Professional Documents
Culture Documents
Confirmation
received - parts internal Logistics
Picker Idle operator Idle
ready to collect via
Receive order for SAP
Planning
WAIT materials from Parts inspected
Office Planning via SAP
Parts logged at Order allocated to a Parts collected from
Parts delivered to Assign to internal Parts delivered to
WAIT Assign to a picker WAIT Parts picked WAIT WAIT collection area in Internal Logistics via WAIT WAIT Collection area and WAIT
collection area. SAP Logistics operator Kormax Machine
SAP logged in SAP
Order allocated to a
picker via SAP WAIT
QA Inspector Idle
WAIT
QA Allocate an
Inspector
WAIT WAIT Operator Idle Confirmation parts
failed passed to
operator
WAIT
Order Received
via SAP
Notify QA
Production Supervisor of parts
for insprection
Confirmation received -
parts ready to collect Picker Idle
via SAP
Storeman Idle
Order allocated to a
Internal Logistics via
SAP
Confirmation provided
Parts Transferred to
to planning parts are
SAP Store Location
WAIT
available via SAP