Pipeline/Riser Design & Operating Data

HSP Power
Parameter Unit Production Water Injection
Fluid

Riser ID inch 12 10 10

Flowline & Spool OD inch 12 12 12

Design Pressure barg 390 390 207

MAOP barg 350 350 176

Maximum 320 350 140 (Note 4 )


Operating
Normal barg <40 320 (note 3) 65-120 (Note 4)
Pressure
Minimum (Note 2)

Design Maximum °C 80 (Note 2) 80 (Note 2) 80 (Note 2)


Temperature Minimum -10 -10 -10

Maximum 65 65 (note 5) 60
Operating
Normal °C 60 ≤ 60 (note 6) 50
Temperature
Minimum 40 (Note 7) 55 (Note 7) 45 (Note 7)

Carbon Steel
Carbon Steel Carbon Steel
with 316
Material - with internal with internal
Stainless Steel
Polymer liner Polymer liner
Flowline cladding

Grade - X65

Specification - API 5L / API 5LD API 5L

Type - Flexible Jumpers


Pipeline Tie-in
Specification - ISO 13628-2 / ISO 13628-11
2
Pipeline Design OHTC (ref ID) W/m .K 3
2
Riser / Jumper Design OHTC W/m .K TBC (Note 8)

Notes;
1. Pressures and temperatures are quoted at the wellhead (116m water depth)
2. To be confirmed during detailed engineering
3. 330barg required at top of riser to achieve 320 barg at wellhead.
4. 65Barg pressure expected for initial years of production with 120barg required once matrix
plugging occurs and injection at fracture pressure is required. These are continious
operating pressures. 135barg pressure required at top of riser to achieve 120barg at
wellhead. An injection pressure of up to 140 barg at the wellhead should be available for
short periods as a contingency (corresponds to a maximum top of riser pressure of
150barg)
5. Maximum FPSO departure temperature for 12 Mbpd single well start-up case; short
duration only. Affect on polymer service life due to short duration temperature excursions
above 60°C to be confirmed during detailed engineering.
6. FPSO departure temperature for normal operating conditions shall be ≤ 60°C. .
7. Minimum temperature does not include start up from cold / shut down.
8. No specific design OHTC value is stated for the flexible production risers and tie-in jumpers.
Actual OHTC of the flexible pipe structure shall be determined during detailed engineering.