You are on page 1of 2

FLOW CHART PENGECORAN

BETON

KEDATANGAN
TRUCK MIXER

BETON NORMAL BETON INTEGRAL

1. LAMA 1. LAMA
PERJALANAN PERJALANAN
2. SUHU 2. SUHU
TIDAK 3. SLUMP 3. SLUMP TIDAK

YA YA

CAMPUR
CONCRETE BUCKET INTEGRAL
PUMP

COR
1. SLUMP
SETELAH
PENCAMPURAN TIDAK
1. SLUMP
DIUJUNG PIPA
TIDAK
SLUMP MENGGUNAKAN BUCKET YA
YA AREA MIN (cm)
Pilecap Raft Matfound 12
BUCKET CONCRETE
COR Pilecap,Slab,Tie beam 12 PUMP
Basement wall 15
Wall & Column 15
Slab,Beam,Prestres beam 12
SLUMP DIILAKUKAN MAX : 2 KALI
COR
SLUMP DI UJUNG CONCRETE
PUMP
1. SLUMP
AREA MIN (cm) DIUJUNG PIPA
Pilecap Raft Matfound 10 TIDAK
Pilecap,Slab,Tie beam 10
Basement wall 13 YA
Wall & Column 13
Slab,Beam,Prestres beam 10 COR
SLUMP DIILAKUKAN MAX : 2 KALI

CATATAN :
1. TIDAK DIPERKENANKAN MENAMBAH AIR.
2. PENGGUNAAN MUTU BETON HARUS SESUAI TABEL YANG SUDAH DITENTUKAN.
3. PENGAMBILAN BENDA UJI :
> 1 SET B.U. = 5 BUAH - { 7(1),14(1),28(2),56(1) }
> UNTUK VERTIKAL (KOLOM,DINDING GESER) PENGAMBILAN B.U. SEBANYAK 1 SET PER 10 M3 { JIKA PENGECORAN
MENGGUNAKAN CONCRETE PUMP , MAKA PENGAMBILAN B.U. DILAKUKAN DIDEKAT TRUCK MIXER SEBANYAK 1 SET PER 10
M3 DAN DITAMBAH 6 BUAH MEWAKILI VOLUME ≤ 120 M3 (RANDOM:JIKA DIPERLUKAN OLEH PENGAWAS) }
> UNTUK HORIZONTAL (BALOK,PELAT,DLL) PENGAMBILAN B.U. SEBANYAK 1 SET PER 25 M3 { JIKA PENGECORAN
MENGGUNAKAN CONCRETE PUMP , MAKA PENGAMBILAN B.U. DILAKUKAN DIDEKAT TRUCK MIXER SEBANYAK 1 SET PER 25
M3 DAN DITAMBAH 6 BUAH MEWAKILI VOLUME ≤ 120 M3 (RANDOM:JIKA DIPERLUKAN OLEH PENGAWAS) }
> APABILA PENGECORAN MENGGUNAKAN BUCKET PENGAMBILAN B.U. DILAKUKAN DIDEKAT KEDATANGAN TRUCK MIXER.
4. PENULISAN IDENTIFIKASI B.U. DAN PEMBUAKAAN B.U. SERTA PENANDATANGANAN B.U. HARUS DISAKSIKAN OLEH
PENGAWAS DAN KONTRAKTOR SEBELUM DIMASUKKAN KEDALAM BAK PERAWATAN B.U.
5. SEMUA PERAWATAN B.U. DISIMPAN DIDALAM LOKASI PROYEK.
6. PENGAMBILAN B.U. YANG AKAN DI TES DI LAB INDEPENDENT HARUS SEIJIN PENGAWAS.
7. CAMPURAN (REDSEAL 4) DILAKUKAN DIDALAM LOKASI PROYEK , DENGAN KETENTUAN 4 LITER / 1 M3
FLOW CHART PENERIMAAN BESI

KEDATANGAN
TRUCK BESI

1. MILL CERT
TIDAK 2. SURAT JALAN
3. TAG PLATE
4.JUMLAH BESI
5. DIAMETER

YA

1. TTG SURAT
JALAN TIDAK
2. TTG TAG PLATE

YA

1. BONGKAR (STOCK
AREA)
2. PENGAMBILAN
SAMPEL BESI

BESI BISA
DIGUNAKAN

CATATAN :
1. SETIAP PENGECEKAN HARUS DISAKSIKAN OLEH OWNER/PENGAWAS
2. SETIAP KEDATANGAN TRUK BESI HARUS DILENGKAPI OLEH :
> MILL CERTIFICATE
> SURAT JALAN
> TAG PLATE
3. BESI YANG DIIJINKAN DIBONGKAR APABILA ITEM NO.2 SUDAH DITANDATANGANI OLEH OWNER/PENGAWAS
4. PENGAMBILAN SAMPEL HARUS SESUAI KEDATANGAN BESI BARU
5. JUMLAH PENGAMBILAN SAMPEL :
> 1 SET = 1 TARIK , 3 TEKUK
> UNTUK BJTS U 50 DIAMBIL PER KEDATANGAN 25-30 TON PER TRUCK = 1 SET/ 1 DIAMETER BERBEDA
> UNTUK BJTS U 40 DIAMBIL PER KEDATANGAN 25-30 TON PER TRUCK = 1 TARIK / 1 DIAMETER BERBEDA (WAJIB), 3 TEKUK
RANDOM (SESUAI PERMINTAAN OWNER/PENGAWAS)