HVAC Load Analysis


for

Asociacion P. De Agentes Inmobiliarios


Lima
Lima

Prepared By:

Ing. Jerry Franco Milla


Generafrio, S. A. C
Lima
Lima

jueves, 11 de Febrero de 2016


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 2

General Project Data Input


General Project Information
Project file name: C:\Users\Generafrio
3\Documents\CLIENTES\CLIENTES\MIRAFLORES - SAN
ISIDRO\CALCULO DE CARGA SALA DE REUNIONES.CHV
Project title: Climatizacion Sala De Capacitacion
Designed by: Ing. Jerry Franco Milla
Project date: Jueves, 11 De Febrero 2016
Project comment: Calculo de Carga Termica Proyecto
Weather reference city: LIMA, PERU
Client name: Asociacion P. De Agentes Inmobiliarios
Client address: Lima
Client city: Lima
Company name: Generafrio, S. A. C
Company representative: Ing. Jerry Franco Milla
Company address: Lima
Company city: Lima
Barometric pressure: 29.876 in.Hg.
Altitude: 42 feet
Latitude: -12 Degrees
Mean daily temperature range: 11.5 Degrees
Starting & ending time for HVAC load calculations: 8am - 6pm
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Cooling loads only
Lighting requirements: 2.00 Watts per square foot
Equipment requirements: 1.50 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 220 Btuh per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 10 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 8.00 feet
Building default wall height: 8.00 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
December 83 73 50% 72 47.40 -2
January 86 76 55% 72 54.51 2
February 87 76 55% 72 55.22 3
March 88 76 55% 72 52.39 3
April 85 75 55% 72 50.96 0
May 82 72 55% 72 40.30 -2
June 80 71 55% 72 36.72 -4
July 77 68 55% 72 22.80 -7
August 75 67 55% 72 21.93 -9
September 75 67 55% 72 21.21 -10
October 74 66 55% 72 16.46 -11
November 78 69 55% 72 26.03 -7
Winter 58 75

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 1 0.600 No No

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 C 0.400 M

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.070 10 15

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 0.700 0.700 1.000 1 0.000

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 4

Zone Input
Zone 1: Sala De Capacitacion (1291.2 sq.ft) (Group 0)
Air Handler number: 1 Zone occurrences: 1
Zone length: (feet) 120.00 Zone width (feet): 10.76
Lighting Watts: 2,582 Equipment Watts: 1,937
Number of people in zone: 45 People profile number: 1
Lighting profile number: 1 Equipment profile number: 1
Ceiling height (feet): 8.00 Heating safety factor (%): 10
Sensible safety factor (%): 10 Latent safety factor (%): 10
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 220
Cooling ventilation method: Direct Cooling ventilation value: 0.000
Cooling infiltration method: Direct Cooling infiltration value: 0.000
Heating ventilation method: Direct Heating ventilation value: 0.000
Heating infiltration method: Direct Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 1,291 Exposed floor slab perimeter (ft): 70
Cooling loads only are calculated for this zone.

Part Type U-Factor Cool TD Heat TD Height Width Area


3 1 0.07 10.000 15.000 8.00 26.25 210.0
4 1 0.07 10.000 15.000 8.00 26.25 210.0

Wall Type ASHRAE# U-Factor Color Height Width Area Direction


1 1 C 0.400 M 8.00 49.20 393.6 E
2 1 C 0.400 M 8.00 49.20 393.6 W

Glass Type S.U-F. Shd C. Height Width Occur. Area Shade Tilt Ref
1 1 0.700 1.000 5.91 32.00 1 189.1 0 90 1

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 5

Building Summary Loads


Building peaks in March at 6pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 0 0 0.00 0 0 0 0.00
Wall 598 0 0.00 0 6,301 6,301 11.69
Glass 189 0 0.00 0 2,206 2,206 4.09
Floor Slab 70 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 8,507 8,507 15.78
Lighting 2,582 0 0.00 0 9,693 9,693 17.99
Equipment 1,937 0 0.00 0 7,269 7,269 13.49
People 45 0 0.00 10,890 12,375 23,265 43.17
Partition 420 0 0.00 0 323 323 0.60
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 0 0 0.00 0 0 0 0.00
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.00
Blow-Thru Fan 0 0 0.00 0 1,732 1,732 3.21
Reserve Cap. 0 0 0.00 0 0 0 0.00
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 2,068 2,068 3.84
Return Duct 0 0 0.00 0 1,034 1,034 1.92
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 10,890 43,002 53,892 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 0 0 0 0.00
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 0 0.00 10,890 38,167 49,057 91.03
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 4,835 4,835 8.97
Building Totals 0 0.00 10,890 43,002 53,892 100.00

Check Figures
Total Building Supply Air (based on a 19° TD): 1,883 CFM
Total Building Vent. Air (0.00% of Supply): 0 CFM
Total Conditioned Air Space: 1,291 Sq.ft
Supply Air Per Unit Area: 1.4583 CFM/Sq.ft
Area Per Cooling Capacity: 287.5080 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4.49 Tons

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 6

Air Handler #1 - Sala De Capacitacion - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
1 Sala De Capacitacion 1,291 0 38,167 10,890 None None
6pm March 45 0 1,883 0 0 0
10,330 0.00 1.46 0 0 0
Runout duct size: 6 in. dia, Diffusers: 15, CFM/runout: 126, Velocity: 639.3 ft/min, Pressure drop: 0.261 in.wg./100ft
Zone Peak Totals: 1,291 0 38,167 10,890
Total Zones: 1 45 0 1,883 0 0 0
Unique Zones: 1 10,330 0.00 1.46 0 0 0
Main trunk duct size: 19 in. h x 18in. w, Velocity: 863.1 ft/min, Pressure drop: 0.069 in.wg./100ft

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 7

Air Handler #1 - Sala De Capacitacion - Total Load Summary


Air Handler Description: Sala De Capacitacion Constant Volume - Proportion
Supply Air Fan: Blow-Thru with program estimated horsepower of 0.68 HP
Fan Input: 65% motor and fan efficiency with 1.5 in. water across the fan
Sensible Heat Ratio: 0.79 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in March.
Outdoor Conditions: 85° DB, 75° WB, 116.28 grains
Summer: Exhaust controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.998 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 38,167 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 2,068 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 40,236 Btuh
Cooling Supply Air: 40,236 / (.998 X 1.1 X 19) = 1,883 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 1,034 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 1,732 Btuh
Total sensible gain on return side of coil: 2,767 Btuh
Total sensible gain on air handling system: 43,002 Btuh
Zone space latent gain: 10,890 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 10,890 Btuh
Total system sensible and latent gain: 53,892 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1,883 CFM
Total Air Handler Vent. Air (0.00% of Supply): 0 CFM
Total Conditioned Air Space: 1,291 Sq.ft
Supply Air Per Unit Area: 1.4583 CFM/Sq.ft
Area Per Cooling Capacity: 287.5080 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 4.49 Tons

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Climatizacion Sala De Capacitacion
Hell Page 8

Building Pie Charts


Building peaks in March at 6pm.

Return Duct - 1.92%


Supply Duct - 3.84%
Wall - 11.69% Blow-Thru Fan - 3.21%
Partition - 0.60%

Glass - 4.09%

Building Lighting - 17.99%


Net Gain
53,892
Btuh

People - 43.17%

Equipment - 13.49%

C:\ ...\CALCULO DE CARGA SALA DE REUNIONES.CHV jueves, 11 de Febrero de 2016, 2:49 p. m.