASK FORCE IN SCHOOL BUILDING
DEPATMENT OF EDUCATION (DepED)
BUILDING

FAC IL IT
PDO III ARCHITECT III UNDERSECRETARY

AL
INEERING D
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS SCH. OF DOORS & WINDOWS

IC
IV
I
PH
YS
SI
ON

4
De ED
PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : .
DATE : CABINET & COUNTER DET.,
p MERALCO AVENUE, PASIG CITY PFSED-DepED PFSED-DepED
TOILET DET., WORKING LAB. TABLE DET.
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
1 2 3 4 5
1 2 3 5 6
9000 9000

9000 9000 50x100x15x1.5mm


400 4500 4500 4500 4500 400 STEEL C-PURLINS
750mm O.C.
4500 4500 4500 4500

1100
F-1 F-2 F-3 F-2 F-1
C-1 C-2 C-1 C-2 C-1 RG-1 RG-1 RG-1 RG-1

A A 10mm% SAG ROD WITH


STANDARD NUTS &
WF-1 WF-1 WF-1 WF-1
WASHERS @ EACH END

3500
3500

RG-2

RG-2
RG-2
EB-1

EB-1

EB-1
WF-1
WF-1

WF-1
F-1 F-1 F-1

R - 1

R - 1

R - 1

R - 1
R - 2

R - 2
R - 2
7000
C-1 C-1 C-1
B
7000

B 100mm THICK
SLAB ON FILL
WITH 10mm
SPACED AT 400

3500
WF-1
WF-1

WF-1
3500

RG-2

RG-2

RG-2
EB-1

EB-1

EB-1
BOTHWAYS

F-1 F-2 F-3 F-2 F-1


C-2 C-1 C-2 RG-1 RG-1 RG-1 RG-1
C-1 C-1
C C
WF-1 WF-1 WF-1 WF-1

1500
1500

1500
1200

1200
RAMP UP RAMP UP

1800 1800

A FOUNDATION PLAN B ROOF FRAMING PLAN


S-1 SCALE 1:100 M. S-1 SCALE 1:100 M.

150MM THK.
CHB

10@600
L
HOR. BARS

NGL NATURAL GRADE LINE


1

10@600
1800
VERT. BARS

600
D
Y-BARS 10 300mm TEMP
X-BARS BARS BOTHWAYS
W

150
t

250
Y-BARS

10mm

100
X-BARS

C O L U M N S C H E D U L E L 100 mm THICK
GRAVEL BEDDING
G-20mm GRAVEL 3-10mm

PLAN
BEDDING 10mm @300 CUT BARS
SECTION 400

LEVEL C-1 C-2 C TYP. FOOTING DETAIL E DETAIL OF RAMP


D DETAIL OF WF-1
SCALE 1 : 50M
S-1 SCALE : NTS
S-1 SCALE : NTS. S-1
400 400
160

160

DESIGN CRITERIA :

SCHEDULE OF FOOTINGS
A. CONCRETE
FOUNDATION LEVEL
LEVEL

fc' = 20.685 Mpa ( 3,000 Psi ), minimum compressive strength of concrete


FOOTING
FOOTING DIMENSIONS (mm) REINFORCEMENT
a 28 days unless otherwise specified.
MAIN BAR: MAIN BAR: REMARKS
MARK LENGTH WIDTH DEPTH THICKNESS B. REBAR
4-%16mm 6-%16mm BAR X BAR Y
(L) (W) (D) (t)
fy = 275.8 Mpa ( 40,000 Psi ), minimum yield strength of reinforcing bars
ROOF

TIES : 10 mm TIES : 10 mm
1@50, 8@75, REST @ 1@50, 8@75, REST @ F-1 800 800 1200 250 4 - 16mm% 4 - 16mm% SQUARE FOOTING unless otherwise specified.
150mm TO CENTER 150mm TO CENTER C. STRUCTURAL STEEL

F-2 1000 1000 1200 250 4 - 16mm% 4 - 16mm% SQUARE FOOTING


Fy = 248 Mpa ( 36 Ksi ), specified minimum yield strength
TO

unless otherwise specified.


SQUARE FOOTING D. FOUNDATION
F-2 900 900 1200 250 4 - 16mm% 4 - 16mm%

SBP = 95.706 Kpa ( 2,000 Psf ), was used in the design for all footings.
No footing shall rest on fill.

REPUBLIC OF THE PHILIPPINES DESIGNER BY :


PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: NQM


DEPARTMENT OF EDUCATION
EMMANUEL P. CUNTAPAY
MULTI-PURPOSE
CHIEF, ARCHITECTURAL DIV.
DPWH
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI
WORKSHOP ENCODED BY: MMC MAX C DepED S-1
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN UNDERSECRETARY & CHAIRMAN UNDERSECRETARY
MAXIMO M. CALBANG JOHN CARLO L. TOLIBAS LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
DEPATMENT OF EDUCATIONBUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

2
S
DPWH CHECKED BY:
DPWH DPWH, TASK FORCE IN SCHOOL BUILDING (DepED) LGP
FOUNDATION PLAN, ROOF FRAMING PLAN
S
IE

ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


INEERING D

PDO III ENGINEER III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
FOOTING DETAIL, COLUMN DETAIL, WF-1,
AL
IC

PFSED-DepED
IV

SI
I

YS

MERALCO AVENUE, PASIG CITY


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p .

RAMP DET.

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


C B 1 A C B 2 A
S- S-
2 2

4-%16x300mm LONG
R- R- BENT ANCHOR BOLTS
2 1 2 2 -1 2
R- EB- EB R- EB EB
-1 -1 300x150x10mm
300
BASE PLATE

50 50

37.5
RG-1 RG-2 RG-2 RG-1 RG-1 RG-2 RG-2 RG-1
R-2

37.5
EB-1 10mm X 150mm
(SEE SCHED) ANCHOR BOLTS
LINE OF R-1/R-2
SPACED @ 800mm O.C.

10mm THICK PLATE


PLAN

1 SECTION DETAIL
A ELEV @ GRID 1 & 5 B ELEV @ GRID 3 SCALE NTS
2-%16
S-2 BOLTS 2-%16

S-2 SCALE: 1:100 M S-2 SCALE: 1:100 M


BOLTS

4-%16x300mm
LONG BENT R-1/R-2
ANCHOR BOLTS

300x150x10mm 10mm THICK PLATE

C B A
BASE PLATE
10mm THICK PLATE 4-%16x300mm LONG
BENT ANCHOR BOLTS
R
-1
300x150x10mm /R
-2
65 65 BASE PLATE

20

20
R-
1 1
R- R-1

150

150
RC BEAM/COLUMN
RG-1 RG-1

EB-1 10mm X 150mm


(SEE SCHED) ANCHOR BOLTS
SPACED @ 1000mm O.C.
2LC-150x65x20x3 LC-150x65x20x3 ELEVATION
ELEVATION
R-1 R-2

2 SECTION DETAIL G TYPICAL RAFTER ANCHORAGE DETAIL


ELEV BET GRIDLINES E DETAIL OF RAfTER SCALE NTS SCALE 1:20 M
C S-2 S-2
SCALE NTS

S-2 SCALE: 1:100 M


S-2

50

15
L1 L2

100
2D LAP SPLICES ARE ALLOWED 2D 2D LAP SPLICES ARE ALLOWED 2D

ONLY IN THIS PORTION ONLY IN THIS PORTION

LC-100x50x15x1.5

2-10mm SIDE BARS F DETAIL OF PURLINS 100x50x15x1.5mm


STEEL C-PURLINS
SCALE NTS 750mm O.C.
S-2
10mm% SAG ROD WITH
STANDARD NUTS &

D TYPICAL BEAM ELEVATION TOP OF RAFTER WASHERS @ EACH END

10mm TIE ROD WITH


S-2 100x50x15x1.5mm
STANDARD NUTS &
STEEL C-PURLINS
750mm O.C. WASHERS @ EACH END
CL.
50x100x15x1.5mm
STEEL C-PURLINS
B E A M S C H E D U L E 1-%10mm A-307
150
150
750mm O.C.
R
ANCHOR BOLT -1
/R
-2
BEAM STEEL REINFORCEMENTS L-50x50x4.5 10mm SAG ROD
FLOOR BEAM DIMENSIONS STIRRUPS
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT 10mm

(mm ) (UNLESS NOTED OTHERWISE)


b h TOP BOTTOM TOP BOTTOM TOP BOTTOM

RG-1 150 400 12mm 2 2 2 2 2 2 1@50, 8@100, REST@200


LEVEL

RG-2 150 400 12mm 2 2 2 2 2 2 1@50, 6@100, REST@200

1@50, 6@100, REST@200


ROOF

J SAG ROD CONNECTION DET.


EB-1 150 250 10mm 2 2 2 2 2 2 1@50, REST@200 H PURLIN CONNECTION DET I TIE ROD CONNECTION DET. SCALE 1 : 10 M

SCALE 1:5M SCALE 1 : 10 M S-2


S-2 S-2

REPUBLIC OF THE PHILIPPINES DESIGNER BY :


PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: NQM


DEPARTMENT OF EDUCATION
EMMANUEL P. CUNTAPAY
MULTI-PURPOSE
CHIEF, ARCHITECTURAL DIV.
DPWH
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI
WORKSHOP ENCODED BY: MMC MAX C DepED S-2
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN UNDERSECRETARY & CHAIRMAN UNDERSECRETARY
MAXIMO M. CALBANG JOHN CARLO L. TOLIBAS LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
DEPATMENT OF EDUCATIONBUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

2
S
DPWH DPWH DPWH, TASK FORCE IN SCHOOL BUILDING CHECKED BY: LGP
(DepED)
S
IE

ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION ELEVATIONS BEAM DETAIL & SCHED.
ELEVATIONS,
INEERING D

PDO III ENGINEER III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
AL

TYPICAL CONNECTION DETAIL


IC

PFSED-DepED
IV

SI
I

YS

MERALCO AVENUE, PASIG CITY


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p .

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


LEGEND:

150 1000 150 CB CATCH BASIN


700 3-10mm EW 10mm BAR HANDLE
INLET 150 400 150
100mm THK.+FIN. SLAB w/10mm 150x300mm RC BEAM w/2-16 TOP 600 CDP CONCRETE DRAIN PIPE
100mm THK.+FIN. SLAB CO
REBARS @200mm OC. BW. BENT AND BOT. REBARS & 10 STIRRUPS
S-2 100mm THK.+FIN. SLAB w/10mm 250 100 250

150
S-1a 100mm THK.+FIN. SLAB
w/10mm REBARS @200mm 150mm THK. CHB w/10mm

150 400 150


UP 2 OUT OF 3 AT L/4 FROM 1@50, 3@100, REST @300mm OC. CDP
w/100mm REBARS @300mm OC. REBARS @300mm OC. BW. BENT 2 3450 OC. BW. BENT UP 2 OUT OF 3 PVCCO POLYVINYL CHLORIDE CLEAN OUT
FACE SUPPORT REBARS @600mm OC. VERT
BW. FROM FACE SUPPORT OUT OF 3 @ L/4 FROM FACE AT L/4 FROM FACE SUPPORT & HOR. WAY

700
SUPPORT & SHORT SPAN 10mm
INLET OUTLET
NGL CO CO CO CV CHECK VALVE
TEMP. . BARS @300mm EW.

1000
3450

100
WATER LEVEL HB HOSE BIBB

100
150 1000 150 2000 150 MANHOLE

(MAX)
MANHOLE

753
PLAN

300
FD FLOOR DRAIN

150
150

740 50 50 50 50
WATER LEVEL
GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)

100
150 440 150
PLASTER
600
1550

300
255 600 255 w/WATERPROOFING OUTLET
OUTLET
GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)

50
COMPOUND OR APPLY

100
150mm THK. CHB
PLAN

2100
ONE FACE BITUMIN TAR w/10mm REBARSS

600 (MIN.
(VARIED)
CDP

1600
TYP. COVER DETAIL
PLASTER 1300 HOR. EVERY 2-LAYER,
GV GATE VALVE
w/WATERPROOFING WALL REINFORCEMENT 600 INLET
CDP VERT. @600mm OC.
2300
2000

LEACHING 10mm VERT. & HOR.


600

COMPOUND OR APPLY

2100
MANHOLE MANHOLE

1900
MH MANHOLE

200
BAR @200mm OC. E.W.
P-1
ONE FACE BITUMIN TAR OUTLET SCALE : 1:10m

0.20
100
150mm THK. CHB w/10mm
CHAMBER DIGESTIVE CHAMBER
REBARS HOR. @3-LAYER,
WALL REINFORCEMENT
VERT @600mm OC. PVCDS POLYVINYL CHLORIDE DOWNSPOUT
GRAVEL BED 100mm THK. SLAB 1SLOPE SECTION
50 (TYP.) 10mm VERT. & HOR. BAR 1SLOPE

100

900
w/100mm REBARS INLET
@200mm OC. E.W.
1550

OUTLET
@300mm BOTHWAYS PVCDP POLYVINYL CHLORIDE DRAIN PIPE

2000

100
5
100mm THK. SLAB PVCDS POLYVINYL CHLORIDE DOWNSPOUT
1SLOPE 2300
CATCH BASIN DETAIL
150

SLOPE

100

150
w/100mm REBARS 10mm REBARS EW SPACED
@300mm BOTHWAYS AS SHOWN
PVCSP POLYVINYL CHLORIDE SOIL PIPE
150 1000 150

PLAN LONGITUDINAL SECTION CROSS SECTION P-1 SCALE : 1:50m


PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING

SECTION PVCVP POLYVINYL CHLORIDE VENT. PIPE

PVCVS POLYVINYL CHLORIDE VENT STACK


3 SEPTIC TANK DETAIL 4 DRAIN PIT DETAIL PVCVTR/W/F POLYVINYL CHLORIDE VENT TROUGH FLOOR/ROOF/WALL
P-1 SCALE : 1:50m
P-1 SCALE : 1:50m
PVCWP POLYVINYL CHLORIDE WASTE PIPE

PVCWS POLYVINYL CHLORIDE WASTE STACK

RD ROOF DRAIN

UD URINAL DRAIN

WC WATER CLOSET

LAV LAVATORY

CS COUNTER SINK

PLUMBING NOTES:

1. GRADES OF HORIZONTAL PIPINGS


RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT

A FORM GRADE NOT LESS THAN TWO PERCENT (2


5

75 PVCDS
2. CHANGE IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF
1
1 2 3 4 5 CB FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP QUARTER BEND,
SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM
R
P
CD
VT C

HORIZONTAL TO VERTICAL A SINGLE 1/8 BEND COMBINATION MAYBE USED


PV
50
m 15
4 0m
0m ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE

75 PVCDS
10 m
C CD LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.

O
150mm CDP
TO MAIN 100mm CDP 100mm CDP 100mm CDP PV
C
P
CB CB CB CB CB

R
0
CB

W
10
TR
DRAINAGE

IC
R
R
R
R
CV

G
PV
T
T
T
T
2
SYSTEM 3. PROHIBITED FITTINGS

75 PVCDS
V
V
V
V
DRAIN 100 PVCWP 100 PVCWP 100 PVCWP 100 PVCCO 50
C
C
C
C
S

.
L
P
V
V
V
V
.
PIT NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL
CD
P
P
P
P
50
AND WASTE LINES, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE
A
m
3
PV
0
5
0
5
0
5
0
5
m C
75PVCDS

75PVCDS 50PVCTW

75PVCDS

75PVCDS

75PVCDS

75 PVCDS
00
P S
OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.

.
L

W
W
P
R

.
1

IC
T
CV C T

W
NE

G
LAB. CABINET PV PV
BI

2
1
50 0
10 C

A
S
B. 1.
4. PIPE CLEAN-OUTS
12 GICWR

12 GICWR

12 GICWR

12 GICWR

.
L
CB

.
L 50 S m

.
L
0m T

O
.
50 TF PV
CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:
50 PVCWP

50 PVCWP

50 PVCWP

50 PVCWP

AI
V

75 PVCDS
C
15 CDP
VC

N
CB
PV P P
AG
C

W
P a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND

E
50 S

M
150mm CDP
CD
P

L
.
L

M
W
P
AI
R

.
ST

IC
IC
T

E
CV C

G
W

G
PV
DR SY ONE-HALF DEGREES (22 1/2°).
PV
m

0
2
2

2
1
0 CC

O
L.S. L.S. L.S. L.S.
50
m 10

75 PVCDS
PV
00
S

.
L
b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES

.
1 M
50 S 50
O PV

.
L

.
F
RO
50 VT
PV PV
C C
P
BEFORE THE HOUSE DRAINAGE CONNECTION.
C

W
CV
CB

S
50 S
P
A c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.

S
R

L
.
50 PVCVTF 50 PVCVTF 50 PVCVTF 50 PVCVTF L 20

W
CL

W
P

IC
IC
VC

G
W

75 PVCDS
P

0
CB

2
d) AT THE END OF ANY HORIZONTAL PIPE LINES.

2
1
0 CC

O
P 10 S PV

B CD

.
50 PVCVTW
L

.
50 S 50

.
L

.
F
CLASSROOM
1 m PV

1
50 VT
50 PVCWP

50 PVCWP

50 PVCWP

50 PVCWP

L.S. L.S. L.S. L.S. C C


5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
0m

IN
A PV PV

75 PVCDS
DR T C P

W
CV
15 50 S

IN
A P P
100 CO 50 CO AG

L
.
E
L 20

W
M

.
50 PVCWP

P
IC
IN
T A

G
O

M
DR YST R

CD
6.

0
DO
NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN
75PVCTR

2
S
CC

O
UR
CB PV
20 GICWL

20 GICWL

20 GICWL

20 GICWL

RR

m
100 PVCSP

I
WC 50 PVCVTW 50 S 50 THE TOP OF THE SEWAGE AND THE UNDER PART OF VAULT ROOF SLAB.

75 PVCVTR

0m
L
HE CO

75 PVCDS
.
TF PV
CV C
PV

10
P

W
50 T CV 7.

W
CV

L
20 NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.

W
L.S. L.S. L.S. L.S. PV

IC
SEPTIC TANK G

G
FD 50 I CB

N
0
2
LAV C

D
R VC
SHE LA

N
C
8.

O
P

U
50 PVCCO 50 PVCCO 50 PVCCO 50 PVCCO 50 50 ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A

WC C
P LICENSED MASTER PLUMBER AND A LICENCED PLUMBING CONTRACTOR.

W
100 PVCSP PV CV P
CD
C
C
50 V 20

75 PVCDS
HLA

E
20 GICWL

C
C

O
m

W
9. ALL DIMENSION ARE IN MILLIMETER OTHERWISE SPECIFIED.
75PVCDS

75PVCDS

75PVCDS

75PVCDS

75PVCDS

0
10
0m

E
10 FD

H
10
0

S
CORRIDOR CB
PV

A CS
P C

P
U
150mm

P
M
K P
P

A
20 CV 20 CV 20 CV 20 CV 20 CV CS
CD

R
L
PV

W
TA

IC
PVCSP m

G
0
10 CV m

0
CB CB IC 00

2
DESIGN CRITERIA
RAMP UP

CB PT 20 1
S CB 32 GV

E
32 GV
LANDING
10
B

0m 150mm
P GV

M
m
CD m L
32
CD CDP TO 0m P
C R

W
M

P
G AT
i. LIVE LOAD_________________ 1000Pa

E
m

I
0m 15 VCS m 32 R

W
CB 0m P T I

.
O
F
MAIN

M
IN
A
10 P ST

E
CB 5 SY

M
N
1 CD A ii ALLOWABLE STRESSES
G

E
M
150mm 32 GV 100mm CDP DRAINAGE A

M
AI ST
CC

E
1. CONCRETE
CDP TO SYSTEM DR SY
32 GICWL
MAIN FR. a. FOR FOOTING, BEAMS AND SLABS
MAIN WATER
DRAINAGE SYSTEM
fc'' = 20 MPa
SYSTEM 2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)
1 PLUMBING RO-IN LAYOUT 2 ISOMETRIC VIEW fm' =6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
P-1 SCALE : 1:100 M.
P-1 SCALE : 1:100 M.
FOR BARS SMALLER THAN 16mm

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.

REPUBLIC OF THE PHILIPPINES DESIGNER BY :


PREPARED CHECKED
CHECKED
BY: BY : REVIEWED BY:
RECOMMENDING APPROVAL : RECOMMENDING APPROVAL
APPROVED
: BY : CONCURRED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

DESIGNED BY: EMMBC


DEPARTMENT OF EDUCATION
EMMANUEL P. CUNTAPAY
ONE STOREY
CHIEF, ARCHITECTURAL DIV.
DPWH
GILBERTO S. REYES DANILO C. MANALANG ANTONIO A. INNOCENTES RAMON C. BACANI
SCIENCE LABORATORY ENCODED BY: MMC MAX C DepED P-1
ASST. DIRECTOR, BUREAU OF DESIGN DIRECTOR, BUREAU OF DESIGN UNDERSECRETARY & CHAIRMAN UNDERSECRETARY
MAXIMO M. CALBANG ELIAS MELQUIADES EMEL CUBA II LUIS G. PURISIMA, Jr. OLIVER R. HERNANDEZ RAMON C. BACANI
DEPATMENT OF EDUCATIONBUILDING
SCHO
AN
D
OL
DEPARTMENT OF EDUCATION SHEET CONTENTS :

1
S
DPWH DPWH DPWH, TASK FORCE IN SCHOOL BUILDING CHECKED BY: LGP
(DepED)
S
IE

PLUMBING LAYOUT DRAIN PIT DETAIL


ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


INEERING D

PDO III ENGINEER III HEAD, PLANNING & DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
ISOMETRIC VIEW CATCH BASIN DETAIL
AL
IC

PFSED-DepED
IV

SI
I

YS

MERALCO AVENUE, PASIG CITY


ON

PFSED-DepED PFSED-DepED DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION LOCATION : DATE :


PH
De ED
p
SEPTIC TANK DETAIL TYP. COVER DETAIL
.

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


GENERAL NOTES LEGEND
SYMBOL DESCRIPTION
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH
OVERHEAD SERVICE ENTRANCE
- CEILING LIGHT OUTLET CONNECTED TO 220V AC, 1O,
THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS
2 WIRE, 60 Hz FITTED WITH
2
- 2 x 40 WATTS FLUORESCENT LAMP
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). 20mm O TYPE "F" CONDULET

THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY F - CEILING FAN OUTLET

AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. - ONE GANG DEVICE SWITCH
S/Sa
THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION
S ab - TWO GANG DEVICE SWITCH CEILING LINE
OF A DULY REGISTERED ELECTRICAL ENGINEER.
BUILDING WALL
S cde - THREE GANG DEVICE SWITCH
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE,
- THREE WAY DEVICE SWITCH METERING CONDUIT
230 V AC, 60 Hz. S
3W
2
2-5.5mm THW
KWHR METER
Sf - FAN CONTROL SWITCH IN 20mmORSC
3. WIRING METHOD SHALL BE AS FOLLOWS :

a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT

3500 mm
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT - RACEWAY CONDUIT CONCEALED UNDER FLOOR
BRANCH CKT., & AUXILIARY SCH. 40
- PANELBOARD
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE

1800 mm

1800 mm
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE
2
3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL - WEATHERPROOF TYPE

BE 15mm O TRADE/NOMINAL SIZE. WP


DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE GROUND FLOOR LINE
I

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP


10 AMPS, 250 VOLT WITH MODERN PLATE COVER
TYPE WITH FACTORY KNOCKOUTS. LP
FIN. GRADE LINE
1 - HOMERUN DIRECT TO PANELBOARD
2
1-5.5mm THW COPPER WIRE

6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED 20


- CIRCUIT BREAKER, RATING AS INDICATED IN 15mmO C

TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE. 16MMO x 2400mm LENGTH
M
- ELECTRIC SERVICE METER GROUNDING ROD COPPERWELD

7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND


- SERVICE ENTRANCE
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT.

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :


ELECTRICAL RISER DIAGRAM
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR NOT TO SCALE

b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.

c. PANELBOARD - 1.80 M ABOVE FINISH FLOOR

1 2 3 4 5
LOAD SCHEDULE

PANELBOARD: LP MAIN : A
40AT, 100AF, 2P, 240V

CIRCUIT BREAKER a
b e
d
CKT. VA
DESCRIPTION WIRE & CONDUIT SIZE 2 2 2 2

NO. LOAD
VOLT POLE AT AF CLASSROOM CLASSROOM

CONVENIENCE OUTLET 2 B F F
1 720 230 2 20 50 3-3.5mm THW IN 15mm C
a b e d
2 LP1
2 LIGHTS & FAN 1200 230 2 20 50 3-3.5mm THW IN 15mm C
2 2 2 2

LP2
3 SPARE 1500 230 2 20 50
Sabc Sf Sf Sdef

TOTAL 3420 C M

RAMP UP
c f
2 2

2
IL = 3420 = 15 A FEEDER: 2-5.5mm THW IN 20mm RSC OVERHEAD SERVICE ENTRANCE
REFER TO RISER DIAGRAM

230 V PROTECTION: 40 AT, 50 AF, 2P, 240 V

ELECTRICAL LAYOUT
SCALE 1:100 M

REPUBLIC OF THE PHILIPPINES PREPARED BY : CHECKED BY : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: 0000009 OWNER : SHEET NO:

DESIGNED BY: NQM


EMEC
AMA
VDS II
ONE STOREY DEPARTMENT OF EDUCATION

SCIENCE LABORATORY ENCODED BY: VDS


Max C. DepED E -1
S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG VENERANDO D. SAHAGUN LUIS G. PURISIMA JR. OLIVER R. HERNANDEZ BUILDING CHECKED BY: LGP
SHEET CONTENTS : FLOOR PLAN LOAD SCHEDULE
S
IE

1
ENG
FAC IL IT

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION ELEVATIONS


INEERING D

PDO - III ENGINEER III HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS GENERAL NOTES LEGEND
AL

SECTIONS
IC

IV

PFSED-DepED PFSED-DepED DepED ELECTRICAL LAYOUT RISER DIAGRAM


SI
I

YS

MERALCO AVENUE, PASIG CITY PFSED-DepED 01 01 2006


ON
LOCATION : DATE :
PH
De ED
p

DETAILS
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

You might also like