MANUFACTURED STD. :-
B - IEC 61439-1 & 2

ENCLOSURE :-
- SHEET STEEL
- DEGREE OF PROTECTION - IP55
800 800 250 - MOUNTING - WALL MOUNTING
C
- SURFACE - RAL 7032
100A ATS PANEL
- POWDER COATED
V A
- THICKNESS - 1.5 mm
- SIZE - 1000 (H) x 800 (W) x 250 (D)mm
CT
R A A B
VSS ASS
LOAD Y
R
R A A R A A
N
D MAIN GEN
FORM OF SEPERATION :-
1000 START STOP HOA START STOP

-FORM 2

ACCESS:-
-FRONT
E

CABLE ENTRY :-
E
- INCOMING : BOTTOM
SIDE VIEW - OUTGOINGS : BOTTOM
FRONT VIEW
BUSBAR :-
- RYBN ; 25x 5mm
- EARTH ; 15 x 5mm
F SUPPLY VOLTAGE :-
- 415V, 3PH, 4W, 50Hz.

LABEL :-
- ENGRAVED PVC

NOTE:-

G -ALL LIVE PARTS ARE COVERED


WITH 3 mm BAKELITE SHEETS.

1 2 3 4 5 6 7
FIT OUT WORK(BRITISH INTERNATONAL SCHOOL) TITLE:-
PROJECT
CLIENT ABU DHABI UNIVERSITY HOLDING COMPANY ATS PANEL:100A
CONSULTANT ARKONSULT ENGINEERING CONSULTANT
CONTRACTOR ALBA TEC CONSTRUCTION&DEVELOPMENT 1st ANGLE PROJECTION
0 26.06.2015 FOR APPROVAL NIBU RG ELE CONT ALL DIM. ARE IN MM
QTN No:- QTY: 01 JOB No:-
REV. DATE DESCRIPTION DRAWN CHECKED SCALE:- N.T.S DRG. No:- SET/RG/14069 SHEET No:- 1/5
1 2 4 5 6 7

1#25x5mm/Ph (RYBN) Cu BAR WITH COLOR CODED SLEEVE


B

P1
S1

1Q 2Q CT1-3 P2
S2

P1
100 4P 100A 4P 100/5A S1

ASS
MCCB MCCB P2
S2

P1 A
C (MOTORISED) (MOTORISED) S1
S2
P2

ELECTRICAL & MECHANICAL


INTERLOCK

R Y B
D 9QF-11
R V1
R Y B R Y B Y
TO CONTROL CIRCUIT TO CONTROL CIRCUIT

VSS
1QF-4 5QF-8 B V
PFR-1 N V2

PFR-2
E

N R Y B N R Y B N R Y B

MAIN SUPPLY GENERATOR SUPPLY TO LOAD


415V/3P/50Hz 415V/3P/50Hz

G
1# 15x05mm Cu BAR
G

1 2 3 4 5 6 7
FIT OUT WORK(BRITISH INTERNATONAL SCHOOL) TITLE:-
PROJECT
CLIENT ABU DHABI UNIVERSITY HOLDING COMPANY ATS PANEL:100A
CONSULTANT ARKONSULT ENGINEERING CONSULTANT
CONTRACTOR ALBA TEC CONSTRUCTION&DEVELOPMENT 1st ANGLE PROJECTION
0 26.06.2015 FOR APPROVAL NIBU RG ELE CONT ALL DIM. ARE IN MM
QTN No:- QTY: 01 JOB No:-
REV. DATE DESCRIPTION DRAWN CHECKED SCALE:- N.T.S DRG. No:- SET/RG/14069 SHEET No:- 2/5
1 2 4 5 6 7

CONTROL MCB
1 M2

M PFR
B

M2

GR1 MR1 MR1


X2
C
SS1 MR2 M9 M2 M10 M11 MR1
M3
M4 X1
STOP M4 X3 TB1-1 TB1-3 TB1-5 TB1-6
PB1
MT GR2 M12
D
M5
D2 B2 A2 A4
GEN/START STOP CLOSE OPEN
START MR1
PB1 M8 YU M M MAIN MCCB
M6
E

D1 A1

GR2
TB1-2 TB1-4
F M7 N1 N1

MR1 MT MR2 MR3

1 2 3 4 5 6 7
FIT OUT WORK(BRITISH INTERNATONAL SCHOOL) TITLE:-
PROJECT
CLIENT ABU DHABI UNIVERSITY HOLDING COMPANY ATS PANEL:100A
CONSULTANT ARKONSULT ENGINEERING CONSULTANT
CONTRACTOR ALBA TEC CONSTRUCTION&DEVELOPMENT 1st ANGLE PROJECTION
0 26.06.2015 FOR APPROVAL NIBU RG ELE CONT ALL DIM. ARE IN MM
QTN No:- QTY: 01 JOB No:-
REV. DATE DESCRIPTION DRAWN CHECKED SCALE:- N.T.S DRG. No:- SET/RG/14069 SHEET No:- 3/5
1 2 4 5 6 7

CONTROL MCB
2 G1 G2

G PFR
B
G2

MR1 GR1 GR1

C
SS1 G9 G2 G10 GR1
G11
G3
G4
STOP TB2-1 TB2-3 TB2-5 TB2-6
PB1
GT MR2
D G5
G12
D2 B2 A2 A4
CLOSE OPEN
START GR1
PB1 YU M M GEN MCCB

E
G8 D1 A1
G6
MR3
TB2-2 TB2-4

F G7
N2 N2

GR1 GT GR2

1 2 3 4 5 6 7
FIT OUT WORK(BRITISH INTERNATONAL SCHOOL) TITLE:-
PROJECT
CLIENT ABU DHABI UNIVERSITY HOLDING COMPANY ATS PANEL:100A
CONSULTANT ARKONSULT ENGINEERING CONSULTANT
CONTRACTOR ALBA TEC CONSTRUCTION&DEVELOPMENT 1st ANGLE PROJECTION
0 26.06.2015 FOR APPROVAL NIBU RG ELE CONT ALL DIM. ARE IN MM
QTN No:- QTY: 01 JOB No:-
REV. DATE DESCRIPTION DRAWN CHECKED SCALE:- N.T.S DRG. No:- SET/RG/14069 SHEET No:- 4/5
1 2 4 5 6 7

BILL OF MATERIALS

B ENCLOSURE 1000(H) x 800(W) x 250(D) mm PRO-TECH 01


0Q1 & 0Q2 100A 4P MCCB SCHNEIDER 02
MOTOR FOR MCCB SCHNEIDER 02

C AUXILIARY RELAY, 240VAC SCHNEIDER 05


PFR-1 & 2 PHASE FAILURE RELAY SCHNEIDER 02
T1 & T2 ON DELAY TIMER (0---30sec.) SCHNEIDER 02
R PANEL INDICATION LAMP (RED) SCHNEIDER 03
Y PANEL INDICATION LAMP (YELLOW) SCHNEIDER 03
D
B PANEL INDICATION LAMP (BLUE) SCHNEIDER 03
ASS AMMETER SELECTOR SWITCH RISHAB 01
CF1-12 10A SP MCB SCHNEIDER 12
SS1 3 POSITION SELECTOR SWITCH SCHNEIDER 1
E
1PB1-2PB1 ON PUSH BUTTON SCHNEIDER 2
1PB2-2PB2 OFF PUSH BUTTON SCHNEIDER 2
V VOLTMETER ( 0 -500V ) RISHAB 01
VSS VOLTMETER SELECTOR SWITCH SALZER 01
F A AMMETER ( 0-100A ) RISHAB 01
CT1-3 100/5A CURRENT TRANSFORMER PC 03
UNDER VOLTAGE FOR MCCB SCHNEIDER 02
MECHANICAL INTER LOCK FOR MCCB SCHNEIDER 01
G

1 2 3 4 5 6 7
FIT OUT WORK(BRITISH INTERNATONAL SCHOOL) TITLE:-
PROJECT
CLIENT ABU DHABI UNIVERSITY HOLDING COMPANY ATS PANEL:100A
CONSULTANT ARKONSULT ENGINEERING CONSULTANT
CONTRACTOR ALBA TEC CONSTRUCTION&DEVELOPMENT 1st ANGLE PROJECTION
0 26.06.2015 FOR APPROVAL NIBU RG ELE CONT ALL DIM. ARE IN MM
QTN No:- QTY: 01 JOB No:-
REV. DATE DESCRIPTION DRAWN CHECKED SCALE:- N.T.S DRG. No:- SET/RG/14069 SHEET No:- 5/5