You are on page 1of 4

5/9/2018 Interviews - Repository of Interview Questions and Answers: SAP Logistics (PP) Interview

More Next Blog» ma

Interviews - Repository of Interview Questions an


Answers
AllInterviewz provides a large collection of interview questions and answers mainly on technical side like C, JAVA, Oracle, SAP, DW etc..

Home C/C# .NET JAVA ORACLE MySQL DW SAP

Main Articles Main


SAP Logistics (PP) Interview
.NET Interview .NET
C Interview Explain how the PP Module is Organized in SAP. C
Informatica Interview The PP module is made up of the following components: Data
JAVA Interview Java
PP-BD Basic Data
MySQL Interview MySQ
Oracle APPS DBA Interview PP-SOP Sales and Operations Planning Oracl
Oracle PLSQL Interview PP-MP Master Planning SAP
Oracle Technical Interview PP-CRP Capacity (Requirements) Planning
SAP ABAP Interview PP-MRP Material Requirements Planning Subsc
SAP BASIS Interview
PP-SFC Production Orders
SAP CO Interview
PP-KAN Kanban S
SAP FI Interview
PP-REM Repetitive Manufacturing
SAP MM Interview
SAP PP Interview PP-PI Production Planning for Process Industries Searc
SAP SD Interview PP-PDS Plant Data Collection
PP-IS Information Systems
Explain How ‘PP’ is ‘Integrated’ with Other Modules. Trans
‘PP’ is one of the modules in SAP R/3 that is complex as the functions cut across many modules. The following modules
are tightly integrated with PP: Selec
Search
CO Controlling
Powered
FI Financial Accounting
MM Materials Management Total
Search
SD Sales & Distribution
PS Project Systems 5 6
PD Personnel Planning and Development
What is a ‘BOM’? FeedB
A ‘BOM (Bill of Material)’ is nothing but a structured list of components (with the object number, quantity, and unit of
measure) that go into the making of a product or an assembly. Depending on the industry sector, they may also be called
recipes or lists of ingredients. The structure of the product determines whether the bill of material is simple or very complex.

What are the ‘BOM Categories’ Supported by SAP? BlogR


The following are the various Categories of BOM:
Rec
Equipment BOM
Material BOM Late

Sales Order BOM Onl


Document Structure
The
Functional Location BOM
WBS BOM SAP

What are all the ‘Technical Types of BOM’? Ora


There are two ‘Technical Types of BOM’ supported in SAP: exp

Variant BOM Mak


Material BOM
Prac
Differentiate ‘Variant BOM’ from ‘Multiple BOM.’
While a ‘Variant BOM’ groups together several BOMs that describe different objects (for example, different models of a car) App

with a high proportion of identical parts, a Multiple BOM groups together several BOMs that describe one object (for app
example, a product) with different combinations of materials for different processing methods.
The Variant BOMs are supported for the following BOM categories: .Net

Material BOMs Ora


Document structures
Lea
Equipment BOMs
Functional location BOMs Big

Multiple BOMs are only supported for Material BOMs.


Is it Possible to Convert a ‘Multiple BOM’ into a ‘Variant BOM’?
No. You can only create a ‘Variant BOM’ from a simple Material BOM. No multiple BOMs can exist for a material.

What is a ‘Work Center’ in PP?


Blog A
▼ 2012

http://allinterviewz.blogspot.in/2012/08/sap-logistics-pp-interview.html 1/4
5/9/2018 Interviews - Repository of Interview Questions and Answers: SAP Logistics (PP) Interview
A ‘Work Center’ in PP (PP-BD-BOM) is an organizational unit that can be a combination of machines or groups of ► Oc
craftsmen, people, and production lines, wherein certain operations are carried out to produce some output. Each of the ▼ Au
work centers is assigned to a cost center. A work center can be assigned to a work center in SAP-HR, which will enable SA
assignment of employees, qualifications, etc.
SA
SA
What is a ‘Routing’ in PP?
A ‘Routing’ in PP (PP-BD-RTG) is used to define the sequence of operations (work steps) and resources required to SA

perform certain operations in order to produce a material with or without reference to an order. The standard values of SA
planned time for the various operations need to be entered into the routing. SA
There are two different types of routing: SA
Routing SA
Rate routing
► Ju
(A similar concept exists in PS where you define a ‘task list,’ which is similar to ‘routing’ in PP.)

What are All the ‘Sub-components’ of Production Orders? Interv


The following are the ‘Sub-components of Production Orders’ (PP-SFC): Ques
Order Planning MySQ
MySQ
Order Execution
SAP L
Order Close
SAP L
What is a ‘Product Hierarchy’? SAP L
Used in pricing, a ‘Product Hierarchy’ is an alphanumeric character string consisting of a maximum of 18 characters. It thus
defines the product and its composition.
Example:
A product hierarchy represented by ‘00050002000300040005.’ The first four characters ‘0005’ could indicate that the
product is a car. The next four characters ‘0002’ could indicate the plant in which the car is manufactured. The third set of
characters could indicate the color of the car. The next set may determine its engine capacity and so on. Thus, the product
hierarchy helps in defining the product composition.

Define ‘BOM Group.’


A ‘BOM Group’ is a collection of BOMs that lets you describe a product or a number of similar products. The value in the
BOM group field uniquely identifies the BOM group. You can use the BOM group as an alternative way of accessing the
BOM. A BOM group comprises either all the alternatives of a multiple BOM or all the variants of a variant BOM.
When you create a BOM group, the system checks the special characters you use. Apart from the usual alphanumeric
characters, you can use the following special characters: ‘-’,‘/’,‘_.’ You cannot use blanks.

Define ‘SOP’ (Sales & Operations Planning).


Suitable for long/medium-term planning, with an aim to streamline a company’s ‘Sales and Operational Planning, SOP’ is a
forecasting tool enabling you to set up sales, production, and other supply chain targets based on existing, future, or
historical data. SOP is most suitable for planning finished goods, and not for material component planning.

SOP plans are passed on to Demand Management (DEM) in the form of independent requirements, which in turn is fed into
MPS (Master Production Scheduling) and MRP (Material Requirements Planning). The results of SOP can be passed on to
profitability analysis, cost center accounting, and activity-based costing.

SOP contains two application components; namely, Standard SOP (PP-SOP) and Flexible Planning (LO-LIS-PLN). The
Standard SOP comes pre-configured with the system. Flexible planning can be configured in a variety of ways.

What is known as ‘Demand Management’?


‘Demand Management’ (PP-MP-DEM) helps in determining the requirement quantities and delivery dates for finished
goods assemblies. It uses the planned independent requirements and customer requirements (customer requirements
come from sales orders). Planning strategies help in deciding the kind of demand program. If production is triggered by
sales orders, then it is known as ‘Make-toOrder’ production; if is not then it is known as ‘Make-to-Stock’ production.

What is ‘Capacity Planning’?


‘Capacity Planning’ aims at economic use of resources. It is integrated with SD, PM, PS, and CS. There are two
components within capacity planning: Capacity evaluation and Capacity levelling. Capacity planning supports short-term
detailed planning, medium-term planning, and long-term rough-cut planning.

Explain ‘MRP’ (Material Requirements Planning).


‘MRP’ aims to guarantee material availability; it is used to procure/produce the required quantities on time (both for internal
purposes and for sales and distribution). This involves monitoring of stocks and, in particular, the automatic creation of
‘procurement proposals’ for purchasing and production. PP-MRP assists and relieves MRP Controllers (who are
responsible for all the activities from specifying when, what, type, etc., of material requirements) in their area of
responsibility. With the automatic planning run in MRP, it is possible to determine any shortages so as to create
procurement elements. With the system generating messages for critical parts and unusual situations, you can rework the
planning results in the specific area with problems.

The material requirements can be planned at plant level or for different MRP areas. With MRP at the plant level, the system
adds together stocks from all of the individual storage locations, with the exception of individual customer stocks, to
determine total plant stock. In the case of material requirements planning on an MRP area level, only the stocks from the
storage locations or subcontractor assigned to the respective MRP areas are taken into account.

What are the Three ‘MRP Procedures’?


Materials Requirements Planning (MRP)
Master Production Scheduling (MPS)
Consumption-based Planning
What is ‘MPS’ (Master Production Scheduling)?
Executed as that of an MRP, ‘MPS’ is nothing but a special form of MRP, which aims to reduce storage costs and to
increase planning stability. With MPS you can flag materials that greatly influence company profits or take up critical
resources as master schedule items and check and plan them separately with a series of special tools.

What is ‘Consumption-based Planning’?


Using past consumption data, ‘Consumption-based Planning’ aims at determining future requirements. In the process, it
makes use of material forecasts or any other ‘static’ planning procedures. The ‘net requirements’ calculation is triggered

http://allinterviewz.blogspot.in/2012/08/sap-logistics-pp-interview.html 2/4
5/9/2018 Interviews - Repository of Interview Questions and Answers: SAP Logistics (PP) Interview
when the stock level falls below a reorder point. The net requirements can also be calculated by forecast requirements from
a historical consumption pattern.

Click below links for more SAP Logistics Interview Questions and Answers
SAP SD Interview
SAP MM Interview

Posted by DBA

12 comments:

geetha reddy December 19, 2013 at 5:14 AM


Nice Blog, For More SAP PP real-time Interview Questions with answersClickHere
Reply

Chandra Shekhar March 14, 2014 at 1:16 PM


nice one, really help full Quns for interviews
Reply

DBA May 19, 2014 at 1:32 PM


Thanks Chandra Shekhar.. Hope these QA helped you..
Reply

Anonymous September 13, 2015 at 12:13 AM


hi geetha.. blog is not opened plz share another link.

Reply

xmen October 1, 2015 at 3:36 AM


Tks very much for your post.

Avoid surprises — interviews need preparation. Some questions come up time and time again — usually
about you, your experience and the job itself. We've gathered together the most common questions so you
can get your preparation off to a flying start.

You also find all interview questions at link at the end of this post.

Source: Interview Questions & Answers:

Best rgs
Reply

Ramya k April 6, 2016 at 11:22 PM

Thanks for the great information ,was looking for this information from long.Great blog SAP Basis Training
in Chennai
Reply

Anonymous April 12, 2016 at 12:37 AM


Thanks for the great information .Got lot of information from this SAP HR Training in Chennai
Reply

sanayamohit October 4, 2016 at 10:01 PM


Thanks for sharing this Informative content. Well explained.Got to learn new things from your Blog.
SAP SD
Reply

Webtrackker Noida March 3, 2017 at 4:58 AM


Webtrackker technology is the best IT training institute in NCR. Webtrackker provide training on all latest
technology such as Sap pp training. Webtrackker is not only training institute but also it also provide best IT
solution to his client. Webtrackker provide training by experienced and working in the industry on same
technology.Webtrackker Technology C-67 Sector-63 Noida 8802820025

SAP pp Training institute in indirapuram

SAP pp Training institute in Noida

http://allinterviewz.blogspot.in/2012/08/sap-logistics-pp-interview.html 3/4
5/9/2018 Interviews - Repository of Interview Questions and Answers: SAP Logistics (PP) Interview
SAP pp Training institute in Ghaziabad

SAP pp Training institute in Vaishali

SAP pp Training institute in Vasundhara

SAP pp Training institute in Delhi South Ex


Reply

Ramya Reddy November 14, 2017 at 2:33 AM

nice .Very useful .Thank you for sharing  sap s4 simple finance online access
Reply

sameera sam January 11, 2018 at 9:04 PM


It was so nice article.I was really satisified by seeing this article

SAP Simple Finance Online Access


Reply

swetank singh March 17, 2018 at 12:38 AM


Good blog, yours information is very effective. the information about sap training course.
SAP PP training institutes in Noida
Reply

Enter your comment...

Comment as: Manickath (Goo Sign out

Publish Preview Notify me

Links to this post

Create a Link

Newer Post Home Older Post

Subscribe to: Post Comments (Atom)

Powered by Blogger.

http://allinterviewz.blogspot.in/2012/08/sap-logistics-pp-interview.html 4/4

You might also like