You are on page 1of 3

Hotel Administration and Management Network

Development of a feature-rich web based Hotel Management Network

1. Title of the project: Hotel Management Network


2. Domain: Hotels
3. Sub Domain: Management
4. Project Architecture: N-Tire Architecture
5. SDLC methodologies: RAD/Waterfall model
6. Abstract of the project:
This project is aimed to developing an Online Hotel Management. This is an easy to
operate user friendly, economically priced software that Committed to meet the all requirements
to manage small, medium and big scale hotels.

Hotel Management Network is one of the leading software for complete management
of your Hotel; it can manage the reception, restaurant, inventory and accounts excellently.

The hotel management software provides all kinds of record keeping feature required in a
hotel like daybooks, daily business book, Preparation of OFI and many more automatically.

The software is fully integrated with CMS (Content Management System) solution and
developed in a manner that is easily manageable, time saving and relieving one from manual
works.

7. Features: The key features of the system are:


 Complete and automatic operating of reception.
 Store management.
 Restaurant management.
 Preparing KOT’s reports.
 Complete history of visitors at your hotel.
 Preparation of visitor’s bill.
 Up to date account manager with all accounting needs.
 Maintaining the inventory section of your hotel.
 Built in backup and restore facilities.
 Internet/LAN compatible.
 Compatible with any windows -9X or higher.

8. Keywords:
 Generic Technology Keywords: Databases, User Interface, Programming
 Specific Technology Keywords: ASP.Net, C#.Net, MS SQL Server
 Project Type Keywords: Analysis, Design, Implementation, Testing
 SDLC Keywords: Presentation, Business, Data Access Layers

9. Environment:
 Servers:
 Operating System Server: - Microsoft Windows 2000 or Higher
 Data Base Server: Microsoft SQL Server 2000/2005

1
 Clients: Microsoft Internet Explorer,
 Tools: Microsoft Visual Studio .Net
 User Interface: ASP.NET with AJAX
 Code Behind: VC#.NET
10. Requirements:
 Hardware requirements:

Number Description
1 PC with 2 GB hard-disk
and 256 MB RAM

 Software requirements:
Number Description
1 Windows 2000/ XP/ or
Higher with MS-office

2. MS-SQL server2000/2005

3. Ms-Visual Studio .Net 2005

4. Ms-Internet Explorer

 Manpower requirements:
3 to 4 Developers can complete this in 3-4 months.

11. Milestones:
No. Milestone Milestone Description Remarks
Name

1 Requirements Complete specification of the Attempt should be made to add


Specification system including defining some more relevant functionality
hierarchies constitutes this other than those that are listed in
milestone. A document detailing this document.
the same should be written and
a presentation on that be made.
2 Technology Understanding of the technology The presentation should be from
familiarization needed to implement the project. the point of view of being able to
apply it to the project, rather than
from a theoretical perspective.
3 Database A database of at least 10 entries It is important to finalize on the
creation of users with at least 1 should database at this stage itself so that
application admin. development and testing can
proceed with the actual database
itself.
4 High-level and Listing down all possible The scenarios should map to the
Detailed scenarios and then coming up requirement specification
Design with flow-charts or pseudo code
to handle the scenario.
5 Development Implementation of the main During this milestone period, it
of front end screen giving the login, screen would be a good idea for the team

2
functionalities. that follows the login giving to start working on a test-plan for
various options, screens for each the entire system. This test-plan
of the options can be updated as and when new
scenarios come to mind.
6 Integrating the The front-end developed in the
front-end with earlier milestone will now be able
the database to update the database. Other
features should be functional at
this stage. In short, the system
should be ready for integration
testing.
7 Integration The system should be thoroughly Another 2 weeks should be there
Testing tested by running all the test to handle any issues found during
cases written for the system testing of the system. After that,
(from milestone 5). the final demo can be arranged.
8 Final Review Issues found during the previous During the final review of the
milestone are fixed and the project, it should be checked that
system is ready for the final all the requirements specified
review. during milestone number 1 are
fulfilled

12. The following steps will be helpful to start off the project:
 Study and be comfortable with technologies such as: ASP.Net with C#, and SQL Server.
 Gather some knowledge of product hierarchies and maintenance before starting the design.
 Create a user database with different access levels.
 Start with creating the login screen.
 Create menus for navigation and group the functionalities as sub menus.
 Create the help-pages of the application in the form of FAQ. This will helps user.

You might also like