May 20, 2015

Mr. Robert Holmes


Client Manager
Cornerstone Environmental
1200 Scottsville Rd, Building C, Suite 320,
Rochester, NY 14624

Re: Colonie Landfill Alternative Access Evaluation

Dear Mr. Holmes:

We are pleased to submit our draft report for the Colonie Landfill Alternative Access Evaluation.
SIMCO Engineering studied a total of four driveway/site access locations including the original
Arrowhead Drive driveway (that proposed access to Route 9 from Fonda Road) analyzed as part of the
Colonie Landfill Traffic Impact Study. A total of three alternative driveways were also analyzed
including the following (see Figure):

1. Current driveway on Route 9


2. Crescent Road
3. Arrowhead Drive (Direct access to Route)

As part of the analysis, SIMCO studied each location in terms of the Driveway Cross Street (roadway
functional classification, roadway characteristics, speed limit, and traffic volume), Driveway Intersection
(weekday peak period level of service – LOS, truck and car sight distance, and surrounding land uses),
and Route 9 Intersection (intersection characteristics, access to Route 9, weekday peak period LOS, and
truck and car sight distance). A summary of the analyses results is provided in Table 1. The detailed
analysis results for the intersection LOS analysis is provided in Appendix A, the NYSDOT criteria for
sight distance is provided in Appendix B, and the sight distance analysis results are provided in Appendix
C.

Using the information provided in Table 1, pros and cons for each of the four alternatives were
summarized in Table 2. Based on the results, all three of the alternative driveway locations are projected
to fail due to poor intersection LOS and/or sight distance deficiencies. Alternatively, the original
Arrowhead Drive driveway is projected to operate satisfactory in all of these areas. The somewhat
circuitous routing for this location will be mitigated using signage that will clearly delineate a path
between the site driveway and Route 9. Based on the results of the analyses, it is clear that the original
Arrowhead Drive driveway is the preferred location.

Traffic ● Parking ● Highways ● Transit ● Airports ● Bridge Inspection ● Construction Inspection ● MBE/DBE Certified
80 Maiden Lane, Suite 501 ● New York, NY 10038-4892 ● (212) 385-8100 ● FAX: (212) 385-8101 ●
Web:www.simcopc.com
If you have any questions or comments, please feel free to contact Mr. Michael Monteleone at 212-385-
8100 (extension 1614).

Sincerely,

SIMCO ENGINEERING, P.C.

Warren Michelsen, P.E., PTOE


Senior Vice President

Traffic ● Parking ● Highways ● Transit ● Airports ● Bridge Inspection ● Construction Inspection ● MBE/DBE Certified
80 Maiden Lane, Suite 501 ● New York, NY 10038-4892 ● (212) 385-8100 ● FAX: (212) 385-8101 ●
Web:www.simcopc.com
Arrowhead Drive
Existing Entrance
Option

Cohoes Crescent
Road Entrance
Table 1 ‐ Colonie Landfill Alternative Access Evaluation
Cross Street Driveway Intersection Route 9 Intersection
Driveway Location
LOS at Intersection 
Functional  Roadway  LOS at Driveway  Intersection with 
Speed Limit AADT (NYSDOT) Truck sight distance Car sight distance Surrounding Uses Access to Route 9 with Route 9  Truck sight distance Car sight distance
Classification Charateristics (weekday) Route 9
(weekday)

Stop‐Controlled
Separate 
Entrance/Exit  Does not meet 
Driveways. LOS C (AM) NYSDOT Intersection 
Meets NYSDOT 
Current Urban Principal  Exit driveway is very  55 mph 14,745 (2008) LOS C (MD) Sight Distance  Residential &  Direct Connection to 
Intersection Sight  (See Driveway) (See Driveway) (See Driveway) (See Driveway)
(at Route 9) Arterial Other wide. Two travel  on Route 9 Route 9 LOS E (PM) Requirement due to  Commerical Route 9
Distance Requirement
lanes in each  the roadway 
direction on Route 9  alignment
with two ‐way center 
left‐turn lane. 

Meets NYSDOT  Meets NYSDOT 
Stop‐Controlled
Intersection Sight  Intersection Sight  Does not meet  Does not meet 
No turn lanes on 
Distance  Distance  NYSDOT Intersection  NYSDOT Intersection 
Two‐way, one travel  Cresent Road.  Two  Travel west along 
40 mph 5,646 (2008) LOS C (AM) Requirement;  Requirement;  LOS F (AM) Sight Distance  Sight Distance 
Crescent Road Urban Minor Arterial lane each in direction Vacant travel lanes in each  Crescent Road to 
on Crescent Road Crescent Road LOS C (PM) significant earthwork  significant earthwork  LOS F (PM) Requirement due to  Requirement due to 
direction on Route 9  Route 9
and vegetation  and vegetation  the roadway  the roadway 
with southbound Left‐
removal would be  removal would be  alignment alignment
turn bay
required required

Stop‐Controlled
No turn lanes on 
Arrowhead Drive.  LOS F (AM)
Arrowhead Drive LOS A (AM) Meets NYSDOT  Meets NYSDOT  Travel west along  Meets NYSDOT  Meets NYSDOT 
Two‐way, one travel  30 mph Minimal Two travel lanes in  LOS E (MD)
(via Arrowhead  Urban Local Roadway LOS A (MD) Intersection Sight  Intersection Sight  Residential Arrowhead Lane to  Intersection Sight  Intersection Sight 
lane in each direction on Arrowhead Road Arrowhead Lane each direction on  LOS F (PM)
Drive) LOS A (PM) Distance Requirement Distance Requirement Route 9 Distance Requirement Distance Requirement
Route 9 with two ‐
way center left‐turn 
lane. 

Stop‐Controlled
No turn lanes on  Travel east along 
LOS A (AM) Meets NYSDOT  Meets NYSDOT  Fonda Road.  Two  Arrowhead Lane to  LOS C (AM)
Arrowhead Drive Two‐way, one travel  30 mph Minimal Industrial & 
Urban Local Roadway LOS B (MD) Intersection Sight  Intersection Sight  travel lanes in each  Green Mountain  LOS B (MD) N/A ‐ Signal N/A ‐ Signal
(via Fonda Road) lane in each direction on Arrowhead Road Arrowhead Lane Commercial
LOS A (PM) Distance Requirement Distance Requirement direction on Route 9  Drive to Fonda Road  LOS C (PM)
with southbound Left‐ to Route 9
turn bay
Table 2 ‐ Colonie Landfill Alternative Access Evaluation
Driveway 
Pros Cons
Location

1. Drivers are familiar with existing driveway operation; 1. The left‐turn movement leaving the driveway is projected to operate 
2. Exit driveway is very wide; poorly during the weekday PM peak period;
Current
3. Sight distance meets NYSDOT standards for cars; 2. Sight distance does not meet NYSDOT standards for trucks due to 
(at Route 9)
4. Direct connection to Route 9. roadway alignment.

1. The left‐turn movement leaving the proposed driveway is projected to  1. The left‐turn movement at Cresent Road and Route 9 is projected to 
operate satisfactory during all weekday peak periods analyzed;                                operate poorly during all weekday periods analyzed;
2.Sight distance meets NYSDOT standards for cars and trucks leaving the  2. Sight distance does not meet NYSDOT standards for cars and trucks 
proposed driveway. at Cresent Road and Route 9 due to roadway alignment;                            
Crescent Road
3. Significant earthwork and vegetation removal would be required at 
proposed driveway.

1. The left‐turn movement leaving the proposed driveway is projected to  1. The left‐turn movement at Arrowhead Drive and Route 9 is 
operate satisfactory during all weekday peak periods analyzed;                                projected to operate poorly during all weekday periods analyzed;
Arrowhead Drive 2. Sight distance meets NYSDOT standards for cars and trucks leaving proposed  2. Trucks entering and exiting the site would travel along the 
(via Arrowhead  driveway; residential portion of Arrowhead Drive.                                                           
Drive) 3. Sight distance meets NYSDOT standards for cars and trucks at the 
Arrowhead Drive and Route 9 intersection.

1. The left‐turn movement leaving the proposed driveway is projected to  1. Route between proposed driveway and Route 9 is circuitous (signs 
operate satisfactory during all weekday peak periods analyzed;                                are proposed to delineate path).
2. Sight distance meets NYSDOT standards for cars and trucks leaving proposed 
driveway;
Arrowhead Drive 3. Access to the proposed driveway would utilize the signal at the intersection 
(via Fonda Road) of Route 9 and Fonda Road which is projected to operate satisfactory during all 
weekday periods analyzed;
4. Trucks entering and exiting the site would travel through a light industrial 
area.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APPENDIX A 
HCS Analysis Reports 
   

 
 
HCS2000: Unsignalized Intersections Release 4.1d

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: Joe Nieciak


Agency/Co.: SIMCO Engineering P.C.
Date Performed: 11/5/2014
Analysis Time Period: Weekday AM (7:15 - 8:15)
Intersection: S Waste Dr Exit @ Loudon Rd
Jurisdiction: Albany
Units: U. S. Customary
Analysis Year: 2021 No Build
Project ID: Colonie Landfill TIS
East/West Street: Solid Waste Dr Exit
North/South Street: Loudon Rd
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 308 1564
Peak-Hour Factor, PHF 0.86 0.87
Hourly Flow Rate, HFR 358 1797
Percent Heavy Vehicles -- -- -- --
Median Type/Storage TWLTL / 1
RT Channelized?
Lanes 2 2
Configuration T T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 24 9
Peak Hour Factor, PHF 0.61 0.50
Hourly Flow Rate, HFR 39 18
Percent Heavy Vehicles 24 33
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / /
Lanes 1 1
Configuration L R
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config | L R |
______________________________________________________________________________
v (vph) 39 18
C(m) (vph) 240 744
v/c 0.16 0.02
95% queue length 0.57 0.07
Control Delay 22.9 10.0-
LOS C A
Approach Delay 18.8
Approach LOS C
______________________________________________________________________________
HCS2000: Unsignalized Intersections Release 4.1d

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: Joe Nieciak


Agency/Co.: SIMCO Engineering P.C.
Date Performed: 11/5/2014
Analysis Time Period: Weekday Midday (12:00 - 13:00)
Intersection: S Waste Dr Exit @ Loudon Rd
Jurisdiction: Albany
Units: U. S. Customary
Analysis Year: 2021 No Build
Project ID: Colonie Landfill TIS
East/West Street: Solid Waste Dr Exit
North/South Street: Loudon Rd
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 553 574
Peak-Hour Factor, PHF 0.88 0.86
Hourly Flow Rate, HFR 628 667
Percent Heavy Vehicles -- -- -- --
Median Type/Storage TWLTL / 1
RT Channelized?
Lanes 2 2
Configuration T T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 37 18
Peak Hour Factor, PHF 0.84 0.81
Hourly Flow Rate, HFR 44 22
Percent Heavy Vehicles 30 38
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / /
Lanes 1 1
Configuration L R
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config | L R |
______________________________________________________________________________
v (vph) 44 22
C(m) (vph) 320 586
v/c 0.14 0.04
95% queue length 0.47 0.12
Control Delay 18.0 11.4
LOS C B
Approach Delay 15.8
Approach LOS C
______________________________________________________________________________
HCS2000: Unsignalized Intersections Release 4.1d

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: Joe Nieciak


Agency/Co.: SIMCO Engineering P.C.
Date Performed: 11/5/2014
Analysis Time Period: Weekday PM (16:45 - 17:45)
Intersection: S Waste Dr Exit @ Loudon Rd
Jurisdiction: Albany
Units: U. S. Customary
Analysis Year: 2021 No Build
Project ID: Colonie Landfill TIS
East/West Street: Solid Waste Dr Exit
North/South Street: Loudon Rd
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 1613 546
Peak-Hour Factor, PHF 0.92 0.93
Hourly Flow Rate, HFR 1753 587
Percent Heavy Vehicles -- -- -- --
Median Type/Storage TWLTL / 1
RT Channelized?
Lanes 2 2
Configuration T T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 10 6
Peak Hour Factor, PHF 0.50 0.50
Hourly Flow Rate, HFR 20 12
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / /
Lanes 1 1
Configuration L R
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config | L R |
______________________________________________________________________________
v (vph) 20 12
C(m) (vph) 109 296
v/c 0.18 0.04
95% queue length 0.64 0.13
Control Delay 45.3 17.7
LOS E C
Approach Delay 34.9
Approach LOS D
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday AM
Intersection: Cohoes Crescent Rd & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Cohoes Crescent Road
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 546 70 0 160
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 606 77 0 177
Percent Heavy Vehicles -- -- 50 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 43 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 47 0
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | LR |
______________________________________________________________________________
v (vph) 0 47
C(m) (vph) 722 287
v/c 0.00 0.16
95% queue length 0.00 0.58
Control Delay 10.0- 20.0
LOS A C
Approach Delay 20.0
Approach LOS C
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday PM
Intersection: Cohoes Crescent Rd & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Cohoes Crescent Road
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 203 12 0 372
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 225 13 0 413
Percent Heavy Vehicles -- -- 50 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 46 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 51 0
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | LR |
______________________________________________________________________________
v (vph) 0 51
C(m) (vph) 1093 369
v/c 0.00 0.14
95% queue length 0.00 0.48
Control Delay 8.3 16.3
LOS A C
Approach Delay 16.3
Approach LOS C
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday AM
Intersection: Route 9 & Cohoes Crescent Rd
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021 Build
Project ID:
East/West Street: Cohoes Crescent Road
North/South Street: Loudon Rd (Route 9)
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 309 53 560 1582
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 343 58 622 1757
Percent Heavy Vehicles -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 2 0 1 2
Configuration T TR L T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 29 14
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 32 15
Percent Heavy Vehicles 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config L | LR |
______________________________________________________________________________
v (vph) 622 47
C(m) (vph) 1154 16
v/c 0.54 2.94
95% queue length 3.34 6.56
Control Delay 11.7 1364
LOS B F
Approach Delay 1364
Approach LOS F
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday PM
Intersection: Route 9 & Cohoes Crescent Rd
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021 Build
Project ID: 12.363 Colonie Landfill Modification
East/West Street: Cohoes Crescent Road
North/South Street: Loudon Rd (Route 9)
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 1636 9 550 209
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 1817 10 611 232
Percent Heavy Vehicles -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 2 0 1 2
Configuration T TR L T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 20 403
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 22 447
Percent Heavy Vehicles 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config L | LR |
______________________________________________________________________________
v (vph) 611 469
C(m) (vph) 331 0
v/c 1.85
95% queue length 40.64
Control Delay 419.0
LOS F F
Approach Delay
Approach LOS
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/13/2015
Analysis Time Period: Weekday AM
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 69 54 17 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 76 60 18 0
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 0 43
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 0 47
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 76 47
C(m) (vph) 1336 937
v/c 0.06 0.05
95% queue length 0.18 0.16
Control Delay 7.9 9.0
LOS A A
Approach Delay 9.0
Approach LOS A
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday MD
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 81 34 30 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 90 37 33 0
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 0 76
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 0 84
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 90 84
C(m) (vph) 1318 918
v/c 0.07 0.09
95% queue length 0.22 0.30
Control Delay 7.9 9.3
LOS A A
Approach Delay 9.3
Approach LOS A
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday PM
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 12 21 54 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 13 23 60 0
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 0 46
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 0 51
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 13 51
C(m) (vph) 1286 886
v/c 0.01 0.06
95% queue length 0.03 0.18
Control Delay 7.8 9.3
LOS A A
Approach Delay 9.3
Approach LOS A
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday AM
Intersection: Route 9 & Arrowhead Ln
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021 Build
Project ID: 12.363 Colonie Landfill Modification
East/West Street: Arrowhead Ln
North/South Street: Loudon Rd (Route 9)
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 323 45 79 1538
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 358 50 87 1708
Percent Heavy Vehicles -- -- 50 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 2 0 1 2
Configuration T TR L T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 30 30
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 33 33
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config L | LR |
______________________________________________________________________________
v (vph) 87 66
C(m) (vph) 868 137
v/c 0.10 0.48
95% queue length 0.33 2.23
Control Delay 9.6 53.6
LOS A F
Approach Delay 53.6
Approach LOS F
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday MD
Intersection: Route 9 & Arrowhead Ln
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021 Build
Project ID: 12.363 Colonie Landfill Modification
East/West Street: Arrowhead Ln
North/South Street: Loudon Rd (Route 9)
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 526 46 79 513
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 584 51 87 570
Percent Heavy Vehicles -- -- 50 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 2 0 1 2
Configuration T TR L T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 49 66
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 54 73
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config L | LR |
______________________________________________________________________________
v (vph) 87 127
C(m) (vph) 682 240
v/c 0.13 0.53
95% queue length 0.44 2.81
Control Delay 11.0 35.7
LOS B E
Approach Delay 35.7
Approach LOS E
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday PM
Intersection: Route 9 & Arrowhead Ln
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021 Build
Project ID: 12.363 Colonie Landfill Modification
East/West Street: Arrowhead Ln
North/South Street: Loudon Rd (Route 9)
Intersection Orientation: NS Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Northbound Southbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 1818 6 27 565
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 2020 6 30 627
Percent Heavy Vehicles -- -- 50 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 2 0 1 2
Configuration T TR L T
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 22 78
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 24 86
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach NB SB Westbound Eastbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config L | LR |
______________________________________________________________________________
v (vph) 30 110
C(m) (vph) 147 42
v/c 0.20 2.62
95% queue length 0.73 11.95
Control Delay 35.7 938.5
LOS E F
Approach Delay 938.5
Approach LOS F
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday AM
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 0 54 17 69
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 0 60 18 76
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 43 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 47 0
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 0 47
C(m) (vph) 1247 777
v/c 0.00 0.06
95% queue length 0.00 0.19
Control Delay 7.9 9.9
LOS A A
Approach Delay 9.9
Approach LOS A
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday MD
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 0 34 30 81
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 0 37 33 90
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 76 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 84 0
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 0 84
C(m) (vph) 1214 778
v/c 0.00 0.11
95% queue length 0.00 0.36
Control Delay 8.0 10.2
LOS A B
Approach Delay 10.2
Approach LOS B
______________________________________________________________________________
HCS+: Unsignalized Intersections Release 5.5

_______________________TWO-WAY STOP CONTROL SUMMARY___________________________

Analyst: SMZ
Agency/Co.: SIMCO
Date Performed: 5/19/2015
Analysis Time Period: Weekday PM
Intersection: Arrowhead Lane & Driveway
Jurisdiction: Colonie, NY
Units: U. S. Customary
Analysis Year: 2021
Project ID: 12.363 Colonies Landfill Modification
East/West Street: Arrowhead Lane
North/South Street: Proposed Driveway
Intersection Orientation: EW Study period (hrs): 0.25

______________________Vehicle Volumes and Adjustments_________________________


Major Street: Approach Eastbound Westbound
Movement 1 2 3 | 4 5 6
L T R | L T R
______________________________________________________________________________
Volume 0 21 54 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 0 23 60 0
Percent Heavy Vehicles 50 -- -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
______________________________________________________________________________
Minor Street: Approach Northbound Southbound
Movement 7 8 9 | 10 11 12
L T R | L T R
______________________________________________________________________________
Volume 46 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 51 0
Percent Heavy Vehicles 50 50
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 0
Configuration LR
______________________________________________________________________________

__________________Delay, Queue Length, and Level of Service___________________


Approach EB WB Northbound Southbound
Movement 1 4 | 7 8 9 | 10 11 12
Lane Config LT | | LR
______________________________________________________________________________
v (vph) 0 51
C(m) (vph) 1286 813
v/c 0.00 0.06
95% queue length 0.00 0.20
Control Delay 7.8 9.7
LOS A A
Approach Delay 9.7
Approach LOS A
______________________________________________________________________________
HCS2000: Signalized Intersections Release 4.1e

Analyst: Joe Nieciak Inter.: Fonda Rd @ Loudon Rd/Rte 9


Agency: SIMCO Engineering P.C. Area Type: All other areas
Date: 11/5/2014 Jurisd: Albany
Period: Weekday AM (7:15 - 8:15) Year : 2021 Build
Project ID: Colonie Landfill TIS
E/W St: Fonda Rd N/S St: Loudon Rd/ Rte 9

_________________________SIGNALIZED INTERSECTION SUMMARY_______________________


| Eastbound | Westbound | Northbound | Southbound |
| L T R | L T R | L T R | L T R |
|_______________|_______________|_______________|_______________|
No. Lanes | 0 0 0 | 0 0 0 | 0 2 0 | 1 2 0 |
LGConfig | | LR | TR | L T |
Volume | |87 26 | 302 88 |73 1573 |
Lane Width | | 11.0 | 11.0 |11.0 11.0 |
RTOR Vol | | 4 | 23 | |
_______________________________________________________________________________
Duration 0.25 Area Type: All other areas
______________________________Signal Operations________________________________
Phase Combination 1 2 3 4 | 5 6 7 8
EB Left | NB Left
Thru | Thru A
Right | Right A
Peds | Peds
WB Left A | SB Left A
Thru | Thru A
Right A | Right
Peds | Peds
NB Right | EB Right
SB Right | WB Right
Green 25.0 50.0
Yellow 4.0 4.0
All Red 2.0 2.0
Cycle Length: 87.0 secs
____________________Intersection Performance Summary___________________________
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate __________ __________ ___________
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
_______________________________________________________________________________
Eastbound

Westbound

LR 451 1570 0.31 0.29 24.6 C 24.6 C

Northbound

TR 1803 3138 0.24 0.57 9.2 A 9.2 A

Southbound
L 503 875 0.22 0.57 9.2 A
T 1970 3428 0.92 0.57 24.1 C 23.2 C

Intersection Delay = 20.9 (sec/veh) Intersection LOS = C

_______________________________________________________________________________
HCS2000: Signalized Intersections Release 4.1e

Analyst: Joe Nieciak Inter.: Fonda Rd @ Loudon Rd/Rte 9


Agency: SIMCO Engineering P.C. Area Type: All other areas
Date: 11/5/2014 Jurisd: Albany
Period: Weekday Midday (12:00 - 13:00) Year : 2021 Build
Project ID: Colonie Landfill TIS
E/W St: Fonda Rd N/S St: Loudon Rd/ Rte 9

_________________________SIGNALIZED INTERSECTION SUMMARY_______________________


| Eastbound | Westbound | Northbound | Southbound |
| L T R | L T R | L T R | L T R |
|_______________|_______________|_______________|_______________|
No. Lanes | 0 0 0 | 0 0 0 | 0 2 0 | 1 2 0 |
LGConfig | | LR | TR | L T |
Volume | |95 55 | 511 78 |70 545 |
Lane Width | | 11.0 | 11.0 |11.0 11.0 |
RTOR Vol | | 9 | 16 | |
_______________________________________________________________________________
Duration 0.25 Area Type: All other areas
______________________________Signal Operations________________________________
Phase Combination 1 2 3 4 | 5 6 7 8
EB Left | NB Left
Thru | Thru A
Right | Right A
Peds | Peds
WB Left A | SB Left A
Thru | Thru A
Right A | Right
Peds | Peds
NB Right | EB Right
SB Right | WB Right
Green 25.0 50.0
Yellow 4.0 4.0
All Red 2.0 2.0
Cycle Length: 87.0 secs
____________________Intersection Performance Summary___________________________
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate __________ __________ ___________
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
_______________________________________________________________________________
Eastbound

Westbound

LR 429 1492 0.55 0.29 27.7 C 27.7 C

Northbound

TR 1856 3229 0.36 0.57 10.0+ B 10.0+ B

Southbound
L 371 645 0.44 0.57 11.4 B
T 1933 3363 0.34 0.57 9.9 A 10.2 B

Intersection Delay = 12.5 (sec/veh) Intersection LOS = B

_______________________________________________________________________________
HCS2000: Signalized Intersections Release 4.1e

Analyst: Joe Nieciak Inter.: Fonda Rd @ Loudon Rd/Rte 9


Agency: SIMCO Engineering P.C. Area Type: All other areas
Date: 11/5/2014 Jurisd: Albany
Period: Weekday PM (16:45 - 17:45) Year : 2021 Build
Project ID: Colonie Landfill TIS
E/W St: Fonda Rd N/S St: Loudon Rd/ Rte 9

_________________________SIGNALIZED INTERSECTION SUMMARY_______________________


| Eastbound | Westbound | Northbound | Southbound |
| L T R | L T R | L T R | L T R |
|_______________|_______________|_______________|_______________|
No. Lanes | 0 0 0 | 0 0 0 | 0 2 0 | 1 2 0 |
LGConfig | | LR | TR | L T |
Volume | |90 178 | 1641 51 |38 626 |
Lane Width | | 11.0 | 11.0 |11.0 11.0 |
RTOR Vol | | 68 | 22 | |
_______________________________________________________________________________
Duration 0.25 Area Type: All other areas
______________________________Signal Operations________________________________
Phase Combination 1 2 3 4 | 5 6 7 8
EB Left | NB Left
Thru | Thru A
Right | Right A
Peds | Peds
WB Left A | SB Left A
Thru | Thru A
Right A | Right
Peds | Peds
NB Right | EB Right
SB Right | WB Right
Green 25.0 50.0
Yellow 4.0 4.0
All Red 2.0 2.0
Cycle Length: 87.0 secs
____________________Intersection Performance Summary___________________________
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate __________ __________ ___________
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
_______________________________________________________________________________
Eastbound

Westbound

LR 469 1631 0.49 0.29 26.6 C 26.6 C

Northbound

TR 1980 3446 0.93 0.57 25.2 C 25.2 C

Southbound
L 84 147 0.61 0.57 24.1 C
T 1951 3395 0.34 0.57 9.9 A 10.9 B

Intersection Delay = 21.7 (sec/veh) Intersection LOS = C

_______________________________________________________________________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APPENDIX B 
NYSDOT Sight Distance Requirements 
   

 
 
NEW YORK STATE
DEPARTMENT OF TRANSPORTATION

Highway Design Manual


Appendix 5C

Intersection Sight Distance Charts

January 15th, 2015


APPENDIX 5C
INTERSECTION SIGHT DISTANCE CHARTS

Table 5C-3 Design Intersection Sight Distance (in feet) - Case B1 - Left Turn From Stop
Design Passenger Car Single-Unit Truck Combination Truck
speed Lanes Crossed Lanes Crossed Lanes Crossed
(mph) 1 2 3 1 2 3 1 2 3
15 170 180 190 210 225 245 255 270 285
20 225 240 250 280 300 325 340 360 380
25 280 295 315 350 375 405 425 450 475
30 335 355 375 420 450 485 510 540 570
35 390 415 440 490 525 565 595 630 665
40 445 475 500 560 600 645 680 720 760
45 500 530 565 630 675 725 765 810 855
50 555 590 625 700 750 805 850 900 950
55 610 650 690 770 825 885 930 990 1045
60 665 710 750 840 900 965 1015 1080 1140
65 720 765 815 910 975 1045 1100 1170 1235
70 775 825 875 980 1050 1125 1185 1260 1330

Table 5C-4 Design Intersection Sight Distance (in feet) - Case B2 - Right Turn From Stop and -
Case B3 - Crossing Maneuver
Passenger Car Single-Unit Truck Combination Truck
Case B2-- Lane Entered Case B2-- Lane Entered Case B2-- Lane Entered
Design
Speed Case B3 – Lanes Crossed Case B3 – Lanes Crossed Case B3 – Lanes Crossed
(mph) 1 2 3 1 2 3 1 2 3
15 145 155 170 190 205 220 235 250 265
20 195 210 225 250 275 295 310 330 350
25 240 260 280 315 340 365 390 415 440
30 290 310 335 375 410 440 465 495 525
35 335 365 390 440 475 510 545 580 615
40 385 415 445 500 545 585 620 660 700
45 430 465 500 565 610 655 695 745 790
50 480 515 555 625 680 730 775 825 875
55 530 570 610 690 745 805 850 910 965
60 575 620 665 750 815 875 930 990 1050
65 625 670 720 815 880 950 1005 1075 1140
70 670 725 775 875 950 1020 1085 1155 1225

Page C3
1/15/15
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APPENDIX C 
Sight Distance Worksheets 

 
 
Existing Driveway at Route 9
Design Speed - 60 mph (Route 9)
Passenger Car Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 710 ft
Does meet requirement
Existing Driveway at Route 9
Design Speed - 60 mph (Route 9)
Single Unit Truck Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 900 ft
Does NOT meet requirement
Proposed Driveway at Crescent Road
Design Speed - 45 mph (Crescent Road)
Passenger Car Crossing One Lane
NYSDOT Intersection Sight Distance Requirement - 500 ft
Does meet requirement
Proposed Driveway at Crescent Road
Design Speed - 45 mph (Arrowhead Lane)
Single Unit Truck Crossing One Lane
NYSDOT Intersection Sight Distance Requirement - 630 ft
Does meet requirement
Crescent Road at Route 9
Design Speed - 60 mph (Route 9)
Passenger Car Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 710 ft
Does NOT meet requirement
Crescent Road at Route 9
Design Speed - 60 mph (Route 9)
Single Unit Truck Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 900 ft
Does NOT meet requirement
Proposed Driveway at Arrowhead Lane
Design Speed - 35 mph (Crescent Road)
Passenger Car Crossing One Lane
NYSDOT Intersection Sight Distance Requirement - 390 ft
Does meet requirement
Proposed Driveway at Arrowhead Lane
Design Speed - 35 mph (Arrowhead Lane)
Single Unit Truck Crossing One Lane
NYSDOT Intersection Sight Distance Requirement - 490 ft
Does meet requirement
Arrowhead Lane at Route 9
Design Speed - 60 mph (Route 9)
Passenger Car Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 710 ft
Does meet requirement
Arrowhead Lane at Route 9
Design Speed - 60 mph (Route 9)
Single Unit Truck Crossing Two Lanes
NYSDOT Intersection Sight Distance Requirement - 900 ft
Does meet requirement