You are on page 1of 6

CURRICULAM VITAE

KASHIF ALI

Cell No: +966-59-1557391 -Address: Rabigh Saudi Arab


E mail- engineerkashi92@gmail.com
Driving License Saudi Arab valid Saudi Aramco Aproval # TTD-PID-1046/361
POSITION DESIRE: ELECTRICAL QA/QC ENGINEER

CAREER OBJECTIVE:
 To be an effective and efficient team member of your
Esteemed organization. And to achieve organization and individual goals.
 Seeking an increasingly responsible position in your
Organization safety& career development and challenging environment where my
qualification, experience and dedication can be utilized for the prospect of the
organization.

EDUCATIONAL QUALIFICATION:

 Bachelor in electrical engineering from Preston


University Lahore Pakistan in (2008).

 Diploma in Electrical Engineering (3year) from


Punjab Board Technical Education Lahore Pakistan

 Diploma in Electrical AUTO CAD 3month program


from Brain College Lahore, Pakistan.

 Diploma in Information Technology in computer 6


month program from Muhammad Din Technical
Education & Vocational Training College,
Bahawalpur, Pakistan.

COMPUTER SKILL:

MS-office complete (words, Excel, power point, Access) MS-window (xp,


7, vista)
Local networking, Auto Cade
PROFESSIONAL EXPERIENCE SUMMARY :

6 years of experience as electrical QA/QC Engineer in construction field.

Current Employer: ABC Ashi and Bushnaqe company E&M Dept.


Location: Jeddah, Saudi Arabia
Designation: Electrical QA/QC Engineer
Duration: May 2014 to till date
Project Name: Saudi Aramco project
King Abdullah University of Science & Technology.Thuwal Saudi Arab

(1) Employer: Harisco Pakistan


Dept: Electromechanical
Location: Sindh pakistan
Designation: QA/QC Engineer
Project Name: Oil & Gas Field Wellhead compression Projects Tajjal-
01&04 And Miano 5,6,7,8 Sawan & Kadanwari Gas
plant OMV Pakistan
Duration: 01 April 2013 to 02 -04-2014

(2) Employer: Harisco Saudi LTD


Dept: Electromechanical
Location: Khober Saudi Arab
Designation: Electrical QA/QC Engineer
Project Name: Massa Ac Plant Expansion Holy Haram at Ajyad (Makkah)
Duration : 15 March 2012 to 15 march 2013

(3)Employer: Saudi Bin ladin Group (RPD) E&M Dept.


Location: Jeddah, Saudi Arabia
Designation: Electrical QA/QC Engineer
Duration: 15 April 2010 to 10 march 2012.
Project Name: Saudi Aramco project
King Abdullah University of Science & Technology.Thuwal Saudi Arab
Project ID : 6092255

(4)Employer: Alphanoor electromechanical works L.L.C


Location: Arab emirates Dubai
Designation: Electrical Quality Control Asst engineer
Duration: 21 April 2008 to 15 Feb 2010.
Project Name:
Green community west jabal Ali Dubai investment park (DUBAI)
Project ID : 156-0240
(1) Description of duties and responsibilities
1. QA/QC documentation and review Contractor construction electrical procedures.
2. Supervise and Monitor Installation of Cable, Cable tray, Lighting, Distribution
control panel, all electrical equipment and Grounding system, etc.
3. Perform routine inspection and document result in accordance with approved CPI
procedures.
4. Monitor activities of supervision contractor and construction Contractors.
5. Witness and verify Continuity, Merger, HI-POT and Component testing for
Medium Voltage & Low Voltage equipment.
6. Monitor Quality control on construction progress activities.
7. Responsible from equipment installation and continue energizing of electrical
equipment to pre-commissioning and commissioning.
8. Issued punch listing for outstanding works.
9. Review Tested documentation, witness and accept all required Testing for CPI
(Client).

10. Etc

(2)Description of duties and responsibilities


1) Responsible for all electrical inspections related to installations, testing,
Commissioning etc.
2) To conduct inspection of all ongoing activities for electrical installations.
3) To conduct inspections for all electrical material deliveries.
4) To attend all electrical inspection with client/contractor representatives.
5) To submit inspection requests in coordination with concerned site/project engineers.
6 ) Prepare method statements and ITPs in coordination with QA/QC senior engineers
and Project engineers.
7 ) Prepare daily QA/QC report regarding inspections, material, Non conformances etc.
8 ) Check the drawings and documents used at site for approvals and compliance
with(SEAS) Project Requirements.
9) Prepare weekly surveillance reports, non conformance reports and verification
of corrective actions.
10) Ensure that all works are carried out as per (SEAS) the approved method
statements and drawings.
11) Ensure that all equipments used are calibrated and with valid certificates.
12) Assist the QA/QC senior engineers in preparation of the final handing over
documents such as HO&M documents, testing and commissioning reports etc.
13) Preparation of testing and commissioning method statements in coordination with
Vendors, QA/QC engineers and project engineers.
14) Routine inspection for the Electrical work activities and Inspection of incoming
Client materials.
15) Supervision of Electrical / Instrument Equipment installations & Erection
activities.
16) Installation of control circuits and Electrical operational systems.
17) Installation of cable trays and conduits for lay out of power and control cables for
EOT Cranes.
18) Inspection installation of HV/LV Cables & Cable Testing such as (Continuity
Test & Insulation Resistance Test).

(3)Description of duties and responsibilities


1) HV Circuit Breaker & Disconnect Switches. Complete with Aluminum Bus bars
Installation.
2) Substation shielding & Grounding systems.
3) Inspection Installation of Duct Bank & Cable Trenches.
4) Construction/Installation of above equipment were supervised & site activities.
Involved the Preparation of Reports, Logging & register to QA/QC plan and Non-
compliance Reports.
5) Carrying out survey for installation of 11kV Distribution systems.
6) Estimation for distribution system for tendering purposes.
7) Preparation of tender documents for foundation, pole erection and stringing.
8) Preparation of material inventory.
9) Compiling of design standards.
10) Coordination with company representatives. Regarding planning & Design
review.
11) Routine inspection for the Electrical work activities and Inspection of in coming
Client materials.
12) To attend all electrical inspection with client/contractor representatives.
(4)Description of duties and responsibilities

15 Sep 2006 to 25 Aug 2007. Responsibilities : Installation of Cable Tray & Cable
Trenches.
1) Preparation and Coordination in the implementation of the QA/QC programs.
2) Participated in the QA/QC meetings.
3) Verifications of Contractors monthly invoices, claims for extra items and different
stages of the project.
4) Inspection of the incoming materials.
5) Checking project specifications, compliance at the quotation stage.
6) Attend the weekly safety meetings.
7) Prepare daily QA/QC report regarding inspections, material, Non conformances
etc.
8) Ensure that all equipments used are calibrated and with valid certificates.
10) Inspection installation of HV/LV Cables & Cable Testing such as (Continuity
Test , & Insulation Resistance Test).
SKILLS :( I have good knowledge about) construction residential Building & Plant
industrial field.
Installation and operation as per standards

Electrical LV, MV, and HV Designing. All type Electrical wiring (3 phase & single
phase).Electrical Testing & Commissioning. All type Electrical Drawings. Electrical
Load Schedule LT and HT panels electrical wiring. Industrial power plants Installation
and maintenance..Industrial DCS,PLC systems installation. Laying the cable trays as per
electrical drawing. Pulling the electrical wires as per plane. Installation of transformers
and LT panels and DP panels.Testing of electrical cables with megger continuity test,
short circuit test, insulation leakage test.Installation of DP panels dressing and
termination of cables in LT and DP panels. Checking the torque testing and losing in LT,
DP panels and transformers.Installation of wiring devices (switches, sockets ,lamps ,air
conditions lights with sensors and etc).Electrical all type materials. Electrical grounding
system and lightning protection system. Generator operating system & maintenance,
troubleshooting system, ATS panels,ups system. Electrical power plants maintenance.
Electrical Instruments, and protection system .High voltage cabling and termination
.Installation of absorption chiller plants( sanyo,LS,)etcAir handling units Fine coil units
etc. electrical solar system design and installation .
Low current
Low current & voltage accessories installation. Data servers, cabling, testing and
installation of switches and router in server racks.IP and CCTV and adobe cameras.
Installation of Digital video recorder.Terminate all the camera cables in DVR.Public
adders systems. High Patch telephone exchanges. Telephone wires and installation of
telephone junction board .BMS, SCADA control system installation. Fire Alarm system
cabling and installation of smoke and heat detector, instruments etc.

PERSONAL DETAIL:
Father’s Name - Muhammad Hussain
Date of birth - 15-09-1986
Marital status - Married
Sex - Male
Nationality - Pakistani
Religion - Islam
Driving License - Saudi Arabia International
PASSPORT DETAIL:

Passport no. - FS1791822


Date of issue - 28-09-2011
Date of expiry - 26-09-2016
Current Visa Status - Yes( Saudi Arab )
LANGUAGE:
English, Arabic, Hindi, Urdu, Punjabi.

DECLARATION: I hereby solemnly declared that above said statement is true and
Correct according to my knowledge& belief.
Truly yours, (Kashif Ali )
SKILLS :( I have good knowledge about) construction residential Building & Plant
industrial field.
Installation and operation as per standards

Electrical LV, MV, and HV Designing. All type Electrical wiring (3 phase & single
phase).Electrical Testing & Commissioning. All type Electrical Drawings. Electrical
Load Schedule LT and HT panels electrical wiring. Industrial power plants Installation
and maintenance..Industrial DCS,PLC systems installation. Laying the cable trays as per
electrical drawing. Pulling the electrical wires as per plane. Installation of transformers
and LT panels and DP panels.Testing of electrical cables with megger continuity test,
short circuit test, insulation leakage test.Installation of DP panels dressing and
termination of cables in LT and DP panels. Checking the torque testing and losing in LT,
DP panels and transformers.Installation of wiring devices (switches, sockets ,lamps ,air
conditions lights with sensors and etc).Electrical all type materials. Electrical grounding
system and lightning protection system. Generator operating system & maintenance,
troubleshooting system, ATS panels,ups system. Electrical power plants maintenance.
Electrical Instruments, and protection system .High voltage cabling and termination
.Installation of absorption chiller plants( sanyo,LS,)etcAir handling units Fine coil units
etc. electrical solar system design and installation .
Low current
Low current & voltage accessories installation. Data servers, cabling, testing and
installation of switches and router in server racks.IP and CCTV and adobe cameras.
Installation of Digital video recorder.Terminate all the camera cables in DVR.Public
adders systems. High Patch telephone exchanges. Telephone wires and installation of
telephone junction board .BMS, SCADA control system installation. Fire Alarm system
cabling and installation of smoke and heat detector, instruments etc.

PERSONAL DETAIL:
Father’s Name - Muhammad Hussain
Date of birth - 15-09-1986
Marital status - Married
Sex - Male
Nationality - Pakistani
Religion - Islam
Driving License - Saudi Arabia International
PASSPORT DETAIL:

Passport no. - FS1791822


Date of issue - 28-09-2011
Date of expiry - 26-09-2016
Current Visa Status - Yes( Saudi Arab )
LANGUAGE:
English, Arabic, Hindi, Urdu, Punjabi.

DECLARATION: I hereby solemnly declared that above said statement is true and
Correct according to my knowledge& belief.
Truly yours, (Kashif Ali )

You might also like