Final major project production schedule

19th February Proposal/ brief/ production Weekly blog/evaluation on the


schedule- week and my progress.
This week I will writing up my
professional brief and
proposal. I will also do a
detailed production schedule
including dates and work that I
need to do that particular
week. I will email people to
make sure I have participants
for my primary research.
26th February Research –primary Weekly blog/evaluation on the
In this week I will need to do week and my progress.
primary research for my
production. I will need to
create a survey asking people
about their preferences on
adverts, I will be mainly asking
my target age group. I will also
be doing vox pops, and focus
groups this is so I can get face
to face answers, this will be
recorded. i will be using the
people I previously contacted
and schedule a day in which I
can interview them.
5th march Research – secondary Weekly blog/evaluation on the
For my secondary research I week and my progress.
will analyse different types of
advertising and the methods
that they use. I will do an in-
depth analysis into a certain
fashion advert. I will also be
looking into my speciality
(production design) and how
they use it in marketing. I will
be looking into the company I
will be creating this for (ASOS)
and researching the brands
values. I will also been looking
Final major project production schedule
into who I can cast for my
production. I will send out
emails asking for people to
audition for my production.
12th march Pre-production I will need to Weekly blog/evaluation on the
create a contingency plan this week and my progress.
is so I can have a backup
option in case anything goes
wrong and so I am still able to
film successfully. I will need to
research into specific locations
and create a location recce.
This is so I can see the health
and safety hazards and the
details of the location such as
its post code and closest public
transport. I will need to make
an equipment list, crew list and
prop list. I will look into what I
need to use for my production
and book any equipment I
need. During this time I will
also be preparing my pitch that
I will be doing in front of the
class. This will include creating
a power point and hand outs.
19th march Pre-production s I will create a Weekly blog/evaluation on the
storyboard featuring the week and my progress.
specific locations and cast. This
is so I can plan out the specific
camera shots I want to use. I
will also film test shoots with
my camera to test out the
equipment and camera
settings. I will also be doing my
pitch to the class this week.
26th march Finalising pre-production Weekly blog/evaluation on the
I will be doing any last minute week and my progress.
pre -production this week. This
may involve sorting out more
Final major project production schedule
specific filming dates/ times
with my cast and sorting out
transport.
2nd April (Easter) Filming Weekly blog/ behind the
During this week I will be scenes of advert
filming my first group of
models in my specific
locations.
9th April (Easter) Filming Weekly blog/ behind the
During the second week of the scenes of advert
Easter holidays I will be filming
the second group of models
this week as well as filming any
re shoots during the end of the
week.
16th April Filming/ editing I will be Weekly blog/ behind the
filming any last minute shots/ scenes of advert
reshoots as well as making a
first draft of my production.
23rd April Editing advert Weekly blog
During this week I will be using
this week mainly for editing my
three adverts.
30th April Last minute improvements Weekly blog
and uploading production
I will use this week to finished
off/ improve any incomplete
work. I will also be sending off
my final drafts of my adverts to
receive some feedback.
7th may Final evaluation Finishing final evaluation
I will be evaluation the
feedback given and starting my
final evaluation/ comparative
evaluation.
14th may Final evaluation Finishing final evaluation
This week I will be finishing off
my evaluation and
comparative evaluation.
Final major project production schedule
21st may Final hand in date
On this date I will submit every
bit of work for this unit.
28th may Preparing exhibition
I will be coming into college to
prepare for my exhibition.
20th June Exhibition day
I will be displaying my
exhibition for the public.