You are on page 1of 11

ACI ÁREA CONSULTORÍA E INGENIERÍA ÁLVARO CHACÓN GARCÍA

Ingeniero Civil, Ced. 4328912


RFC: CAGX790610PX8, CURP:CXGA790610HNTHRL02
Servicios de: Períto Responsable de Obra, Elaboración de Anteproyectos Ingeniería Básica y Detallada, Supervisión de Obras, Circuito Amatista No. 147, Fracc. La Joya, CP 63195, Tepic, Nayarit México
Investigación en Desarrollo y Aplicación de Software para Ingeniería Estructural, Capacitación a Empresas y Profesionales de la Ingeniería. Tel 311 103 49 96

SERVICIO Igeniería Básica y Detallada ETAPA ---- INFORMACIÓN Cálculo de la Resistencia a Flexión de Secciones Doblemente
reforzadas.
PROYECTO --- DCTO. APOYO --- MOSTRADA
UBICADO EN --- UNIDADES Sistema MKS

DATOS DE LA SECCIÓN FACT DE RED. PORCENTAJES EN REFUERZO SIMPLE


b 100.00 cm r 7.50 cm f'c 250.00 kg/cm 2
φ 0.9 ρb 0.025498 ρmin 0.003399 β1
h 40.00 cm d 32.50 cm fy 4,200.00 kg/cm 2
Vφ 0.75 ρmax 0.019123 0.850
d' 7.50 cm
PROCEDIMIENTO 1 PROCEDIMIENTO 2
"DISEÑO DE ESTRUCTURAS DE CONCRETO", NILSON H. ARTUR. "ASPECTOS FUNDAMENTALES DEL CONCRETO REFORZADO", GLEZ. CUEVAS
SECCIÓN 3.7 SECCIÓN 5.3.2
1. Cálculo Mmax 2. Mexc 3. A's, As A's cm 2
As cm 2
4. Revisar A´s Fluye A's (cm2) As (cm2) Equilibrio PAR Verificación
As2 cm 2
a (cm) Mn (t-m) Mu (t-m)M'u (t-m) A's cm As cm
2 2
Cant # Var A's Cant # Var As ρ' ρ ρ-3.50a Rev Cant # Var A's Cant # Var As ρ' ρ ρdt Tant C Tens/Comp Mu (kN-m) φMn (kN-m)
62.15 12.28 68.80 95.00 36.75 35.00 97.15 5 5 9.9 8 8 40.5 0.0030 0.0125 0.0347 Rev!! 3 8 15.2 5 8 25.3 0.0047 0.0078 0.0225 8.3 1.478 Try c 931.63 343.47 Rev!!

ACH INGENIERÍA Pág 1 de 11 ACI


A's As
f´c fy B H d´ r Mu Cant Var No. A´s Cant Var No. As ρdt
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63 3.00 8.00 15.20 8.00 8.00 25.34 0.02248
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
250.00 4,200.00 100.00 40.00 7.50 7.50 931.63Err:509 Err:509 Err:509Err:509 Err:509 Err:50 Err:509
ρ'col ρcol c CT % T Es Ecu Ey E´s E´s>Ey
0.00468 0.00780 8.25 Try c 157,307.20 147.83% 106,408.57 2E+06 0.003 2.10E-03 2.73E-04 A's no fluye
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Err:509 Err:509 Err:50 ### Err:509 Err:509 Err:509 2E+06 0.003 2.10E-03 Err:509 Err:509
Fuerza(ton)
a Cc (conc) Cs (as') Ctotal Es E´s>Ey T (As) Cc (conc) Cs (as')
7.01 149,015.63 8,291.58 157,307.20 0.008818182 As fluye 106,408.57 149.02 8.29
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Brazo (cm) M (ton-cm) Mn ØMn
T (As) Cc (conc) Cs (as') T (As) Cc (conc) Cs (as') T (As) ton-m ton-m ØMn(kN-m) revisión
106.41 16.49 12.50 12.50 2,457.83 103.64 1,330.11 38.92 35.02 343.47 <
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 12.50 12.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Mu(kN-m)
931.63 Rev!!
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
931.63 Err:509
ACH INGENIERÍA
INGENIERÍA ESTRUCTURAL
Diseño de Concreto Reforzado
Diseño Conc. Flexión y Cortante.
DATOS DE LA SECCIÓN
b 100.00 cm
h 100.00 cm
d 95.00 cm
f´c 250.00 kg/cm²
Fy 4,200.00 kg/cm²
φ 0.90
Para cortante Fy 2,530.00 kg/cm²
Para cortante φ 0.75

Cantidad var
Separación 17.00 cm
No. Var 8
área de la var 5.07 cm²
As 29.81 cm²

ρ= 0.003138
ω= 0.052710
Mn = 11,523,977.35 kg cm
Mn = 11,523,977.35 kg cm
φM n = 103,715.80 kg m
ACH INGENIERÍA
INGENIERÍA ESTRUCTURAL
DISEÑO DE CONCRETO REFORZADO.
DISEÑO DE TRABE A LA FLEXIÓN Y A CORTANTE (TENSIÓN DIAGONAL)
DCTFC

Diámetro Área Peso


No. Var
plg mm cm² Kg/m
3 3/ 8 9.5 0.71 0.559
4 1/ 2 12.7 1.27 0.994
5 5/ 8 15.9 1.98 1.554
6 3/ 4 19.1 2.85 2.237
8 1 25.4 5.07 3.978
10 1 1/ 4 31.8 7.92 6.215
12 1 1/ 2 38.1 11.40 8.950

DATOS DEL ACERO


Resisitencia a la Tensión
fy 6,300.00 kg/cm²
Resisitencia a la Fluencia.
fy 4,200.00 kg/cm²
Diámetro Área Peso
No. Var
plg mm cm² Kg/m
9 1 1/ 8 28.6 6.41 5.034
10 1 1/ 4 31.8 7.92 6.215
11 1 3/ 8 34.9 9.58 7.520
12 1 1/ 2 38.1 11.40 8.950
ACH INGENIERÍA
INGENIERÍA ESTRUCTURAL
DISEÑO DE CONCRETO REFORZADO.
DISEÑO DE TRABE A LA FLEXIÓN Y A CORTANTE (TENSIÓN DIAGONAL)
DCTFC
Diámetro Área Peso
No. Var
plg mm cm² Kg/m
3 3/ 8 9.5 0.71 0.559
4 1/ 2 12.7 1.27 0.994
5 5/ 8 15.9 1.98 1.554
6 3/ 4 19.1 2.85 2.237
8 1 25.4 5.07 3.978
10 1 1/ 4 31.8 7.92 6.215
12 1 1/ 2 38.1 11.40 8.950

DATOS DEL ACERO


Resisitencia a la Tensión
fy 6,300.00 kg/cm²
Resisitencia a la Fluencia.
fy 4,200.00 kg/cm²

You might also like