ip
Mesaieed Power Company Limited i
Document Number: | Tit Rev Date
| MPAMSIQ OOSIFO1 | Tool Box Talk Attendance Form 2016-06-12
Tool Box Talk Attendance Form
Company: ect
Section/Team: o&M
Date: 2017 [0 [30 yv/mm/ad)
Time: O14 2ahours
Name of Presenter: Giridhar Chimakurthy,
Title/Position: Operations Manager
Signature:
Subject: Chemical Burn incident at ECP
Sections covered:
of the incident, analysis of the causes of incident, lessons
learnt from the incident
Hand outs if any:
Chemical Burn Incident at ECP power point presentation
No: Full Name ‘Company Signature
1 [Melvin Dominyez Mect—
TAMER Btiaeee MPC) seq
Sood RAZ}
MPC] ssafed
Swyesh —frajapuh’ ape sa
‘Tool Box Talk Attendance form
Page 1 of 1MPAMSIQ O0S/FO1
Tool Box Talk Attendance Form
2016-06-12
Tool Box Talk Attendance Form
Company: MPCL
Section/Team: ARRETION
Date: yp Novembe 2019 (yyyy/enmn/ad)
Time: 16:00 24 hours
Name of Presenter:
Gi Ri DehR CHIMa RUR THY
Title/Position:
Open Mevrorge—
Signature: GEG RT
Subject: Chen Gt Ruins jandet ar GCP om ly/apoa>
Sections covered: Pein tee
Hand outs if any: Passe poinr Preentabion om a
No: Full Name Company Signature
1 | AWMED eran Node HS
2 | Ata Rain ed ape. L
3 PARK TAsmpocen Marc
4 FReepozico mace 2 - mee
S| pet ets ca RR ———_—.
6 |