Professional Documents
Culture Documents
DATOS:
f´c= 210 Kg/cm2
fy= 4200 Kg/cm2
acabados= 120 k/m2
tabiquería= 0 k/m2
s/c= 400 k/m2
r= 2.5 cm
𝑡 16
𝑡 = ℎ ∗ 𝑐𝑜𝑠 𝛼 → ℎ = = = 19.71𝑐𝑚
cos 𝛼 25
√949
𝑐 18
ℎ𝑚 = ℎ + = 19.71 + = 28.71
2 2
4- Metrado de cargas
D=0.809 t/m
L=0.400 t/m
2.175 tn/m
1.663 tn/m
2.00 1.20
4.351 tn 1.995 tn
a
1.00 1.00 0.60 0.60
VA VB
⟶ 𝑉𝐵 = 2.98
⟶ 𝑉𝐴 = 3.37
3.365
0,985
2.981
𝑋 2−𝑋
= ⇒ 𝑋 = 1.547
3.365 0.985
3.365
DMF
2.380
2.603
Mmax=2.603t.m
𝑡
𝑀𝑢 = 10.77 > 𝑀𝑚𝑎𝑥 = 2.603 𝑜𝑘 …
𝑚
6- Verificación por corte
25
V´A = VA COSβ = 3.365 COSβ = 3.365 = 2.73
√949
V´A 2.73∗1000
-𝑐𝑜𝑟𝑡𝑒 𝑢𝑛𝑖𝑡𝑎𝑟𝑖𝑜 (Ѵ𝑐) = = = 1.69
𝑏∗𝑑 120∗13.5
(Ѵ 𝑑𝑒 𝑑𝑖𝑠𝑒ñ𝑜) = (0.53∅√𝑓 ′ 𝑐) ∗ 1.1 = (0.53 ∗ 0.85√210) ∗ 1.1 = 7.18
7- Diseño estructural
Mmax=2.603 t/m
8- Diseño de acero
∅ As
3/8” 0.71
½” 1.27 𝜙
𝑆= ∗ 100
𝐴𝑠
1.27
𝑆1/2" = ∗ 120 = 28.91 ⇒ 𝜙1/2" @ .25
5.27
8.1- Acero negativo (-)
𝐴𝑠 + 5.27
8.2.1- 𝑨𝒔− = = = 1.976𝑐𝑚2
3 3
0.71
𝑆3/8" = ∗ 120 = 24.62 ⇒ 𝜙3/8" @ .20
3.46
1.27
𝑆1/2" = ∗ 120 = 44.04 ⇒ 𝜙1/2" @ .40
3.46
𝐴𝑠 + = 𝜙1/2" @ .25
𝐴𝑠 − = 𝜙3/8" @ .20
0.71
𝑆3/8" = ∗ 120 = 29.18 ⇒ 𝜙3/8" @ .25
2.92
1.27
𝑆1/2" = ∗ 120 = 52.19 ⇒ 𝜙1/2" @ .50
2.92