Listado Total de Insumos

IU Código Descripción Unidad Cantidad Precio Parcial

MANO DE OBRA
39 11185 CHARLAS DE INDUCCION PERSONAL OBRERO HH 44.57 160.00 7,131.20
47 00006 CAPATAZ HH 544.53 25.21 13,727.60
47 00086 TOPOGRAFO HH 242.00 21.73 5,258.66
47 00007 OPERARIO HH 4,762.62 21.01 100,062.65
47 00008 OFICIAL HH 1,809.52 17.03 30,816.13
47 00009 PEON HH 4,261.38 15.32 65,284.34
47 01347 GUARDIAN HH 840.00 15.32 12,868.80
235,149.38
MATERIALES
00 10391 TRANSPORTE DE MATERIALES A OBRA KG 676,981.05 0.20 135,396.21
04 00033 ARENA FINA M3 22.86 50.00 1,143.00
05 00029 ARENA GRUESA M3 105.55 45.00 4,749.75
05 00099 PIEDRA CHANCADA DE 1/2" M3 148.81 62.00 9,226.22
21 00003 CEMENTO PORTLAND TIPO IP (42.5KG) BOL 892.96 18.50 16,519.76
23 00405 CEMENTO PORTLAND TIPO V (42.5KG) BOL 1,228.40 25.50 31,324.20
29 06952 AGUA PARA INGERIR DE 20 L UND 209.00 19.50 4,075.50
29 07030 CONOS DE SEÑALIZACION UND 6.00 38.00 228.00
29 06944 FILTRO PARA POLVO UND 14.00 25.00 350.00
29 06947 UNIFORME MAMELUCO PARA OBRERO UND 14.00 93.22 1,305.08
29 08160 UNIFORME TYVEX UND 140.00 45.80 6,412.00
29 08311 ZAPATOS PUNTA DE ACERO PAR 40.00 81.80 3,272.00
30 06950 LENTES DESEGURIDAD (CAMBIO C/5 DIAS) UND 112.00 8.00 896.00
30 08444 PROTECTOR SOLAR 1LT UND 8.00 105.00 840.00
30 04972 SEÑALES INFORMATIVAS UND 4.00 75.00 300.00
30 08418 SEÑALES PREVENTIVAS UND 4.00 68.00 272.00
30 02333 YESO DE 15 Kg BOL 6.33 9.00 56.97
49 10395 SC MOVILIZACION DE EQUIPO EN CAMA BAJA (IDA Y VUELTA) KG 87,450.00 0.20 17,490.00
233,856.69
EQUIPO
37 00004 HERRAMIENTAS MANUALES %MO 8,315.90
8,315.90

COSTO DIRECTO 477,321.97


GASTOS GENERALES 113.671512 % 542,579.10
UTILIDAD 10 % 47,732.20

SUB TOTAL 1,067,633.27


IGV 18 % 192,173.99

PRESUPUESTO TOTAL 1,259,807.26

Son : UN MILLON DOSCIENTOS CINCUENTA Y NUEVE MIL OCHOCIENTOS SIETE CON 26/100 SOLES