You are on page 1of 86

Ukuran Utama

Panjang kapal
LBP = 85.83 m
LWL = LBPr x 1,025 7.01
LWL = 89.26 m
Lebar Kapal 4.2915
B= 14.02 m
Sarat Kapal 20.68
T= 5.17 m 0.8616666667
tinggi Kapal 91.33
H = 6.81 m 5.7885 3.44667
Koefisien Bentuk
Koefisien Blok
Berdasarkan buku “Element of Ship Design” Cb General Cargo:

Cb = 0.770

Koefisien Midship
Berdasarkan buku “Ship Design for Efficiency and Economy” Cm General Cargo :
Series 60
Cm = 0.980

Koefisien Waterline
Berdasarkan buku “Ship Design for Efficiency and Economy” Cw General Cargo :

Cw = 0.870

Koefisien Prismatik Horizontal

Cph = 0.77

Koefisien Prismatik Vertikal

Cpv = 0.88

Volume Tanapa Bulbous Bow


V = Lwl x B x T x Cb = 4981.799 m3
Desain Bulbous

Lbp = 85.83 m 4.292


Lwl = 89.26 m
B = 14.02 m
T = 5.2 m
H = 6.81 m
V = 11.5 knot
Cb = 0.770
Cm = 0.980
Volume = Lwl x B x T x Cb = 4981.799 m3
Volume bulbous bow= 11.293280 m3
Volume kapal total = volume + bulbous = 4993.092 m3
Amidship= B x T x Cm = 71.034 m2

Δ=Vxγxc
γ = berat jenis air laut = 1.025 ton/m3
c = Faktor kulit = 1.004
Δ= 5138.3908
4.29 2.15 1.0729 3.505
0.280400 1.753

5.47925
5.789 0.61850 0.3093
1.0215 0.5108
6.2993

0.862
0.215

Sheer
a 3.0746 4.000 12.298
b 3.0224 4.000 12.090
0.000 2.97 4.000 11.880
1.000 2.7572 4.000 11.029
2.000 2.555 4.000 10.220
3.000 2.3739 4.000 9.496
4.000 2.2233 4.000 8.893
5.000 2.1006 4.000 8.402
6.000 1.9955 4.000 7.982
7.000 1.8975 4.000 7.590
85.848 8.000 1.8 4.000 7.200
9.000 1.8 4.000 7.200
10.000 1.8 4.000 7.200
0.2804 11.000 1.8 4.000 7.200
12.000 1.8 4.000 7.200
13 1.9976 4.000 7.990
14.000 2.1951 4.000 8.780
15 2.4059 4.000 9.624
16 2.6514 4.000 10.606
17 2.9531 4.000 11.812
18 3.316 4.000 13.264
19 3.721 4.000 14.884
20 4.14 4.000 16.560
c 4.2579 4.000 17.032
d 4.3755 4.000 17.502
Hidrostatika kapal

SHEET :
LINES PLAN REV. :
LOA = - m. CB = 0.77 BY
LWL = 89.26 m. CM = 0.98 DESIGN DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECK DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = HP APP. DATE
V = 11.2 Knot SIGN
LWL = 89.26 m.
BWL = 14.0 m.
DWL Design
l = 4.292 m.
la' = 1.715 m.
la" = 2.146 m.
WATER PLANE 6; ( T = 4 m )
lf = 2.146 m.
0,5 B
NO. SECT MS 0,5B.MS FM SMA (0,5B)3 .MS 0,5B.MS.FM2
(m)
(4) = (6) = (7) = (8) =
(1) (2) (3) (5)
(2).(3) (4).(5) (2)3.(3) (2).(3).(5)2
-0.50 1.520 0.400 0.607 -10.500 -6.378 1.403 66.970
-0.25 3.070 1.599 4.907 -10.250 -50.301 46.252 515.586
0.061 4.430 0.900 3.985 -9.939 -39.610 78.212 393.688
0.5 5.510 2.000 11.020 -9.500 -104.690 334.568 994.555
1 6.200 1.000 6.200 -9.000 -55.800 238.328 502.200
1.5 6.630 2.000 13.260 -8.500 -112.710 582.868 958.035
2 6.920 1.500 10.380 -8.000 -83.040 497.061 664.320
3 7.200 4.000 28.800 -7.000 -201.600 1492.992 1411.200
4 7.340 2.000 14.680 -6.000 -88.080 790.894 528.480
5 7.420 4.000 29.680 -5.000 -148.400 1634.074 742.000
6 7.510 2.000 15.020 -4.000 -60.080 847.130 8.000
240.320
7 7.510 4.000 30.040 -3.000 -90.120 1694.259 7.000
270.360
6.000
8 7.510 2.000 15.020 -2.000 -30.040 847.130 60.080
5.000
9 7.510 4.000 30.040 -1.000 -30.040 1694.259 30.040
4.000
10 7.510 2.000 15.020 0.000 0.000 847.130 0.000
3.000
11 7.510 4.000 30.040 1.000 30.040 1694.259 2.000 30.040
12 7.510 2.000 15.020 2.000 30.040 847.130 1.000 60.080
13 7.510 4.000 30.040 3.000 90.120 1694.259 0.000
270.360
-2.00 -1.00 0.00
14 7.110 2.000 14.220 4.000 56.880 718.851 227.520
15 6.270 4.000 25.080 5.000 125.400 985.968 627.000
16 5.200 2.000 10.400 6.000 62.400 281.216 374.400
17 4.090 4.000 16.360 7.000 114.520 273.672 801.640
18 2.750 1.500 4.125 8.000 33.000 31.195 264.000
18.5 2.000 2.000 4.000 8.500 34.000 16.000 289.000
19 1.330 1.000 1.330 9.000 11.970 2.353 107.730
19.5 0.650 2.000 1.300 9.500 12.350 0.549 117.325
20 0.000 0.500 0.000 10.000 0.000 0.000 0.000
S1 = S2 = S3 = S4 =
380.575 -500.169 18172.010 10546.928
AWL = 2/3 . l . S1 = 1088.826 m2
LCF = l . S2 / S1 = -5.640 m.
IT = 2.!/3.(1/3).l.S3 = 17330.040 m4
Iy = 2.!/3.l3.S4 = 555727.739 m4
IL = Iy - (AWL . LCF2) = 521091.557 m4
CW = AWL / (LWL . BWL) = 0.870
Koreksi Water Line
AWL Rancangan = 1,088.740
Koreksi = ( AWL− AWLrancangan )
x 100
AWL

Syarifuddin Yamin
D31106019
Hidrostatika kapal

= 0.0079 %

Syarifuddin Yamin
D31106019
Hidrostatika kapal

Perhitungan Radius Bilga

B= 14.02 m Radius Bilga = 1.838


T= 5.17 m
Cm = 0.98
R= 1.838 m

7
l= 0.430833 m
l' = 0.215417 m

GADING SARAT ORDINAT FS HASIL KALI


5
I II III IV III*IV = V
0 5.200 0.5 2.600 5.6019567
0.12 5.849 2 11.698 6.3285
4
0.36 6.362 1 6.362 6.5844
0.652 6.655 2 13.310 6.7476
1.019 6.860 1.5 10.290 6.8546
3
1.45 6.951 4 27.804 6.948
1.994 7.010 2 14.020

10 2.5
3
7.010
7.010
4
2
28.040
14.020
2

3.5 7.010 4 28.040


4 7.010 2 14.020
1
4.5 7.010 4 28.040
5 7.010 2 14.020
5.5 7.010 4 28.040
0
6 7.010 1 7.010 5.000 5.500 6.000 6.500
Σ= 247.314

0.00
A10SAC = 71.034
A10GD = 2/3 x T/12 x Σ
= 71.03
Koreksi = [(A10GD-A10sac )/A10GD] x 100%
= 0.00 %

Syarifuddin Yamin
D31106019
Data Kapal Rancangan
Lbp = 85.83 m
B= 14.02 m
T= 5.17 m
H= 6.81 m
Cb = 0.77
Cm = 0.98
Cw = 0.87
Cpv = 0.88
Cph = 0.770
Fb = 1.64 m
Fn = 0.24
Displ. = 5138.39 Ton
Vol. = 4981.80 m3
Dwt = 4300 Ton
Vs = 14 knot
Lwl= 89.26 m

Berdasarkan konvensi lambung timbul (ILLC) tahun 1966,halaman 103 memberikan


peraturan sebagai berikut:

Buritan Haluan

Ap 1/3 Ap 1/6 Ap 1/6 Fp 1/3 Fp Fp

28.61
SHEER PLAN 14.31

Untuk Buritan Kapal 4


Ap = 25 (LBP/3 + 10) = 965.250 mm = 0.97 m 3.86
1/3 Ap = 11.1 (LBP/3 + 10) = 428.571 mm = 0.43 m 1.71
1/6 Ap = 2.8 (LBP/3 +10) = 108.1080 mm = 0.11 m 0.43

Untuk Haluan Kapal


Fp = 50 (LBP/3 + 10) = 1930.500 mm = 1.93 m
1/3 Fp = 22.2 (LBP/3 + 10) = 857.142 mm = 0.86 m
1/6 Fp = 5.6 (LBP/3 + 10) = 216.2160 mm = 0.22 m

RADIUS BILGA

R= (B*T*(1-Cm)/0.4292)^0.5
R= 1.838
PERENCANAAN BURITAN

# Diameter propeller Kapal


DP= 0,6 x T
= 0,6 x 4
= 3.10 m

# Diameter bos propeller


Dbp= 1/6 x DP
= 1/6 x 2,4
= 0.52 m

# Menghitung jarak antara propeller dan tinggi kemudi


1). = 0.01 x DP
= 0.031 m
2). = 0.09 x DP
= 0.279 m
3). = 0.17 x DP
= 0.527 m
4). = 0.15 x DP
= 0.4653 m
5). = 0.18 x DP
= 0.55836 m
6). = 0.4 x DP
= 1.241 m

# Perhitungan kemudi

1). Luas daun kemudi


A = ( (T x Lbp/100) + (25 (B /Lbp ) )
= 8.521 m

2). Tinggi maksimum daun kemudi


h maks = 2/3 x T
= 3.447 m
18.36667
3). Lebar daun kemudi
= A / h maks
= 2.472 m

4). Perhitungan jarak minimum antara propeller dengan tinggi buritan


atau terhadap kemudi
a = 0.01 x DP
= 0.031 m
b = 0.09 x DP
= 0.279 m
c = 0.17 x DP
= 0.527 m
d = 0.15 x DP
= 0.4653 m
e = 0.18 x DP
= 0.55836 m
f = 0.4 x DP
= 0.124 m

5). Ukuran tinggi baling-baling


l = 50 x Lbp
= 463.22 mm

t = 2.4 x Lbp
= 22.235 mm

b = 36 x Lbp
= 333.52 mm
Bentuk Linggi

D 3.102 6.204

a 1.7061 3.4122
e 0.517 1.034
b 1.8095 3.619
Gading -0.5 -0.25 0 0.5 1
NO Frame 0 Frame 0.5 Frame 01
WL 0 0.0 1.320
Wl 0.25 0.22 1.486
Wl 0.5 0.43 1.644
Wl 0.75 0.65 1.750
WL 1 0.9 1.792
Wl 1.5 1.3 1.900
WL 2 1.7 2.000
Wl 2.5 2.15 2.170

WL 3 2.6 2.470

WL 3.5 3.0 2.910


WL 4 3.4 0 3.405
Wl 4.5 3.9 0.000 2.339 4.109
WL 5 4.3 0.000 3.195 4.676
WL 5.5 4.7 1.380 4.070 5.374

WL 6 5.17 1.520 3.070 4.430 5.510 6.200

Luas 2.8578611 8.6797119 31.1975033

v1= 4993.0918586768 -3.6159 -2.8638


v2= 4812.546543 -3.3366 %
1.825

6.6 8

5.5 6

-3.6159
5

4.4
4

3.3
2

1
2.2
0
-1 -0.5
3

3.3
2

1
2.2
0
-3.6159 -1 -0.5
-3.6159
1.1

0.0
0.000 2.220 4.440 6.660

-3.6159
-3.337

-3.6159

-3.6159

-3.6159
-3.6159 -3.6159

80

70
-3.6159 -3.6159
60

50

40

30

20

10

0
-2.00 -1.00 0.00 1.00 2.00
Gading -0.5 -0.25 0 0.5 1
NO Frame 0 Frame 0.5 Frame 01
WL 6 6.2 -1.52 -3.07 -4.43 -6.20 4.770
WL 5.5 5.7 -1.38 -5.37 4.010
WL 5 5.2 3.420
Wl 4.5 4.7 #REF! 2.990
WL 4 4.1 #REF! 2.740
WL 3.5 3.6 0.00 2.560
WL 3 3.1 0.00 2.4
Wl 2.5 2.6 0.00 2.25
WL 2 2.1 0.00 2.07
Wl 1.5 1.55 0.00 1.84
WL 1 1.0 0.00 1.48
Wl 0.75 0.775 0.00 1.219
Wl 0.5 0.52 0 0.9
Wl 0.25 0.26 - 0.510
WL 0 0.0 - 0.000
1.5 2 3 4 5 6 7 8 9
Frame 1.5 Frame 02 Frame 03 Frame 04 Frame 05 Frame 06 Frame 07 Frame 08 Frame 09
1.870 2.440 3.450 4.330 4.930 5.200 5.200 5.200 5.200
1.856 2.342 3.081 3.964 4.790 5.849 5.849 5.849 5.849
2.276 2.917 4.237 5.418 6.105 6.362 6.362 6.362 6.362
2.455 3.256 4.878 5.949 6.538 6.655 6.655 6.655 6.655
2.641 3.462 5.006 6.030 6.654 6.860 6.860 6.860 6.860
2.904 3.758 5.125 6.123 6.709 6.951 6.951 6.951 6.951
3.150 4.092 5.645 6.619 7.161 7.510 7.510 7.510 7.510
3.460 4.380 5.813 6.697 7.194 7.510 7.510 7.510 7.510

3.740 4.820 5.974 6.781 7.222 7.510 7.510 7.510 7.510

4.283 5.139 6.174 6.866 7.265 7.510 7.510 7.510 7.510


4.805 5.517 6.368 6.964 7.301 7.510 7.510 7.510 7.510
5.224 5.849 6.568 7.055 7.337 7.510 7.510 7.510 7.510
5.686 6.240 6.768 7.146 7.373 7.510 7.510 7.510 7.510
6.136 6.573 6.964 7.231 7.394 7.510 7.510 7.510 7.510

6.630 6.920 7.200 7.340 7.420 7.510 7.510 7.510 7.510

41.708831 49.2815888889 59.936097 67.41163 71.902349 74.62 74.62 74.62 74.62

-3.6159 0.1 7.410

8.000

7.000

6.000

5.000

4.000

3.000
-3.6159

2.000

1.000

0.000
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5
3.000

2.000

1.000

0.000
-1 -0.5 -3.61590215
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5

-3.6159

-3.6159

-3.6159
-3.615902
-3.6159

Sectiona

-3.6159

00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 1


1.5 2 3 4 5 6 7 8 9
Frame 1.5 Frame 02 Frame 03 Frame 04 Frame 05 Frame 06 Frame 07 Frame 08 Frame 09
5.220 5.690 6.460 6.980 7.260 7.300 7.300 7.300 7.300
4.620 5.174 6.068 6.717 7.130 7.300 7.300 7.300 7.300
4.120 4.800 5.800 6.553 7.072 7.300 7.300 7.300 7.300
3.813 4.533 5.600 6.457 7.040 7.300 7.300 7.300 7.300
3.600 4.342 5.472 6.379 7.010 7.300 7.300 7.300 7.300
3.440 4.186 5.356 6.319 6.990 7.300 7.300 7.300 7.300
3.3 4.056 5.244 6.258 6.98 7.3 7.3 7.3 7.3
3.17 3.935 5.132 6.2 6.96 7.3 7.3 7.3 7.3
3 3.77 5 6.119 6.9 7.3 7.3 7.3 7.3
2.75 3.554 4.833 6 6.78 7.249 7.249 7.249 7.249
2.38 3.216 4.56 5.72 6.56 7.0509 7.0509 7.0509 7.0509
2.1 2.947 4.3 5.49 6.37 6.8809 6.8809 6.8809 6.8809
1.75 2.57 3.954 5.17 6.1 6.6415 6.6415 6.6415 6.6415
1.267 2.004 3.449 4.760 5.700 6.283 6.283 6.283 6.283
0.570 1.310 2.810 4.210 5.060 5.300 5.300 5.300 5.300
10 11 12 13 14 15 16 17
Frame 10 Frame 11 Frame 12 Frame 13 Frame 14 Frame 15 Frame 16 Frame 17
5.200 5.200 5.200 5.200 4.740 3.890 2.800 1.650
5.849 5.849 5.849 5.849 3.791 3.197 2.142 1.310
6.362 6.362 6.362 6.362 5.723 4.817 3.746 2.695
6.655 6.655 6.655 6.655 6.141 5.276 4.215 3.037
6.860 6.860 6.860 6.860 6.212 5.308 4.267 3.102
6.951 6.951 6.951 6.951 6.295 5.347 4.325 3.154
7.510 7.510 7.510 7.510 6.840 6.006 4.923 3.782
7.510 7.510 7.510 7.510 6.878 6.032 4.962 3.808

7.510 7.510 7.510 7.510 6.917 6.058 4.994 3.846

7.510 7.510 7.510 7.510 6.949 6.090 5.032 3.885


7.510 7.510 7.510 7.510 6.981 6.122 5.058 3.923
7.510 7.510 7.510 7.510 7.013 6.167 5.103 3.968
7.510 7.510 7.510 7.510 7.045 6.186 5.135 4.013
7.510 7.510 7.510 7.510 7.077 6.231 5.173 4.051

7.510 7.510 7.510 7.510 7.110 6.2700 5.2000 4.0900

71.03 74.62 74.62 74.62 68.013935 59.211436 48.270710278 36.634907222

5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.


5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.

-3.6159

-3.6159

6.6

5.5

4.4

3.3 -3.6159

2.2

1.1

0.0
0.000 2.220 4.440 6.660
-3.6159

Sectional Area Curve

8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00


10 11 12 13 14 15 16 17
Frame 10 Frame 11 Frame 12 Frame 13 Frame 14 Frame 15 Frame 16 Frame 17
7.3 7.3 7.3 7.3 7.2097 6.88 6 4.58
7.3 7.3 7.3 7.3 7.1949 6.669 5.693 4.217
7.3 7.3 7.3 7.3 7.1782 6.559 5.511 4.03
7.3 7.3 7.3 7.3 7.1715 6.477 5.374 3.911
7.3 7.3 7.3 7.3 7.158 6.413 5.26 3.817
7.3 7.3 7.3 7.3 7.143 6.354 5.175 3.707
7.3 7.3 7.3 7.3 7.127 6.29 5.08 3.6
7.3 7.3 7.3 7.3 7.09 6.224 4.968 3.468
7.3 7.3 7.3 7.3 7.035 6.138 4.8 3.287
7.249 7.249 7.249 7.249 6.92 5.994 4.541 3
7.0509 7.0509 7.0509 7.0509 6.6665 5.679 4.11 2.6
6.8809 6.8809 6.8809 6.8809 6.46 5.34 3.76 2.33
6.6415 6.6415 6.6415 6.6415 6.17 4.92 3.36 2
6.2831 6.2831 6.2831 6.2831 5.7 4.35 2.86 1.62
5.3 5.3 5.3 5.3 4.8469 3.58 2.3 1.16
-3.6159

18 18.5 19 19.5 20
Frame 18 Frame 18.5 Frame 19 Frame 19.5 Frame 20 NO
0.540 0.010 0 0.001 0.000 WL 0
0.740 0.444 0.244 0.130 0.000 Wl 0.25 -100.000
1.691 1.170 0.727 0.244 0.000 Wl 0.5
1.913 1.363 0.833 0.330 0.000 Wl 0.75
1.971 1.421 0.900 0.389 0.000 WL 1
2.032 1.481 0.962 0.470 0.000 Wl 1.5
2.442 1.667 1.032 0.507 0.000 WL 2
2.487 1.712 1.064 0.534 0.000 Wl 2.5

2.526 1.750 1.096 0.507 0.000 WL 3

2.558 1.788 1.128 0.470 0.000 WL 3.5 -100.000


2.600 1.821 1.173 0.484 0.000 WL 4
2.641 1.853 1.212 0.491 0.000 Wl 4.5
2.679 1.904 1.250 0.565 0.000 WL 5
2.712 1.955 1.288 0.558 0.000 WL 5.5

2.7500 2.0000 1.3300 0.6500 0.0000 WL 6

23.893298611 16.7624325 10.7073572 4.7725 1.43611111E-05 Luas

-100.000
-3.6159
-3.6159

12 12.5 13 13.5 14 14.5 15 15.5 16 16.5 17 17.5 18 18.5 19 19.5 20


12 12.5 13 13.5 -3.6159
14 14.5 15 15.5 16 16.5 17 17.5 18 18.5 19 19.5 20
-3.337

-3.6159
-3.6159

15.00 16.00 17.00 18.00 19.00 20.00


18 18.5 19 19.5 20
Frame 18 Frame 18.5 Frame 19 Frame 19.5 Frame 20
3.01 2.2 1.44 0.7 0
2.746 2.013 1.25 0.601
2.574 1.868 1.13 0.51
2.461 1.762 1.04 0.45
2.354 1.651 0.99 0.39
2.252 1.547 0.92 0.35
2.144 1.44 0.85 0.32
2.025 1.343 0.77 0.29
1.89 1.241 0.666 0.23
1.7 1.114 0.553 0.12
1.445 0.927 0.434 0
1.244 0.786 0.349 -
1.005 0.612 0.247 -
0.702 0.4 0.136 -
0.37 0.1735 0 -
0 Lbp = 85.83 m
0.04 Lwl = 87.97575 m
0.2 B = 14.02 m
0.4 2.75275 T = 5.17 m
0.6 H = 6.81 m
0.71 V = 14.00 knot
0.751 Cb = 0.770
0.758 Cm = 0.980
0.42 Cw = 0.870
0.757 Volume = Lwl x B x T x Cb = 4910.12 m3
0.715 Amidship = B x T x Cm = 71.034 m2
0.6 Dari grafik Design of Bulbous Bow diperoleh :
0.5
0.38 Cvpr /100= 0.0023
0.3 Czb = 0.58
0.203 CABL = 0.10
0.11 CABT = 0.09
0 CLPR = 0.028 (Dari BKI 3 % LBP) 2.5749
CBB = 0.06

VPR = 11.293 m3
-3.616 ZB = 3.00 m
ABL = 7.10 m2 2.5749
ABT = 6.3930 m 2

LPR = 2.04 m = 2.403


BB = 0.84 m
-3.6159
Perhitungan ABT pada Gading 20 = (Vol.VPR−Vol.VPRRan
GD.20 = 1/3 x T/12 x Σ = 1.4361E-05 m2 Vol .VPRRancang
0.23
Koreksi ABT/gading 20 = -100.000 % <0.05 %

Desain Bulbous Bow


VPR (Volume Bulbous Bow)

18.5 19 19.5 20
-3.6159 VPR = Cvpr x V(Volume Kapal)
ABL (Luas Bulbous Bow secara memanjang)
ABL = CABL x Luas Midship
18.5 19 19.5 20 -3.6159 ABT (Luas Bulbous Bow secara melintang)
ABT = CABT x Luas Midship
LPR (Panjang Bulbous Bow)
LPR = CLPR x Lbp
-3.6159 BB (Lebar Bulbous Bow)
BB = CBB x B (Lebar kapal)
-100.000 ZB (Tinggi pertengahan Bulbous Bow)
ZB = CZB x T (Sarat)
-3.6159
Volume Kapal = Lwl x B x T x Cb
Luas Midship = B x T x Cm

WL ORD FS HK
0 0 0.5 0
0.25 0.165 2 0.33
0.5 0.264 1 0.264
-3.6159 0.73 0.32 2 0.63
0.99 0.3545 1.5 0.53175
1.52 0.395 4 1.58
2 0.413 2 0.826
2.5 0.4206 4 1.6824
3 0.414 2 0.828
3.48 0.397 4 1.588
4 0.359 2 0.718
4.46 0.308 4 1.232
4.99 0.22 2 0.44
5.5 0.12 4 0.48
6 0 1 0
Σ= 11.13015

6.39365283
-3.6159 0.00964947
Perhitungan ABL pada Gambar (ABL')
t= 0.430833 m t" = 0.2154167 m
t' = 0.107708 m

12 6 0.000 1 0
11 5.5 0.059 4 0.236
10 5 0.138 2 0.276
9 4.5 0.322 4 1.288
8 4 0.614 2 1.228
7 3.5 1.045 4 4.18
6 3 1.491 2 2.982
5 2.5 1.764 4 7.056
0.7 4 2 1.832 2 7.328
0.23 3 1.5 1.800 4 2.7
0.31 2 1 1.596 1.5 2.394
0.12 1.5 0.75 1.407 2 2.814
0.07 1 0.5 1.100 0.75 0.825
0.5 0.25 0.703 0.5 0.3515
0.13 0 0 0.000 0.25 0
Σ= 33.6585

Perhitungan ABL pada Gambar (ABL')


Bulbous
ABL' = 1/3 x T/12 x Σ = 4.834 m2 6.00

m
Koreksi = (ABL'-ABL/ABL') x 100 % = -31.952 % <0.05 %

(Vol.VPR−Vol.VPRRancangan) 5.00
x100
Vol.VPRRancangan

4.00

3.00 z

2.00
4.00

3.00 z

2.00

1.00

0.00
0 0.2 0.4 0.6 0.8

Chart Title
7

0.009649
4 0.00964947

0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45
1

0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45
Waterline Tinggi panjang
12 6 5.17 0
11 5.5 4.739 0.059
10 5 4.308 0.138
9 4.5 3.878 0.322
8 4 3.4 0.61
7 3.5 3.016 1.045
6 3 2.59 1.49
5 2.5 2.154 1.764
4 2 1.7 1.832
3 1.5 1.293 1.8
2 1 0.86 1.60
1.5 0.75 0.6463 1.407
1 0.5 0.431 1.100
0.5 0.25 0.2154 0.703
0 0 0.0000 0

Bulbous Bow
6.00

5.00

4.00

3.00 z

2.00
4.00

3.00 z

2.00

1.00

-31.952

0.00
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2
SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.26 m. CM = 0.98 DESIGNED DATE
LBP = 85.83 m. CW = 0.87 SIGN
B = 14.02 m. CPL = 0.77 BY
H = 6.81 m. CPV = 0.88 CHECKED DATE
T = 5.17 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t = 0.061 m. t = 0.148 m.
SECTION A SECTION B
tb = 0.250 m. tb = 0.250 m.
td = 0.309 m. td = 0.309 m.
ASAC = 0.000 m2 ts = 0.511 m. ASAC = 2.640 m2 ts = 0.511 m.
T 0,5 B AS T 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) (m) ( m2 ) (m) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN

5.377 4.650 1.00 4.650 5.204 0.000 1.00 0.000


5.439 1.250 4.00 5.000 5.352 1.866 4.00 7.464
5.500 2.500 1.00 2.500 5.500 3.250 1.00 3.250
S5 = 12.150 0.497 S5 = 10.714 1.056
5.500 2.500 1 2.500 5.500 3.250 1 3.250
5.750 4.000 4 16.000 5.750 4.500 4 18.000
6.000 4.740 1 4.740 6.000 5.110 1 5.110
S6 = 35.390 5.898 S6 = 37.074 3.653
6.000 4.740 1 4.740 6.000 5.110 1 5.110
6.613 5.100 4 20.400 6.613 5.540 4 22.160
7.225 5.510 1 5.510 7.225 5.940 1 5.940
S7 = 66.040 2.699 S7 = 70.284 14.490
7.225 5.510 1.0 5.510 7.225 5.940 1.0 5.940
7.863 5.690 4.0 22.760 7.863 6.100 4.0 24.400
8.500 5.800 1.0 5.800 8.500 6.200 1.0 6.200
S7 = 34.070 11.601 S7 = 36.540 12.442
SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.215 m. t1 = 0.215 m.
SECTION 0 SECTION 0,5
t2 = 0.431 m. t2 = 0.431 m.
t3 = 0.309 m. t3 = 0.309 m.
ASAC = 2.858 m2 t4 = 0.511 m. ASAC = 8.680 m2 t4 = 0.511 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 0.000 1 0.000 a 0.000 1 0.000
0.250 0.000 4 0.000 b 0.000 4 0.000
0.500 0.000 1 0.000 1.000 0.000 1 0.000
S5 = 0.000 0.000 S5 = 0.000 0.000
0.500 0.000 1 0.000 1.000 0.000 1 0.000
0.750 0.000 4 0.000 1.500 0.000 4 0.000
1.000 0.000 1 0.000 2.000 0.000 1 0.000
S5 = 0.000 0.000 S5 = 0.000 0.000
1.000 0.000 1 0.000 2.00 0.000 1 0.000
1.500 0.000 4 0.000 2.500 0.000 4 0.000
2.000 0.000 1 0.000 3.000 0.000 1 0.000
S5 = 0.000 0.000 S5 = 0.000 0.000
2.000 0.000 1 0.000 3.000 0.000 1 0.000
2.500 0.000 4 0.000 3.500 0.000 4 0.000
3.000 0.000 1 0.000 4.000 0.000 1 0.000
S5 = 0.000 0.000 S5 = 0.000 0.000
3.000 0.000 1 0.000
3.500 0.000 4 0.000
4.000 0.000 1 0.000
S5 = 0.000 0.000 0.000
4.000 0.000 1 0.000 a 0.000 1 0.000
4.500 0.000 4 0.000 b 1.819 4 7.274
5.000 0.000 1 0.000 5.000 3.195 1 3.195
S5 = 0.000 0.000 S5 = 10.469 1.503
5.000 0.000 1 0.000 5.000 3.195 1 3.195
5.500 1.380 4 5.520 5.500 4.070 4 16.280
6.000 4.430 1 4.430 6.000 5.510 1 5.510
S5 = 9.950 2.858 S5 = 24.985 7.176
6.000 4.430 1 4.430 6.000 5.510 1 5.510
6.6125 3.726 4 14.904 6.613 4.246 4 16.984
7.225 3.928 1 3.928 7.225 4.5009 1 4.501
S6 = 23.262 4.796 S5 = 26.9945 5.565
7.225 3.928 1 3.928 7.225 4.5009 1 4.501
7.8625 4.154 4 16.615 7.863 4.7942 4 19.177
8.500 4.245 1 4.245 8.500 4.9668 1 4.967
S7 = 24.789 8.441 S5 = 28.6445 9.753

A Rancangan = 2.858 A Rancangan = 8.680

A SAC = 2.858 A SAC = 8.680

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGNED DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 1 SECTION 1,5
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 31.198 m2 ASAC = 41.709 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 1.320 1 1.320 0.000 1.870 1 1.870
0.250 1.486 4 5.944 0.250 1.856 4 7.424
0.500 1.644 1 1.644 0.500 2.276 1 2.276
S1,5 = 8.908 1.279 S0,5 = 11.570 1.662
0.500 1.644 1 1.644 0.500 2.276 1 2.276
0.750 1.750 4 7.000 0.750 2.455 4 9.820
1.000 1.792 1 1.792 1.000 2.641 1 2.641
S1,5 = 10.436 1.499 S1 = 14.737 2.116
1.000 1.792 1 1.792 1.000 2.641 1 2.641
1.500 1.900 4 7.600 1.500 2.904 4 11.616
2.000 2.000 1 2.000 2.000 3.150 1 3.150
S1,5 = 11.392 3.272 S1,5 = 17.407 5.000
2.000 2.000 1 2.000 2.000 3.150 1 3.150
2.500 2.170 4 8.680 2.500 3.460 4 13.840
3.000 2.470 1 2.470 3.000 3.740 1 3.740
S2 = 13.150 3.777 S2 = 20.730 5.954
3.000 2.470 1 2.470 3.000 3.740 1 3.740
3.500 2.910 4 11.640 3.500 4.283 4 17.132
4.000 3.405 1 3.405 4.000 4.805 1 4.805
S3 = 17.515 5.031 S3 = 25.677 7.375
4.000 3.405 1 3.405 4.000 4.805 1 4.805
4.500 4.109 4 16.436 4.500 5.224 4 20.896
5.000 4.676 1 4.676 5.000 5.686 1 5.686
S4 = 24.517 7.042 S4 = 31.387 9.015
5.000 4.676 1 4.676 5.000 5.686 1 5.686
5.500 5.374 4 21.496 5.500 6.136 4 24.544
6.000 6.200 1 6.200 6.000 6.630 1 6.630
S5 = 32.372 9.298 S5 = 36.860 10.587
6.000 6.200 1 6.200 6.000 6.630 1 6.630
6.613 4.687 4 18.746 6.613 5.097 4 20.386
7.225 4.953 1 4.953 7.225 5.330 1 5.330
S6 = 29.899 6.164 S6 = 32.346 6.669
7.225 4.953 1 4.953 7.225 5.330 1 5.330
7.863 5.261 4 21.044 7.863 5.605 4 22.419
8.500 5.4501 1 5.450 8.500 5.783 1 5.783
S7 = 31.447 10.708 S7 = 33.531 11.417

A Rancangan = 31.198 A Rancangan = 41.709

A SAC = 31.198 A SAC = 41.709

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 2 SECTION 3
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 49.282 m2 t4 = 0.5108 m. ASAC = 59.936 m2 t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 2.440 1 2.440 0.000 3.450 1 3.450
0.250 2.342 4 9.368 0.250 3.081 4 12.324
0.500 2.917 1 2.917 0.500 4.237 1 4.237
S0,5 = 14.725 2.115 S0,5 = 20.011 2.874
0.500 2.917 1 2.917 0.500 4.237 1 4.237
0.750 3.256 4 13.024 0.750 4.878 4 19.512
1.000 3.462 1 3.462 1.000 5.006 1 5.006
S1 = 19.403 2.786 S1 = 28.755 4.130
1.000 3.462 1 3.462 1.000 5.006 1 5.006
1.500 3.758 4 15.032 1.500 5.125 4 20.500
2.000 4.092 1 4.092 2.000 5.645 1 5.645
S1,5 = 22.586 6.487 S1,5 = 31.151 8.947
2.000 4.092 1 4.092 2.000 5.645 1 5.645
2.500 4.380 4 17.520 2.500 5.813 4 23.252
3.000 4.820 1 4.820 3.000 5.974 1 5.974
S2 = 26.432 7.592 S2 = 34.871 10.016
3.000 4.820 1 4.820 3.000 5.974 1 5.974
3.500 5.139 4 20.556 3.500 6.174 4 24.696
4.000 5.517 1 5.517 4.000 6.368 1 6.368
S3 = 30.893 8.873 S3 = 37.038 10.638
4.000 5.517 1 5.517 4.000 6.368 1 6.368
4.500 5.849 4 23.396 4.500 6.568 4 26.272
5.000 6.240 1 6.240 5.000 6.768 1 6.768
S4 = 35.153 10.097 S4 = 39.408 11.319
5.000 6.240 1 6.240 5.000 6.768 1 6.768
5.500 6.573 4 26.292 5.500 6.964 4 27.856
6.000 6.920 1 6.920 6.000 7.200 1 7.200
S5 = 39.452 11.331 S5 = 41.824 12.013
6.000 6.920 1 6.920 6.000 7.200 1 7.200
6.613 5.474 4 21.897 6.613 6.094 4 24.378
7.225 5.666 1 5.666 7.225 6.192 1 6.192
S6 = 34.482 7.109 S6 = 37.770 7.787
7.225 5.666 1 5.666 7.225 6.192 1 6.192
7.863 5.876 4 23.505 7.863 6.273 4 25.094
8.500 6.012 1 6.012 8.500 6.317 1 6.317
S7 = 35.182 11.979 S7 = 37.603 12.804

A Rancangan = 49.282 A Rancangan = 59.936

A SAC = 49.282 A SAC = 59.936

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 4 SECTION 5
t2 = 0.4308 m. t3 = 0.4308 m.
t3 = 0.3093 m. t4 = 0.3093 m.
ASAC = 67.412 m2 t4 = 0.5108 m. ASAC = 71.902 m2 ts = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 4.330 1 4.330 0.000 4.930 1 4.930
0.250 3.964 4 15.856 0.250 4.790 4 19.160
0.500 5.418 1 5.418 0.500 6.105 1 6.105
S0,5 = 25.604 3.677 S0,5 = 30.195 4.336
0.500 5.418 1 5.418 0.500 6.105 1 6.105
0.750 5.949 4 23.796 0.750 6.538 4 26.152
1.000 6.030 1 6.030 1.000 6.654 1 6.654
S1 = 35.244 5.061 S1 = 38.911 5.588
1.000 6.030 1 6.030 1.000 6.654 1 6.654
1.500 6.123 4 24.492 1.500 6.709 4 26.836
2.000 6.619 1 6.619 2.000 7.161 1 7.161
S1,5 = 37.141 10.668 S1,5 = 40.651 11.676
2.000 6.619 1 6.619 2.000 7.161 1 7.161
2.500 6.697 4 26.788 2.500 7.194 4 28.776
3.000 6.781 1 6.781 3.000 7.222 1 7.222
S2 = 40.188 11.543 S2 = 43.159 12.396
3.000 6.781 1 6.781 3.000 7.222 1 7.222
3.500 6.866 4 27.464 3.500 7.265 4 29.060
4.000 6.964 1 6.964 4.000 7.301 1 7.301
S3 = 41.209 11.836 S3 = 43.583 12.518
4.000 6.964 1 6.964 4.000 7.301 1 7.301
4.500 7.055 4 28.220 4.500 7.337 4 29.348
5.000 7.146 1 7.146 5.000 7.373 1 7.373
S4 = 42.330 12.158 S4 = 44.022 12.644
5.000 7.146 1 7.146 5.000 7.373 1 7.373
5.500 7.231 4 28.924 5.500 7.394 4 29.576
6.000 7.340 1 7.340 6.000 7.420 1 7.420
S5 = 43.410 12.468 S5 = 44.369 12.744
6.000 7.340 1 7.340 6.000 7.420 1 7.420
6.613 6.487 4 25.950 6.613 6.777 4 27.108
7.225 6.528 1 6.528 7.225 6.802 1 6.802
S6 = 39.818 8.209 S6 = 41.330 8.521
7.225 6.528 1 6.528 7.225 6.802 1 6.802
7.863 6.564 4 26.254 7.863 6.826 4 27.305
8.500 6.589 1 6.589 8.500 6.845 1 6.845
S7 = 39.371 13.406 S7 = 40.952 13.944

A Rancangan = 71.902
A Rancangan = 67.412
A SAC = 71.902
A SAC = 67.412
Koreksi Luas = 0.000 %
Koreksi Luas = 0.000 %
SHEET
LINES PLAN REV.
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGNED DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 6 SECTION 7
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 74.624 m2 t4 = 0.5108 m. ASAC = 74.624 m2 t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 5.200 1 5.200 0.000 5.200 1 5.200
0.250 5.849 4 23.396 0.250 5.849 4 23.396
0.500 6.362 1 6.362 0.500 6.362 1 6.362
S0,5 = 34.958 5.020 S0,5 = 34.958 5.020
0.500 6.362 1 6.362 0.500 6.362 1 6.362
0.750 6.655 4 26.620 0.750 6.655 4 26.620
1.000 6.860 1 6.860 1.000 6.860 1 6.860
S1 = 39.842 5.722 S1 = 39.842 5.722
1.000 6.860 1 6.860 1.000 6.860 1 6.860
1.500 6.951 4 27.804 1.500 6.951 4 27.804
2.000 7.510 1 7.510 2.000 7.510 1 7.510
S1,5 = 42.174 12.113 S1,5 = 42.174 12.113
2.000 7.510 1 7.510 2.000 7.510 1 7.510
2.500 7.510 4 30.040 2.500 7.510 4 30.040
3.000 7.510 1 7.510 3.000 7.510 1 7.510
S2 = 45.060 12.942 S2 = 45.060 12.942
3.000 7.510 1 7.510 3.000 7.510 1 7.510
3.500 7.510 4 30.040 3.500 7.510 4 30.040
4.000 7.510 1 7.510 4.000 7.510 1 7.510
S3 = 45.060 12.942 S3 = 45.060 12.942
4.000 7.510 1 7.510 4.000 7.510 1 7.510
4.500 7.510 4 30.040 4.500 7.510 4 30.040
5.000 7.510 1 7.510 5.000 7.510 1 7.510
S4 = 45.060 12.942 S4 = 45.060 12.942
5.000 7.510 1 7.510 5.000 7.510 1 7.510
5.500 7.510 4 30.040 5.500 7.510 4 30.040
6.000 7.510 1 7.510 6.000 7.510 1 7.510
S5 = 45.060 12.942 S5 = 45.060 12.942
6.000 7.510 1 7.510 6.000 7.510 1 7.510
6.613 6.918 4 27.672 6.613 6.950 4 27.800
7.225 6.931 1 6.931 7.225 6.950 1 6.950
S6 = 42.113 8.682 S6 = 42.260 8.713
7.225 6.931 1 6.931 7.225 6.950 1 6.950
7.863 6.942 4 27.768 7.863 6.950 4 27.800
8.500 6.950 1 6.950 8.500 6.950 1 6.950
S7 = 41.649 14.181 S7 = 41.700 14.199

A Rancangan = 74.624 A Rancangan = 74.624

A SAC = 74.624 A SAC = 74.624

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGNED DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 8 SECTION 9
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 74.624 m2 t4 = 0.5108 m. ASAC = 74.624 m2 t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 5.200 1 5.200 0.000 5.200 1 5.200
0.250 5.849 4 23.396 0.250 5.849 4 23.396
0.500 6.362 1 6.362 0.500 6.362 1 6.362
S0,5 = 34.958 5.020 6.75 34.958 5.020
0.500 6.362 1 6.362 0.500 6.362 1 6.362
0.750 6.655 4 26.620 0.750 6.655 4 26.620
1.000 6.860 1 6.860 1.000 6.860 1 6.860
S1 = 39.842 5.722 S1 = 39.842 5.722
1.000 6.860 1 6.860 1.000 6.860 1 6.860
1.500 6.951 4 27.804 1.500 6.951 4 27.804
2.000 7.510 1 7.510 2.000 7.510 1 7.510
S1,5 = 42.174 12.113 S1,5 = 42.174 12.113
2.000 7.510 1 7.510 2.000 7.510 1 7.510
2.500 7.510 4 30.040 2.500 7.510 4 30.040
3.000 7.510 1 7.510 3.000 7.510 1 7.510
S2 = 45.060 12.942 S2 = 45.060 12.942
3.000 7.510 1 7.510 3.000 7.510 1 7.510
3.500 7.510 4 30.040 3.500 7.510 4 30.040
4.000 7.510 1 7.510 4.000 7.510 1 7.510
S3 = 45.060 12.942 S3 = 45.060 12.942
4.000 7.510 1 7.510 4.000 7.510 1 7.510
4.500 7.510 4 30.040 4.500 7.510 4 30.040
5.000 7.510 1 7.510 5.000 7.510 1 7.510
S4 = 45.060 12.942 S4 = 45.060 12.942
5.000 7.510 1 7.510 5.000 7.510 1 7.510
5.500 7.510 4 30.040 5.500 7.510 4 30.040
6.000 7.510 1 7.510 6.000 7.510 1 7.510
S5 = 45.060 12.942 S5 = 45.060 12.942
6.000 7.510 1 7.510 6.000 7.510 1 7.510
6.613 6.950 4 27.800 6.613 6.950 4 27.800
7.225 6.950 1 6.950 7.225 6.950 1 6.950
S6 = 42.260 8.713 S6 = 42.260 8.713
7.225 6.950 1 6.950 7.225 6.950 1 6.950
7.863 6.950 4 27.800 7.863 6.950 4 27.800
8.500 6.950 1 6.950 8.500 6.950 1 6.950
S7 = 41.700 14.199 S7 = 41.700 14.199

A Rancangan = 74.624 A Rancangan = 74.624

A SAC = 74.624 A SAC = 74.624

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN

SECTIONS AREA CALCULATION

t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 10 SECTION 11
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 71.034 m2 ASAC = 74.624 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 5.200 1 5.200 0.000 5.200 1 5.200
0.250 5.849 4 23.396 0.250 5.849 4 23.396
0.500 6.362 1 6.362 0.500 6.362 1 6.362
S0,5 = 34.958 5.020 S0,5 = 34.958 5.020
0.500 6.362 1 6.362 0.500 6.362 1 6.362
0.750 6.655 4 26.620 0.750 6.655 4 26.620
1.000 6.860 1 6.860 1.000 6.860 1 6.860
S1 = 39.842 5.722 S1 = 39.842 5.722
1.000 6.860 1 6.860 1.000 6.860 1 6.860
1.500 6.951 4 27.804 1.500 6.951 4 27.804
2.000 7.010 1 7.010 2.000 7.510 1 7.510
S1,5 = 41.674 11.970 S1,5 = 42.174 12.113
2.000 7.010 1 7.010 2.000 7.510 1 7.510
2.500 7.010 4 28.040 2.500 7.510 4 30.040
3.000 7.010 1 7.010 3.000 7.510 1 7.510
S2 = 42.060 12.081 S2 = 45.060 12.942
3.000 7.010 1 7.010 3.000 7.510 1 7.510
3.500 7.010 4 28.040 3.500 7.510 4 30.040
4.000 7.010 1 7.010 4.000 7.510 1 7.510
S3 = 42.060 12.081 S3 = 45.060 12.942
4.000 7.010 1 7.010 4.000 7.510 1 7.510
4.500 7.010 4 28.040 4.500 7.510 4 30.040
5.000 7.010 1 7.010 5.000 7.510 1 7.510
S4 = 42.060 12.081 S4 = 45.060 12.942
5.000 7.010 1 7.010 5.000 7.510 1 7.510
5.500 7.010 4 28.040 5.500 7.510 4 30.040
6.000 7.010 1 7.010 6.000 7.510 1 7.510
S5 = 42.060 12.081 S5 = 45.060 12.942
6.000 7.010 1 7.010 6.000 7.510 1 7.510
6.613 6.950 4 27.800 6.613 6.950 4 27.800
7.225 6.950 1 6.950 7.225 6.950 1 6.950
S6 = 41.760 8.610 S6 = 87.320 18.002
7.225 6.950 1 6.950 7.225 6.950 1 6.950
7.863 6.950 4 27.800 7.863 6.950 4 27.800
8.500 6.950 1 6.950 8.500 6.950 1 6.950
S7 = 41.700 14.199 S7 = 129.020 43.931

A Rancangan = 71.034 A Rancangan = 74.624

A SAC = 71.034 A SAC = 74.624

Koreksi Luas = 12.081 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APPROVED DATE
V = 11 Knot SIGN

SECTIONS AREA CALCULATION

t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 12 SECTION 13
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 74.624 m2 ASAC = 74.624 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 5.200 1 5.200 0.000 5.200 1 5.200
0.250 5.849 4 23.396 0.250 5.849 4 23.396
0.500 6.362 1 6.362 0.500 6.362 1 6.362
S0,5 = 34.958 5.020 S0,5 = 34.958 5.020
0.500 6.362 1 6.362 0.500 6.362 1 6.362
0.750 6.655 4 26.620 0.750 6.655 4 26.620
1.000 6.860 1 6.860 1.000 6.860 1 6.860
S1 = 39.842 5.722 S1 = 39.842 5.722
1.000 6.860 1 6.860 1.000 6.860 1 6.860
1.500 6.951 4 27.804 1.500 6.951 4 27.804
2.000 7.510 1 7.510 2.000 7.510 1 7.510
S1,5 = 42.174 12.113 S1,5 = 42.174 12.113
2.000 7.510 1 7.510 2.000 7.510 1 7.510
2.500 7.510 4 30.040 2.500 7.510 4 30.040
3.000 7.510 1 7.510 3.000 7.510 1 7.510
S2 = 45.060 12.942 S2 = 45.060 12.942
3.000 7.510 1 7.510 3.000 7.510 1 7.510
3.500 7.510 4 30.040 3.500 7.510 4 30.040
4.000 7.510 1 7.510 4.000 7.510 1 7.510
S3 = 45.060 12.942 S3 = 45.060 12.942
4.000 7.510 1 7.510 4.000 7.510 1 7.510
4.500 7.510 4 30.040 4.500 7.510 4 30.040
5.000 7.510 1 7.510 5.000 7.510 1 7.510
S4 = 45.060 12.942 S4 = 45.060 12.942
5.000 7.510 1 7.510 5.000 7.510 1 7.510
5.500 7.510 4 30.040 5.500 7.510 4 30.040
6.000 7.510 1 7.510 6.000 7.510 1 7.510
S5 = 45.060 12.942 S5 = 45.060 12.942
6.000 7.510 1 7.510 6.000 7.510 1 7.510
6.613 6.950 4 27.800 6.613 6.950 4 27.800
7.225 6.950 1 6.950 7.225 6.950 1 6.950
S6 = 42.260 8.713 S6 = 42.260 8.713
7.225 6.950 1 6.950 7.225 6.950 1 6.950
7.863 6.950 4 27.800 7.863 6.950 4 27.800
8.500 6.950 1 6.950 8.500 6.950 1 6.950
S7 = 41.700 14.199 S7 = 41.700 14.199

A Rancangan = 74.624 A Rancangan = 74.624

A SAC = 74.624 A SAC = 74.624

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
P = - HP APPROVED DATE
V = 11 Knot SIGN

SECTIONS AREA CALCULATION

t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 14 SECTION 15
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 68.014 m2 ASAC = 59.211 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 4.740 1 4.740 0.000 3.890 1 3.890
0.250 3.791 4 15.164 0.250 3.197 4 12.788
0.500 5.723 1 5.723 0.500 4.817 1 4.817
S0,5 = 25.627 3.680 S0,5 = 21.495 3.087
0.500 5.723 1 5.723 0.500 4.817 1 4.817
0.750 6.141 4 24.564 0.750 5.276 4 21.104
1.000 6.212 1 6.212 1.000 5.308 1 5.308
S1 = 36.499 5.242 S1 = 31.229 4.485
1.000 6.212 1 6.212 1.000 5.308 1 5.308
1.500 6.295 4 25.180 1.500 5.347 4 21.388
2.000 6.840 1 6.840 2.000 6.006 1 6.006
S1,5 = 38.232 10.981 S1,5 = 32.702 9.393
2.000 6.840 1 6.840 2.000 6.006 1 6.006
2.500 6.878 4 27.512 2.500 6.032 4 24.128
3.000 6.917 1 6.917 3.000 6.058 1 6.058
S2 = 41.269 11.853 S2 = 36.192 10.395
3.000 6.917 1 6.917 3.000 6.058 1 6.058
3.500 6.949 4 27.796 3.500 6.090 4 24.360
4.000 6.981 1 6.981 4.000 6.122 1 6.122
S3 = 41.694 11.975 S3 = 36.540 10.495
4.000 6.981 1 6.981 4.000 6.122 1 6.122
4.500 7.013 4 28.052 4.500 6.167 4 24.668
5.000 7.045 1 7.045 5.000 6.186 1 6.186
S4 = 42.078 12.086 S4 = 36.976 10.620
5.000 7.045 1 7.045 5.000 6.186 1 6.186
5.500 7.077 4 28.308 5.500 6.231 4 24.924
6.000 7.110 1 7.110 6.000 6.270 1 6.270
S5 = 42.463 12.196 S5 = 37.380 10.736
6.000 7.110 1 7.110 6.000 6.270 1 6.270
6.613 6.950 4 27.800 6.613 6.620 4 26.482
7.225 6.950 1 6.950 7.225 6.670 1 6.670
S6 = 41.860 8.630 S6 = 39.422 8.127
7.225 6.950 1 6.950 7.225 6.670 1 6.670
7.863 6.950 4 27.800 7.863 6.760 4 27.041
8.500 6.950 1 6.950 8.500 6.867 1 6.867
S7 = 41.700 14.199 S7 = 40.578 13.817

A Rancangan = 68.014 A Rancangan = 59.211

A SAC = 68.014 A SAC = 59.211

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
P = - HP APPROVED DATE
V = 11 Knot SIGN

SECTIONS AREA CALCULATION

t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 16 SECTION 17
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 48.271 m2 ASAC = 36.635 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 2.800 1 2.800 0.000 1.650 1 1.650
0.250 2.142 4 8.568 0.250 1.310 4 5.240
0.500 3.746 1 3.746 0.500 2.695 1 2.695
S0,5 = 15.114 2.171 S0,5 = 9.585 1.377
0.500 3.746 1 3.746 0.500 2.695 1 2.695
0.750 4.215 4 16.860 0.750 3.037 4 12.148
1.000 4.267 1 4.267 1.000 3.102 1 3.102
S1 = 24.873 3.572 S1 = 17.945 2.577
1.000 4.267 1 4.267 1.000 3.102 1 3.102
1.500 4.325 4 17.300 1.500 3.154 4 12.616
2.000 4.923 1 4.923 2.000 3.782 1 3.782
S1,5 = 26.490 7.609 S1,5 = 19.500 5.601
2.000 4.923 1 4.923 2.000 3.782 1 3.782
2.500 4.962 4 19.848 2.500 3.808 4 15.232
3.000 4.994 1 4.994 3.000 3.846 1 3.846
S2 = 29.765 8.549 S2 = 22.860 6.566
3.000 4.994 1 4.994 3.000 3.846 1 3.846
3.500 5.032 4 20.128 3.500 3.885 4 15.540
4.000 5.058 1 5.058 4.000 3.923 1 3.923
S3 = 30.180 8.668 S3 = 23.309 6.695
4.000 5.058 1 5.058 4.000 3.923 1 3.923
4.500 5.103 4 20.412 4.500 3.968 4 15.872
5.000 5.135 1 5.135 5.000 4.013 1 4.013
S4 = 30.605 8.790 S4 = 23.808 6.838
5.000 5.135 1 5.135 5.000 4.013 1 4.013
5.500 5.173 4 20.692 5.500 4.051 4 16.204
6.000 5.200 1 5.200 6.000 4.090 1 4.090
S5 = 31.027 8.912 S5 = 24.307 6.982
6.000 5.200 1 5.200 6.000 4.090 1 4.090
6.613 5.967 4 23.869 6.613 4.994 4 19.976
7.225 6.035 1 6.035 7.225 5.092 1 5.092
S6 = 35.103 10.082 S6 = 29.157 6.011
7.225 6.035 1 6.035 7.225 5.092 1 5.092
7.863 6.183 4 24.732 7.863 5.351 4 21.405
8.500 6.388 1 6.388 8.500 5.716 1 5.716
S7 = 37.154 5.336 S7 = 32.213 10.968

A Rancangan = 48.271 A Rancangan = 36.635

A SAC = 48.271 A SAC = 36.635

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
P = - HP APPROVED DATE
V = 11 Knot SIGN

SECTIONS AREA CALCULATION

t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 18 SECTION 18,5
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 23.893 m2 ASAC = 16.762 m2
t4 = 0.5108 m. t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 0.540 1 0.540 0.000 0.010 1 0.010
0.250 0.740 4 2.960 0.250 0.444 4 1.776
0.500 1.691 1 1.691 0.500 1.170 1 1.170
S0,5 = 5.191 0.745 S0,5 = 2.956 0.425
0.500 1.691 1 1.691 0.500 1.170 1 1.170
0.750 1.913 4 7.652 0.750 1.363 4 5.452
1.000 1.971 1 1.971 1.000 1.421 1 1.421
S1 = 11.314 1.625 S1 = 8.043 1.155
1.000 1.971 1 1.971 1.000 1.421 1 1.421
1.500 2.032 4 8.128 1.500 1.481 4 5.924
2.000 2.442 1 2.442 2.000 1.667 1 1.667
S1,5 = 12.54 3.602 S1,5 = 9.012 2.588
2.000 2.442 1 2.442 2.000 1.667 1 1.667
2.500 2.487 4 9.948 2.500 1.712 4 6.848
3.000 2.526 1 2.526 3.000 1.750 1 1.750
S2 = 14.916 4.284 S2 = 10.265 2.948
3.000 2.526 1 2.526 3.000 1.750 1 1.750
3.500 2.558 4 10.232 3.500 1.788 4 7.152
4.000 2.600 1 2.600 4.000 1.821 1 1.821
S3 = 15.358 4.411 S3 = 10.723 3.080
4.000 2.600 1 2.600 4.000 1.821 1 1.821
4.500 2.641 4 10.564 4.500 1.853 4 7.412
5.000 2.679 1 2.679 5.000 1.904 1 1.904
S4 = 15.843 4.550 S4 = 11.137 3.199
5.000 2.679 1 2.679 5.000 1.904 1 1.904
5.500 2.712 4 10.848 5.500 1.955 4 7.820
6.000 2.750 1 2.750 6.000 2.000 1 2.000
S5 = 16.277 4.675 S5 = 11.724 3.367
6.000 2.750 1 2.750 6.000 2.000 1 2.000
6.613 3.642 4 14.567 6.613 2.864 4 11.458
7.225 3.817 1 3.817 7.225 3.080 1 3.080
S6 = 21.134 4.357 S6 = 16.538 3.410
7.225 3.817 1 3.817 7.225 3.080 1 3.080
7.863 4.228 4 16.914 7.863 3.647 4 14.586
8.500 4.799 1 4.799 8.500 4.243 1 4.243
S7 = 25.530 8.693 S7 = 21.909 7.460

A Rancangan = 23.893 A Rancangan = 16.762

A SAC = 23.893 A SAC = 16.762

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
P = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.2154 m. t1 = 0.2154 m.
SECTION 19 SECTION 19,5
t2 = 0.4308 m. t2 = 0.4308 m.
t3 = 0.3093 m. t3 = 0.3093 m.
ASAC = 10.707 m2 t4 = 0.5108 m. ASAC = 4.772 m2 t4 = 0.5108 m.
NO. WL 0,5 B AS NO. WL 0,5 B AS
MS 0,5B . MS MS 0,5B . MS
(m) ( m2 ) (m) ( m2 )
(4) = (5) = (4) = (5) =
(1) (2) (3) (1) (2) (3)
(2).(3) 2/3.t.SN (2).(3) 2/3.t.SN
0.000 0.000 1 0.000 0.000 0.001 1 0.001
0.250 0.244 4 0.976 0.250 0.130 4 0.520
0.500 0.727 1 0.727 0.500 0.244 1 0.244
S0,5 = 1.703 0.245 S0,5 = 0.765 0.110
0.500 0.727 1 0.727 0.500 0.244 1 0.244
0.750 0.833 4 3.332 0.750 0.330 4 1.320
1.000 0.900 1 0.900 1.000 0.389 1 0.389
S1 = 4.959 0.712 S1 = 1.953 0.280
1.000 0.900 1 0.900 1.000 0.389 1 0.389
1.500 0.962 4 3.848 1.500 0.470 4 1.880
2.000 1.032 1 1.032 2.000 0.507 1 0.507
S1,5 = 5.780 1.660 S1,5 = 2.776 0.797
2.000 1.032 1 1.032 2.000 0.507 1 0.507
2.500 1.064 4 4.256 2.500 0.534 4 2.136
3.000 1.096 1 1.096 3.000 0.507 1 0.507
S2 = 6.384 1.834 S2 = 3.150 0.905
3.000 1.096 1 1.096 3.000 0.507 1 0.507
3.500 1.128 4 4.512 3.500 0.470 4 1.880
4.000 1.173 1 1.173 4.000 0.484 1 0.484
S3 = 6.781 1.948 S3 = 2.871 0.825
4.000 1.173 1 1.173 4.000 0.484 1 0.484
4.500 1.212 4 4.848 4.500 0.491 4 1.964
5.000 1.250 1 1.250 5.000 0.565 1 0.565
S4 = 7.271 2.088 S4 = 3.013 0.865
5.000 1.250 1 1.250 5.000 0.565 1 0.565
5.500 1.288 4 5.152 5.500 0.558 4 2.232
6.000 1.330 1 1.330 6.000 0.650 1 0.650
S5 = 7.732 2.221 S5 = 3.447 0.990
6.000 1.330 1 1.330 6.000 0.650 1 0.650
6.613 2.030 4 8.119 6.613 1.112 4 4.446
7.225 2.243 1 2.243 7.225 1.306 1 1.306
S6 = 11.692 2.410 S6 = 6.403 1.320
7.225 2.243 1 2.243 7.225 1.306 1 1.306
7.863 2.849 4 11.396 7.863 1.910 4 7.640
8.500 3.585 1 3.585 8.500 2.723 1 2.723
S7 = 17.223 5.864 S7 = 11.669 3.973

A Rancangan = 10.707 A Rancangan = 4.772

A SAC = 10.707 A SAC = 4.772

Koreksi Luas = 0.000 % Koreksi Luas = 0.000 %


SHEET
LINES PLAN REV.
LOA = - m. CB = 0.77 BY
LWL = 89.260 m. CM = 0.98 DESIGNED DATE
LBP = 85.830 m. CW = 0.87 SIGN
B = 14.020 m. CPL = 0.77 BY
H = 6.810 m. CPV = 0.88 CHECKED DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
P = - HP APPROVED DATE
V = 11 Knot SIGN
SECTIONS AREA CALCULATION
t1 = 0.215 m.
SECTION 20
t2 = 0.431 m.
t3 = 0.309 m.
ASAC = 0.000 m2 t4 = 0.5108 m.
NO. WL 0,5 B AS
MS 0,5B . MS
(m) ( m2 )
(4) = (5) =
(1) (2) (3)
(2).(3) 2/3.t.SN
0.000 0.000 1 0.000
0.250 0.000 4 0.000
0.500 0.000 1 0.000
S0,5 = 0.000 0.000
0.500 0.000 1 0.000
0.750 0.000 4 0.000
1.000 0.000 1 0.000
S1 = 0.000 0.000
1.000 0.000 1 0.000
1.500 0.000 4 0.000
2.000 0.000 1 0.000
S1,5 = 0.000 0.000
2.000 0.000 1 0.000
2.500 0.000 4 0.000
3.000 0.000 1 0.000
S2 = 0.000 0.000
3.000 0.000 1 0.000
3.500 0.000 4 0.000
4.000 0.000 1 0.000
S3 = 0.000 0.000
4.000 0.000 1 0.000
4.500 0.000 4 0.000
5.000 0.000 1 0.000
S4 = 0.000 0.000
5.000 0.000 1 0.000
5.500 0.000 4 0.000
6.000 0.000 1 0.000
S5 = 0.000 0.000
6.000 0.000 1 0.000
6.500 0.100 4 0.399
7.000 0.214 1 0.214
S6 = 0.613 0.126
7.000 0.214 1 0.214
7.500 0.816 4 3.264
8.000 1.676 1 1.676
S7 = 5.155 1.755

A Rancangan = 0.000

A SAC = 0.000

Koreksi Luas = 0.000 %


`
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
AS
( m2 )
(5) =
2/3.t.SN
SHEET :
LINES PLAN REV. :
LOA = - m. CB = 0.77 BY
LWL = 89.26 m. CM = 0.98 DESIGN DATE
LBP = 85.83 m. CW = 0.87 SIGN
B = 14.02 m. CPL = 0.77 BY
H = 6.81 m. CPV = 0.88 CHECK DATE
T = 5.17 m. CPF = - SIGN
CPA = - BY
BHP = - HP APP. DATE
V = 11 Knot SIGN
AM = B . T . CM
= 71.034 m2
l = 4.292 m.
SECTIONS AREA, VOLUME AND LONGITUDINAL
la' = 1.715 m.
CENTRE OF BUOYANCY
la" = 2.146 m.
l''' = 1.020 m.
lf = - m.
RA A
NO. SECT MS A.MS FM SMA
(%) ( m2 )
(3) = (5) = (7) =
(1) (2) (4) (6)
(2)/100.AM (3).(4) (5).(6)
-0.50 0.0 0.000 0.400 0.000 -10.799 0.000
-0.25 3.7 2.640 1.599 4.220 -10.400 -43.887
0 4.0 2.858 0.900 2.571 -10.000 -25.710
0.45 12.2 8.680 2.000 17.359 -9.550 -165.782
1 43.9 31.198 1.000 31.198 -9.000 -280.778
1.52 58.7 41.709 2.000 83.418 -8.480 -707.382
2 69.4 49.282 1.500 73.922 -8.000 -591.379
3 84.4 59.936 4.000 239.744 -7.000 -1678.211
4 94.9 67.412 2.000 134.823 -6.000 -808.940
5 101.2 71.902 4.000 287.609 -5.000 -1438.047
6 105.1 74.624 2.000 149.249 -4.000 -596.995
7 105.1 74.624 4.000 298.497 -3.000 -895.492
8 105.1 74.624 2.000 149.249 -2.000 -298.497
9 105.1 74.624 4.000 298.497 -1.000 -298.497
10 100.0 71.034 2.000 142.068 0.000 0.000
11 105.1 74.624 4.000 298.497 1.000 298.497
12 105.1 74.624 2.000 149.249 2.000 298.497
13 105.1 74.624 4.000 298.497 3.000 895.492
14 95.7 68.014 2.000 136.028 4.000 544.111
Section Area

15 83.4 59.211 4.000 236.846 5.000 1184.229


16 68.0 48.271 2.000 96.541 6.000 579.249 80
17 51.6 36.635 4.000 146.540 7.000 1025.777
18 33.6 23.893 1.500 35.840 8.000 286.720 70
18.5 23.6 16.762 2.000 33.525 8.500 284.961
19 15.1 10.707 1.000 10.707 9.000 96.366 60
19.5 6.7 4.772 2.000 9.545 9.500 90.677
20 0.0 0.000 0.738 0.000 10.000 0.000 50
20.238 0.0 0.000 0.951 0.000 10.238 0.000
20.475 0.0 0.000 0.238 0.000 10.475 0.000 40
S1 = S2 =
3364.241 -2245.020 30
V1 = LWL . B. T. CB + Vbulbous = 4993.092 m 3

V2 = 1/3 . l . S1 = 4812.547 m3
20
Vd = {(V2 - V1) / V1}.100% = -3.61590 % < 0,05% ; Ok ! 10
LCB = l . S2 / S1 = -2.864 m. = -3.337% LBP; Ok!
0
-1.00 0.00
30
20
10
0
-1.00 0.00
SHEET :
LINES PLAN REV. :
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGN DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECK DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APP. DATE
V = 11.2 Knot SIGN
LWL = 86.642 m. Panjang Kapal
BWL = 14.020 m. dari gading 1-20 =
WATER PLANE AREA, CENTRE OF FLOATATION, INERTIA MOMENT Twl = 2.154 m. 85.830
AND COEFFICIENT Vol = 2,616.711 m3.
l = 4.292 m.
la' = 0.406 m. Buritan = 0.812
la" = 2.146 m.
WATER PLANE 2.5; ( T = 4 m ) la''' = - m. Bulbous =
lf = m.
0,5 B 0,5B.MS.FM2
NO. SECT MS 0,5B.MS FM SMA (0,5B)3 .MS
(m)
(4) = (6) = (7) = (8) =
(1) (2) (3) (5)
(2).(3) (4).(5) (2)3.(3) (2).(3).(5)2
a 0.000 0.095 0.000 -9.189 0.000 0.000 0.000
b 0.200 0.378 0.076 -9.095 -0.688 0.003 6.260
1 2.170 0.595 1.290 -9.000 -11.613 6.076 104.514
1.5 3.460 2.000 6.920 -8.500 -58.820 82.843 499.970
2 4.380 1.500 6.570 -8.000 -52.560 126.042 420.480
3 5.813 4.000 23.252 -7.000 -162.764 785.708 1139.348
4 6.697 2.000 13.394 -6.000 -80.364 600.718 482.184
5 7.194 4.000 28.776 -5.000 -143.880 1489.263 719.400
6 7.510 2.000 15.020 -4.000 -60.080 847.130 240.320
7 7.510 4.000 30.040 -3.000 -90.120 1694.259 270.360
8 7.510 2.000 15.020 -2.000 -30.040 847.130 60.080
9 7.510 4.000 30.040 -1.000 -30.040 1694.259 30.040
10 7.010 2.000 14.020 0.000 0.000 688.944 0.000
11 7.510 4.000 30.040 1.000 30.040 1694.259 30.040
12 7.510 2.000 15.020 2.000 30.040 847.130 60.080
13 7.510 4.000 30.040 3.000 90.120 1694.259 270.360
14 6.878 2.000 13.756 4.000 55.024 650.753 220.096
15 6.032 4.000 24.128 5.000 120.640 877.898 603.200
16 4.962 2.000 9.924 6.000 59.544 244.343 357.264
17 3.808 4.000 15.232 7.000 106.624 220.877 746.368
18 2.487 1.500 3.731 8.000 29.844 23.074 238.752
18.5 2.500 2.000 5.000 8.500 42.500 31.250 361.250
19 1.064 1.000 1.064 9.000 9.576 1.205 86.184
19.5 0.534 2.000 1.068 9.500 10.146 0.305 96.387
20 0.000 0.500 0.000 10.000 0.000 0.000 0.000
c 0.5611 0.000 0.000 10.000 0.000 0.000 0.000
d 0.000 0.000 0.000 10.000 0.000 0.000 0.000
S1 = S2 = S3 = S4 =
333.420 -136.871 15147.726 7042.937
AWL = 2/3 . l . S1 = 953.916 m2
LCF = l . S2 / S1 = -1.762 m.
IT = 2.!/3.(1/3).l.S3 = 14445.881 m4
Iy = 2.!/3.l3.S4 = 371099 m4
IL = Iy - (AWL . LCF2) = 368138.576 m4
CW = AWL / (LWL . BWL) = 0.785
SHEET :
LINES PLAN
REV. :
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGN DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECK DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APP. DATE
V = 11.2 Knot SIGN
LWL = 86.283 m. Panjang Kapal
BWL = 13.902 m. dari gading 1-20 =
WATER PLANE AREA, CENTRE OF FLOATATION, INERTIA MOMENT Twl = 1.293 m. 85.830
AND COEFFICIENT Vol = 1,550.360 m3.
l = 4.292 m.
la' = 0.226 m. Buritan = 0.4529
la" = 2.146 m.
WATER PLANE 1.5; ( T = 4 m ) la''' = 0 m. Bulbous =
lf =
0,5 B (m)
NO. SECT MS 0,5B.MS FM SMA (0,5B)3 .MS 0,5B.MS.FM2
(m)
(4) = (6) = (7) = (8) =
(1) (2) (3) (5)
(2).(3) (4).(5) (2)3.(3) (2).(3).(5)2
a 0.000 0.053 0.000 -9.106 0.000 0.000 0.000
b 0.140 0.211 0.030 -9.053 -0.268 0.001 2.422
1 1.900 0.553 1.050 -9.000 -9.452 3.791 85.071
1.5 2.904 2.000 5.808 -8.500 -49.368 48.980 419.628
2 3.758 1.500 5.637 -8.000 -45.096 79.609 360.768
3 5.125 4.000 20.500 -7.000 -143.500 538.445 1004.500
4 6.123 2.000 12.246 -6.000 -73.476 459.116 440.856
5 6.709 4.000 26.836 -5.000 -134.180 1207.907 670.900
6 6.951 2.000 13.902 -4.000 -55.608 671.695 222.432
7 6.951 4.000 27.804 -3.000 -83.412 1343.389 250.236
8 6.951 2.000 13.902 -2.000 -27.804 671.695 55.608
9 6.951 4.000 27.804 -1.000 -27.804 1343.389 27.804
10 6.951 2.000 13.902 0.000 0.000 671.695 0.000
11 6.951 4.000 27.804 1.000 27.804 1343.389 27.804
12 6.951 2.000 13.902 2.000 27.804 671.695 55.608
13 6.951 4.000 27.804 3.000 83.412 1343.389 250.236
14 6.295 2.000 12.590 4.000 50.360 498.904 201.440
15 5.347 4.000 21.388 5.000 106.940 611.492 534.700
16 4.325 2.000 8.650 6.000 51.900 161.804 311.400
17 3.154 4.000 12.616 7.000 88.312 125.500 618.184
18 2.032 1.500 3.048 8.000 24.384 12.585 195.072
18.5 1.481 2.000 2.962 8.500 25.177 6.497 214.005
19 0.962 1.000 0.962 9.000 8.658 0.890 77.922
19.5 0.470 2.000 0.940 9.500 8.930 0.208 84.835
20 0.000 0.500 0.000 10.000 0.000 0.000 0.000
c 0.538 0.000 0.000 10.000 0.000 0.000 0.000
d 0.000 0.000 0.000 10.000 0.000 0.000 0.000
S1 = S2 = S3 = S4 =
302.087 -146.287 11816.064 6111.430
AWL = 2/3 . l . S1 = 864.270 m2
LCF = l . S2 / S1 = -2.078 m.
IT = 2.!/3.(1/3).l.S3 = 11268.587 m4
Iy = 2.!/3.l3.S4 = 322017 m4
IL = Iy - (AWL . LCF2) = 318284.472 m4
CW = AWL / (LWL . BWL) = 0.721
SHEET :
LINES PLAN REV. :
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGN DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECK DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APP. DATE
V = 11.2 Knot SIGN
LWL = 86.158 m. Panjang Kapal
BWL = 13.310 m. dari gading 1-20 =
WATER PLANE AREA, CENTRE OF FLOATATION, INERTIA MOMENT Twl = 0.646 m. 85.830
AND COEFFICIENT Vol = 741.096 m3.
l = 4.292 m.
la' = 0.164 m. Buritan = 0.3281
la" = 2.146 m.
WATER PLANE 0.75; ( T = 4 m ) la''' = - m. Bulbous =
lf =
0,5 B 0,5B.MS.FM2
NO. SECT MS 0,5B.MS FM SMA (0,5B)3 .MS
(m)
(4) = (6) = (7) = (8) =
(1) (2) (3) (5)
(2).(3) (4).(5) (2)3.(3) (2).(3).(5)2
a 0.000 0.038 0.000 -9.076 0.000 0.000 0.000
b 0.070 0.076 0.005 -9.038 -0.048 0.000 0.437
1 1.750 0.538 0.942 -9.000 -8.477 2.885 76.294
1.5 2.455 2.000 4.910 -8.500 -41.735 29.593 354.748
2 3.256 1.500 4.884 -8.000 -39.072 51.778 312.576
3 4.878 4.000 19.512 -7.000 -136.584 464.286 956.088
4 5.949 2.000 11.898 -6.000 -71.388 421.077 428.328
5 6.538 4.000 26.152 -5.000 -130.760 1117.879 653.800
6 6.655 2.000 13.310 -4.000 -53.240 589.487 212.960
7 6.655 4.000 26.620 -3.000 -79.860 1178.974 239.580
8 6.655 2.000 13.310 -2.000 -26.620 589.487 53.240
9 6.655 4.000 26.620 -1.000 -26.620 1178.974 26.620
10 6.655 2.000 13.310 0.000 0.000 589.487 0.000
11 6.655 4.000 26.620 1.000 26.620 1178.974 26.620
12 6.655 2.000 13.310 2.000 26.620 589.487 53.240
13 6.655 4.000 26.620 3.000 79.860 1178.974 239.580
14 6.141 2.000 12.282 4.000 49.128 463.177 196.512
15 5.276 4.000 21.104 5.000 105.520 587.455 527.600
16 4.215 2.000 8.430 6.000 50.580 149.769 303.480
17 3.037 4.000 12.148 7.000 85.036 112.045 595.252
18 1.913 1.500 2.870 8.000 22.956 10.501 183.648
18.5 1.363 2.000 2.726 8.500 23.171 5.064 196.954
19 0.833 1.000 0.833 9.000 7.497 0.578 67.473
19.5 0.330 2.000 0.660 9.500 6.270 0.072 59.565
20 0.000 0.500 0.000 10.000 0.000 0.000 0.000
c 0.000 0.000 0.000 10.000 0.000 0.000 0.000
d 0.000 0.000 0.000 10.000 0.000 0.000 0.000
S1 = S2 = S3 = S4 =
289.076 -131.146 10490.002 5764.594
AWL = 2/3 . l . S1 = 827.046 m2
LCF = l . S2 / S1 = -1.947 m.
IT = 2.!/3.(1/3).l.S3 = 10003.966 m4
Iy = 2.!/3.l3.S4 = 303742 m4
IL = Iy - (AWL . LCF2) = 300606.969 m4
CW = AWL / (LWL . BWL) = 0.721
SHEET :
LINES PLAN REV. :
LOA = - m. CB = 0.770 BY
LWL = 89.260 m. CM = 0.980 DESIGN DATE
LBP = 85.830 m. CW = 0.870 SIGN
B = 14.020 m. CPL = 0.770 BY
H = 6.810 m. CPV = 0.880 CHECK DATE
T = 5.170 m. CPF = - SIGN
CPA = - BY
BHP = - HP APP. DATE
V = 11.2 Knot SIGN
LWL = 86.118 m. Panjang Kapal
BWL = 11.698 m. dari gading 1-20 =
WATER PLANE AREA, CENTRE OF FLOATATION, INERTIA MOMENT Twl = 0.215 m. 85.830
AND COEFFICIENT Vol = 217.011 m3.
l = 4.292 m.
la' = 0.144 m. Buritan = 0.2875
la" = 2.146 m.
WATER PLANE 0.25; ( T = 4 m ) la''' = - m. Bulbous =
lf = m.
0,5 B 0,5B.MS.FM2
NO. SECT MS 0,5B.MS FM SMA (0,5B)3 .MS
(m)
(4) = (6) = (7) = (8) =
(1) (2) (3) (5)
(2).(3) (4).(5) (2)3.(3) (2).(3).(5)2
a 0.000 0.033 0.000 -9.067 0.000 0.000 0.000
b 0.060 0.134 0.008 -9.033 -0.073 0.000 0.656
1 1.486 0.533 0.793 -9.000 -7.135 1.751 64.215
1.5 1.856 2.000 3.712 -8.500 -31.552 12.787 268.192
2 2.342 1.500 3.513 -8.000 -28.104 19.269 224.832
3 3.081 4.000 12.324 -7.000 -86.268 116.986 603.876
4 3.964 2.000 7.928 -6.000 -47.568 124.575 285.408
5 4.790 4.000 19.160 -5.000 -95.800 439.609 479.000
6 5.849 2.000 11.698 -4.000 -46.792 400.198 187.168
7 5.849 4.000 23.396 -3.000 -70.188 800.396 210.564
8 5.849 2.000 11.698 -2.000 -23.396 400.198 46.792
9 5.849 4.000 23.396 -1.000 -23.396 800.396 23.396
10 5.849 2.000 11.698 0.000 0.000 400.198 0.000
11 5.849 4.000 23.396 1.000 23.396 800.396 23.396
12 5.849 2.000 11.698 2.000 23.396 400.198 46.792
13 5.849 4.000 23.396 3.000 70.188 800.396 210.564
14 3.791 2.000 7.582 4.000 30.328 108.966 121.312
15 3.197 4.000 12.788 5.000 63.940 130.704 319.700
16 2.142 2.000 4.284 6.000 25.704 19.656 154.224
17 1.310 4.000 5.240 7.000 36.680 8.992 256.760
18 0.740 1.500 1.110 8.000 8.880 0.608 71.040
18.5 0.444 2.000 0.888 8.500 7.548 0.175 64.158
19 0.244 1.000 0.244 9.000 2.196 0.015 19.764
19.5 0.130 0.000 0.000 9.500 0.000 0.000 0.000
20 0.000 0.500 0.000 10.000 0.000 0.000 0.000
c 0.030 0.000 0.000 10.000 0.000 0.000 0.000
d 0.000 0.000 0.000 10.000 0.000 0.000 0.000
S1 = S2 = S3 = S4 =
219.950 -168.016 5786.467 3681.809
AWL = 2/3 . l . S1 = 629.276 m 2

LCF = l . S2 / S1 = -3.278 m.
IT = 2.!/3.(1/3).l.S3 = 5518.361 m4
Iy = 2.!/3.l3.S4 = 193998 m4
IL = Iy - (AWL . LCF2) = 187235.465 m4
CW = AWL / (LWL . BWL) = 0.625
PERHITUNGAN VOLUME KAPAL

l 0.431 m
l' 0.216 m
No WL Luas FS Product
0 609.714 0.5015045 305.7741099
0.25 629.276 2.0060181 1262.33986
0.5 771.864 1.003009 774.1863123
0.75 827.046 2.0060181 1659.068639
1 849.36 1.50150451 1275.31096
1.5 864.270 4 3457.08142
2 941.584 2 1883.167442
2.5 953.916 4 3815.663958
3 957.261 2 1914.522986
3.5 967.431 4 3869.722149
4 978.850 2 1957.700269
4.5 992.858 4 3971.430858
5 1015.068 2 2030.13699
5.5 1041.812 4 4167.249734
6 1088.826 1 1088.825657
έ 33432.1813

1 T
x x ∑61 ¿
Volume = 3 12
¿
= 4801.233 m3
Volume Rancangan = LWL x B x T x Cb
= 4993.092 m3
Koreksi Volume = ( Vol . ranc−Vol . )
x 100
Vol . ranc
= 3.8425 %
GADING 1 GADING 1.5
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 1.32 1 1.320 0 1.87 1 1.870
0.25 1.486 4 5.944 0.25 1.856 4 7.424
0.5 1.644 1 1.644 0.5 2.276 1 2.276
l = 0.2154167 S1 = 8.908 l = 0.2154167 S1 = 11.570
Am = 2 * k * l * S1 1.279 Am = 2 * k * l * S1 1.662
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 1.644 1 1.644 0.5 2.276 1 2.276
0.75 1.75 4 7.000 0.75 2.455 4 9.820
1 1.792 1 1.792 1 2.641 1 2.641
l = 0.2154167 S2 = 10.436 l = 0.2154167 S2 = 14.737
Am = 2 * k * l * S2 2.778 Am = 2 * k * l * S2 3.778
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 1.792 1 1.792 1 2.641 1 2.641
1.5 1.9 4 7.600 1.5 2.904 4 11.616
2 2 1 2.000 2 3.15 1 3.150
l = 0.4308333 S3 = 11.392 l = 0.4308333 S3 = 17.407
Am = 2 * k * l * S3 6.050 Am = 2 * k * l * S3 8.778
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 2 1 2.000 2 3.15 1 3.150
2.5 2.17 4 8.680 2.5 3.46 4 13.840
3 2.47 1 2.470 3 3.74 1 3.740
l = 0.4308333 S4= 13.150 l = 0.4308333 S4= 20.730
Am = 2 * k * l * S4 9.827 Am = 2 * k * l * S4 14.732
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 2.47 1 2.470 3 3.74 1 3.740
3.5 2.91 4 11.640 3.5 4.283 4 17.132
4 3.405 1 3.405 4 4.805 1 4.805
l = 0.4308333 S5 = 17.515 l = 0.4308333 S5 = 25.677
Am = 2 * k * l * S5 14.858 Am = 2 * k * l * S5 22.107
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 3.405 1 3.405 4 4.805 1 4.805
4.5 4.109 4 16.436 4.5 5.224 4 20.896
5 4.676 1 4.676 5 5.686 1 5.686
l = 0.4308333 S6 = 24.517 l = 0.4308333 S6 = 31.387
Am = 2 * k * l * S6 21.900 Am = 2 * k * l * S6 31.122
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 4.676 1 4.676 5 5.686 1 5.686
5.5 5.374 4 21.496 5.5 6.136 4 24.544
6 6.2 1 6.200 6 6.63 1 6.630
l = 0.4308333 Sd = 32.372 l = 0.4308333 Sd = 36.860
Am = 2 * k * l * Sd 31.198 Am = 2 * k * l * Sd 41.709
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 6.2 1 6.200 6 6.63 1 6.630
6.6125 4.6865 4 18.746 6.6125 5.0965 4 20.386
0.85H 4.9528 1 4.953 0.85H 5.3301 1 5.330
l = 0.30925 Sd = 29.899 l = 0.30925 Sd = 32.346
Am = 2 * k * l * Sd 37.362 Am = 2 * k * l * Sd 48.378
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 4.9528 1 4.953 0.85H 5.3301 1 5.330
7.8625 5.2611 4 21.044 7.8625 5.6047 4 22.419
Deck 5.4501 1 5.450 Deck 5.7825 1 5.783
l = 0.51075 Sd = 31.447 l = 0.51075 Sd = 33.531
Am = 2 * k * l * Sd 48.069 Am = 2 * k * l * Sd 59.795
GADING 4 GADING 5
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 4.33 1 4.330 0 4.93 1 4.930
0.25 3.964 4 15.856 0.25 4.79 4 19.160
0.5 5.418 1 5.418 0.5 6.105 1 6.105
l = 0.2154167 S1 = 25.604 l = 0.2154167 S1 = 30.195
Am = 2 * k * l * S1 3.677 Am = 2 * k * l * S1 4.336
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 5.418 1 5.418 0.5 6.105 1 6.105
0.75 5.949 4 23.796 0.75 6.538 4 26.152
1 6.03 1 6.030 1 6.654 1 6.654
l = 0.2154167 S2 = 35.244 l = 0.2154167 S2 = 38.911
Am = 2 * k * l * S2 8.738 Am = 2 * k * l * S2 9.924
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 6.03 1 6.030 1 6.654 1 6.654
1.5 6.123 4 24.492 1.5 6.709 4 26.836
2 6.619 1 6.619 2 7.161 1 7.161
l = 0.4308333 S3 = 37.141 l = 0.4308333 S3 = 40.651
Am = 2 * k * l * S3 19.406 Am = 2 * k * l * S3 21.600
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 6.619 1 6.619 2 7.161 1 7.161
2.5 6.697 4 26.788 2.5 7.194 4 28.776
3 6.781 1 6.781 3 7.222 1 7.222
l = 0.4308333 S4= 40.188 l = 0.4308333 S4= 43.159
Am = 2 * k * l * S4 30.949 Am = 2 * k * l * S4 33.996
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 6.781 1 6.781 3 7.222 1 7.222
3.5 6.866 4 27.464 3.5 7.265 4 29.060
4 6.964 1 6.964 4 7.301 1 7.301
l = 0.4308333 S5 = 41.209 l = 0.4308333 S5 = 43.583
Am = 2 * k * l * S5 42.785 Am = 2 * k * l * S5 46.514
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 6.964 1 6.964 4 7.301 1 7.301
4.5 7.055 4 28.220 4.5 7.337 4 29.348
5 7.146 1 7.146 5 7.373 1 7.373
l = 0.4308333 S6 = 42.330 l = 0.4308333 S6 = 44.022
Am = 2 * k * l * S6 54.943 Am = 2 * k * l * S6 59.159
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 7.146 1 7.146 5 7.373 1 7.373
5.5 7.231 4 28.924 5.5 7.394 4 29.576
6 7.34 1 7.340 6 7.42 1 7.420
l = 0.4308333 Sd = 43.410 l = 0.4308333 Sd = 44.369
Am = 2 * k * l * Sd 67.412 Am = 2 * k * l * Sd 71.902
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 7.34 1 7.340 6 7.42 1 7.420
6.6125 6.4874 4 25.950 6.6125 6.7769 4 27.108
0.85H 6.5282 1 6.528 0.85H 6.8022 1 6.802
l = 0.30925 Sd = 39.818 l = 0.30925 Sd = 41.330
Am = 2 * k * l * Sd 75.621 Am = 2 * k * l * Sd 80.423
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 6.5282 1 6.528 0.85H 6.8022 1 6.802
7.8625 6.5635 4 26.254 7.8625 6.8262 4 27.305
Deck 6.5889 1 6.589 Deck 6.8445 1 6.845
l = 0.51075 Sd = 39.371 l = 0.51075 Sd = 40.952
Am = 2 * k * l * Sd 89.027 Am = 2 * k * l * Sd 94.367
GADING 8 GADING 9
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 5.2000 1 5.200 0 5.2 1 5.200
0.25 5.849 4 23.396 0.25 5.849 4 23.396
0.5 6.362 1 6.362 0.5 6.362 1 6.362
l = 0.2154167 S1 = 34.958 l = 0.2154167 S1 = 34.958
Am = 2 * k * l * S1 5.020 Am = 2 * k * l * S1 5.020
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 6.362 1 6.362 0.5 6.362 1 6.362
0.75 6.655 4 26.620 0.75 6.655 4 26.620
1 6.86 1 6.860 1 6.86 1 6.860
l = 0.2154167 S2 = 39.842 l = 0.2154167 S2 = 39.842
Am = 2 * k * l * S2 10.742 Am = 2 * k * l * S2 10.742
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 6.86 1 6.860 1 6.86 1 6.860
1.5 6.951 4 27.804 1.5 6.951 4 27.804
2 7.51 1 7.510 2 7.51 1 7.510
l = 0.4308333 S3 = 42.174 l = 0.4308333 S3 = 42.174
Am = 2 * k * l * S3 22.855 Am = 2 * k * l * S3 22.855
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 7.51 1 7.510 2 7.51 1 7.510
2.5 7.51 4 30.040 2.5 7.51 4 30.040
3 7.51 1 7.510 3 7.51 1 7.510
l = 0.4308333 S4= 45.060 l = 0.4308333 S4= 45.060
Am = 2 * k * l * S4 35.798 Am = 2 * k * l * S4 35.798
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 7.51 1 7.510 3 7.51 1 7.510
3.5 7.51 4 30.040 3.5 7.51 4 30.040
4 7.51 1 7.510 4 7.51 1 7.510
l = 0.4308333 S5 = 45.060 l = 0.4308333 S5 = 45.060
Am = 2 * k * l * S5 48.740 Am = 2 * k * l * S5 48.740
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 7.51 1 7.510 4 7.51 1 7.510
4.5 7.51 4 30.040 4.5 7.51 4 30.040
5 7.51 1 7.510 5 7.51 1 7.510
l = 0.4308333 S6 = 45.060 l = 0.4308333 S6 = 45.060
Am = 2 * k * l * S6 61.682 Am = 2 * k * l * S6 61.682
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 7.51 1 7.510 5 7.51 1 7.510
5.5 7.51 4 30.040 5.5 7.51 4 30.040
6 7.51 1 7.510 6 7.51 1 7.510
l = 0.4308333 Sd = 45.060 l = 0.4308333 Sd = 45.060
Am = 2 * k * l * Sd 74.624 Am = 2 * k * l * Sd 74.624
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 7.51 1 7.510 6 7.51 1 7.510
6.6125 6.95 4 27.800 6.6125 6.95 4 27.800
0.85H 6.95 1 6.950 0.85H 6.95 1 6.950
l = 0.30925 Sd = 42.260 l = 0.30925 Sd = 42.260
Am = 2 * k * l * Sd 83.337 Am = 2 * k * l * Sd 83.337
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 6.95 1 6.950 0.85H 6.95 1 6.950
7.8625 6.95 4 27.800 7.8625 6.95 4 27.800
Deck 6.95 1 6.950 Deck 6.95 1 6.950
l = 0.51075 Sd = 41.700 l = 0.51075 Sd = 41.700
Am = 2 * k * l * Sd 97.536 Am = 2 * k * l * Sd 97.536
GADING 12 GADING 13
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 5.2000 1 5.200 0 5.2000 1 5.200
0.25 5.849 4 23.396 0.25 5.849 4 23.396
0.5 6.362 1 6.362 0.5 6.362 1 6.362
l = 0.2154167 S1 = 34.958 l = 0.2154167 S1 = 34.958
Am = 2 * k * l * S1 5.020 Am = 2 * k * l * S1 5.020
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 6.362 1 6.362 0.5 6.362 1 6.362
0.75 6.655 4 26.620 0.75 6.655 4 26.620
1 6.86 1 6.860 1 6.86 1 6.860
l = 0.2154167 S2 = 39.842 l = 0.2154167 S2 = 39.842
Am = 2 * k * l * S2 10.742 Am = 2 * k * l * S2 10.742
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 6.86 1 6.860 1 6.86 1 6.860
1.5 6.951 4 27.804 1.5 6.951 4 27.804
2 7.51 1 7.510 2 7.51 1 7.510
l = 0.4308333 S3 = 42.174 l = 0.4308333 S3 = 42.174
Am = 2 * k * l * S3 22.855 Am = 2 * k * l * S3 22.855
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 7.51 1 7.510 2 7.51 1 7.510
2.5 7.51 4 30.040 2.5 7.51 4 30.040
3 7.51 1 7.510 3 7.51 1 7.510
l = 0.4308333 S4= 45.060 l = 0.4308333 S4= 45.060
Am = 2 * k * l * S4 35.798 Am = 2 * k * l * S4 35.798
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 7.51 1 7.510 3 7.51 1 7.510
3.5 7.51 4 30.040 3.5 7.51 4 30.040
4 7.51 1 7.510 4 7.51 1 7.510
l = 0.4308333 S5 = 45.060 l = 0.4308333 S5 = 45.060
Am = 2 * k * l * S5 48.740 Am = 2 * k * l * S5 48.740
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 7.51 1 7.510 4 7.51 1 7.510
4.5 7.51 4 30.040 4.5 7.51 4 30.040
5 7.51 1 7.510 5 7.51 1 7.510
l = 0.4308333 S6 = 45.060 l = 0.4308333 S6 = 45.060
Am = 2 * k * l * S6 61.682 Am = 2 * k * l * S6 61.682
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 7.51 1 7.510 5 7.51 1 7.510
5.5 7.51 4 30.040 5.5 7.51 4 30.040
6 7.51 1 7.510 6 7.51 1 7.510
l = 0.4308333 Sd = 45.060 l = 0.4308333 Sd = 45.060
Am = 2 * k * l * Sd 74.624 Am = 2 * k * l * Sd 74.624
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 7.51 1 7.510 6 7.51 1 7.510
6.6125 6.95 4 27.800 6.6125 6.95 4 27.800
0.85H 6.95 1 6.950 0.85H 6.95 1 6.950
l = 0.30925 Sd = 42.260 l = 0.30925 Sd = 42.260
Am = 2 * k * l * Sd 83.337 Am = 2 * k * l * Sd 83.337
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 6.95 1 6.950 0.85H 6.95 1 6.950
7.8625 6.95 4 27.800 7.8625 6.95 4 27.800
Deck 6.95 1 6.950 Deck 6.95 1 6.950
l = 0.51075 Sd = 41.700 l = 0.51075 Sd = 41.700
Am = 2 * k * l * Sd 97.536 Am = 2 * k * l * Sd 97.536
GADING 16 GADING 17
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 2.8 1 2.800 0 1.65 1 1.650
0.25 2.142 4 8.568 0.25 1.31 4 5.240
0.5 3.746 1 3.746 0.5 2.695 1 2.695
l = 0.2154167 S1 = 15.114 l = 0.2154167 S1 = 9.585
Am = 2 * k * l * S1 2.171 Am = 2 * k * l * S1 1.377
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 3.746 1 3.746 0.5 2.695 1 2.695
0.75 4.215 4 16.860 0.75 3.037 4 12.148
1 4.267 1 4.267 1 3.102 1 3.102
l = 0.2154167 S2 = 24.873 l = 0.2154167 S2 = 17.945
Am = 2 * k * l * S2 5.743 Am = 2 * k * l * S2 3.954
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 4.267 1 4.267 1 3.102 1 3.102
1.5 4.325 4 17.300 1.5 3.154 4 12.616
2 4.923 1 4.923 2 3.782 1 3.782
l = 0.4308333 S3 = 26.490 l = 0.4308333 S3 = 19.500
Am = 2 * k * l * S3 13.351 Am = 2 * k * l * S3 9.554
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 4.923 1 4.923 2 3.782 1 3.782
2.5 4.962 4 19.848 2.5 3.808 4 15.232
3 4.994 1 4.994 3 3.846 1 3.846
l = 0.4308333 S4= 29.765 l = 0.4308333 S4= 22.860
Am = 2 * k * l * S4 21.900 Am = 2 * k * l * S4 16.120
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 4.994 1 4.994 3 3.846 1 3.846
3.5 5.032 4 20.128 3.5 3.885 4 15.540
4 5.058 1 5.058 4 3.923 1 3.923
l = 0.4308333 S5 = 30.180 l = 0.4308333 S5 = 23.309
Am = 2 * k * l * S5 30.569 Am = 2 * k * l * S5 22.815
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 5.058 1 5.058 4 3.923 1 3.923
4.5 5.103 4 20.412 4.5 3.968 4 15.872
5 5.135 1 5.135 5 4.013 1 4.013
l = 0.4308333 S6 = 30.605 l = 0.4308333 S6 = 23.808
Am = 2 * k * l * S6 39.359 Am = 2 * k * l * S6 29.653
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 5.135 1 5.135 5 4.013 1 4.013
5.5 5.173 4 20.692 5.5 4.051 4 16.204
6 5.2 1 5.200 6 4.09 1 4.090
l = 0.4308333 Sd = 31.027 l = 0.4308333 Sd = 24.307
Am = 2 * k * l * Sd 48.271 Am = 2 * k * l * Sd 36.635
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 5.2 1 5.200 6 4.09 1 4.090
6.6125 5.9672 4 23.869 6.6125 4.9939 4 19.976
0.85H 6.0345 1 6.035 0.85H 5.0915 1 5.092
l = 0.30925 Sd = 35.103 l = 0.30925 Sd = 29.157
Am = 2 * k * l * Sd 55.508 Am = 2 * k * l * Sd 42.646
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 6.0345 1 6.035 0.85H 5.0915 1 5.092
7.8625 6.1829 4 24.732 7.8625 5.3513 4 21.405
Deck 6.3883 1 6.388 Deck 5.7161 1 5.716
l = 0.51075 Sd = 37.154 l = 0.51075 Sd = 32.213
Am = 2 * k * l * Sd 68.159 Am = 2 * k * l * Sd 53.615
GADING 19 GADING 19.5
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0 0 1 0.000 0 0.001 1 0.001
0.25 0.244 4 0.976 0.25 0.13 4 0.520
0.5 0.727 1 0.727 0.5 0.244 1 0.244
l = 0.2154167 S1 = 1.703 l = 0.2154167 S1 = 0.765
Am = 2 * k * l * S1 0.245 Am = 2 * k * l * S1 0.110
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.5 0.727 1 0.727 0.5 0.244 1 0.244
0.75 0.833 4 3.332 0.75 0.33 4 1.320
1 0.9 1 0.900 1 0.389 1 0.389
l = 0.2154167 S2 = 4.959 l = 0.2154167 S2 = 1.953
Am = 2 * k * l * S2 0.957 Am = 2 * k * l * S2 0.390
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
1 0.9 1 0.900 1 0.39 1 0.389
1.5 0.962 4 3.848 1.5 0.47 4 1.880
2 1.032 1 1.032 2 0.507 1 0.507
l = 0.4308333 S3 = 5.780 l = 0.4308 S3 = 2.776
Am = 2 * k * l * S3 2.617 Am = 2 * k * l * S3 1.188
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
2 1.032 1 1.032 2 0.507 1 0.507
2.5 1.064 4 4.256 2.5 0.534 4 2.136
3 1.096 1 1.096 3 0.507 1 0.507
l = 0.4308333 S4= 6.384 l = 0.4308 S4= 3.150
Am = 2 * k * l * S4 4.451 Am = 2 * k * l * S4 2.092
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
3 1.096 1 1.096 3 0.507 1 0.507
3.5 1.128 4 4.512 3.5 0.47 4 1.880
4 1.173 1 1.173 4 0.484 1 0.484
l = 0.4308333 S5 = 6.781 l = 0.4308333 S5 = 2.871
Am = 2 * k * l * S5 6.398 Am = 2 * k * l * S5 2.917
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
4 1.173 1 1.173 4 0.484 1 0.484
4.5 1.212 4 4.848 4.5 0.491 4 1.964
5 1.25 1 1.250 5 0.565 1 0.565
l = 0.4308333 S6 = 7.271 l = 0.4308333 S6 = 3.013
Am = 2 * k * l * S6 8.487 Am = 2 * k * l * S6 3.782
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
5 1.25 1 1.250 5 0.565 1 0.565
5.5 1.288 4 5.152 5.5 0.558 4 2.232
6 1.33 1 1.330 6 0.65 1 0.650
l = 0.4308333 Sd = 7.732 l = 0.4308333 Sd = 3.447
Am = 2 * k * l * Sd 10.707 Am = 2 * k * l * Sd 4.772
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
6 1.33 1 1.330 6 0.65 1 0.650
6.6125 2.0298 4 8.119 6.6125 1.1116 4 4.446
0.85H 2.2425 1 2.243 0.85H 1.3062 1 1.306
l = 0.30925 Sd = 11.692 l = 0.30925 Sd = 6.403
Am = 2 * k * l * Sd 13.118 Am = 2 * k * l * Sd 6.092
NO. WL ORDINAT FS HASIL KALI NO. WL ORDINAT FS HASIL KALI
I II III II * III = IV I II III II * III = IV
0.85H 2.2425 1 2.243 0.85H 1.3062 1 1.306
7.8625 2.8489 4 11.396 7.8625 1.9101 4 7.640
Deck 3.5849 1 3.585 Deck 2.7226 1 2.723
l = 0.51075 Sd = 17.223 l = 0.51075 Sd = 11.669
Am = 2 * k * l * Sd 18.982 Am = 2 * k * l * Sd 10.066
TABEL LUAS WATERLINE TABEL Iy
AWL HASIL AWL HASIL
6 1088.826 6 555983.147
5.5 1041.812 5.5 483423.313
5 1015.068 5 444396.307
4.5 992.858 4.5 413457.393
4 978.850 4 396715.786
3.5 967.431 3.5 383886.131
3 957.261 3 373053.859
2.5 953.916 2.5 371099.086
2 941.584 2 356995.512
1.5 864.270 1.5 322017.100
1 849.355 1 312719.885
0.75 827.046 0.75 303741.969
0.5 771.864 0.5 275235.480
0.25 629.276 0.25 193998.035
0 609.714 0 201470.489

TABEL OF TABEL IL
AWL HASIL AWL HASIL
6 -5.643 6 521313.288
5.5 -4.331 5.5 463880.864
5 -3.549 5 431610.013
4.5 -2.935 4.5 404907.026
4 -2.601 4 390094.314
3.5 -2.343 3.5 378576.600
3 -2.104 3 368816.811
2.5 -1.762 2.5 368138.576
2 -1.804 2 353932.715
1.5 -2.078 1.5 318284.472
1 -2.003 1 309311.827
0.75 -1.947 0.75 300606.969
0.5 -1.980 0.5 272209.798
0.25 -3.278 0.25 187235.465
0 -3.093 0 195637.240

TABEL Ix
AWL HASIL
6 17330.040
5.5 16382.248
5 15870.538
4.5 15494.427
4 15172.189
3.5 14883.638 TABEL LUAS WATERLINE
3 14625.323
2.5 14445.881 7
2 14247.680
1.5 11268.587
1 10813.936 6
0.75 10003.966
0.5 8384.654
0.25 5518.361
5

4
6

5
0 4508.059

0
500.000 600.000 700.000 800.000 900.000 1000.00
PERHITUNGAN VOLUME
l= 0.4308333333
l' = 0.2154166667

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
0 609.714 1 609.714 0 0.000 -3.093 -1885.898
0.25 629.276 4 2517.106 1 2517.106 -3.278 -8251.570
279.9471 0.5 771.864 1 771.864 2 1543.728 -1.980 -1528.206
S0.51 = 3898.683 S12 = 4060.833 S13 = -11665.674

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
0.5 771.864 1 771.864 3 2315.591 -1.980 -1528.206
0.75 827.046 4 3308.183 4 13232.731 -1.947 -6440.854
633.90555 1 849.355 1 849.355 5 4246.777 -2.003 -1701.368
S11 = 4929.402 S12 = 19795.100 S13 = -9670.428

l= 0.8616666667
l' = 0.4308333333

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
1 849.355 1 849.355 5 4246.777 -2.003 -1701.368
1.5 864.270 4 3457.081 6 20742.489 -2.078 -7184.428
1387.5796 2 941.584 1 941.584 7 6591.086 -1.804 -1698.199
S21 = 5248.021 S12 = 31580.352 S13 = -10583.994

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
2 941.584 1 941.584 7 6591.086 -1.804 -1698.199
2.5 953.916 4 3815.664 8 30525.312 -1.762 -6721.997
2208.2466 3 957.261 1 957.261 9 8615.353 -2.104 -2013.942
S31 = 5714.509 S12 = 45731.751 S13 = -10434.138

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
3 957.261 1 957.261 9 8615.353 -2.104 -2013.942
3.5 967.431 4 3869.722 10 38697.221 -2.343 -9065.630
3042.0289 4 978.850 1 978.850 11 10767.351 -2.601 -2545.865
S41 = 5805.834 S12 = 58079.926 S13 = -13625.437

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
4 978.850 1 978.850 11 10767.351 -2.601 -2545.865
4.5 992.858 4 3971.431 12 47657.170 -2.935 -11654.560
3898.7193 5 1015.068 1 1015.068 13 13195.890 -3.549 -3602.633
S51 = 5965.349 S12 = 71620.412 S13 = -17803.058

NO WL LUAS WL FS HASIL KALI I FM HASIL KALI II OF HASIL KALI III


Vol I II III II*III = IV V IV*V=VI VI IV*VI = VII
5 1015.068 1 1015.068 13 13195.890 -3.549 -3602.633
5.5 1041.812 4 4167.250 14 58341.496 -4.331 -18048.630
4799.3253 6 1088.826 1 1088.826 15 16332.385 -5.643 -6144.057
S61 = 6271.144 S12 = 87869.772 S13 = -27795.320
Skala Bonjean 1 : 30
Gading 0 0.5 1 1.5
Luas
A0.5 0.000 0.00 0.043 0.055
A1 0.000 0.00 0.093 0.126
A2 0.000 0.00 0.202 0.293
A3 0.000 0.00 0.328 0.491
A4 0.000 0.00 0.495 0.737
A5 0.000 0.05 0.730 1.037
A6 0.095 0.29 1.040 1.390
A0.85H 0.255 0.47 1.245 1.613
Adeck 0.560 0.80 1.602 1.993

UNTUK GAMBAR BONJEAN CURVE


Gading 0 0.5 1 1.5
Adeck 0.560 0.80 1.602 1.993
A0.85H 0.255 0.47 1.245 1.613
A6 0.095 0.29 1.040 1.390
A5 0.000 0.05 0.730 1.037
A4 0.000 0.00 0.495 0.737
A3 0.000 0.00 0.328 0.491
A2 0.000 0.00 0.202 0.293
A1 0.000 0.00 0.093 0.126
A0.5 0.000 0.00 0.043 0.055

TABEL PERHITUNGAN HIDROSTATIK CURVE


Skala 1 : 150 1 1 1
Nama VOLUMINA (V) BLOCK COEFFICIENT
MIDSHIP
(CB)COEFFICIENT
WATERLINE
(CMn)
COEFFICIENT (CWn)
Vn (CBn) (CMn) (CWn)
Sarat
T0
T0.5 1.866 0.593 0.916 0.704
T1 4.226 0.622 0.909 0.718

T2 9.251 0.663 0.940 0.775

T3 14.722 0.706 0.960 0.791

T4 20.280 0.726 0.970 0.805

T5 25.991 0.718 0.976 0.805

T6 31.996 0.69241 0.990 0.812

UNTUK GAMBAR HIDROSTATIK CURVE


Ukur dari AP 13 14 15
Nama Vn Cbn Cmn Cwn
Sarat
T6 31.996 0.692 0.990 0.812
T5 25.991 0.718 0.976 0.805
T4 20.280 0.726 0.970 0.805
T3 14.722 0.706 0.960 0.791
T2 9.251 0.663 0.940 0.775
T1 4.226 0.622 0.909 0.718
T0.5 1.866 0.593 0.916 0.704
T0
2 3 4

0.070 0.096 0.123


0.163 0.233 0.291
0.380 0.532 0.647
0.633 0.866 1.032
0.928 1.220 1.426
1.265 1.597 1.831
1.643 1.998 2.247
1.880 2.257 2.521
2.279 2.684 2.968

CURVE
2 3 4
2.279 2.684 2.968
1.880 2.257 2.521
1.643 1.998 2.247
1.265 1.597 1.831
0.928 1.220 1.426
0.633 0.866 1.032
0.380 0.532 0.647
0.163 0.233 0.291
0.070 0.096 0.123

1 1 0.3
KOEFISIEN PRISMATIK
KOEFISIEN
MEMANJANG
PRISMATIK
LETAK TITIK
(CPLn)
VERTIKAL
TEKAN TERHADAP
(CPVn) MIDSHIP (OBn)
(CPLn) (CPVn) (OBn)

0.647 0.842 -9.974


0.685 0.866 -6.539

0.705 0.855 -6.723

0.735 0.892 -6.086

0.748 0.902 -7.823

0.735 0.891 -9.948

0.699 0.853 -14.774

16 17 10
Cphn Cpvn OBn
0.699 0.853 -14.774
0.735 0.891 -9.948
0.748 0.902 -7.823
0.735 0.892 -6.086
0.705 0.855 -6.723
0.685 0.866 -6.539
0.647 0.842 -9.974
1 2 3 4 5 6 7 8
T
(m) -0.870 -0.435 0 0.5 1 1.5 2 3
0.00 1.870 2.440 3.450
0.25 1.856 2.342 3.081
0.50 2.276 2.917 4.237
0.75 2.455 3.256 4.878
1.00 1.320 2.641 3.462 5.006
1.25 1.486 2.904 3.758 5.125
1.50 1.644 3.150 4.092 5.645
1.75 1.750 3.460 4.380 5.813
2.00 1.792 3.740 4.820 5.974
2.50 1.900 4.283 5.139 6.174
3.00 2.000 4.805 5.517 6.368
3.50 2.170 5.224 5.849 6.568
4.00 - 2.470 5.686 6.240 6.768
4.50 - 2.910 6.136 6.573 6.964
5.00 2.500 3.250 - - 3.405 6.630 6.920 7.200
5.50 4.000 4.500 - - 4.109 - ` -
6.00 4.740 5.110 - - 4.676 #REF! - #REF!
6.50 5.100 5.540 - - 5.374 - - #REF!
7.00 5.510 5.940 - - 6.200 - - #REF!
7.40 5.690 6.100 - - - - - #REF!
7.80 5.800 6.200 - - - - - #REF!
S' 5.900 6.250 - - - - - -
S 5.960 6.290 - - - - - #REF!

Gading -0.5 -0.25 0 0.5 1 1.5 2


NO Frame 0 Frame 0.5 Frame 01 Frame 1.5 Frame 02
WL 0 0.0 1320 1870 2440
Wl 0.25 0.3 1486 1856 2342
Wl 0.5 0.5 0 1644 2276 2917
Wl 0.75 0.8 0 1750 2455 3256
WL 1 1.0 0 1792 2641 3462
Wl 1.5 1.6 0 1900 2904 3758
WL 2 2.1 0 2000 3150 4092
Wl 2.5 2.6 0 2170 3460 4380
WL 3 3.1 0 2470 3740 4820
WL 3.5 3.6 0 2910 4283 5139
WL 4 4.1 0 3405 4805 5517
Wl 4.5 4.7 2339 4109 5224 5849
WL 5 5.2 3195 4676 5686 6240
WL 5.5 5.7 2.69 4070 5374 6136 6573
WL 6 6.2 3.37 3.6 3.82 5510 6200 6630 6920
Luas 5.021352 8679.711944 31197.503 41708.8314 49281.589
9 10 11 12 13 14 15 16
HALF BREADTH OF SECTION ( m )
4 5 6 7 8 9 10 11
4.330 4.930 5.200 5.200 5.200 5.200 5.200 l =
3.964 4.790 5.849 5.849 5.849 5.849 5.849 Am =
5.418 6.105 6.362 6.362 6.362 6.362 6.362 NO. WL
5.949 6.538 6.655 6.655 6.655 6.655 6.655 I
6.030 6.654 6.860 6.860 6.860 6.860 6.860 1.000
6.123 6.709 6.951 6.951 6.951 6.951 6.951 1.500
6.619 7.161 7.510 7.510 7.510 7.510 7.010 2.000
6.697 7.194 7.510 7.510 7.510 7.510 7.010 l =
6.781 7.222 7.510 7.510 7.510 7.510 7.010 Am =
6.866 7.265 7.510 7.510 7.510 7.510 7.010 NO. WL
6.964 7.301 7.510 7.510 7.510 7.510 7.010 I
7.055 7.337 7.510 7.510 7.510 7.510 7.010 2.000
7.146 7.373 7.510 7.510 7.510 7.510 7.010 2.500
7.231 7.394 7.510 7.510 7.510 7.510 7.010 3.000
7.340 7.420 7.510 7.510 7.510 7.510 7.010 l =
- - #REF! - - - - Am =
- - #REF! - - - - NO. WL
- - #REF! - - - - I
- - #REF! - - - - 3.000
- - #REF! - - - GADING 3.500
- - #REF! - - - NO. WL 4.000
- - #REF! - - - I l=
- - - - - - NO. WL Am =

3 4 5 6 7 8 9 10
Frame 03 Frame 04 Frame 05 Frame 06 Frame 07 Frame 08 Frame 09 Frame 10
3450 4330 4930 5200 5200 5200 5200 5200
3081 3964 4790 5849 5849 5849 5849 5849
4237 5418 6105 6362 6362 6362 6362 6362
4878 5949 6538 6655 6655 6655 6655 6655
5006 6030 6654 6860 6860 6860 6860 6860
5125 6123 6709 6951 6951 6951 6951 6951
5645 6619 7161 7510 7510 7510 7510 7510
5813 6697 7194 7510 7510 7510 7510 7510
5974 6781 7222 7510 7510 7510 7510 7510
6174 6866 7265 7510 7510 7510 7510 7510
6368 6964 7301 7510 7510 7510 7510 7510
6568 7055 7337 7510 7510 7510 7510 7510
6768 7146 7373 7510 7510 7510 7510 7510
6964 7231 7394 7510 7510 7510 7510 7510
7200 7340 7420 7510 7510 7510 7510 7510
59936.097 67411.63 71902.34944 74624.35444 74624.354444 74624.3544 74624.354 71034.0767
17 18 19 20 21 22 23 24
(m)
12 13 14 15 16 17 18 18.5
5.000 5.200 4.740 3.890 2.800 1.650 0.540 0.010
5.500 5.849 3.791 3.197 2.142 1.310 0.740 0.444
6.000 6.362 5.723 4.817 3.746 2.695 1.691 1.170
l= 6.655 6.141 5.276 4.215 3.037 1.913 1.363
Am = 6.860 6.212 5.308 4.267 3.102 1.971 1.421
6.951 6.951 6.295 5.347 4.325 3.154 2.032 1.481
7.510 7.510 6.840 6.006 4.923 3.782 2.442 1.667
7.510 7.510 6.878 6.032 4.962 3.808 2.487 1.712
7.510 7.510 6.917 6.058 4.994 3.846 2.526 1.750
7.510 7.510 6.949 6.090 5.032 3.885 2.558 1.788
7.510 7.510 6.981 6.122 5.058 3.923 2.600 1.821
7.510 7.510 7.013 6.167 5.103 3.968 2.641 1.853
7.510 7.510 7.045 6.186 5.135 4.013 2.679 1.904
7.510 7.510 7.077 6.231 5.173 4.051 2.712 1.955
7.510 7.510 7.110 6.270 5.200 4.090 2.750 2.000
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -
- - - - - - #REF! -

11 12 13 14 15 16 17 18
Frame 11 Frame 12 Frame 13 Frame 14 Frame 15 Frame 16 Frame 17 Frame 18
5200 5200 5200 4740 3890 2800 1650 540
5849 5849 5849 3791 3197 2142 1310 740
6362 6362 6362 5723 4817 3746 2695 1691
6655 6655 6655 6141 5276 4215 3037 1913
6860 6860 6860 6212 5308 4267 3102 1971
6951 6951 6951 6295 5347 4325 3154 2032
7510 7510 7510 6840 6006 4923 3782 2442
7510 7510 7510 6878 6032 4962 3808 2487
7510 7510 7510 6917 6058 4994 3846 2526
7510 7510 7510 6949 6090 5032 3885 2558
7510 7510 7510 6981 6122 5058 3923 2600
7510 7510 7510 7013 6167 5103 3968 2641
7510 7510 7510 7045 6186 5135 4013 2679
7510 7510 7510 7077 6231 5173 4051 2712
7510 7510 7510 7110 6270 5200 4090 2750
74624.3544 74624.354 74624.3544 68013.935 59211.4356 48270.71028 36634.9072 23893.299
25 26 27

19 19.5 20
- #REF! 0.000 0.00
0.244 #REF! - 0.25
0.727 #REF! - 0.50
0.833 #REF! - 0.75
0.900 0.389 - 1.00
0.962 0.470 - 1.25
1.032 0.507 - 1.50
1.064 0.534 - 1.75
1.096 0.507 - 2.00
1.128 0.470 - 2.50
1.173 0.484 - 3.00
1.212 0.491 - 3.50
1.250 0.565 - 4.00
1.288 0.558 - 4.50
1.330 0.650 - 5.00
#REF! - - 5.50
#REF! #REF! #REF! 6.00
#REF! #REF! - 6.50
#REF! #REF! - 7.00
- - - 7.40
- - - 7.80
- - -
- - -

18.5 19 19.5 20
Frame 18.5 Frame 19 Frame 19.5 Frame 20
10 0 1 0.1
444 244 130 0
1170 727 244 0
1363 833 330 0
1421 900 389 0
1481 962 470 0
1667 1032 507 0
1712 1064 534 0
1750 1096 507 0
1788 1128 470 0
1821 1173 484 0
1853 1212 491 0
1904 1250 565 0
1955 1288 558 0
2000 1330 650 0
16762.4325 10707.3572 4772.4844 0.014361

You might also like