AVAILABILITY CHECK
Availability check is a process of checking the stock availability while creating sales order.
1. In Schedule line category
Check availability and requirement
Piven: DEE aw
Sched.ine cat. [2 [Determmatic HRP
| Busmess data
Detvery block
Movement Type
Moverent Type 1-Step
Order Tyee ) Cie wea.detsches
tem Category
‘Acct Assgt Cat.
vt is. Val. ST
Specciss. Val ST
(vimem rela
incomelproced. 35) DeheRelschesiune
(vinee./asserbV7
et
2. Availability check/checking group
We maintain this field in "material master sales general/plant”. This field controls how sales
requirements are updated in MRP,
01 - Daily requirement
02 - Individual requirement
01:System cumulates sales order requirements of particular day and updates in a single line in
pp.
(02:System updates each sales order requirement into MRP along with the sales order number.
Note: If we maintain "01" back order processing is not possible.
KP: No check
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 1AVAILABILITY CHECK
(®_.) Change Material P-MOBILE (Finished product)
WF S&D > Basic Functions > Availability Check & Transfer of requirement >
‘Availability Check > Availability check with ATP > Define Checking group
"Checking Group" is nothing but availability check field in "material master sales
general/plant"
(22 tnaivua reget
Indeq CMOS Enh
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 3AVAILABILITY CHECK
In this configuration step we can define our own checking group. The standard checking groups
are:
01 - Daily Requirements
02 - Individual Requirement
KP - No Check
This configuration step will also help to control how the sales requirement should be
transferred to MRP.
Note:Availability check is material and plant specific
If multiple users are accessing availability check for the same material in the same plant then
system performs availability check for the first user and block availability for the other users.
F rene ORO BOB
‘nvktheck Descoton
os Day requrements
ce Indweua rege
loz Indes rear
2 Indus reant
is fap Leadtme
3 Rep Lead tine
c Reseraten of rater
In this step with the combination of availability check and initiator we check block.
Initiator: A-Sales Order C- Reservations.
8- Delivery
efine checking groups default values:
Path: SPRO > S&D > Basic Functions > Availability Check and Transfer of requirements >
Availability Check > Availability Check with ATP > Define checking groups default values
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 4AVAILABILITY CHECK
O vewentes DH ORRE
ee ee
Ma... Plant Descriptn Name 1 A. Descrptn
(reer suis Fished product Ny Ar Depot ce addualreare >
TERT SPI1 Frshed product Pant 1 c2 Indwdvalreare ——}™
Frished product ‘Steel Pant 2 Indwdual rear
If we maintain checking group here it automatically proposes by default while creating material
master.
In this configuration step we maintain checking group to the combination of material type and
plant.
IV. Carry out Control for Availability Check:
We also call it as "scope of check’. We configure scope of check with the combination of
"Checking group and Checking rule".
[oa] méwdual reqre
1 | 80 order
Ind. restricted-use stock
\w/o subcontracting
(check wehout ALT
WNo storoc. mspectn
Replenishment lead tme
[Whinclde sales reamts
Whindude debveres
Diinaiship.notincat.
Ind.depen.reservat.
InclreLorder reas
Ind. planned orders
Ind. production orders
stocks | Inloutward movements j
Oindude safety stock (x) Inc.Purchase Orders
(Cistockin Transfer [¥iind. purch.requistions
Ind.qualty insp. stock [ine dependent reas
Dinas blocked stock icude reservations
1 |po not check
[| check leases fo.
e checkal panned -
[x Take al producto
‘checkng period: GR
Receipts in past
Mssng parts processing
[include recepts from past and future
By Srinivasulu Algaskhanpet (SAP SD Consultant)
Page SAVAILABILITY CHECK
" Checking Rule" specifies in which transaction we want to configure availability check.
A-Sales Order - Delivery
1. Include Safety stock:This is the minimum stock level which company has to maintain to meet
the future emergency requirements.
We have this field in "Material master MRP 2" view. If we check this field system will consider
safety stock also while performing availability check.
2. Stock in Transit: We use this field in STO Process
In STO two-step process where we do delivery in supplying plant the stock will be displayed as.
stock in transit in receiving point.
If we check this system will consider the stock which is in transit also, while performing
availability check in receiving point,
3. Include Quality Inspection Stock:if we check this system will consider the stock which is in
quality inspection while performing availability check.
‘The movement type for quality inspection is
Note:To check the result "post the un-restricted stock” by using movement type "503"
Stock Posting - MBC
Stock Overview - MMBE
Check and uncheck the field and check the result.
4, Include Blocked Stock:if we check this field system will consider the stock which is blocked
while performing availability check.
‘The movement type for blocked store is "505"
Note:Post the blocked stock and check in stock overview. Check and uncheck this field and see
the result by creating order.
5. Check without RLT:if we check this field system will not confirm the quantities if the stack is
not available,
Hf we uncheck this, system will confirm the quantities in future dates based on RLT.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 6AVAILABILITY CHECK
6. Include Purchase Orders:f we check this system will consider the inward movements (the
purchase order stock) while performing availability check.
7. Include Purchase Requisition:In real time we don't depend on purchase requisition. Because,
it is not the exact source for getting the stock.
8. Include Sales Requirement:if we check this system will deduct the open order quantities
from stock while performing availability check.
Hf we uncheck this system will consider the stock while performing availability check.
Note:Create material, post the stock and check the result.
Schedule line > Environment > Availability
9. Include Deliver
Whenever we create deliveries the deliveries will also updates in "MD\
Hf we check this system deducts open delivery quantities from stock while performing
availability check.
If we uncheck this system will not deduct open delivery quantities from stock while performing.
availability check.
V. Define Procedure by Requirement Class:
In this configuration step we need to check requirement and availability.
VI. Define Procedure by schedule line category:
In the configuration step we check availability and requirement fields.
VIL Determine Procedure for each delivery item category:
‘This configuration controls whether to perform availability check in delivery document or not.
In below scenarios we perform availability check in delivery document,
2. Delivery without reference
bb. Adding new line items in deliveries
«. Increase or decrease the quantities in deliveries
d. Stock Transfer
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 7AVAILABILITY CHECK
Exercise:
1, Create Order without posting stock and check how it is proposing the stock?
Contnue ATP quantities Scope of check Other plants
Item fie ‘Schd. Line £
Mobile (PSenes)
= fa
Rea.delvdate [02.08.2018] Open Quantity ee, =)
(OF atyidate Max.Part.Delveries 9
Deh/cont.Date 02.09.2014 / 02.09.201
System is not confirming any quantity as there is no stock
2. Post stock with quantity § and created order with § quantity and check
Won 2 ee SOR OH
SesDoamert ten fF Item category HHS) Su Rem Sas Phone
wees i)
dv eben Sc. Pa |
+ 0
Order quantity is 5 and system also confirmed quantity of 5.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page &AVAILABILITY CHECK
3. Now create order with quantity 10 and check.
One-time delvery Delvery proposal ATP quantties Scope of check Other pints
tem fo] scnd.une ff]
west em)
‘Solar Mobile (PSeries)
pane fra]
Req.deW.date [02.08.2014 Open Quantty
(OR aty/date Max.Part.Delveries:
(bap
DeW/conf.Date (02.09.2038) / 02.09.2014 Confirmed aby r_\
Sr _—
When we enter order quantity and press enter system will check the availability. As we have
stock of 5 quantity system is proposing only § quantities.
lick on tick mark) and check the schedule lines.
St SA Ce et ON
Keon ee Boa oe
SieOretten fT] eaepey FR) Stan seat ae
ve eee) ste se)
Beak et Some | so rome onto | cart pee A too Tote | ote (one eh 8
Ca ent owe gat [a
Even the order quantity is 10 system confirms only 5.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 9AVAILABILITY CHECK
4, Maintain RLT (2 days) in Material master and uncheck the field check without RLT in
scope of check and create order.
tem re
Rea.deiv date Open Quantity os
Ce aerate Macpatcewenes [5]
DaW/conf.oste 02.09.2014 7 02.09.2014 Confirmed Quantty | —SSC*
DaW/conf.pate _[64-09.2014)/ 09.09.2014
In this scenario we can see that system is confirming the 5 quantity and proposing the delivery
date for another 5 quantity in future as we maintained RLT.
Click on the tick mark (¥! and check the schedule lines.
Keon 200 Boo Oe
‘Steommet ten fF) en araoy i) sttensrarPne
vers aE) sare ie)
System confirming the quantities on 2 different dates.
‘This is all about the availability check. We can do same this by posting quality inspection stock,
block stock, stock in transit etc.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 10AVAILABILITY CHECK
Back Order Processing:
Whenever high delivery priority customer places an order, if the stock is not available then we
{go back to open orders of low delivery priority customers and cancel the confirmations and
assign to high delivery priority customer order.
Note: The back order processing is available only for those materials that have the individual
vailability check" must be
requirements j.e., in material master record the parameter for
‘The T. Code to create checking rule is “OPIL”
‘The T. Code to assign checking rule to availability check is “OVZ9”
‘After maintaining these setting continue with the configuration for back order processing.
Checking Rule for updating backorder
Path: SPRO > S&D > Basic functions > Availability check and transfer of requirements >
‘Availability check with ATP > Checking rule for updating back orders
Here we assign checking rule "Bt
Change View "Checking Rule for Updating Backorders": Overview
7oBEB
to our plant
(Check Rule Description of Checking Rule
Checking 1
(Checking rule 01
If we don’t find our plant in this path, in this case we need to maintain plant parameters.
Path: SPRO > Production > Material Requirements Planning > Plant Parameters > Carry out
overall maintenance of plant parameters > Create
2. Carryout control for availability check:
Here maintain the combination for checking group "02" and checking rule "BO"
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 11AVAILABILITY CHECK
Note:
a. If the plant is not displayed in backorder then maintain plant parameter for that plant.
Path: SPRO > MM > Inventory management & Physical inventory > Plant Parameter
Select the standard Plant 1000 and click on copy and maintain plant parameter
b. Maintain plant parameter in production
Path: SPRO > Production > Material requirement plant
overall maintenance of plant parameters
> Plant parameter > Carryout
Click on copy
"1000" in from plant
"SPI2" in to plant and again click on copy.
FD vewentes 2 GO 2B
Avatabity check [ca] inddual regret
Checking Rule [Bo] Backorder processing
(Sods)
induce safety stock ) IncLPurchase Orders
(Dstodn Transfer (Dine. purch requistions
(Diind.quatty sp. stock (Dina. dependent reas
(Dine. blocked stock Winchde reservatons
(Dine, restcted-use stock Windude sales eames
we subcontractng [incude deivenes
Dinetshp.nothcat.
Replenishment lead tine
(check wehout RLT Inc.depen.reserat. [0 not check
Inckrelorder reas Fe not check
‘Storage loation nspection Inc. panned orders 0 not check
(Oto storoc. nspectn Inc. producton orders Do not take nto
sng parts processhig
Checkng perod: GR |)
Recepts in past [B) include future recepts only
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 12AVAILABILITY CHECK
3. Define Default Settings:
Fixed date and quantity: If we check this system will not allow users to change delivery dates
and confirmed quantities.
Availability checking rule:in case of shortages system proposes dialogue box with the help of
availability check rule.
‘Scenario for Back Order Processing:
i Create a Material: P-Mobile
MRP Type: PD Availability check: 02 Strategy group: 10
i. Create 2 Customer:
112 —Low delivery priority customer
130 — High delivery priority customer
il, Do stock posting for created material
T.code: MB1C aty: 5
iv. Create order for low delivery priority customer (Qtty:2) and check in schedule line data
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 13,AVAILABILITY CHECK
¥. Create another order for low delivery priority customer (Qty: 3) and check the confirmed
quantity in schedule line data.
vi. Create another order for high delivery priority customer (Qty: 3) and check the confirmed
quantity in schedule line data.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 14AVAILABILITY CHECK
System will not confirm any quantity as there is no stock.
So in order to confirm the quantity to high delivery priority customer do the back order
processing.
T.code: v_ra
oe
waters femoris Jeo [i
Pant [eos wo Ir)
‘customer dota
Soko party — 2 [
‘astomer urehase order nurber Teo f ica
ses document — a | i)
Enter material, plant and execute.
feu. Jowsne [rem [oiveeltin|i sisorsovaee euamnsty contimed quancte [open evmncicy |
Select the orders from which we want to cancel the confirmations and select the order to which
‘you want to assign the confirmed quantity
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 15AVAILABILITY CHECK
Select both and click on Backorders.
on ‘Solar Mobile (PSeries)Sota Mabie (PSer
me fmaoua fl onan 53
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 16AVAILABILITY CHECK
Remove committed quantity and cick on okay 4)
‘We can see that the confirmed quantity becomes “0”. After that click on high delivery priority
customer order and click on change confirmation
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 17AVAILABILITY CHECK
Enter the committed quantity and dick on okay ¥).
‘And save the document.
Go to the order of high delivery priority customer and check the committed quantity i
schedule lines. System confirms the quantity.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 18AVAILABILITY CHECK
Re-scheduling:
If system performs backorder processing automatically then we call it as re-scheduling.
i. Create Material and post the stock of § quantities. In our case itis Q-Mobile.
Ji, Create order for low delivery priority customer and save. (Qty: 5)
(a er et
ween 200 pon Oe
‘etoamee ton _ BF ecru [aI sanansearrore
i ee) Svan seers os
Cmte teeny [a
care tay
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 19AVAILABILITY CHECK
iv. T.Code for Re-scheduling is V_V2
Here we can see the for high delivery priority customer quantity has been confirmed
automatically.
‘And also check the same in schedule lines for high delivery priority customers order.
KON D3 ee Bee Oe
This is all about availability check, back order processing and re-scheduling process.
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 20