Professional Documents
Culture Documents
Text: in_ID
>The LOCALE subcommand of the SET command has an invalid parameter. It cou
ld
>not be mapped to a valid backend locale.
GET
FILE='C:\Users\User\Desktop\SKRIPSI miranti\VARIABLE DATASHET.sav'.
Correlations
Page 1
Notes
Output Created 10-FEB-2018 13:37:04
Comments
Input Data C:
\Users\User\Desktop\SKRI
PSI miranti\VARIABLE
DATASHET.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working Data 40
File
Missing Value Handling Definition of Missing User-defined missing
values are treated as
missing.
Cases Used Statistics for each pair of
variables are based on all
the cases with valid data
for that pair.
Syntax CORRELATIONS
/VARIABLES=X1 X2 X3
X4 X5 X6 X7 X8 X9 X10 Y
/PRINT=TWOTAIL
NOSIG
/MISSING=PAIRWISE.
Resources Processor Time 00:00:00,00
Elapsed Time 00:00:00,05
Page 2
Correlations
Page 3
Correlations
Perencanaan Pengawasan
dan dan
Tenaga Kerja Penjadwalan Pengendalian
Kondisi Cuaca Pearson Correlation ,548** ,460** ,371* ,472**
Sig. (2-tailed) ,000 ,003 ,019 ,002
N 40 40 40 40
** ** **
Peralatan Pearson Correlation ,670 ,708 ,657 ,672**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Material Pearson Correlation ,744 ,848 ,667 ,714**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** **
Tenaga Kerja Pearson Correlation 1 ,775 ,680 ,731**
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** **
Perencanaan dan Pearson Correlation ,775 1 ,761 ,845**
Penjadwalan
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** **
Pengawasan dan Pearson Correlation ,680 ,761 1 ,762**
Pengendalian
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** ** **
Organisasi dan personil inti Pearson Correlation ,731 ,845 ,762 1
proyek
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** ** **
Gambar Kerja Pearson Correlation ,692 ,865 ,725 ,898**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Lokasi Pearson Correlation ,638 ,721 ,624 ,702**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Fasilitas Pendukung Pearson Correlation ,708 ,843 ,633 ,739**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Total Skor Pearson Correlation ,861 ,949 ,814 ,902**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
Page 4
Correlations
Organisasi dan
personil inti
proyek Gambar Kerja Lokasi
** **
Kondisi Cuaca Pearson Correlation ,472 ,450 ,487** ,519**
Sig. (2-tailed) ,002 ,004 ,001 ,001
N 40 40 40 40
** ** **
Peralatan Pearson Correlation ,672 ,632 ,648 ,577**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Material Pearson Correlation ,714 ,747 ,617 ,702**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Tenaga Kerja Pearson Correlation ,731 ,692 ,638 ,708**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Perencanaan dan Pearson Correlation ,845 ,865 ,721 ,843**
Penjadwalan
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** ** **
Pengawasan dan Pearson Correlation ,762 ,725 ,624 ,633**
Pengendalian
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
** **
Organisasi dan personil inti Pearson Correlation 1 ,898 ,702 ,739**
proyek
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** **
Gambar Kerja Pearson Correlation ,898 1 ,698 ,760**
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** **
Lokasi Pearson Correlation ,702 ,698 1 ,666**
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** ** **
Fasilitas Pendukung Pearson Correlation ,739 ,760 ,666 1
Sig. (2-tailed) ,000 ,000 ,000
N 40 40 40 40
** ** **
Total Skor Pearson Correlation ,902 ,895 ,799 ,875**
Sig. (2-tailed) ,000 ,000 ,000 ,000
N 40 40 40 40
Page 5
Correlations
Fasilitas
Pendukung Total Skor
**
Kondisi Cuaca Pearson Correlation ,519 ,599**
Sig. (2-tailed) ,001 ,000
N 40 40
**
Peralatan Pearson Correlation ,577 ,768**
Sig. (2-tailed) ,000 ,000
N 40 40
**
Material Pearson Correlation ,702 ,863**
Sig. (2-tailed) ,000 ,000
N 40 40
**
Tenaga Kerja Pearson Correlation ,708 ,861**
Sig. (2-tailed) ,000 ,000
N 40 40
**
Perencanaan dan Pearson Correlation ,843 ,949**
Penjadwalan
Sig. (2-tailed) ,000 ,000
N 40 40
**
Pengawasan dan Pearson Correlation ,633 ,814**
Pengendalian
Sig. (2-tailed) ,000 ,000
N 40 40
**
Organisasi dan personil inti Pearson Correlation ,739 ,902**
proyek
Sig. (2-tailed) ,000 ,000
N 40 40
**
Gambar Kerja Pearson Correlation ,760 ,895**
Sig. (2-tailed) ,000 ,000
N 40 40
**
Lokasi Pearson Correlation ,666 ,799**
Sig. (2-tailed) ,000 ,000
N 40 40
Fasilitas Pendukung Pearson Correlation 1 ,875**
Sig. (2-tailed) ,000
N 40 40
**
Total Skor Pearson Correlation ,875 1
Sig. (2-tailed) ,000
N 40 40
*. Correlation is significant at the 0.05 level (2-tailed).
**. Correlation is significant at the 0.01 level (2-tailed).
Page 6
RELIABILITY
/VARIABLES=X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 Y
/SCALE('95') ALL
/MODEL=ALPHA
/STATISTICS=DESCRIPTIVE COV.
Reliability
Notes
Output Created 10-FEB-2018 13:43:07
Comments
Input Data C:
\Users\User\Desktop\SKRI
PSI miranti\VARIABLE
DATASHET.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working Data 40
File
Matrix Input
Missing Value Handling Definition of Missing User-defined missing
values are treated as
missing.
Cases Used Statistics are based on all
cases with valid data for
all variables in the
procedure.
Syntax RELIABILITY
/VARIABLES=X1 X2 X3
X4 X5 X6 X7 X8 X9 X10 Y
/SCALE('95') ALL
/MODEL=ALPHA
/STATISTICS=DESCRIPT
IVE COV.
Resources Processor Time 00:00:00,02
Elapsed Time 00:00:00,02
Scale: 95
Page 7
Case Processing Summary
N %
Cases Valid 40 100,0
a
Excluded 0 ,0
Total 40 100,0
a. Listwise deletion based on all variables in the procedure.
Reliability Statistics
Cronbach's
Alpha Based on
Cronbach's Standardized
Alpha Items N of Items
,784 ,961 11
Item Statistics
Mean Std. Deviation N
Kondisi Cuaca 10,25 2,799 40
Peralatan 15,50 2,207 40
Material 18,40 4,037 40
Tenaga Kerja 22,15 2,983 40
Perencanaan dan 22,30 4,363 40
Penjadwalan
Pengawasan dan 15,05 2,459 40
Pengendalian
Organisasi dan personil inti 19,23 3,605 40
proyek
Gambar Kerja 11,33 2,235 40
Lokasi 10,80 2,278 40
Fasilitas Pendukung 17,93 4,317 40
Total Skor 162,92 26,416 40
Page 8
Inter-Item Covariance Matrix
Perencanaan
dan
Kondisi Cuaca Peralatan Material Tenaga Kerja Penjadwalan
Kondisi Cuaca 7,833 2,231 4,487 4,577 5,615 2,551
Peralatan 2,231 4,872 5,692 4,410 6,821 3,564
Material 4,487 5,692 16,297 8,964 14,928 6,621
Tenaga Kerja 4,577 4,410 8,964 8,900 10,082 4,992
Perencanaan dan 5,615 6,821 14,928 10,082 19,036 8,164
Penjadwalan
Pengawasan dan 2,551 3,564 6,621 4,992 8,164 6,049
Pengendalian
Organisasi dan personil inti 4,763 5,346 10,395 7,863 13,290 6,758
proyek
Gambar Kerja 2,814 3,115 6,738 4,617 8,438 3,983
Lokasi 3,103 3,256 5,672 4,338 7,164 3,497
Fasilitas Pendukung 6,276 5,500 12,236 9,114 15,869 6,722
Total Skor 44,250 44,808 92,031 67,858 109,408 52,901
Page 9
Inter-Item Covariance Matrix
Fasilitas
Pendukung Total Skor
Kondisi Cuaca 6,276 44,250
Peralatan 5,500 44,808
Material 12,236 92,031
Tenaga Kerja 9,114 67,858
Perencanaan dan 15,869 109,408
Penjadwalan
Pengawasan dan 6,722 52,901
Pengendalian
Organisasi dan personil inti 11,504 85,915
proyek
Gambar Kerja 7,333 52,820
Lokasi 6,549 48,087
Fasilitas Pendukung 18,635 99,738
Total Skor 99,738 697,815
REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS R ANOVA
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT Y
/METHOD=ENTER X1 X2 X3 X4 X5 X6 X7 X8 X9 X10.
Regression
Page 10
Notes
Output Created 10-FEB-2018 13:53:14
Comments
Input Data C:
\Users\User\Desktop\SKRI
PSI miranti\VARIABLE
DATASHET.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working Data 40
File
Missing Value Handling Definition of Missing User-defined missing
values are treated as
missing.
Cases Used Statistics are based on
cases with no missing
values for any variable
used.
Syntax REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF
OUTS R ANOVA
/CRITERIA=PIN(.05)
POUT(.10)
/NOORIGIN
/DEPENDENT Y
/METHOD=ENTER X1
X2 X3 X4 X5 X6 X7 X8 X9 ...
Resources Processor Time 00:00:00,05
Elapsed Time 00:00:00,08
Memory Required 9168 bytes
Additional Memory 0 bytes
Required for Residual Plots
Page 11
a
Variables Entered/Removed
Variables Variables
Model Entered Removed Method
1 Fasilitas . Enter
Pendukung,
Kondisi
Cuaca,
Peralatan,
Pengawasan
dan
Pengendalian,
Lokasi,
Material,
Tenaga Kerja,
Gambar
Kerja,
Organisasi
dan personil
inti proyek,
Perencanaan
dan
Penjadwalanb
Model Summary
Adjusted R Std. Error of the
Model R R Square Square Estimate
1 1,000a 1,000 1,000 ,000
a
ANOVA
Sum of
Model Squares df Mean Square F Sig.
1 Regression 27214,775 10 2721,478 . .b
Residual ,000 29 ,000
Total 27214,775 39
a. Dependent Variable: Total Skor
b. Predictors: (Constant), Fasilitas Pendukung, Kondisi Cuaca, Peralatan, Pengawasan dan
Pengendalian, Lokasi, Material, Tenaga Kerja, Gambar Kerja, Organisasi dan personil inti proyek,
Perencanaan dan Penjadwalan
Page 12
a
Coefficients
Standardized
Unstandardized Coefficients Coefficients
Model B Std. Error Beta t
1 (Constant) 6,750E-14 ,000 ,000 1,000
Kondisi Cuaca 1,000 ,000 ,106 37940316,61 ,000
Peralatan 1,000 ,000 ,084 24134063,09 ,000
Material 1,000 ,000 ,153 34940401,27 ,000
Tenaga Kerja 1,000 ,000 ,113 27426215,04 ,000
Perencanaan dan 1,000 ,000 ,165 23971282,83 ,000
Penjadwalan
Pengawasan dan 1,000 ,000 ,093 24838833,50 ,000
Pengendalian
Organisasi dan personil inti 1,000 ,000 ,136 23997880,76 ,000
proyek
Gambar Kerja 1,000 ,000 ,085 14730882,86 ,000
Lokasi 1,000 ,000 ,086 24499240,58 ,000
Fasilitas Pendukung 1,000 ,000 ,163 37540141,77 ,000
a
Coefficients
Model Sig.
1 (Constant) 1,000
Kondisi Cuaca ,000
Peralatan ,000
Material ,000
Tenaga Kerja ,000
Perencanaan dan ,000
Penjadwalan
Pengawasan dan ,000
Pengendalian
Organisasi dan personil inti ,000
proyek
Gambar Kerja ,000
Lokasi ,000
Fasilitas Pendukung ,000
a. Dependent Variable: Total Skor
Page 13