CONSTRUCTION OF 10,000 GALLON WATER SCHEME IN OPOLO COMMUNITY, BAYELSA STATE

ID Task Name Duration Start FinishMay '17 Oct '17 Mar '18
W T F S S M T W T F S S M T W T F S S M T W
0 PROVISION OF 10,000 LITRES OVERHEAD WATER 255.38 Aug 1 '17 Apr 8 '18
1 SCHEME
MOBILIZATION/DEMOBILIZATION days
27 days Aug 1 '17 Aug 27 '17
2 Project Kick off meeting 1 day Aug 1 '17 Aug 1 '17
3 Mobilization of drilling rig, equipment, materials and 3 days Aug 2 '17 Aug 4 '17
4 personnel tosurvey
Geophysical and from site 5 days Aug 3 '17 Aug 7 '17
5 Engineering design 25 days Aug 3 '17 Aug 27 '17
6 PROCUREMENT 150 days Aug 2 '17 Dec 27 '17
7 Procurement of materials needed for the workscope 150 days Aug 2 '17 Dec 27 '17
8 WATER BOREHOLE DRILLING WORK 29.5 days Aug 15 '17 Sep 12 '17
9 Drilling of 300m deep bore-hole to accommodate 15 days Aug 15 '17 Aug 29 '17
10 250mm casing
Provide and Install 250mm reinforced PVC casing 3 days Aug 30 '17 Sep 1 '17
11 Provide and Install Johnson type stainless steel 4 days Sep 2 '17 Sep 5 '17
12 screen and install a low-level electrode
Provide 2 days Sep 6 '17 Sep 7 '17
13 Well development by airlifting with good 1 day Sep 6 '17 Sep 6 '17
14 compression
Provide equipment
and install to about
appropriate size3hrs
APIand
steeltesing
risers to 3 days Sep 7 '17 Sep 9 '17
15 the pump (1:2:4
Construct set - 19 agg.) concrete slab 4 days Sep 7 '17 Sep 10 '17
16 Provide and install lockable screw cap on top of the 2 days Sep 11 '17 Sep 12 '17
17 casing and install 10HP submersible pump
Supply 3 days Sep 7 '17 Sep 9 '17
18 FOUNDATION 45 days Aug 8 '17 Sep 21 '17

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

PRESCO TECHNOLOGIES LIMITED


CONSTRUCTION OF 10,000 GALLON WATER SCHEME IN OPOLO COMMUNITY, BAYELSA STATE

ID Task Name Duration Start FinishMay '17 Oct '17 Mar '18
W T F S S M T W T F S S M T W T F S S M T W
19 Construction of reinforced concrete tank foundation 45 days Aug 8 '17 Sep 21 '17
20 to carry
STEEL 10,000 gallons
STANCHION & STEEL capacity
TANK tank 55.88 days Sep 21 '17 Nov 14 '17
21 Construction of 12m high steel support for tank 6 days Sep 22 '17 Sep 27 '17
22 complete with
Construct, accessand
fabricate ladder and
install 600mm
10,000 wide steel 45 days
gallon Sep 21 '17 Nov 4 '17
23 capacity
Provide and Install piping from borehole to branded
'Dorman Long' steel tank properly tank and 8 days Nov 6 '17 Nov 13 '17
24 from tank
Provide andtoInstall
distribution including
all required wasteconncetions
electrical drain pipe 5 days Nov 10 '17 Nov 14 '17
25 fromWATER
2.5KM pump toDISTRIBUTION
control panel NETWORK
and to public power 73.13 days Nov 15 '17 Jan 25 '18
26 (EXCAVATION)
Excavate pipeline trench 600 wide and 900mm deep 27 days Nov 15 '17 Dec 11 '17
27 for UPVCinstall
provide, pipe laying
and lay high-pressure uPVC 10 bar 32 days Dec 18 '17 Jan 18 '18
28 pipes oftrench
Backfill 150mm diameter
after laying of appropriate diameter 7 days
pipe with selected Jan 19 '18 Jan 25 '18
29 materials
WATER DISTRIBUTION NETWORK/PIPE & FITTINGS 7 days Jan 26 '18 Feb 1 '18
30 (2.5KM)
Construct and erect 1.2m high DOUBLE HEAD STAND 7 days Jan 26 '18 Feb 1 '18
31 TAPS fetching
TREATMENT PLANTpoints complete with PVC pipes and 28.38 days Feb 2 '18 Mar 1 '18
32 Procure and install a treatment plant with all 7 days Feb 23 '18 Mar 1 '18
33 necessary aaccessories
Construct treatment and piping toshelter
plant/panel make it 21 days Feb 2 '18 Feb 22 '18
34 FENCING 35.5 days Mar 3 '18 Apr 6 '18
35 Construct and erect chain link wire 5mm thick fence 4 days Mar 12 '18 Mar 15 '18
36 Fill area within the premises with sharp sand to a 8 days Mar 3 '18 Mar 10 '18
37 height ofand
Provide 300mm
lay 100mm thick concrete (1:2:4 - 10 days Mar 16 '18 Mar 25 '18
19mm agg.)flooring within the premises
Task Inactive Summary External Tasks
Split Manual Task External Milestone
Milestone Duration-only Deadline
Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only

PRESCO TECHNOLOGIES LIMITED


CONSTRUCTION OF 10,000 GALLON WATER SCHEME IN OPOLO COMMUNITY, BAYELSA STATE

ID Task Name Duration Start FinishMay '17 Oct '17 Mar '18
W T F S S M T W T F S S M T W T F S S M T W
38 Construct 25m x 1.5m x 0.15m concrete walkway 12 days Mar 26 '18 Apr 6 '18
39 TESTING AND DEMOBILIZATION 2 days Apr 7 '18 Apr 8 '18
40 Completion, Testing, Clean-up, commissioning and 2 days Apr 7 '18 Apr 8 '18
Demobilization

Task Inactive Summary External Tasks


Split Manual Task External Milestone
Milestone Duration-only Deadline
Summary Manual Summary Rollup Progress
Project Summary Manual Summary Manual Progress
Inactive Task Start-only
Inactive Milestone Finish-only