Description of items Unit Quantity Unit Price


(B1) Preliminaries
(B*) Underground water tank
1 Excavation M3 697 6
2 Diposal to borrow pit M3 697 8
3 Polytheene sheet M2 43.6 12
4 laying compacting one road base layer of 25cm thickness M3 11.66 56
5 PCC 10CM M3 4.36 700
6 R.C.C. Raft Footings M3 15.12 1000
7 R.C.C. Raft Walls M3 22.5 1000
8 5CM SCREED M3 2.18 700
9 Solid Block M2 92.8 130
10 Waterproof M2 165.84 60
11 GRP LINING M2 128 112
12 RCC Top Slab M3 11.34 1000
13 GRP CAT Ladder Unit 1 3500
14
(B2) Total
Amount

4,182.00
5,576.00
523.20
652.96
3,052.00
15,120.00
22,500.00
1,526.00
12,064.00
9,950.40
14,336.00
11,340.00
3,500.00

104,322.56