76' 7" +/- COMPONENT LIST

CENTER LINE
PRODUCT QTY
SC250 StrataCell STRUCTURAL SOIL CELL 3276
FG3030 FilterGrid BI-AXIAL FILTER LAYER 860 m2
RRPREC1 RootRain PRECINCT SINGLE INLET 4
RRARB2 RootRain URBAN SINGLE INLET 4
RER300 ReRoute LINEAR RIBBED R/BARRIER 24.5 m

RRARB2 RootRain URBAN INLET.

SC250 StrataCell STRUCTURAL SOIL


MODULES LOADED WITH SCREENED
SANDY LOAM SOIL MIX, ORGANIC 4-8%
BY VOLUME.
30' +/-

CENTER LINE
RER300 ReRoute RIBBED LINEAR
BARRIER INSTALLED ABOVE StrataCells,
WITH RIBS FACING TREE.

NTER LINE
RRPREC1 RootRain PRECINCT SINGLE
INLET DEEP WATERING AND AERATION
SYSTEM.
LINKED TREEPIT - PLAN

RER300 ReRoute RIBBED LINEAR


BARRIER INSTALLED ABOVE StrataCellS,
WITH RIBS FACING TREE.

PERVIOUS CONCRETE.
GEOCOMPOSITE FILTER FABRIC ON
TOP OF AND BELOW SOIL CELLS.
RRARB2 RootRain PRECINCT SINGLE NOTE : ENSURE THE PIT BASE IS SCREEDED AND LEVELLED
INLET DEEP WATERING AND AERATION PROPERLY BEFORE PLACING CELLS ON BASE, TO ALLOW
SYSTEM. FOR EASE OF INSTALLATION OF OVERALL MATRIX.
NOTE : ADEQUATE DRAINAGE FROM BASE OF TREEPIT TO
BE PROVIDED IF DESIGN INCORPORATES WSUD PRINCIPLES,
10" + 16" + OR IF SITE CONDITIONS REQUIRE.

SC250 StrataCell STRUCTURAL SOIL 20"


MODULES LOADED WITH SCREENED
4" DISCLAIMER
SANDY LOAM SOIL MIX, ORGANIC 4-8% All foundation details to be verified by a qualified engineer. The manufacturer
BY VOLUME. disclaims liability resulting from any loss or damage incurred from their
their products, or their installation method, either direct or consequential.
4" DRAINAGE LAYER.
Designed: CA Checked: JB
18' 4" +/- 4' 6" +/- 6' 8" +/-
Date: 04/04/16 Approved: JB
Scale:
LINKED TREEPIT - SECTION AA AS SHOWN

No. Revision: Date: Title


INSTALLATION/EXCAVATION TIPS LINKED TREEPIT
1. ADD 5% TO OUTER PLAN DIMENSIONS WHEN EXCAVATING PIT. LOW IMPACT DEVELOPMENT
2. ALWAYS CHECK PIT DIMENSIONS AT BASE OF PIT, ENSURING SIDES ARE
CLEAN AND SQUARE. 1 OF 2
3. LEVEL AND SCREED DRAINAGE LAYER PRIOR TO PLACEMENT OF CELLS.
Drawing No. TPM-LTTG9-A Rev. A
76' 7" +/- COMPONENT LIST
PRODUCT QTY

CENTER LINE
SC250 StrataCell STRUCTURAL SOIL CELL 3276
FG3030 FilterGrid BI-AXIAL FILTER LAYER 860 m2
RRPREC1 RootRain PRECINCT SINGLE INLET 4
RRARB2 RootRain URBAN SINGLE INLET 4
RER300 ReRoute LINEAR RIBBED R/BARRIER 24.5 m
CENTER LINE
30' +/-

CENTER LINE

LINKED TREEPIT - PLAN

NOTE : ENSURE THE PIT BASE IS SCREEDED AND LEVELLED


PROPERLY BEFORE PLACING CELLS ON BASE, TO ALLOW
FOR EASE OF INSTALLATION OF OVERALL MATRIX.
NOTE : ADEQUATE DRAINAGE FROM BASE OF TREEPIT TO
BE PROVIDED IF DESIGN INCORPORATES WSUD PRINCIPLES,
OR IF SITE CONDITIONS REQUIRE.

DISCLAIMER
All foundation details to be verified by a qualified engineer. The manufacturer
disclaims liability resulting from any loss or damage incurred from their
their products, or their installation method, either direct or consequential.

Designed: CA Checked: JB
Date: 04/04/16 Approved: JB
Scale:
AS SHOWN

No. Revision: Date: Title


INSTALLATION/EXCAVATION TIPS LINKED TREEPIT
1. ADD 5% TO OUTER PLAN DIMENSIONS WHEN EXCAVATING PIT. LOW IMPACT DEVELOPMENT
2. ALWAYS CHECK PIT DIMENSIONS AT BASE OF PIT, ENSURING SIDES ARE
CLEAN AND SQUARE. 2 of 2
3. LEVEL AND SCREED DRAINAGE LAYER PRIOR TO PLACEMENT OF CELLS.
Drawing No. TPM-LTTG9-A Rev. A