Professional Documents
Culture Documents
IN KYRGYZ REPUBLIC
KYRGYZ REPUBLIC
The views expressed in this presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank Institute
(ADBI), the Asian Development Bank (ADB), its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in
this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms.
WATER RESOURCES
Glaciers:
8 000 glaciers;
650 km3 of ice.
Rivers:
30 000 rivers; Naryn River Victory Peak
Length about 150 000 km.
Lakes:
2000 lakes;
Total area 6836 km2.
Hydro energy
Potential of small and medium-sized
watercourses
Solar energy
Potential is 4,64 billions kWh
Annual duration of sunshine is 2100-
2900 hours
Wind energy
Potential of wind energy with wind
speeds from 4 to 5 m/s
Annual potential 2 billions kWh
RENEWABLE ENERGY IN KYRGYZ REPUBLIC
Geothermal resources:
Promising direction is the use of the
thermal mass of the land for heating or air
conditioning using modern heat pumps.
Biodegradable waste:
270 million m3 of biogas;
35,000 rural families (5%) with biogas for
heating and cooking food;
150 thousand rural families (20% of the
rural population) with biogas only for
cooking.
HYDRO ENERGY IN KYRGYZ REPUBLIC
Currently, 16 small hydropower plants are operating 11. Issyk-Ata power plant - 1.4 MW (Chui Region);
1. Lebedinovka HPP - 7.6 MW (Chui Region); 12. Naimanskaya HPP - 0.6 MW (Osh Region);
2. Alamedin HPP 1 - 2.2 MW (Chui Region); 13. Maryam HPP - 0.5 MW (Chui Region);
3. Alamedin HPP 2 - 2.5 MW (Chui Region); 14. KSK HPP - 1 MW (Osh Region)
4. Alamedin HPP 3 - 2.14 MW (Chui Region); 15. Mini hydro power station "Kyrgyz Ata" - 0.2 MW
(Osh Region)
5. Alamedin HPP 4 - 2.14 MW (Chui Region);
16. “Tegirmenty HPS” small HPP – 3.0 MW (Chui
6. Alamedin HPP 5 - 6.4 MW (Chui Region); Region)
Now the construction of small HPP (0,54 MW) on the Beles River, Batken Region by the LLC “Ibragimova” is in process
REGULATORY AND LEGAL FRAMEWORK
The Law of Kyrgyz Republic “On Renewable Energy Sources” gives to RES subjects the next preferences:
- the right to a guaranteed connection to the energy networks of installations using renewable energy sources;
- the right to a guaranteed acquisition by the distribution electric power companies of all the generated energy;
- are exempted from customs duties when importing and exporting equipment, plants and components for RES;
- the validity period of a fixed tariff for a period of up to 8 years from the date of commissioning of an installation using
renewable energy sources;
- abolition of licensing of activities related to the use of renewable energy sources;
- fixed tariffs for energy in the amount of the maximum tariff set by the republic, with the use of increasing coefficients,
differentiated depending on the type of renewable energy sources.
PREFERENCES
The coefficients to the maximum tariff for electricity for the end user for each type of renewable energy souces
for the payback period are set in the following amounts:
- for installations using water energy, the coefficient is 2.1 or 4.71 KGS;
- for installations using solar energy, the coefficient is 6.0 or 13.44 KGS;
- for plants using biomass energy, the coefficient is 2.75 or 6.16 KGS;
- for installations using wind energy, the coefficient is 2.5 or 5.60 KGS;
- for installations using ground energy, the coefficient is 3.35 or 7.51 KGS.