You are on page 1of 14

PROJECT NAME : 132/33 KV AL ARIDA S/S

‫شركـة كوجيلكس‬
Grid Solutions
CONTRACT NO. : 4400006058 COGELEX

INPECTION TRACKING STATUS INSPECTION REQUEST REWORK STATUS RFI STATUS

RFI NO. ACTIVITY DESCRIPTION AREA/LOCATION DRAWING NO. DATE ISSUED INSPECTION DATE APPROVED REINSPECTION DATE INSPECTION DATE CLOSED/OPEN
Y/N
APPROVED W/
001 Excavation Works SWGR/GIS SA-098322 22-09-2016 22-09-2016 COMMENTS CLOSED

002 Steel Reinforcement and formworks isolated FDN CTRL.RM.BLDG SA-098322 29-09-2016 29-09-2016 YES CLOSED
003 Application of asphaltic primer SWGR/GIS/CTRL.RM SA-098322 01-10-2016 01-10-2016 YES CLOSED
004 R.C.C for Foundation (isolated footings CTRL.RM.BLDG SA-098322 02-10-2016 03-10-2016 YES CLOSED
005 Concrete pouring for (Lean concrete) SWGR/GIS/CTRL.RM SA-098322 21-09-2016 21-09-2016 YES CLOSED
006 Application of Bitumen (Isolated Foundation) CTRL.BLDG SA-098322 04-10-2016 05-10-2016 YES CLOSED
007 Application of Bitumen (Isolated Foundation) CTRL.BLDG SA-098322 04-10-2016 05-10-2016 YES CLOSED
008 Screeding of Raft Foundation Main Building SWGR/GIS BLDG. SA-098322 09-10-2016 09-10-2017 YES CLOSED
009 Installation of Waterproofing Membrane Raft fdn. SWGR/GIS BLDG. SA-098322 01-10-2016 08-10-2016 YES CLOSED
010 Screeding of Raft Foundation Main Building SWGR/GIS BLDG. SA-098322 09-10-2016 09-10-2017 YES CLOSED
011 Lean Concrete under Tie-Beam CTRL.BLDG SA-098322 09-10-2016 09-10-2017 YES CLOSED
012 Concrete pouring of Grade Beam CTRL.BLDG SA-098322 19-10-2016 19-10-2016 YES CLOSED
013 Concrete pouring for Basement Raft Foundation SWGR/GIS SA-098322 23-10-2016 23-10-2016 YES CLOSED
014 Steel & Formworks for Basement Raft Foundation SWGR/GIS SA-098322 23-10-2016 23-10-2016 YES CLOSED
015 Application of Bitumen (Grade Beam) CTRL.BLDG SA-098322 25-10-2016 25-10-2016 YES CLOSED
016 Steel Reinforcement and formworks basement SWGR/GIS BLDG. SA-098323 29-10-2016 29-10-2016 NO 29-10-2016 29-10-2016 CLOSED
intermediate columns (16-A)
APPROVED W/
017 Concreting of Basement intermediate columns SWGR/GIS BLDG. SA-098323 30-10-2016 30-10-2016 COMMENTS CLOSED

018 Steel Reinforcement and formworks Basement wallup to SWGR/GIS BLDG. SA-098338 31-10-2016 31-10-2016 YES CLOSED
construction joint
019 Excavation of 100 MVA Transformer firewall (19-A) TRANSFORMER AREA SA-098339 31-10-2016 01-11-2016 NO 09-11-2016 10-11-2016 CLOSED
020 Steel Reinforcement and formworks of Control Building CTRL.BLDG SA-098323 02-11-2016 02-11-2016 YES CLOSED
Columns
APPROVED W/
021 Concreting of Basement walls along w/ columns up to SWGR/GIS BLDG. SA-098338 06-11-2016 07-11-2016 COMMENTS CLOSED
construction joint
APPROVED W/
022 Concreting of super structure columns ground flr. CTRL.BLDG SA-098323 07-11-2016 08-11-2016 COMMENTS CLOSED

023 Concreting of super structure columns ground flr. CTRL.BLDG SA-098323 13-11-2016 14-11-2016 YES CLOSED

024 Steel Reinforcement and formworks of Basement walls SWGR/GIS BLDG. SA-098338 13-11-2016 14-11-2016 YES CLOSED
along w/ intermediate columns North Side

025 Concrete pouring of Basement walls along w/ SWGR/GIS BLDG. SA-098323 13-11-2016 14-11-2016 YES CLOSED
intermediate columns North Side (Phase 2)
026 Steel Reinforcement and formworks of 100 MVA TRANSFORMER AREA SA-098339 16-11-2016 16-11-2016 YES CLOSED
Transformer firewall Foundation

027 TRANSFORMER AREA SA-098339 21-11-2016 22-11-2016 YES CLOSED


Concreting of 100 MVA Transformer firewall Foundation

028 TRANSFORMER AREA SA-098339 22-11-2016 23-11-2016 YES CLOSED


Concreting of 100 MVA Transformer firewall Foundation

029 Steel Reinforcement and formworks of Ground floor SWGR/GIS BLDG. SA-098326 21-11-2016 22-11-2016 YES CLOSED
Slab South Side (Phase1)

030 Concrete pouring of Ground floor Slab South Side SWGR/GIS BLDG. SA-098326 22-11-2016 23-11-2016 YES CLOSED
(Phase1)

031 Steel Reinforcement and formworks of Ground floor SWGR/GIS BLDG. SA-098326 01-12-2016 03-12-2016 YES CLOSED
Slab South Side (Phase2)

032 Concrete pouring of Ground floor Slab South Side SWGR/GIS BLDG. SA-098326 01-12-2016 03-12-2016 YES CLOSED
(Phase2)

033 Steel Reinforcement and formworks of 100 MVA TRANSFORMER AREA SA-098339 01-12-2016 03-12-2016 YES CLOSED
Transformer firewall (2 nos.)

034 Concrete pouring of 100 MVA Transformer firewall (2 TRANSFORMER AREA SA-098339 03-12-2016 04-12-2017 YES CLOSED
nos.)

035 Excavation of 100 MVA Transformer M.V and H.V Cable TRANSFORMER AREA SA-098339 07-12-2016 08-12-2016 YES CLOSED
trench

036 Concrete pouring fo ground floor columns at Grid line C- SWGR BUILDING SA-098323 13-12-2016 14-12-2016 YES CLOSED
1-13 at level of + 4.65 mtrs

037 SWGR BUILDING SA-098323 07-12-2016 08-12-2016 YES CLOSED


Steel Reinforcement and formworks of ground floor
columns at Grid line C-1-13 at level of + 4.65 mtrs

038 SWGR/GIS BLDG. SA-098323 12-12-2016 13-12-2016 YES CLOSED


Steel Reinforcement and formworks of ground floor
intermediate columns at grid line F1-13 and H/1 11-12

039 Steel Reinforcement and formworks of ground floor SWGR/GIS BLDG. SA-098323 12-12-2016 13-12-2016 YES CLOSED
main stair and landing up to elev. +3.05

040 Steel Reinforcement and formworks of ground floor GIS BUILDING SA-098322 12-12-2016 13-12-2016 YES CLOSED
firewall at grid line I/11-12 elev.+2.50 mtrs

041 Concreting if ground floor intermediate columns at grid SWGR/GIS BLDG. SA-098323 13-12-2016 14-12-2016 YES CLOSED
line F/5-13 and H/I 11-12 elev.+4.65 mtrs.

042 Concreting of Ground floor Main Stairs and landing up SWGR/GIS BLDG. SA-098335 13-12-2016 14-12-2016 YES CLOSED
to elev.+3.05 mtrs.

043 Concreting of Ground Floor Firewall at grid line I/11-12 GIS BUILDING SA-098322 13-12-2016 14-12-2016 YES CLOSED
elev.+2.50 mtrs

044 Lean Concrete for 100 MVA Transformer H.V and M.V TRANSFORMER AREA SA-098339 13-12-2016 14-12-2016 YES CLOSED
Cable Trench
Steel Reinforcement and formworks of ground floor
045 intermediate columns including auxiliary transformer SWGR BUILDING SA-098323 14-12-2016 15-12-2016 YES CLOSED
firewall elev.+4.65 mtrs.

046 Application of Bituminous Coating (2 layers) TRANSFORMER AREA SA-098339 14-12-2016 15-12-2016 YES CLOSED

047 Concreting of Ground Floor Intermediate Columns SWGR BUILDING SA-098380 18-12-2016 19-12-2016 YES CLOSED
Including auxiliary Transformer firewall at grid line elev.
+4.65 mtrs

048 Steel Reinforcement and formworks of ground floor SWGR/GIS BLDG. SA-098335 18-12-2016 19-12-2016 YES CLOSED
main stairs and landing up to +3.60 mtrs

049 Concrete pouring of ground floor main stairs and SWGR/GIS BLDG. SA-098335 18-12-2016 19-12-2016 YES CLOSED
landing up to +3.60 mtrs

050 Steel Reinforcement and formworks of fire fighting roof GIS BUILDING SA-098382 18-12-2016 19-12-2016 YES CLOSED
slab at elev.+3.60 mtrs.

051 Concrete pouring of fire fighting roof slab at elev.+3.60 GIS BUILDING SA-098382 18-12-2016 19-12-2016 YES CLOSED
mtrs.

052 Steel Reinforcement and formworks for ground floor GIS BUILDING SA-098323 19-12-2016 19-12-2016 YES CLOSED
columns at grid line H/G5 elev.+4.65 mtrs.

053 Concrete pouring of ground floor columns at grid line GIS BUILDING SA-098323 19-12-2016 19-12-2016 YES CLOSED
H/G5 elev.+4.65 mtrs.

Application of Bituminous Coating and installation of


054 4mm Water Proofing Membrane at M.V and H.V 100 TRANSFORMER AREA SA-098339 19-12-2016 20-12-2016 YES CLOSED
MVA Cable Trench

055 Steel Reinforcement and formworks of ground floor GIS BUILDING SA-098380 22-12-2016 24-12-2016 YES CLOSED
firewall at grid line I/1-5 elev.+4.65 mtrs

056 Application of Bituminous Coating and installation of SWGR/GIS BUILDING SA-098379 21-12-2016 22-12-2016 YES CLOSED
4mm Water Proofing Membrane at Basement wall grid
line C/1-13 at elev.+0.00
Steel Reinforcement and formworks of 100 MVA
057 Transformer M.V Cable Trench at grid line I/6-12 at TRANSFORMER AREA SA-098339 22-12-2016 24-12-2016 YES CLOSED
elev.-2.70 mtrs.

Steel Reinforcement and formworks of Ground Floor


058 Roof Beam including main stair at grid line C/8-13 at SWGR BUILDING SA-098335 24-12-2016 25-12-2016 YES CLOSED
elev.+5.30 mtrs.

059 Concrete pouring of ground floor firewall including GIS BUILDING SA-098380 24-12-2016 25-12-2016 YES CLOSED
columns at grid line I/5-8 elev.+4.65 mtrs.

060 Concrete pouring of ground floor roof beam at grid line SWGR BUILDING SA-098331 24-12-2016 25-12-2016 YES CLOSED
C/8-13

061 Concrete pouring of Main Stair and Landing at elev. + SWGR BUILDING SA-098335 24-12-2016 25-12-2016 YES CLOSED
5.30 mtrs
062 Concrete pouring of 100 MVA Transformer M.V Cable TRANSFORMER AREA SA-098339 24-12-2016 25-12-2016 YES CLOSED
Trench foundation

063 Application of Bituminous Coating and installation of SWGR BUILDING SA-098379 25-12-2016 26-12-2016 YES CLOSED
4mm Water Proofing Membrane at Basement wall grid
line F/1-5, I/H/G-5 at elev.+0.00
Steel Reinforcement and formworks of 100 MVA
064 Transformer H.V Cable Trench Foundation at grid line TRANSFORMER AREA SA-098339 24-12-2016 25-12-2016 YES CLOSED
I/6-12 at elev.+2.70 mtrs.

065 Concrete pouring of 100 MVA Transformer H.V Cable TRANSFORMER AREA SA-098339 25-12-2016 26-12-2016 YES CLOSED
Trench Foundation at grid line I/6-12 at elev.+2.70 mtrs.

066 Steel Reinforcement and formworks of Roof Beam at SWGR/GIS SA-098331 26-12-2016 27-12-2016 YES CLOSED
grid line A/8-13 up to F/A-13 at elev.+6.30 mtr. BUILDING/CTRL.BLDG.

067 Concrete pouring of Roof Beam at grid line A/8-13 up to SWGR/GIS SA-098331 26-12-2016 27-12-2016 YES CLOSED
F/A-13 at elev.+6.30 mtr. BUILDING/CTRL.BLDG.

Steel Reinforcement and formworks of 100 MVA


068 Transformer H.V Cable Trench Foundation at grid line TRANSFORMER AREA SA-098339 25-12-2016 26-12-2016 YES CLOSED
I/10-11 at elev.+2.70 mtrs.

Concrete pouring of 100 MVA Transformer H.V Cable


069 Trench Foundation at grid line I/10-11 at elev.+2.70 TRANSFORMER AREA SA-098339 25-12-2016 26-12-2016 YES CLOSED
mtrs.

070 Block Laying on Basement wall at grid line F/5-12 SWGR/GIS BUILDING SA-098379/SA- 25-12-2016 26-12-2016 YES CLOSED
including stair wall partition 098388

071 Plastering on Basement wall at grid line F/5-12 SWGR/GIS BUILDING SA-098379/SA- 25-12-2016 26-12-2016 YES CLOSED
including stair wall partition 098388

072

073 Lean Concrete for Oil Tank Foundation (75mm) at grid TRANSFORMER AREA SA-098378 27-12-2016 28-12-2016 YES CLOSED
line 3

Steel Reinforcement and formworks of 100 MVA


074 Transformer H.V Cable Trench Foundation at grid line TRANSFORMER AREA SA-098339 28-12-2016 29-12-2016 YES CLOSED
I/5-6 at elev.+2.70 mtrs.

Steel Reinforcement and formworks of Ground Floor SA-098322/SA-


075 Firewall at grid including Columns line I/8-11 at elev. GIS/BUILDING 28-12-2016 29-12-2016 YES CLOSED
098386
+4.65 mtrs.
076 Steel Reinforcement and formworks of Under Roof GIS/BUILDING SA-098382/SA- 28-12-2016 29-12-2016 YES CLOSED
Beam at grid line I/F-11 at elev.+5.85 mtrs. 098332/SA-098384

077 Application of Black Coal tar primer and Installation of TRANSFORMER AREA SA-098378 28-12-2016 29-12-2016 YES CLOSED
4mm Water proofing membrane above lean Concrete at
100 MVA Transformer Oil Pit

078 Concrete pouring of 100 MVA Transformer H.V Cable TRANSFORMER AREA SA-098339 31-12-2016 01-01-2017 APPROVED W/
CLOSED
Trench Foundation at grid line I/5-6 at elev.+2.70 mtrs. COMMENTS

079 Concrete pouring of Ground Floor Firewall including GIS/BUILDING SA-098333/SA- 31-12-2016 01-01-2017 APPROVED W/
CLOSED
Corbel Columns at grid line I/8-11 at elev.+4.65 mtrs. 098380 COMMENTS

080 Concrete pouring of Under Roof Beam at grid line I/F-11 GIS/BUILDING SA-098382/SA- 28-12-2016 29-12-2016 APPROVED W/
CLOSED
at elev.+5.85 mtrs. 098332/SA-098384 COMMENTS

081 Steel Reinforcement and formworks of Roof Beam at CONTROL/BLDG. SA-098331 31-12-2016 01-01-2017 APPROVED W/
CLOSED
grid line A/2-8 at elev.+5.99 mtrs up to +7.60 mtrs COMMENTS

082 Steel Reinforcement and formworks of Roof Beam at CONTROL/BLDG. SA-098331 31-12-2016 01-01-2017 APPROVED W/
CLOSED
grid line C/1-8 at elev.+5.99 mtrs COMMENTS

083 Steel Reinforcement and formworks of Roof Beam at SWGR/GIS BUILDING SA-098331 31-12-2016 01-01-2017 APPROVED W/
CLOSED
grid line F/11-13 at elev.+5.99 mtrs COMMENTS

Steel Reinforcement and formworks of Firewall


APPROVED W/
084 including corbel at grid line F/8-11 and I/5-8 at elev. SWGR/GIS BUILDING SA-098331 31-12-2016 01-01-2017 COMMENTS CLOSED
+5.85 mtrs

085

086

087

088

089
090

091 Steel Reinforcement and formworks of Roof Beam at CONTROL/BLDG. SA-098331 03-01-2017 04-01-2017 APPROVED W/
CLOSED
grid line A/C-2 at elev.+5.40 mtrs. COMMENTS

092 Steel Reinforcement and formworks of Roof Beam at CONTROL/BLDG. SA-098331 03-01-2017 04-01-2017 APPROVED W/
CLOSED
grid line A/C-8 at elev.+5.40 mtrs. COMMENTS

093 Steel Reinforcement and formworks of Roof Beam at SWGR/BUILDING. SA-098331 03-01-2017 04-01-2017 APPROVED W/
CLOSED
grid line C/F-8 at elev.+5.99 mtrs. COMMENTS

094 Steel Reinforcement and formworks of Corbel at grid GIS/BUILDING. SA-098333 03-01-2017 04-01-2017 APPROVED W/
CLOSED
line I/F-5 at elev.+5.85 mtrs. COMMENTS

095 Steel Reinforcement and formworks of Roof Beam at GIS/BUILDING. SA-098333 03-01-2017 04-01-2017 APPROVED W/
CLOSED
grid line I/F-5 at elev.+5.85 mtrs. COMMENTS

096 Steel Reinforcement and formworks of Roof Beam at SWGR/GIS BUILDING. SA-098331 03-01-2017 04-01-2017 APPROVED W/
CLOSED
grid line I/F-8 at elev.+5.85 mtrs. COMMENTS

097 Steel Reinforcement and formworks of Roof Beam at SWGR/BUILDING. SA-098331 03-01-2017 04-01-2017 YES CLOSED
grid line C/1-2 elev.+5.85 mtrs.

098 Steel Reinforcement and formworks of Roof Beam at SWGR/BUILDING. SA-098331 03-01-2017 04-01-2017 YES CLOSED
grid line C/1-2 elev.+5.85 mtrs.

099 Steel Reinforcement and formworks of 100 MVA TRANSFORMER AREA SA-098375 03-01-2017 04-01-2017 APPROVED W/
04-01-2017 05-01-2017 CLOSED
Transformer Oil Tank Wall at elev.+0.40 mtrs.(99-A) COMMENTS

100

101 Masonry Block works on wall at grid line C/9-13 at elev. SWGR/BUILDING. SA-098380 03-01-2017 04-01-2017 YES CLOSED
+2.40 mtrs.

102 Application of Waterproofing Membrane on wall at grid SWGR/GIS BUILDING. SA-098380/SA- 03-01-2017 04-01-2017 APPROVED W/
CLOSED
line C/I 12-13 at elev.+0.30 mtrs 098391 COMMENTS

103 Application of Black Coal tar primer and Installation of SWGR/GIS BUILDING. SA-098380/SA- 03-01-2017 04-01-2017 APPROVED W/
CLOSED
4mm Water proofing membrane above raft 098391 COMMENTS
foundationat grid line C/I-12-13
104

105

106

107

108

Steel Reinforcement and formworks for Wall stage 3


109 including R.C Columns at grid line I/5-13 elev.+8.40 GIS/BUILDING.(109-A) SA-098380/SA- 05-01-2017 07-01-2017 APPROVED W/
05-01-2017 07-01-2017 CLOSED
mtrs. w/ Main Stairs elev.+5.30 mtrs up to +8.50 mtrs 098323/SA-098335 COMMENTS
and R.C Columns above Corbel up to +8.40 mtrs

110 Steel Reinforcement and formworks for Tie-Beam at grid CONTROL BLDG. SA-098322 07-01-2017 08-01-2017 APPROVED W/
CLOSED
line C/1-13 at elev.+0.20 mtrs. COMMENTS

APPROVED W/
111 Steel Reinforcement and formworks for Oil Tank Slab TRANSFORMER AREA SA-098375 07-01-2017 08-01-2017 COMMENTS CLOSED

Surface preparation for Basement Ceiling and Wall prior SWGR/GIS BUILDING. COMMENTS CONSULTANT
112 SA-098379 06-01-2017 07-01-2017 ON NG LOG
for primer application at grid line C/I 1-13 BOOK NOT SIGN/OPEN

113 Steel Reinforcement and formworks of M.V Cable Trench TRANSFORMER AREA SA-098339 09-01-2017 10-01-2017 APPROVED W/
CLOSED
at grid line I/11-12 elev.+0.30 mtrs. COMMENTS

114 Steel Reinforcement and formworks of H.V Cable Trench TRANSFORMER AREA SA-098339 14-01-2017 15-01-2017 APPROVED W/
CLOSED
at grid line I/5-11 elev.+0.30 mtrs. COMMENTS

Steel Reinforcement and formworks of Tie-Beam


APPROVED W/
115 Connection between Control area and SWGR Bldg.at CONTROL/SWGR BLDG. SA-098322 08-01-2017 09-01-2017 COMMENTS CLOSED
grid line C/2-13 at elev.+0.40 mtrs.

APPROVED W/
116 Mock up for Basement Ceiling Paint GIS BUILDING. SA-098380 07-01-2017 08-01-2017 COMMENTS CLOSED
117

118

119

120 Steel Reinforcement and formworks of Grade Slab Relay CONTROL BUILDING. SA-098326 09-01-2017 10-01-2017 APPROVED W/
CLOSED
Room at grid line 11-13 elev.+0.40 mtrs. COMMENTS

121

Steel Reinforcement and formworks of Main Stairs


122 Beam MB-6 at level of +6.30 mtrs including beam RB-9 GIS BUILDING. SA-098335 10-01-2017 11-01-2017 YES CLOSED
at level of +6.90 mtrs.

Steel Reinforcement and formworks of M.V Cable Trench


APPROVED W/
123 wall at grid line I/6-7 & I/9-10 at elev.+0.30 mtrs.(123-A TRANSFORMER AREA SA-098339 11-01-2017 12-01-2017 COMMENTS 11-01-2017 12-01-2017 CLOSED
resubmit)

124 Steel Reinforcement and formworks of Roof Beam URB- GIS BUILDING. SA-098332 18-01-2017 19-01-2017 APPROVED W/
CLOSED
1 at grid line F/5-11 COMMENTS

125

126

127

128

129

130
NOT
131 1st Coat Painting for Wall and Ceiling SWGR/GIS BUILDING. SA-098380 12-01-2017 14-01-2017 APPROVED OPEN

132

133 Steel Reinforcement and formworks of M.V & H.V Cable TRANSFORMER AREA SA-098339 12-01-2017 14-01-2017 APPROVED W/
CLOSED
Trench wall at grid line I/6-8 at elev.+0.30 mtrs. COMMENTS

134 Steel Reinforcement and formworks of Grade Slab at CONTROL BUILDING. SA-098326 15-01-2017 16-01-2017 APPROVED W/
CLOSED
grid line 8-13 at elev.+0.40 mtrs. COMMENTS

135 Steel Reinforcement and formworks of Roof Beam URB- GIS BUILDING. SA-098332 14-01-2017 15-01-2017 APPROVED W/
CLOSED
4 at grid line F/11 COMMENTS

Steel Reinforcement and formworks of R.C Support


136 Columns of Main Stairs at grid line F/12 elev.+6.30 mtrs. GIS BUILDING. SA-098335 14-01-2017 15-01-2017 YES CLOSED

137 Steel Reinforcement and formworks of Grade Slab at CONTROL BUILDING. SA-098326 18-01-2017 19-01-2017 APPROVED W/
CLOSED
grid line 4-8 at elev.+0.40 mtrs. COMMENTS

138

139

140

141

142

143 Steel Reinforcement and formworks of Roof Beam URB- GIS BUILDING. SA-098332 21-01-2017 22-01-2017 APPROVED W/
CLOSED
2,URB-3 and URB-5 at grid line I/F 5-8 COMMENTS

144 Steel Reinforcement and formworks of Roof Beam URB- GIS BUILDING. SA-098332 23-01-2017 24-01-2017 APPROVED W/
23-01-2017 24-01-2017 CLOSED
2 and URB-5 at grid line I/F 8-11 (148-A) COMMENTS
145

146 Concreting of 100 MVA Transformer H.V Cable Trench # TRANSFORMER AREA SA-098339 21-01-2017 22-01-2017 APPROVED W/
CLOSED
3 COMMENTS

147

148

149

150 Steel Reinforcement and formworks of Main Stairs from GIS BUILDING. SA-098335 24-01-2017 25-01-2017 APPROVED W/
CLOSED
grid line F1/F 11-12 at elev.+6.90 up to 10.26 mtrs. COMMENTS

151 Steel Reinforcement and formworks of Canopy S2 at GIS BUILDING. SA-098333 24-01-2017 25-01-2017 APPROVED W/
CLOSED
grid line G/H 5 elev.4.10 mtrs. COMMENTS

152 Steel Reinforcement and formworks of 100 MVA TRANSFORMER AREA SA-098339 26-01-2017 28-01-2017 APPROVED W/
CLOSED
Tranformer Firewall Stage 2-3 up to level +7.70 mtrs COMMENTS

153

154

155

156

Surface preparation for 100 MVA Transformer H.V and


APPROVED W/
157 M.V Cable Trench prior for application of water TRANSFORMER AREA SA-098339 28-01-2017 29-01-2017 COMMENTS CLOSED
proofing.

158 Steel Reinforcement and formworks of R.C Main Stairs GIS BUILDING. SA-098335 29-01-2017 30-01-2017 APPROVED W/
CLOSED
up to level of +12.95 mtrs COMMENTS
159 Steel Reinforcement and formworks of 100 MVA TRANSFORMER AREA SA-098339 31-01-2017 01-02-2017 APPROVED W/
CLOSED
Tranformer Firewall Stage 2up to level +3.60 mtrs COMMENTS

160 Concrete pouring of 100 MVA Tranformer Firewall


Stage 2up to level +3.60 mtrs

161

162

163 Steel Reinforcement and formworks of Staircase Roof GIS BUILDING. SA-098332 01-02-2017 02-02-2017 APPROVED W/
CLOSED
Floor TRB-1 and TRB-2 COMMENTS

164 Concrete pouring of Staircase Roof Floor TRB-1 and TRB- GIS BUILDING. SA-098332 01-02-2017 02-02-2017 APPROVED W/
CLOSED
2 COMMENTS

Application of Waterproofing Membrane on M.V and


APPROVED W/
165 H.V Cable trench at grid line I/1- 12 at elev.+0.30 mtrs. TRANSFORMER AREA SA-098339 02-02-2017 04-02-2017 COMMENTS 04-02-2017 05-02-2017 CLOSED
(165-A)

166 Inspection Request for forworks at Transformer area fire TRANSFORMER AREA SA-098339 05-02-2017 06-02-2017 APPROVED W/
CLOSED
wall satge 3 up to +7.7mtrs COMMENTS

167

168

169

170

171

172
173

174

175

176

177

178

179

180 Steel Reinforcement and formworks of GIS Roof Slab GIS BUILDING. SA-098332 12-02-2017 13-02-2017 YES CLOSED
Wire mesh at grid kine I/F 5-11

181

182

183

184

185

186 Concrete pouring of 100 MVA Tranformer Foundation TRANSFORMER AREA SA-098339 12-02-2017 13-02-2017 APPROVED W/
CLOSED
(Lean con'c) at Grid line I/9-12 COMMENTS
187

Steel Reinforcement and formworks of Reinforcement


APPROVED W/
188 Beam RB 12 including Canopy at grid line F/C 13elev. SWGR BUILDING. SA-098331 13-02-2017 14-02-2017 COMMENTS CLOSED
+3.90/4.10 mtrs.

189

190

191

192

193

194

195

196

197

198

199

200
201

202

203

204

205

206

207

208

209

210

211

212

213

You might also like