MUNICIPAL TESTING LABORATORY, INC.

375 RABRO DRIVE, HAUPPAUGE NY 11788 • TEL: (631) 761-5555 • www.mtllab.net

DATA SHEET FOR 4 X 8 CONCRETE CYLINDERS

CLIENT: Macy PLANT: FerraraBros LAB #


ADDRESS: REPORT #
05/01/201
REPORT DATE: 8
CONTRACTOR: Navillus INSPECTOR: Omar Elshahat
PROJECT: Macy 16015
Cylinder Maker & ACI Certification # Omar Elshahat COMPANY: MTL
LOCATION OF POUR: 2nd Floor slab
SPECIFIED STRENGTH PSI: 4000 pump WEATHER: Clear TOTAL YARDS PLACED: 210
3000 PSI = 377.5 KN, 3200 PSI = 402.4 KN, 3500 PSI = 440.1 KN, 4000 PSI = 503 KN, 4500 PSI = 565.0 KN, 5000 PSI = 628.8 KN

NOT
ALL FIELD TEST PERFORMED IN ACCORDANCE WITH ASTM: YES: X KNOWN:
PRINT ALL ENTRIES. ALL INFORMATION REQUIRED BY ASTM/ACI.
Air Unit Temp Age
Date Date Slump C173/ Wt. F Truck of Specific Location of Tested
Seal/ID # Cast Tested C143 C231 C138 C1064 # Test Total Load (KN) Portion
Cylinder Set Number One
H9393 05/01/20 9 5.5 72 114 409 2nd Floor slab
18
H9394 05/01/20 9 5.5 72 114 409 2nd Floor slab
18
H9395 05/01/20 9 5.5 72 114 409 2nd Floor slab
18
H9396 05/01/20 9 5.5 72 114 409 2nd Floor slab
18
H9397 05/01/20 9 5.5 72 114 409 2nd Floor slab
18

Cylinder Set Number Two

Date Delivered: Days in Field: Delivered By:


All spaces are to be completed only by the client or field inspector, except for laboratory use items.